CN211238572U - ground clip - Google Patents
ground clip Download PDFInfo
- Publication number
- CN211238572U CN211238572U CN201922158467.XU CN201922158467U CN211238572U CN 211238572 U CN211238572 U CN 211238572U CN 201922158467 U CN201922158467 U CN 201922158467U CN 211238572 U CN211238572 U CN 211238572U
- Authority
- CN
- China
- Prior art keywords
- hook
- buckle
- main body
- wire
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型公开了一种接地线夹,它包括勾主体、舌片、卡扣、拉绳和旋转绳;勾主体上连接有接地铜线,舌片以其底端与勾主体铰接,卡扣连接于勾主体下,拉绳的一端为自由端、另一端穿过卡扣伸至勾主体内分别与两舌片相连,旋转绳的一端与卡扣相连、另一端与勾主体的顶部相连。使用时,利用操作杆操作使勾主体夹挂于导线上,下拉勾主体,受导线下压力,使舌片绕铰接部位转动,舌片张开夹紧导线,舌片张开的同时拉动拉绳张紧,连接稳固,不容易从导线上滑脱;拆卸时,下拉拉绳,拉绳自卡扣内断开,舌片失去约束呈自由状态,此时通过旋转绳即可操控整个线夹转动,线夹转动自到导线下后即可顺利移除;整个拆卸过程简单便捷,提高了工作效率。
The utility model discloses a grounding wire clip, which comprises a hook main body, a tongue piece, a buckle, a pulling rope and a rotating rope; the hook main body is connected with a grounding copper wire; Connected under the hook main body, one end of the pull rope is a free end, and the other end extends through the clip into the hook main body and is respectively connected with the two tongue pieces. When in use, use the operating lever to clamp the main body of the hook on the wire, pull down the main body of the hook, and receive the downward pressure of the wire to make the tongue rotate around the hinged part, the tongue is opened to clamp the wire, and the tongue is opened while pulling the rope. The tension is tight, the connection is stable, and it is not easy to slip off the wire; when disassembling, pull down the pull rope, the pull rope will be disconnected from the buckle, and the tongue will lose its restraint and be in a free state. The wire clip can be removed smoothly after it rotates under the wire; the whole disassembly process is simple and convenient, and the work efficiency is improved.
Description
技术领域technical field
本实用新型属于电力系统用安全防护辅助工器具技术领域,特别是涉及一种接地线夹。The utility model belongs to the technical field of safety protection auxiliary tools for power systems, in particular to a grounding wire clip.
背景技术Background technique
携带型短路接地线在电力系统中的应用非常广泛,是电力生产人员在生产过程中所使用的有效安全保护设施之一,其作用是释放电力设备上的残余电荷,以防止突然来电或邻近带电设备和线路产生感应电压时造成工作人员触电。在输电线检修完成后,必须及时拆除短路接地线,才可对输电线路进行供电。目前较常用的短路接地线夹装拆较困难,与输电线连接不够可靠稳固,由于接地线夹结构不合理,造成检修人员站在耐张塔的横担上不可能将接地线挂到瓷瓶串外侧导线上(大转角耐张塔转角外侧导线除外),挂装、拆卸均不方便,从而使线路停电检修工作由于挂接地线这一环节而增加检修人员、延长检修时间,并存在一定的安全风险。The portable short-circuit grounding wire is widely used in the power system and is one of the effective safety protection facilities used by the power production personnel in the production process. When the equipment and lines generate induced voltage, the staff will be electrocuted. After the maintenance of the transmission line is completed, the short-circuit grounding wire must be removed in time before power can be supplied to the transmission line. At present, the commonly used short-circuit grounding clamp is difficult to assemble and disassemble, and the connection with the transmission line is not reliable and stable. Due to the unreasonable structure of the grounding clamp, it is impossible for the maintenance personnel to hang the grounding wire to the porcelain bottle string on the cross arm of the tension tower. On the outer conductors (except the outer conductors of the corners of the large corner tension tower), it is inconvenient to mount and disassemble, so that the line power outage maintenance work will increase the number of maintenance personnel and prolong the maintenance time due to the link of the hanging ground wire, and there is a certain safety. risk.
实用新型内容Utility model content
本实用新型的目的在于针对现有技术的不足之处,提供一种装卸便捷且挂接可靠的接地线夹。The purpose of the utility model is to provide a grounding wire clip which is convenient to assemble and disassemble and reliable to connect, aiming at the deficiencies of the prior art.
本实用新型提供的这种接地线夹,它包括勾主体、舌片、卡扣、拉绳和旋转绳;勾主体上连接有接地铜线,舌片以其底端与勾主体铰接,卡扣连接于勾主体下,拉绳的一端为自由端、另一端穿过卡扣伸至勾主体内分别与两舌片相连,旋转绳的一端与卡扣相连、另一端与勾主体的顶部相连。The grounding wire clip provided by the utility model comprises a hook main body, a tongue piece, a buckle, a pulling rope and a rotating rope; the hook main body is connected with a grounding copper wire, the tongue piece is hinged with the hook main body at its bottom end, and the buckle is fastened. Connected under the hook main body, one end of the pull rope is a free end, the other end extends through the clip and extends into the hook main body to be connected to the two tongues respectively, one end of the rotating rope is connected to the clip and the other end is connected to the top of the hook main body.
在一个具体实施方式中,所述勾主体为整体件,包括挂钩段和直线段,挂钩段为n型,直线段连接于一侧端部下,所述舌片铰接于挂钩段内。In a specific embodiment, the hook body is an integral piece, including a hook section and a straight section, the hook section is n-shaped, the straight section is connected under one end of one side, and the tongue is hinged in the hook section.
作为优选,在所述勾主体上设有弹性构件,弹性构件包括T形管和弹簧,T形管包括水平段和竖直段,竖直段内设弹簧,弹簧的另一端与所述舌片接触,所述拉绳自T形管的竖直段穿过后与舌片相连。Preferably, an elastic member is provided on the hook main body, the elastic member includes a T-shaped tube and a spring, the T-shaped tube includes a horizontal section and a vertical section, a spring is arranged in the vertical section, and the other end of the spring is connected to the tongue piece. Contact, the drawstring is connected to the tongue after passing through the vertical section of the T-shaped tube.
在一个具体实施方式中,它还包括调力组件,调力组件包括圆环套和一对调节螺栓,圆环套上设有一对贯穿壁厚的径向螺纹孔,调节螺栓连接于螺纹孔内;圆环套固接于勾主体的直线段下。In a specific embodiment, it also includes a force adjustment component, the force adjustment component includes a ring sleeve and a pair of adjustment bolts, the annular sleeve is provided with a pair of radial threaded holes through the wall thickness, and the adjustment bolts are connected in the threaded holes ; The ring sleeve is fixed under the straight line segment of the main body of the hook.
进一步的,所述卡扣为圆管,其管壁上设有一对通孔;卡扣同轴套于拉绳外,卡扣置于圆环套内,调节螺栓拧入通孔处。Further, the buckle is a round tube with a pair of through holes on the pipe wall; the buckle is coaxially sleeved outside the pull rope, the buckle is placed in the circular sleeve, and the adjusting bolt is screwed into the through holes.
本实用新型在使用时,利用操作杆操作使勾主体夹挂于导线上,下拉勾主体,受导线下压力,使舌片绕铰接部位转动,舌片张开夹紧导线,舌片张开的同时拉动拉绳张紧,连接稳固,不容易从导线上滑脱;拆卸时,下拉拉绳,拉绳自卡扣内断开,舌片失去约束呈自由状态,此时通过旋转绳即可操控整个线夹转动,线夹转动自到导线下后即可顺利移除;整个拆卸过程简单便捷,降低了工作难度,利于节省工作成本和提高工作效率。When the utility model is in use, the hook main body is clamped and hung on the wire by the operation of the operating lever, the hook main body is pulled down, and under the downward pressure of the wire, the tongue piece rotates around the hinge part, the tongue piece is opened to clamp the wire, and the tongue piece is opened. At the same time, the pull rope is pulled to tighten, the connection is stable, and it is not easy to slip off the wire; when disassembling, pull down the pull rope, the pull rope will be disconnected from the buckle, and the tongue will lose its restraint and be in a free state. At this time, the entire rope can be controlled by rotating the rope The wire clip is rotated, and the wire clip can be removed smoothly after it rotates under the wire; the entire disassembly process is simple and convenient, which reduces the difficulty of work, saves work costs and improves work efficiency.
附图说明Description of drawings
图1为本实用新型一个优选实施例挂接状态示意图。FIG. 1 is a schematic diagram of the hooking state of a preferred embodiment of the present invention.
图2为本优选实施例中调力组件的放大示意图。FIG. 2 is an enlarged schematic view of the force regulating assembly in the preferred embodiment.
图3为本优选实施例中弹性构件与拉绳的位置关系示意图。FIG. 3 is a schematic diagram of the positional relationship between the elastic member and the pull rope in the preferred embodiment.
图示序号:Icon serial number:
1—勾主体,11—挂钩段,12—直线段,13—立座;1—the main body of the hook, 11—the hook segment, 12—the straight segment, 13—the stand;
2—舌片;3—卡扣;4—拉绳;5—旋转绳;2- Tongue; 3- Buckle; 4- Pull rope; 5- Rotating rope;
6—弹性构件,61—T形管,62—弹簧;6—Elastic member, 61—T-shaped tube, 62—Spring;
7—调力组件,71—圆环套,72—调节螺栓;7—Force adjustment component, 71—Circle sleeve, 72—Adjusting bolt;
8—接地铜线。8—Ground copper wire.
具体实施方式Detailed ways
如图1所示,本实施例公开的这种接地线夹,包括勾主体1、舌片2、卡扣3、拉绳4、旋转绳5、弹性构件6和调力组件7。As shown in FIG. 1 , the grounding wire clip disclosed in this embodiment includes a hook body 1 , a tongue piece 2 , a
勾主体1为整体件,包括挂钩段11和直线段12;挂钩段11为n型挂钩,其盲端的顶部设有立座13用以连接旋转绳5,起外连接有接地铜线8,其开口侧的两端上设有安装孔用于安装舌片2;直线段12连接于一侧端部下。舌片2为折弯弹片,舌片的底端为铰接头,舌片以其铰接头套于安装孔处,通过销轴胶接,一对舌片相对布置呈X型。The hook main body 1 is an integral piece, including a hook segment 11 and a
卡扣3通过调力组件7设置于直线段的底端。如图2所示,调力组件7包括圆环套71和一对调节螺栓72,圆环套上设有一对贯穿壁厚的径向螺纹孔,调节螺栓连接于螺纹孔内;卡扣3为圆管,其管壁上设有一对通孔,安装时将卡扣3插入圆环套71中通过调节螺栓拧入通孔内完成装配。安装完成后将拉绳4自卡扣中穿过后伸入勾主体内,拉绳在勾主体中分别与绕过销轴后与一对舌片的顶部相连。将旋转绳5系于立座与圆环套之间。并在勾主体1的拉绳外套上弹性构件6以提高使用效果。如图3所示,弹性构件6包括T形管61和弹簧62,T形管包括水平段和竖直段,竖直段内设弹簧,弹簧的另一端与舌片接触,拉绳自T形管的竖直段穿过后与舌片相连。The
为了提高绝缘性能,保证绝缘效果,可将弹性构件、调力组件和卡扣选用高强度绝缘材料制成,如环氧树脂。In order to improve the insulation performance and ensure the insulation effect, the elastic components, force regulating components and buckles can be made of high-strength insulating materials, such as epoxy resin.
使用时,通过操作杆将线夹挂在导线上,导线挤开舌片,舌片绕销轴转动,拉出拉绳,同时弹性构件受压,将拉绳拉出绳槽,从而保证舌片与卡扣之间的这段拉绳呈张紧状态,使得在悬垂竖直导线上挂装或遇大风时,连接稳固,不容易与导线滑脱。在工作完成后,需要摘卸时,操作人员可以通过拉绳摘掉线夹,向下拉动拉绳,拉绳自卡扣处脱离,舌片与卡扣之间的拉绳失去约束呈自由状态,使舌片与导线之间夹紧力大大减小,再操控旋转绳即可将线夹翻转180度,即可摘掉线夹。提高了作业便捷度,降低了作业难度,提高了作业效率,并且可实现操作人员在挂接、拆除接地线时的位移范围极大缩小,可实现接地线端头在空间360°范围内挂、拆,实现了电力设备的安全、可靠接地,极大地增加了操作人员的操作空间,提高了操作人员的操作灵活性和安全性。When in use, hang the wire clip on the wire through the operating lever, the wire squeezes the tongue, the tongue rotates around the pin shaft, and the pull rope is pulled out. The pulling rope between the buckle and the buckle is in a tensioned state, so that the connection is stable when hanging on the hanging vertical wire or in the event of a strong wind, and it is not easy to slip off the wire. After the work is completed, when it needs to be removed, the operator can remove the clip through the pull rope, pull the pull rope downward, and the pull rope will be detached from the buckle, and the pull rope between the tongue and the buckle will lose its restraint and be in a free state. , so that the clamping force between the tongue and the wire is greatly reduced, and then the wire clip can be turned 180 degrees by manipulating the rotating rope, and the wire clip can be removed. It improves the convenience of operation, reduces the difficulty of operation, improves the operation efficiency, and can greatly reduce the displacement range of the operator when connecting and removing the ground wire, and can realize the hanging of the end of the ground wire within the space of 360°, It realizes the safe and reliable grounding of electric equipment, greatly increases the operating space of the operator, and improves the operation flexibility and safety of the operator.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922158467.XU CN211238572U (en) | 2019-12-05 | 2019-12-05 | ground clip |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922158467.XU CN211238572U (en) | 2019-12-05 | 2019-12-05 | ground clip |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211238572U true CN211238572U (en) | 2020-08-11 |
Family
ID=71916035
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922158467.XU Active CN211238572U (en) | 2019-12-05 | 2019-12-05 | ground clip |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211238572U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113131235A (en) * | 2021-05-13 | 2021-07-16 | 国网甘肃省电力公司天水供电公司 | Grounding end capable of steering lead end |
| CN114156699A (en) * | 2021-11-23 | 2022-03-08 | 国网辽宁省电力有限公司本溪供电公司 | Intelligent management box for grounding wire in power failure operation |
| CN118431789A (en) * | 2024-07-04 | 2024-08-02 | 国网安徽省电力有限公司无为市供电公司 | Emergency power supply electrical connector and electrical connection method |
-
2019
- 2019-12-05 CN CN201922158467.XU patent/CN211238572U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113131235A (en) * | 2021-05-13 | 2021-07-16 | 国网甘肃省电力公司天水供电公司 | Grounding end capable of steering lead end |
| CN114156699A (en) * | 2021-11-23 | 2022-03-08 | 国网辽宁省电力有限公司本溪供电公司 | Intelligent management box for grounding wire in power failure operation |
| CN118431789A (en) * | 2024-07-04 | 2024-08-02 | 国网安徽省电力有限公司无为市供电公司 | Emergency power supply electrical connector and electrical connection method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211238572U (en) | ground clip | |
| CN102074810B (en) | Special retractable-type insulating ground rod for extra-high voltage power transmission line | |
| CN204045765U (en) | A kind of novel electric power circuit anti-fall grounding wire line clamping device | |
| CN104201489B (en) | A kind of novel electric power circuit anti-fall grounding wire line clamping device | |
| CN203983842U (en) | Repair apparatus hangs eminence grounding wire device | |
| CN202127205U (en) | Rapidly-fixing clamp for cables | |
| KR101087740B1 (en) | One-touch ground bracket clamp | |
| CN102412525A (en) | Power insulation protective umbrella anti-drop hook | |
| CN203481420U (en) | Grounding wire device used for power transmission line overhauling | |
| CN203631776U (en) | Multi-linkage type grounding wire clamp | |
| CN203422397U (en) | Lead wire joint fixing grounding tool for high voltage test | |
| CN204577646U (en) | Extension type ground wire fixing device | |
| CN104906719A (en) | Assembled tower climbing anti-falling device | |
| CN201663250U (en) | Reversible ground wire hook | |
| CN205377163U (en) | General type 500kV overhead earth wire carries ply -yarn drill utensil | |
| CN203422391U (en) | Lead wire joint fixing tool for high voltage test | |
| CN202678788U (en) | Ring type fixing device used for disassembling and assembling ground wire with insulating rod | |
| CN103244044A (en) | Insulating flat ribbon rope ladder for inserting of power transmission line | |
| CN111697487A (en) | Voltage-measurable live-line double-insulator-string replacing device and operation method | |
| CN208386010U (en) | A kind of fixture for replacing power transmission tower side of wire end insulation | |
| CN110653741A (en) | Tool for electrically fastening clamp bolt in overhead electrified remote control of power transmission line | |
| CN210704540U (en) | A tool for high-altitude live remote control electric tightening of wire clamp bolts for transmission lines | |
| CN205092508U (en) | Special use of suspension type composite insulator is rolled off production line and is hung ladder | |
| CN205141178U (en) | Interlock formula earth clamp | |
| CN204893863U (en) | Jumper clamp bolt fastening tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |