CN211172073U - 半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 - Google Patents
半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 Download PDFInfo
- Publication number
- CN211172073U CN211172073U CN201922148863.4U CN201922148863U CN211172073U CN 211172073 U CN211172073 U CN 211172073U CN 201922148863 U CN201922148863 U CN 201922148863U CN 211172073 U CN211172073 U CN 211172073U
- Authority
- CN
- China
- Prior art keywords
- gantry crane
- barricade
- rows
- retaining wall
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型属于隧道工程施工技术领域,具体是一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构。解决目前传统做法门吊基础与渣土坑挡墙独立设置存在占用场地较多,施工成本高,施工周期较长等问题,包括设置于车站维护结构上的两排冠梁以及设置于车站顶板龙门吊基础与渣土坑挡墙合建结构,冠梁顶面与地面同标高,且每50cm预埋一块钢板,所述的龙门吊基础与渣土坑挡墙合建结构包括预埋在车站顶板的两排钢筋,两排钢筋上施工有两排挡墙,挡墙顶部每50cm预埋一块钢板,钢板上部布设龙门吊轨道,龙门吊轨道两端部均设置有限位器,挡墙与冠梁在同一水平面上且相互连接在一起。
Description
技术领域
本实用新型属于隧道工程施工技术领域,具体是一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构。
背景技术
随着我国城市地铁建设的普及,在原本狭窄的城市道路下方设置地铁车站的情况越来越多,为了不影响城市车辆通行,减小施工过程占用的场地,较多车站目前均采用半幅盖挖法施工,盾构区间施工时需架设45T龙门吊和设置渣土坑,传统做法门吊基础与渣土坑挡墙独立设置,这种方法问题是占用场地较多,施工成本高,施工周期较长。
发明内容
本实用新型解决目前传统做法门吊基础与渣土坑挡墙独立设置存在占用场地较多,施工成本高,施工周期较长等问题,提供一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构。
本实用新型采取以下技术方案:一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构,包括设置于车站维护结构上的两排冠梁以及设置于车站顶板龙门吊基础与渣土坑挡墙合建结构,冠梁顶面与地面同标高,且每50cm预埋一块钢板,所述的龙门吊基础与渣土坑挡墙合建结构包括预埋在车站顶板的两排钢筋,两排钢筋上施工有两排挡墙,挡墙顶部每50cm预埋一块钢板,钢板上部布设龙门吊轨道,龙门吊轨道两端部均设置有限位器,挡墙与冠梁在同一水平面上且相互连接在一起。
进一步的,两侧冠梁之间预埋有侧墙植筋,侧墙植筋上施工L型挡墙。
进一步的,L型挡墙安装在冠梁与挡墙连接的一端。
与现有技术相比,本实用新型具有以下有益效果:
(1)利用冠梁结构设置门吊轨道梁,可减少施工工序,节约时间。
(2)龙门吊基础与渣土坑挡墙合建,可节约施工场地,同时减小临建施工成本。
(3)解决半幅盖挖车站因场地狭小造成盾构施工进度受限的问题。
本实用新型充分利用车站现有结构,使龙门吊基础兼做渣土坑挡墙,不仅节约施工场地,加快了施工进度,而且降低了盾构临建的成本,简化了施工程序,提高了工程进度。具有工艺简单、实用性强、利于推广。
附图说明
图1为半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构;
图2为A-A剖面结构图;
图中:1-限位器,2-挡墙,3-L型挡墙,4-顶板预埋钢筋,5-侧墙植筋,6-冠梁,7-轨道,8-车站顶板。
具体实施方式
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例;基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
如图1、2所示,一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构,包括设置于车站维护结构上的两排冠梁6以及设置于车站顶板龙门吊基础与渣土坑挡墙合建结构,冠梁6顶面与地面同标高,且每50cm预埋一块钢板,所述的龙门吊基础与渣土坑挡墙合建结构包括预埋在车站顶板8的两排钢筋4,两排钢筋4上施工有两排挡墙2,挡墙2顶部每50cm预埋一块钢板,钢板上部布设龙门吊轨道7,龙门吊轨道7两端部均设置有限位器1,挡墙2与冠梁6在同一水平面上且相互连接在一起。
两侧冠梁6之间预埋有侧墙植筋5,侧墙植筋5上施工L型挡墙3。
L型挡墙3安装在冠梁6与挡墙2连接的一端。
实施步骤包括以下:
步骤一,龙门吊基础与渣土坑挡墙合建结构施工。
A、顶板预埋两排钢筋,深度大于40倍d;B、钢筋绑扎;C、预埋轨道梁钢板;D、浇筑混凝土;
B、步骤二,渣土坑侧墙施工。
A、车站结构植筋,深度为30倍钢筋直径d;B、钢筋绑扎;C、浇筑混凝土;
步骤三,安设龙门吊轨道。
A、轨道布设并连接;B、焊接轨道压板固定轨道;C、轨道端头设置限位器。
最后应说明的是:以上各实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述各实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的范围。
Claims (3)
1.一种半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构,其特征在于:包括设置于车站维护结构上的两排冠梁(6)以及设置于车站顶板龙门吊基础与渣土坑挡墙合建结构,冠梁(6)顶面与地面同标高,且每50cm预埋一块钢板,所述的龙门吊基础与渣土坑挡墙合建结构包括预埋在车站顶板(8)的两排钢筋(4),两排钢筋(4)上施工有两排挡墙(2),挡墙(2)顶部每50cm预埋一块钢板,钢板上部布设龙门吊轨道(7),龙门吊轨道(7)两端部均设置有限位器(1),挡墙(2)与冠梁(6)在同一水平面上且相互连接在一起。
2.根据权利要求1所述的半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构,其特征在于:两侧冠梁(6)之间预埋有侧墙植筋(5),侧墙植筋(5)上施工L型挡墙(3)。
3.根据权利要求2所述的半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构,其特征在于:所述的L型挡墙(3)安装在冠梁(6)与挡墙(2)连接的一端。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922148863.4U CN211172073U (zh) | 2019-12-04 | 2019-12-04 | 半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922148863.4U CN211172073U (zh) | 2019-12-04 | 2019-12-04 | 半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211172073U true CN211172073U (zh) | 2020-08-04 |
Family
ID=71800617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922148863.4U Expired - Fee Related CN211172073U (zh) | 2019-12-04 | 2019-12-04 | 半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211172073U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499467A (zh) * | 2020-11-24 | 2021-03-16 | 中建八局轨道交通建设有限公司 | 地铁车站扩大端装配式龙门吊轨道基础及其施工方法 |
-
2019
- 2019-12-04 CN CN201922148863.4U patent/CN211172073U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112499467A (zh) * | 2020-11-24 | 2021-03-16 | 中建八局轨道交通建设有限公司 | 地铁车站扩大端装配式龙门吊轨道基础及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041349A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法 | |
CN105003272A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的逆作施工方法 | |
CN106638663A (zh) | 一种沉陷区高压输电铁塔基础加固及整体纠倾平移方法 | |
CN210031842U (zh) | 基于排桩、连系梁和对拉锚索的相临深基坑联合支护体系 | |
CN103103988A (zh) | 利用中心岛楼板水平支撑结构的基坑施工方法 | |
CN104295301B (zh) | 一种浅埋暗挖碎裂岩体地铁隧道交叉点的施工方法 | |
CN109457708A (zh) | 一种深基坑混凝土结构施工过程中临时支撑的施工方法 | |
CN102410031B (zh) | 桩墙法建造地下空间结构 | |
CN109868726A (zh) | 一种预制装配式柱形桥墩及其施工方法 | |
CN211172073U (zh) | 半幅盖挖地铁车站龙门吊基础与渣土坑挡墙合建结构 | |
CN205036380U (zh) | 一种四联拱pba暗挖地铁车站主体结构 | |
CN204457789U (zh) | 一种用桩拱墙支撑扩挖大直径盾构隧道建造的地铁车站 | |
CN110593266A (zh) | 一种重载通行条件下的基坑坡道加强支护结构施工方法 | |
CN210858740U (zh) | 一种大盾构施工预留洞无支撑快速封堵结构 | |
CN105927252B (zh) | 一种利用矩形顶管开挖大断面地下空间结构体系转换方法 | |
CN208734343U (zh) | 一种带有临时中隔柱支撑的车站隧道开挖结构 | |
CN103669422A (zh) | 一种锚杆静压桩桩头防水施工方法 | |
CN116201177A (zh) | 基于永临结合的地下工程改扩建用新型接口及其构建方法 | |
CN106337373B (zh) | 一种斜穿既有线架空顶进箱涵的施工方法 | |
CN205503131U (zh) | 一种富水砂卵石地层异型深竖井结构体系 | |
CN210797573U (zh) | 一种基于板下滑槽的地下结构内部运输系统 | |
CN209461988U (zh) | 110kv电缆沟原位支托结构 | |
CN203429557U (zh) | 应用在顶进地道桥施工中的锚杆后背梁 | |
CN206887746U (zh) | 一种混凝土圆柱墩系梁逆序施工用圆柱模板 | |
CN109742715B (zh) | 一种迁改后电力管沟的布置结构及电力管沟迁改方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 Termination date: 20211204 |
|
CF01 | Termination of patent right due to non-payment of annual fee |