CN211447334U - One-step prefabricated structure for building complex nodes of wall body - Google Patents
One-step prefabricated structure for building complex nodes of wall body Download PDFInfo
- Publication number
- CN211447334U CN211447334U CN201922020469.2U CN201922020469U CN211447334U CN 211447334 U CN211447334 U CN 211447334U CN 201922020469 U CN201922020469 U CN 201922020469U CN 211447334 U CN211447334 U CN 211447334U
- Authority
- CN
- China
- Prior art keywords
- wall body
- prefabricated
- prefabricated wall
- building
- pipelines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a one-time prefabricated structure for building complex nodes of a wall body, which comprises a building wall body (1), a door lintel (2), a prefabricated wall body (3), a plurality of reserved pipelines and a top inclined building (7); the plurality of reserved pipeline holes are pre-arranged in a prefabricated wall body (3) of the integrally formed structure to form a wall body node prefabricated structure, and the plurality of pipelines are correspondingly arranged in the plurality of reserved pipeline holes; the bottom of the prefabricated wall body (3) is installed on a door lintel (2) constructed at the top of the door opening, masonry walls (1) are built on two sides of the door opening and the prefabricated wall body (3), and the top is obliquely built (7) and constructed at the top of the prefabricated wall body (3). The utility model discloses can pass when realizing same position department ventilation pipe, water pipe and cable testing bridge through the wall body node prefabricated construction of the one shot forming who has the reservation pipeline hole, solve the inconvenience when building by laying bricks or stones construction and shutoff, effectively improve construction quality and efficiency.
Description
Technical Field
The utility model relates to a construction field especially relates to a prefabricated construction for building complex node of wall body by laying bricks or stones.
Background
Along with the development of economy and science and technology in China, people have more and more diversified requirements on building functions, meanwhile, the performance of equipment machine rooms is more precise, pipelines are comprehensively arranged in the machine rooms and other constructions, and often ventilation pipes, water pipes and cable bridges penetrate through the same position, so that certain difficulty is brought to masonry construction and plugging, particularly, after the ventilation pipes, the water pipes, the cable bridges and other floors of some super high-rise buildings are comprehensively arranged through the pipelines, the phenomenon that the ventilation pipes, the water pipes, the cable bridges and the like penetrate through one part at the same time still occurs, the construction speed is reduced, and the construction quality of complex nodes cannot be guaranteed.
Disclosure of Invention
An object of the utility model is to provide a prefabricated construction for building by laying bricks or stones complicated node of wall body can pass when realizing same position department ventilation pipe, water pipe and cable testing bridge through the wall body node prefabricated construction who has the one shot forming who reserves the pipeline hole, has solved the inconvenience when building by laying bricks or stones construction and shutoff, effectively improves construction quality and efficiency.
The utility model discloses a realize like this:
a one-time prefabricated structure for building complex nodes of a wall body comprises a building wall body, a door lintel, a prefabricated wall body, a plurality of reserved pipelines and top inclined building; the plurality of reserved pipeline holes are pre-arranged in a prefabricated wall body of an integrally formed structure to form a wall body node prefabricated structure, and the plurality of pipelines are correspondingly arranged in the plurality of reserved pipeline holes; the bottom of the prefabricated wall body is installed on a door lintel constructed at the top of the door opening, masonry walls are built on two sides of the door opening and the prefabricated wall body, and the top is obliquely built on the top of the prefabricated wall body.
Prefabricated wall body's both sides be equipped with unsmooth type serrated raft, the medial extremity that lies in the wall body of building of prefabricated wall body both sides be equipped with unsmooth type serrated raft assorted serrated raft structure, make prefabricated wall physical stamina build with build the wall body overlap joint and build by laying bricks or stones.
The pipelines comprise one or more ventilating pipes, one or more water pipes and one or more cable bridges.
The utility model discloses a wall body node prefabricated construction that has reserved pipeline hole realizes assembled wall body construction, can be according to deepening design model one shot forming to satisfy the construction requirements of cable testing bridge, water pipe, ventilation pipe department entrance to a cave and architectural surface etc. of registering one's residence through reserving the pipeline hole, can effectively improve complicated node construction quality, and improved construction speed greatly, processing, preparation and installation are simple.
Drawings
FIG. 1 is a front view of the construction of a primary prefabricated structure for constructing complex joints of walls according to the present invention;
FIG. 2 is a front view of a prefabricated structure of a wall node in a primary prefabricated structure for constructing a complex wall node of the present invention;
fig. 3 is a perspective view of the utility model used for building a prefabricated construction of the complicated node of wall body.
In the figure, a wall body is built by 1, a lintel is built by 2, a prefabricated wall body is built by 3, a corrugated raft is 31, a ventilation pipe is 4, a water pipe is 5, a cable bridge is 6, and the top is obliquely built by 7.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Referring to the attached drawings 1 to 3, a one-time prefabricated structure for building complex nodes of a wall body comprises a building wall body 1, a door lintel 2, a prefabricated wall body 3, a plurality of reserved pipelines and a top inclined building 7; a plurality of reserved pipeline holes are pre-arranged in a prefabricated wall body 3 of an integrally formed structure to form a wall body node prefabricated structure, and a plurality of pipelines are correspondingly arranged in the reserved pipeline holes; the bottom of the prefabricated wall body 3 is installed on a door lintel 2 constructed at the top of the door opening, masonry walls 1 are built on two sides of the door opening and the prefabricated wall body 3, and the top is obliquely built 7 and constructed at the top of the prefabricated wall body 3.
Prefabricated wall body 3's both sides be equipped with unsmooth type serrated raft 31, lie in the medial extremity of building wall body 1 of 3 both sides of prefabricated wall body be equipped with unsmooth type serrated raft 31 assorted serrated raft structure, make prefabricated wall body 3 can build with building 1 overlap joint of wall body by laying bricks or stones, improve the reliability that the overlap joint was built by laying bricks or stones.
The pipelines comprise one or more ventilation pipes 4, one or more water pipes 5 and one or more cable bridges 6, and different pipeline structures can be preset according to actual construction requirements so as to meet the construction requirements. Preferably, the plurality of ventilation ducts 4, the plurality of water ducts 5 and the plurality of cable bridges 6 may be the same or different in size to meet different construction requirements.
The utility model discloses a construction method is:
the method comprises the following steps: and carrying out deepening design and modeling at the complex nodes of the masonry wall, and typesetting and drawing to form an extractable prefabricated wall model with reserved pipeline holes and concave-convex serrated racking 31.
Step two: and checking the extracted prefabricated wall model, and performing industrial processing after error is not found, so as to form the prefabricated wall 3.
Step three: and constructing the masonry wall body 1 and the door lintel 2 at the door opening on site.
Step four: the prefabricated wall body 3 is installed after the concrete of the door lintel 2 reaches the strength, and the fixed support is carried out to ensure the installation and positioning accuracy.
Step five: after the prefabricated wall body 3 is installed and fixed, masonry of the wall bodies 1 on two sides is carried out, and during masonry, overlapping masonry with the reserved concave-convex type serrated racking 31 is carried out; preferably, the concave-convex type serrated racking 31 can adopt a retreating-advancing arrangement.
Step six: and (5) constructing the top inclined masonry 7 after the masonry wall 1 is built for 14 days.
Step seven: the vent pipe 4, the water pipe 5 and the cable bridge frame 6 are respectively arranged in place in the vent pipe hole, the water pipe hole and the cable bridge frame hole.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention, therefore, any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention should be included in the scope of the present invention.
Claims (3)
1. The utility model provides a prefabricated construction of once for building complicated node of wall body, characterized by: the prefabricated wall comprises a masonry wall body (1), a door lintel (2), a prefabricated wall body (3), a plurality of reserved pipelines and a top inclined masonry (7); the plurality of reserved pipeline holes are pre-arranged in a prefabricated wall body (3) of the integrally formed structure to form a wall body node prefabricated structure, and the plurality of pipelines are correspondingly arranged in the plurality of reserved pipeline holes; the bottom of the prefabricated wall body (3) is installed on a door lintel (2) constructed at the top of the door opening, masonry walls (1) are built on two sides of the door opening and the prefabricated wall body (3), and the top is obliquely built (7) and constructed at the top of the prefabricated wall body (3).
2. A one-shot precast structure for constructing complex joints of walls according to claim 1, wherein: prefabricated wall body's (3) both sides be equipped with unsmooth type serrated raft (31), the medial extremity that lies in masonry wall body (1) of prefabricated wall body (3) both sides be equipped with unsmooth type serrated raft (31) assorted serrated raft structure, make prefabricated wall body (3) can with build wall body (1) overlap joint and build by laying bricks or stones.
3. A one-shot precast structure for constructing complex joints of walls according to claim 1, wherein: the pipelines comprise one or more ventilation pipes (4), one or more water pipes (5) and one or more cable bridges (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922020469.2U CN211447334U (en) | 2019-11-18 | 2019-11-18 | One-step prefabricated structure for building complex nodes of wall body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922020469.2U CN211447334U (en) | 2019-11-18 | 2019-11-18 | One-step prefabricated structure for building complex nodes of wall body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211447334U true CN211447334U (en) | 2020-09-08 |
Family
ID=72317974
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922020469.2U Active CN211447334U (en) | 2019-11-18 | 2019-11-18 | One-step prefabricated structure for building complex nodes of wall body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211447334U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114892819A (en) * | 2022-06-08 | 2022-08-12 | 中建五局第三建设(深圳)有限公司 | Pre-closing construction method for wall body of pipeline dense area |
-
2019
- 2019-11-18 CN CN201922020469.2U patent/CN211447334U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114892819A (en) * | 2022-06-08 | 2022-08-12 | 中建五局第三建设(深圳)有限公司 | Pre-closing construction method for wall body of pipeline dense area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101265724B (en) | Run-through steel plate type square steel tube concrete column and axle i-beam node | |
CN106121231A (en) | A kind of skyscraper interts cross construction method | |
WO2018028652A1 (en) | Brick-concrete integrated wall, civil engineering prefabricated member connection method, integrated building construction method | |
CN211447334U (en) | One-step prefabricated structure for building complex nodes of wall body | |
CN101240566A (en) | Square steel pipe concrete and H-shaped steel beam nod connection structure | |
CN113282986A (en) | Electromechanical integrated pipeline assembly type construction method | |
CN110158974A (en) | A kind of complete interspersed construction method of high level assembled arthitecutral structure | |
CN206737186U (en) | A kind of assembled wall structure | |
CN103590533B (en) | Sandwich type partition plate combined structure | |
CN204252367U (en) | Air-conditioning duct wears the lightweight precast concrete component of building block exterior wall | |
CN110644623A (en) | Ecological movable integral house and installation method | |
CN206667756U (en) | Vertical crane span structure built-in fitting | |
CN211007147U (en) | Fabricated building | |
WO2001066866A1 (en) | Multipurpose floor and beams thereof | |
CN212376009U (en) | Prefabricated assembled reinforced concrete structure house | |
CN110777962A (en) | Complete prefabrication construction method for filler wall masonry structural parts | |
CN206542144U (en) | A kind of prefabricated integrated line box building element | |
CN113971304B (en) | Building construction method and building based on convertible function building model (BIM) | |
CN207063312U (en) | A kind of arc wallboard and its attachment structure, building | |
CN217079542U (en) | Prefabricated formula piping lane fire prevention shutoff baffle | |
CN220790094U (en) | Connecting piece | |
CN215331705U (en) | Building with function conversion structure reserved | |
CN221095502U (en) | Hollow structure assembled wall for boarding facility | |
CN208517927U (en) | A kind of protection structure suitable for city underground proximity engineering construction | |
CN217326464U (en) | Integrated steel plate hoop prefabricated part for electromechanical pipeline installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |