CN211257466U - Wind-resistant building curtain wall - Google Patents

Wind-resistant building curtain wall Download PDF

Info

Publication number
CN211257466U
CN211257466U CN201921813424.4U CN201921813424U CN211257466U CN 211257466 U CN211257466 U CN 211257466U CN 201921813424 U CN201921813424 U CN 201921813424U CN 211257466 U CN211257466 U CN 211257466U
Authority
CN
China
Prior art keywords
frame
building curtain
wind
inboard
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921813424.4U
Other languages
Chinese (zh)
Inventor
金学政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Delaiqi Curtain Wall Decoration Engineering Co ltd
Original Assignee
Yancheng Jinsheng Door And Window Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng Jinsheng Door And Window Manufacturing Co ltd filed Critical Yancheng Jinsheng Door And Window Manufacturing Co ltd
Priority to CN201921813424.4U priority Critical patent/CN211257466U/en
Application granted granted Critical
Publication of CN211257466U publication Critical patent/CN211257466U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an anti-wind type building curtain relates to building curtain technical field, including first frame, the second frame is installed to the inboard of first frame, and pegs graft and have the panel in the inboard of second frame, the preformed groove has been seted up on the top of second frame, the front intersection between the second frame pastes and covers and has the sheet rubber, and the inboard of sheet rubber is pegged graft and is had adjustment mechanism, the back of second frame is connected with the carrier bar. The utility model discloses in, when installing the operation at the counter plate, then the artifical screw rod that rotates for it moves towards sleeve pipe one side, then the second frame removes for first frame, so the connecting rod subassembly of rhombus column structure moves up the operation and drives through the movable rod, makes it the contained angle change, tends to the linear type structure of vertical direction, then removes the constraint to the second frame, the second frame that will deposit unusual panel through the manual work again takes out, so be convenient for carry out pull formula change work to its inside damaged panel.

Description

Wind-resistant building curtain wall
Technical Field
The utility model relates to a building curtain technical field especially relates to an anti-wind type building curtain.
Background
The existing building technology is more and more advanced, under the concept of protecting the outer wall of a building, a layer of building curtain wall is required to be covered and installed on the outer side of the building to enhance the attractiveness and harmony of the building, and the building curtain wall refers to the outer wall enclosure without bearing the weight of the building and is generally composed of a panel (glass, a metal plate, a stone plate, a ceramic plate and the like) and a rear supporting structure (an aluminum beam column, a steel structure, a glass rib and the like).
When the existing building curtain wall is installed, the curtain wall assembly is not easy to detach through the assistance of the adjusting mechanism, so that the speed of replacing the panel by people is slow, and the wind resistance of the building curtain wall can not be enhanced through multi-directional supporting and connecting operations.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving current building curtain when the installation, be difficult for dismantling the curtain subassembly through the adjustment mechanism is supplementary for people are slow to its speed of changing the panel, and can not be through diversified support, connection operation, strengthen this building curtain's the shortcoming of wind-resistant performance, and the wind-resistant type building curtain who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a wind-resistant type building curtain, includes first frame, the second frame is installed to the inboard of first frame, and pegs graft in the inboard of second frame and have the panel, the reservation groove has been seted up on the top of second frame, the front intersection between the second frame pastes and covers and have the sheet rubber, and pegs graft in the inboard of sheet rubber and have adjustment mechanism, the back of second frame is connected with the carrier bar, and one side of carrier bar installs the wall body, the wall body is connected with the carrier bar through fixed box, and the wall body is connected with first frame through the bracing piece.
Preferably, the second frame is provided with four groups at equal intervals, and the inner side of the second frame is attached to the outer side of the panel.
Preferably, adjustment mechanism's inboard is including the screw rod, and is through connection between screw rod and the sheet rubber, the one end of screw rod is connected with the sleeve pipe, and the sleeve pipe is close to the outer wall of screw rod one end and installs the movable rod, the other end of movable rod is connected with the connecting rod, and all is connected through the connecting axle between the connecting rod, the outer wall of screw rod is seted up flutedly.
Preferably, the connecting rods are connected end to end through connecting shafts to form a movable structure, and the movable rods on one side of the connecting rods are symmetrical about the transverse axis of the sleeve.
Preferably, the support rods, the wall body and the first frame are distributed vertically, and the wall body and the fixing box form a detachable structure through bolts.
Preferably, the preformed groove and the second frame form an integrated structure through the open groove, and the bearing rod on the back of the second frame is connected with the fixed box in a hooking mode.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, when installing the operation at the counter plate, then the artifical screw rod that rotates for it moves towards sleeve pipe one side, then the second frame removes for first frame, so the connecting rod subassembly of rhombus column structure moves up the operation and drives through the movable rod, makes it the contained angle change, tends to the linear type structure of vertical direction, then removes the constraint to the second frame, the second frame that will deposit unusual panel through the manual work again takes out, so be convenient for carry out pull formula change work to its inside damaged panel.
2. The utility model discloses in, when installing the work to this building curtain, it is rotatory to need the screw rod, arch department landing to the recess inboard until the movable rod, make the movable rod cooperation strut by the connecting rod, the frame that the connecting axle constitutes supports the operation to the back of second frame, and hang in the outer wall of fixed box through the carrier bar hook, carry out secondary support work, and simultaneously, under the effect of first frame, can effectively must prescribe a limit to the orientation wall body outside distance of second frame, the event can bear this building curtain through first frame and bracing piece, firm work, directly promote the device's anti-wind performance.
3. The utility model discloses in, carry out the viscose through the intersection to the sheet rubber and panel and paint the operation for the screw rod is difficult for intaking along the marginal active area of second frame, promotes this adjustment mechanism's performance, and under the effect of the panel that glue bonds, it is difficult and the second frame between cause and rock the phenomenon by a wide margin when strong wind weather.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the structure of the middle side of the present invention;
fig. 3 is a schematic diagram of the top view structure of the present invention;
FIG. 4 is a schematic view of the connection structure of the connecting rod and the connecting shaft of the present invention;
fig. 5 is a schematic view of the structure of the middle screw rod of the present invention.
Illustration of the drawings:
1. a first frame; 2. a second frame; 3. a panel; 4. a rubber sheet; 5. an adjustment mechanism; 501. a screw; 502. a sleeve; 503. a movable rod; 504. a connecting rod; 505. a connecting shaft; 506. a groove; 6. a wall body; 7. a carrier bar; 8. a support bar; 9. a fixing box; 10. and (5) reserving a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-5, a wind-resistant building curtain wall comprises a first frame 1, a second frame 2, a panel 3, a rubber sheet 4, an adjusting mechanism 5, a screw 501, a sleeve 502, a movable rod 503, a connecting rod 504, a connecting shaft 505, a groove 506, a wall 6, a bearing rod 7, a supporting rod 8, a fixing box 9 and a preformed groove 10, wherein the second frame 2 is installed on the inner side of the first frame 1, the panel 3 is inserted into the inner side of the second frame 2, the preformed groove 10 is formed in the top end of the second frame 2, the rubber sheet 4 is adhered to the front intersection between the second frames 2, the adjusting mechanism 5 is inserted into the inner side of the rubber sheet 4, the rubber sheet 4 and the panel 3 are adhered to the intersection, so that the screw 501 is not prone to water entering along the edge movable area of the second frame 2, the service performance of the adjusting mechanism 5 is improved, the bearing rod 7 is connected to the back of the second frame 2, and a wall body 6 is installed on one side of the bearing rod 7, the wall body 6 is connected with the bearing rod 7 through a fixing box 9, and the wall body 6 is connected with the first frame 1 through a support rod 8.
Further, 2 equidistance of second frame are provided with four groups, and the inboard of second frame 2 is laminated with the outside of panel 3 mutually, carries out regionalization management through panel 3 for people are changing, are handling the during operation, and are more convenient to the panel 3 of damage.
Further, the inner side of the adjusting mechanism 5 comprises a screw 501, the screw 501 is in penetrating connection with the rubber sheet 4, one end of the screw 501 is connected with a sleeve 502, a movable rod 503 is mounted on the outer wall of the sleeve 502 close to one end of the screw 501, the other end of the movable rod 503 is connected with a connecting rod 504, the connecting rods 504 are connected through a connecting shaft 505, and a groove 506 is formed in the outer wall of the screw 501.
Furthermore, a movable structure is formed by connecting the connecting rods 504 end to end through connecting shafts 505, the movable rods 503 on one side of the connecting rods 504 are symmetrical about the transverse axis of the sleeve 502, the screw rods 501 rotate until the protruding parts of the movable rods 503 slide to the inner sides of the grooves 506, so that the movable rods 503 are matched and spread to support the back of the second frame 2 through the frame consisting of the connecting rods 504 and the connecting shafts 505, and the frame is hooked on the outer wall of the fixing box 9 through the bearing rods 7 to perform secondary support work, and the wind resistance of the building curtain wall is effectively enhanced.
Further, be vertical form distribution between bracing piece 8 and wall body 6, the first frame 1, and wall body 6 constitutes detachable construction through bolt and fixed box 9, under the effect of first frame 1, can effectively must prescribe a limit to the 6 outside distances of the orientation wall body of second frame 2, so can bear, firm work to this building curtain wall through first frame 1 and bracing piece 8, directly promote the device's wind resistance ability.
Further, the preformed groove 10 forms an integrated structure with the second frame 2 through the fluting, and is connected for the hook between the carrier bar 7 of second frame 2 back and the fixed box 9, and people peg graft the panel 3 to the inside of second frame 2 along the inboard of preformed groove 10, and the installation to the inboard of first frame 1 with second frame 2 is orderly again for this building curtain's installation rate.
The working principle is as follows: when the curtain wall support is used, firstly, the panel 3 is inserted into the second frame 2 through the inner side of the preformed groove 10 by a worker, then the second frame 2 with a notch at the edge area is orderly installed to the inner side of the first frame 1, so that the arc notch at the edge of the second frame 2 is attached to the outer side of the screw 501, then the screw 501 is manually rotated, one side of the screw 501 far away from the sleeve 502 moves, the movable rod 503 which is initially in a vertical state is pulled to be inclined through the connecting rod 504 and slides into the groove 506 on the outer wall of the screw 501, so that the movement operation of the screw 501 is completed, meanwhile, the plurality of groups of connecting rods 504 are in a rhombic structure with an inner angle of 90 degrees and abut against the back of the second frame 2, and then the hook at one end of the bearing rod 7 at the back of the second frame 2 is hooked on two sides of the outer wall of the fixed box 9, so that the support assembly and the limiting assembly formed by the first frame 1 and the supporting rods, The job is defined.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a wind-resistant type building curtain, includes first frame (1), its characterized in that, second frame (2) are installed to the inboard of first frame (1), and the inboard of second frame (2) is pegged graft and is had panel (3), reserve groove (10) have been seted up on the top of second frame (2), the front intersection subsides between second frame (2) cover has sheet rubber (4), and the inboard of sheet rubber (4) is pegged graft and has adjustment mechanism (5), the back of second frame (2) is connected with carrier bar (7), and one side of carrier bar (7) installs wall body (6), wall body (6) are connected with carrier bar (7) through fixed box (9), and wall body (6) are connected with first frame (1) through bracing piece (8).
2. A wind-resistant building curtain wall according to claim 1, characterised in that the second frames (2) are arranged in four equidistant groups, and the inner side of the second frames (2) is attached to the outer side of the panel (3).
3. The wind-resistant building curtain wall according to claim 1, wherein the inner side of the adjusting mechanism (5) comprises a screw (501), the screw (501) is connected with the rubber sheet (4) in a penetrating manner, one end of the screw (501) is connected with a sleeve (502), a movable rod (503) is installed on the outer wall of the sleeve (502) close to one end of the screw (501), the other end of the movable rod (503) is connected with a connecting rod (504), the connecting rods (504) are connected with each other through a connecting shaft (505), and a groove (506) is formed in the outer wall of the screw (501).
4. A wind-resistant building curtain wall according to claim 3, characterized in that the connecting rods (504) are connected end to end by connecting shafts (505) to form a movable structure, and the movable rods (503) on one side of the connecting rods (504) are symmetrical about the transverse axis of the sleeve (502).
5. A wind-resistant building curtain wall according to claim 1, wherein the support rods (8) are vertically distributed with the wall body (6) and the first frame (1), and the wall body (6) and the fixing box (9) form a detachable structure through bolts.
6. A wind-resistant building curtain wall according to claim 1, characterized in that the preformed groove (10) is integrated with the second frame (2) through a slot, and the bearing rod (7) at the back of the second frame (2) is connected with the fixing box (9) in a hooking way.
CN201921813424.4U 2019-10-28 2019-10-28 Wind-resistant building curtain wall Expired - Fee Related CN211257466U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921813424.4U CN211257466U (en) 2019-10-28 2019-10-28 Wind-resistant building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921813424.4U CN211257466U (en) 2019-10-28 2019-10-28 Wind-resistant building curtain wall

Publications (1)

Publication Number Publication Date
CN211257466U true CN211257466U (en) 2020-08-14

Family

ID=71959562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921813424.4U Expired - Fee Related CN211257466U (en) 2019-10-28 2019-10-28 Wind-resistant building curtain wall

Country Status (1)

Country Link
CN (1) CN211257466U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459672A (en) * 2020-11-23 2021-03-09 浙江安防职业技术学院 Compression-resistant door and window

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112459672A (en) * 2020-11-23 2021-03-09 浙江安防职业技术学院 Compression-resistant door and window

Similar Documents

Publication Publication Date Title
CN211257466U (en) Wind-resistant building curtain wall
CN209941982U (en) Building steel structure curtain wall supporting structure
CN202299262U (en) Installation mechanism for stone compound board
CN202417177U (en) Aluminum alloy window casing for integral external wall
CN104318860B (en) A kind of modularity fast-assembling finished door head and mounting process thereof
CN209163160U (en) A kind of fixed bracket of building curtain wall installation
CN213087303U (en) Wallboard mounting structure and wallboard system
CN202466902U (en) Transverse decorative molding curtain wall system connected through sleeve core
CN210767466U (en) Suspended type aluminum veneer ceiling mounting structure capable of being adjusted according to floor height
CN210797987U (en) Horizontal aluminum plate line structure
CN208578225U (en) A kind of bright frame decorative strip installing structure of building curtain wall
CN209959140U (en) Aluminum alloy door and window with detachable guardrail frame
CN103243888B (en) Stone-like aluminum alloy light grid component and construction method of decorative outer wall made of stone-like aluminum alloy light grid components
CN201885471U (en) Support frame component for heat collector
CN207878812U (en) Roofing vertically discharges the corner protective device of steel wire rope or cable
CN211172592U (en) Titanium zinc composite sheet building curtain
CN213418179U (en) Curtain wall structure with good sealing performance
CN218841638U (en) Lifting platform with storage mechanism
CN205840070U (en) A kind of mounting structure of top glass curtain wall
CN215443196U (en) Building wall curtain wall installation location construction equipment
CN211524629U (en) Rain-proof stone material tripe system
CN203150034U (en) Main framework steel structure of light-emitting diode (LED) screen
CN215106873U (en) Quick detachable UHPC board installation node subassembly
CN212796341U (en) Whiteboard for accounting teaching
CN215858241U (en) In-groove sliding type collapse-prevention welding operation shed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 224000 Building 1, group 2, Yangxu village, panhuang street, Yandu District, Yancheng City, Jiangsu Province

Patentee after: Jiangsu delaiqi curtain wall decoration Engineering Co.,Ltd.

Address before: 224000 Building 1, group 2, Yangxu village, panhuang street, Yandu District, Yancheng City, Jiangsu Province

Patentee before: Yancheng Jinsheng door and window manufacturing Co.,Ltd.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200814

Termination date: 20211028

CF01 Termination of patent right due to non-payment of annual fee