CN211444687U - Aerial wall pipeline installation device - Google Patents
Aerial wall pipeline installation device Download PDFInfo
- Publication number
- CN211444687U CN211444687U CN201921509007.0U CN201921509007U CN211444687U CN 211444687 U CN211444687 U CN 211444687U CN 201921509007 U CN201921509007 U CN 201921509007U CN 211444687 U CN211444687 U CN 211444687U
- Authority
- CN
- China
- Prior art keywords
- guide rail
- pipeline
- wall
- aerial
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides an aerial wall-penetrating pipe installation device, the guide rail level sets up in the top of wall body outer hole, and the one end of guide rail is fixed in outside the wall body through the mounting panel, simultaneously, is provided with the tractor that moves along the guide rail on the guide rail, is provided with a plurality of hoist ropes on the tractor in order to hoist the pipeline of treating the installation to make the pipeline level and relative with the hole, then the tractor drives the pipeline again and removes and pass the wall body. The device's structure is very simple, but can effectively solve the aerial wall installation operation of wearing of pipeline, and it replaces current operation platform through the guide rail to pull the operation on replacing the operation platform through the tractor on the guide rail, greatly improved the convenience, the security, the accuracy and the work efficiency of pipeline installation.
Description
Technical Field
The utility model relates to an auxiliary pipeline passes the wall body at high school and carries out installation device installed.
Background
In modern industrial and civil buildings, high-altitude through-wall pipelines are often installed, operation platforms are required to be built on two sides of a hole of a wall body for installing the pipelines, then the pipelines are lifted by utilizing lifting equipment and placed on the operation platforms, and then the pipelines are dragged by manpower or corresponding instruments to penetrate through the hole of the wall body, so that the aim of installing the pipelines through the wall body is fulfilled. The installation process mainly comprises two steps of vertical hoisting and horizontal wall penetrating, when the wall is penetrated horizontally, a large number of workers are needed to perform matching operation on two sides of the wall, but due to the blocking of the wall, the matching difficulty of the workers on two sides of the wall is extremely high, the problems of blocking, dislocation, wall damage and the like are easily caused, the installation accuracy is low, the efficiency is low, and meanwhile, the danger of high-altitude operation is improved.
Disclosure of Invention
An object of the utility model is to provide a simple structure and work are quick, accurate aerial wall-penetrating pipe installation device to improve aerial wall-penetrating pipe installation's accuracy and work efficiency, and reduce the operation risk.
Aerial wall pipe installation device, guide rail including the level setting, the one end fixed mounting of guide rail is provided with the tractor that removes along the guide rail in the wall body surface on the guide rail, and the pipeline of treating the installation is connected through a plurality of hoist cables to the tractor.
The aerial through-wall pipeline installation device of the utility model is characterized in that a hole is arranged on the wall body, the guide rail is horizontally arranged outside the wall body and positioned above the hole, and one end of the guide rail is fixedly connected with the outer side of the wall body, thereby stabilizing the guide rail; then, a to-be-installed trolley is suspended on the guide rail by using a sling, and the pipeline is made to be horizontal and opposite to the hole; and then, driving the traction trolley to move along the guide rail and driving the pipeline to pass through the hole on the wall body, thus finishing the wall-through installation work of the pipeline. The device's structure is very simple, but can effectively solve the aerial wall installation operation of wearing of pipeline, and it replaces current operation platform through the guide rail to pull the operation on replacing the operation platform through the tractor on the guide rail, greatly improved the convenience, the security, the accuracy and the work efficiency of pipeline installation.
Drawings
Fig. 1 is a schematic structural view of an aerial through-wall duct installation apparatus.
Fig. 2 is a partial schematic structural view of the aerial wall duct installation apparatus shown in fig. 1.
Detailed Description
The utility model provides an aerial wall pipeline installation device, includes the guide rail that the level set up, and the one end fixed mounting of guide rail is in wall body 20 surfaces, is provided with the tractor 2 along the guide rail removal on the guide rail, and the tractor passes through a plurality of hoist cables 3 and connects the pipeline 30 of treating the installation.
As shown in fig. 1, a hole 21 is formed in a wall 20, a guide rail is horizontally arranged outside the wall and above the hole, and one end of the guide rail is fixedly connected with the outer side of the wall, so that the guide rail is stabilized; then, a to-be-installed trolley is suspended on the guide rail by using a sling, and the pipeline is made to be horizontal and opposite to the hole; and then, driving the traction trolley to move along the guide rail and driving the pipeline to pass through the hole on the wall body, thus finishing the wall-through installation work of the pipeline.
