CN211455131U - Engineering cost progress show board - Google Patents

Engineering cost progress show board Download PDF

Info

Publication number
CN211455131U
CN211455131U CN202020510645.0U CN202020510645U CN211455131U CN 211455131 U CN211455131 U CN 211455131U CN 202020510645 U CN202020510645 U CN 202020510645U CN 211455131 U CN211455131 U CN 211455131U
Authority
CN
China
Prior art keywords
frame body
display board
push plate
pulley
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020510645.0U
Other languages
Chinese (zh)
Inventor
陈煦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020510645.0U priority Critical patent/CN211455131U/en
Application granted granted Critical
Publication of CN211455131U publication Critical patent/CN211455131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses an engineering cost progress display board, which comprises a base, a support post, an elastic piece, a push plate, a guide post, a pulley, a brake, a frame body, a clapboard, a bearing, a connecting post, a display board, a pull rod, a handle, a slide board, a spring, a positioning seat, a support, a fixed block, a vertical rod and a rain board, wherein the elastic piece is arranged in the support post, the push plate is arranged at the lower end of the elastic piece, the guide post is arranged at the lower end of the push plate, the pulley is arranged at the lower end of the guide post, the brake is arranged at the outer side of the pulley, the frame body is fixed at the upper end surface of the base, the clapboard is arranged in the frame body, the bearing is arranged at the upper wall and the inner wall of the frame body, the connecting post is arranged at the inner end of the bearing, the display board is arranged, the upper end of the fixing block is provided with a vertical rod, and the upper end of the vertical rod is provided with a rain board.

Description

Engineering cost progress show board
Technical Field
The utility model relates to an equipment technical field for the engineering cost specifically is an engineering cost progress show board.
Background
The construction cost refers to the construction price of the project, and refers to the total sum of all the expenses expected or actually required for completing the construction of one project. The project cost is defined from the perspective of an owner (investor), the project cost refers to the construction cost of a project, namely, the investment cost of all fixed assets expected to be paid or actually paid for constructing the project, and is defined from the perspective of an acceptance packet, the project cost refers to the project price, namely, the price of a building installation project and the total price of the construction project, which are predicted or actually formed in markets such as land, equipment, technical labor and contract through transaction modes such as bidding and the like.
The road condition of a construction site is poor, the existing progress display device is poor in applicability and mobility and has certain limitation; current progress display device is mostly fixed structure, and the show board can't rotate, can't overcome the staff and watch inconvenient condition, and the practicality is relatively poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an engineering cost progress show board to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a project cost progress display board comprises a base, a support column, an elastic piece, a push plate, a guide pillar, a pulley, a brake, a frame body, a partition plate, a bearing, a connecting column, a display board, a pull rod, a handle, a sliding plate, a spring, a positioning seat, a support, a fixing block, a vertical rod and a rain plate, wherein the support column is arranged at the lower end of the base, the elastic piece is arranged in the support column, the push plate is arranged at the lower end of the elastic piece, the guide pillar is arranged at the lower end of the push plate, the pulley is arranged at the lower end of the guide pillar, the brake is arranged on the outer side of the pulley, the frame body is fixed on the upper end face of the base, the partition plate is arranged in the frame body, the bearing is arranged on the upper wall and the inner lower wall in the frame body, the connecting column is arranged at the inner end of the, the positioning seat outside is equipped with the support, support inner is fixed in the framework side, the fixed block is fixed at the framework up end, and the fixed block upper end is equipped with the montant, the montant upper end is equipped with the rain board.
As a further aspect of the present invention: the terminal surface is equipped with the screw under the push pedal, and the guide pillar upper end is equipped with the external screw thread, and the push pedal is connected through the screw with the guide pillar, is convenient for carry out the dismouting to push pedal and guide pillar.
As a further aspect of the present invention: the side of the frame body is provided with a placing groove, the handle is arranged in the placing groove, and the pull rod can be conveniently pulled through the handle.
As a further aspect of the present invention: even the post the inner is equipped with the jump ring, and show board both ends are equipped with the draw-in groove, and the jump ring setting can be fixed the show board through even the post in the draw-in groove, and is convenient for carry out the dismouting to the show board.
As a further aspect of the present invention: the show board side is equipped with the recess, and pull rod inner is equipped with the fastener, and the fastener setting is fixed a position the show board through the pull rod is convenient for, behind the pulling pull rod, can rotate the show board to can overcome the staff and watch inconvenient condition, the practicality is strong.
Compared with the prior art, the beneficial effects of the utility model are that: for the bottom surfaces under different road conditions, the guide pillar and the push plate are pushed by the pulley to slide, and the push plate can effectively buffer and absorb shock under the action of the spring, and has strong applicability, flexible movement and wide application range; the show board side is equipped with the recess, and pull rod inner is equipped with the fastener, and the fastener setting is fixed a position the show board through the pull rod is convenient for, behind the pulling pull rod, can rotate the show board to can overcome the staff and watch inconvenient condition, the practicality is strong.
Drawings
Fig. 1 is a schematic structural view of a construction cost progress display board.
Fig. 2 is a front view of a construction cost progress display board.
In the figure: the device comprises a base 1, a support column 2, an elastic piece 3, a push plate 4, a guide column 5, a pulley 6, a brake 7, a frame body 8, a partition plate 9, a bearing 10, a connecting column 11, a display plate 12, a pull rod 13, a handle 14, a sliding plate 15, a spring 16, a positioning seat 17, a support 18, a fixing block 19, a vertical rod 20 and a rain plate 21.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, in an embodiment of the present invention, an engineering cost progress display board includes a base 1, a pillar 2, an elastic member 3, a push plate 4, a guide post 5, a pulley 6, a brake 7, a frame 8, a partition plate 9, a bearing 10, a connecting post 11, a display board 12, a pull rod 13, a handle 14, a slide plate 15, a spring 16, a positioning seat 17, a bracket 18, a fixing block 19, a vertical rod 20, and a rain plate 21, wherein the pillar 2 is disposed at a lower end of the base 1, the elastic member 3 is disposed in the pillar 2, the push plate 4 is disposed at a lower end of the elastic member 3, the guide post 5 is disposed at a lower end of the push plate 4, a screw hole is disposed at a lower end of the push plate 4, an external thread is disposed at an upper end of the guide post 5, the push plate 4 is connected with the guide post 5 through a thread, so as to, the pulley 6 pushes the guide post 5 and the push plate 4 to slide, the push plate 4 can effectively buffer and absorb shock under the action of the spring 3, the applicability is strong, the movement is flexible, the application range is wide, the device can be fixed at a required working point through the brake 7, the elastic piece 3 in the support post 2 is pressed by the push plate 4 and the guide post 5, the balance can be ensured, the frame body 8 is fixed on the upper end surface of the base 1, the partition plate 9 is arranged in the frame body 8, the bearing 10 is arranged on the upper wall and the inner lower wall in the frame body 8, the inner end of the bearing 10 is provided with the connecting post 11, the inner end of the connecting post 11 is provided with the display plate 12, the inner end of the connecting post 11 is provided with the snap spring, the two ends of the display plate 12 are provided with the clamping grooves, the snap spring is arranged in the clamping grooves, the display plate 12 can be fixed through the connecting post 11 and is, the inner end of the pull rod 13 is provided with a clamping piece which is arranged in the groove, the display board 12 can be conveniently positioned and fixed through the pull rod 13, after the pull rod 13 is pulled, the display board 12 can be rotated, so that the condition that workers cannot conveniently watch is overcome, the practicability is strong, the pull rod 13 is provided with a handle 14, the side surface of the frame body 8 is provided with a placing groove, the handle 14 is arranged in the placing groove, the pull rod 13 is conveniently pulled through the handle 14, the sliding plate 15 is arranged at the outer end of the pull rod 13, the outer end of the sliding plate 15 is provided with a spring 16, the spring 16 and the sliding plate 15 are arranged in the positioning seat 17, the sliding of the sliding plate 15 can be limited and fixed through the spring 16 and the positioning seat 17, the outer side of the positioning seat 17 is provided with a support 18, the inner end of the support 18 is fixed on the, the upper end of the vertical rod 20 is provided with a rain plate 21, and the rain plate 21 can effectively shade sun and rain.
The utility model discloses a theory of operation is: the lower end of the base 1 is provided with a pillar 2, an elastic part 3 is arranged in the pillar 2, the lower end of the elastic part 3 is provided with a push plate 4, the lower end of the push plate 4 is provided with a guide pillar 5, the lower end face of the push plate 4 is provided with a screw hole, the upper end of the guide pillar 5 is provided with an external thread, the push plate 4 is connected with the guide pillar 5 through a thread, the push plate 4 and the guide pillar 5 are convenient to disassemble and assemble, the lower end of the guide pillar 5 is provided with a pulley 6, the outer side of the pulley 6 is provided with a brake 7, the pulley 6 pushes the guide pillar 5 and the push plate 4 to slide on the bottom surfaces of different road conditions, the push plate 4 can effectively buffer and absorb shock under the action of the spring 3, the applicability is strong, the movement flexibility type is strong, the application range is wide, the device can be fixed at a required working point through the brake 7, the, the inner end of the connecting column 11 is provided with a display board 12, the inner end of the connecting column 11 is provided with a clamp spring, the two ends of the display board 12 are provided with clamp grooves, the clamp springs are arranged in the clamp grooves, the display board 12 can be fixed through the connecting column 11 and is convenient for dismounting the display board 12, the outer side wall of the display board 12 is provided with a pull rod 13, the side surface of the display board 12 is provided with a groove, the inner end of the pull rod 13 is provided with a clamp member, the clamp member is arranged in the groove, the display board 12 is convenient for positioning and fixing through the pull rod 13, the display board 12 can be rotated after pulling the pull rod 13, thereby overcoming the condition of inconvenient watching of workers, the practicability is strong, the pull rod 13 is provided with a handle 14, the side surface of the frame body 8 is provided with a placing groove, the handle 14 is arranged in the placing groove, the pull rod 13 is convenient for pulling operation through the handle, can carry out spacing fixed to slide of slide 15 through spring 16 and positioning seat 17, fixed block 19 is fixed at framework 8 up end, and 19 upper ends are equipped with montant 20, and 20 upper ends of montant are equipped with rain board 21, can carry out the sunshade effectively and keep off the rain through setting up rain board 21.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. A project cost progress display board comprises a base, a support column, an elastic piece, a push plate, a guide pillar, a pulley, a brake, a frame body, a partition board, a bearing, a connecting column, a display board, a pull rod, a handle, a sliding plate, a spring, a positioning seat, a support, a fixing block, a vertical rod and a rain plate, and is characterized in that the support column is arranged at the lower end of the base, the elastic piece is arranged in the support column, the push plate is arranged at the lower end of the elastic piece, the guide pillar is arranged at the lower end of the push plate, the pulley is arranged at the lower end of the guide pillar, the brake is arranged on the outer side of the pulley, the frame body is fixed on the upper end surface of the base, the partition board is arranged in the frame body, the bearing is arranged on the upper wall and the inner lower wall of the frame body, the connecting, the spring and the sliding plate are arranged in the positioning seat, a support is arranged on the outer side of the positioning seat, the inner end of the support is fixed on the side face of the frame body, the fixed block is fixed on the upper end face of the frame body, a vertical rod is arranged at the upper end of the fixed block, and a rain plate is arranged at the upper end of the vertical rod.
2. The project cost progress display board according to claim 1, wherein the push board has a screw hole on a lower end surface thereof, and an external thread on an upper end of the guide post, the push board being connected to the guide post via the screw thread.
3. The construction cost progress display board according to claim 1, wherein a placing groove is formed in a side surface of the frame body, and the handle is disposed in the placing groove.
4. The construction cost progress display board according to claim 1, wherein the inner ends of the connecting columns are provided with snap springs, the two ends of the display board are provided with clamping grooves, and the snap springs are arranged in the clamping grooves.
5. The construction cost progress display board according to claim 1, wherein the display board is provided with a groove on a side surface, and a clamping member is provided at an inner end of the pull rod, and the clamping member is disposed in the groove.
CN202020510645.0U 2020-04-09 2020-04-09 Engineering cost progress show board Expired - Fee Related CN211455131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020510645.0U CN211455131U (en) 2020-04-09 2020-04-09 Engineering cost progress show board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020510645.0U CN211455131U (en) 2020-04-09 2020-04-09 Engineering cost progress show board

Publications (1)

Publication Number Publication Date
CN211455131U true CN211455131U (en) 2020-09-08

Family

ID=72317274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020510645.0U Expired - Fee Related CN211455131U (en) 2020-04-09 2020-04-09 Engineering cost progress show board

Country Status (1)

Country Link
CN (1) CN211455131U (en)

Similar Documents

Publication Publication Date Title
CN211455131U (en) Engineering cost progress show board
CN211171677U (en) Side slope rolling stone protection device
CN211257466U (en) Wind-resistant building curtain wall
CN211369603U (en) Railing is prevented to building engineering instrument formula stair
CN215978543U (en) Construction steel bar location structure
CN213710503U (en) Steel structure bearing frame for building engineering
CN211087609U (en) Dress designing teaching show board
CN211775837U (en) Steel construction building device with rain-proof anti-wind takes off
CN210398317U (en) Wall-mounted mounting rack convenient to adjust for display screen
CN210896474U (en) Progress show board for construction management
CN215407784U (en) Ground nail easy to install for fixing tent
CN217282143U (en) Through tunnel cable support
CN210482906U (en) High anti foam lines installation is with positioner
CN218234425U (en) Building support frame with protective structure
CN220928808U (en) Building engineering faces limit fence device
CN214738800U (en) Connecting structure of prefabricated part and building main body
CN213653766U (en) Combined splicing assembly for tent
CN212802805U (en) Rail guard is used in building site construction with adjustable
CN215717110U (en) Connecting device for fixing climbing frame net piece
CN212802155U (en) Firm formula mounting structure is used to building curtain bright frame
CN217412247U (en) Stud bending device
CN215859162U (en) A transportation installing support for assembled construction component
CN205630579U (en) A transport frock frame for passenger train bar accessory
CN220167150U (en) Supporting connecting piece for steel structure building
CN210398198U (en) All-in-one screen protection support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200908

Termination date: 20210409