In the aerial through-wall pipeline installation device, the guide rail 1 is I-shaped steel, and one end of the guide rail is fixedly welded with the installation plate 4 which is fixedly installed on a wall body; the traction trolley comprises two pairs of idler wheels 5 which are respectively arranged on two sides of the I-steel, a movable plate 6 is arranged below the I-steel and is simultaneously connected with the four idler wheels, at least two lifting lugs 7 are arranged at the bottom of the movable plate, a positioning plate 8 is also arranged between the two lifting lugs 7 at the bottom of the movable plate 6, and the two lifting lugs are respectively connected to different positions of a pipeline through slings 3; the positioning plate is also connected with the pipeline through a sling 3, and the connecting position of the sling and the pipeline is positioned between the connecting positions of the sling connecting the two lifting lugs and the pipeline. The structure of the mounting device is simple, easy to realize and mount, the sling between different lifting lugs and the pipeline can keep the pipeline in a horizontal state, and the positioning plate and the corresponding sling are arranged between the lifting lugs, so that the pipeline can be prevented from shaking, and the accuracy and the safety of mounting work are improved. In addition, a plurality of hoisting motors (not shown) can be installed on the traction trolley 2, and each hoisting motor is respectively connected with different slings 3, so that the convenience of pipeline hoisting can be improved, and the levelness of the pipeline can be adjusted to be opposite to the hole on the wall body.
Claims (4)
1. The utility model provides an aerial wall pipe installation device which characterized in that: the pipeline installing device comprises a guide rail (1) which is horizontally arranged, one end of the guide rail is fixedly arranged on the surface of a wall body, a traction trolley (2) which moves along the guide rail is arranged on the guide rail, and the traction trolley is connected with a pipeline to be installed through a plurality of slings (3).
2. The aerial through-wall duct installation device of claim 1, wherein: the guide rail (1) is made of I-shaped steel, one end of the guide rail is fixedly welded with a mounting plate (4), and the mounting plate is fixedly mounted on a wall body; the traction trolley comprises two pairs of idler wheels (5) which are arranged on two sides of the I-shaped steel respectively, a movable plate (6) is arranged below the I-shaped steel and is connected with the four idler wheels simultaneously, at least two lifting lugs (7) are installed at the bottom of the movable plate, and the two lifting lugs are connected to different positions of a pipeline through slings (3) respectively.
3. The aerial through-wall duct installation device of claim 2, wherein: a positioning plate (8) is arranged at the bottom of the moving plate (6) and between the two lifting lugs (7), the positioning plate is connected with a pipeline through a sling (3), and the connecting position of the sling and the pipeline is arranged between the sling connecting the two lifting lugs and the connecting position of the pipeline.
4. An aerial through-wall duct installation apparatus as claimed in claim 1, 2 or 3, wherein: a plurality of hoisting motors are arranged on the traction trolley (2), and each hoisting motor is respectively connected with different slings (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921509007.0U CN211444687U (en) | 2019-09-11 | 2019-09-11 | Aerial wall pipeline installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921509007.0U CN211444687U (en) | 2019-09-11 | 2019-09-11 | Aerial wall pipeline installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211444687U true CN211444687U (en) | 2020-09-08 |
Family
ID=72296306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921509007.0U Active CN211444687U (en) | 2019-09-11 | 2019-09-11 | Aerial wall pipeline installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211444687U (en) |
-
2019
- 2019-09-11 CN CN201921509007.0U patent/CN211444687U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104477736A (en) | Shaft elevator installation method | |
CN211569911U (en) | Plate hoisting system for curtain wall installation | |
CN102425318A (en) | Self-moving steel structure workshop | |
CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
CN105019664B (en) | High-altitude sliding installation method for box room type electric room | |
CN104495632A (en) | Expanded type suspension rope lifting and hoisting system | |
CN102826459B (en) | Method for hoisting underwater structural part of ocean platform | |
CN211444687U (en) | Aerial wall pipeline installation device | |
CN207243334U (en) | A kind of long and narrow working face large-sized transversal component high-altitude system in place | |
CN203961317U (en) | Slip list Pin and many truss structures moulding bed | |
CN201250058Y (en) | Improved lifting trolley | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN205314590U (en) | Special mechanism of main equipment dismouting in factory building and frame | |
CN215755931U (en) | Large transformer hoisting equipment in factory building | |
CN110654977A (en) | Flexible-straight converter valve submodule replacing tool and method | |
CN203257106U (en) | Multifunctional power-driven walking type walking system | |
CN211444754U (en) | Unsettled wall installation device that wears | |
CN212154622U (en) | Outer wall plate mounting ladder stand for steel structure factory building | |
CN212334397U (en) | Auxiliary tool for hoisting and moving pipeline | |
CN105712211B (en) | A kind of equipment for being easy to steel structural overhead assembled | |
CN114822890A (en) | Nuclear power station equipment gate installation method | |
RU151298U1 (en) | BLOCK OF LOCOMOTIVE APPLIANCES, TECHNOLOGICAL CONTROL FOR HIM AND INSTALLATION METHOD | |
CN209853613U (en) | Automatic air pipe hoisting device | |
CN208182475U (en) | Prefabricated box girder steel strand stretching operation platform | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |