CN211171834U - Double-deck waterstop construction fixing device - Google Patents
Double-deck waterstop construction fixing device Download PDFInfo
- Publication number
- CN211171834U CN211171834U CN201921535756.0U CN201921535756U CN211171834U CN 211171834 U CN211171834 U CN 211171834U CN 201921535756 U CN201921535756 U CN 201921535756U CN 211171834 U CN211171834 U CN 211171834U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixing
- double
- clamping
- fixing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
本实用新型公开了一种双层止水带施工固定装置,包括若干并排设置的固定模块,所述固定模块包括固定框架、固定夹以及支撑机构;所述固定框架包括背板以及垂直固定至所述背板上下两端的端板;所述支撑机构平行于所述端板设置于所述背板的中间,所述支撑机构的长度等于所述端板的长度,所述支撑机构的远离所述背板的一端设置有固定部,所述固定部用于固定混凝土模板;所述固定夹有两个,分别设置于所述支撑机构的上下两侧,所述固定夹包括限位板以及夹紧板,所述限位板以及所述夹紧板均能够相互靠近或远离。本装置不仅能够固定不同间距的双层止水带,还可以对止水带之间的混凝土模板进行固定。
The utility model discloses a double-layer waterstop construction fixing device, which comprises a plurality of fixing modules arranged side by side. The fixing modules comprise a fixing frame, a fixing clip and a supporting mechanism; the fixing frame comprises a back plate and is vertically fixed to the The end plates at the upper and lower ends of the back plate; the support mechanism is arranged in the middle of the back plate parallel to the end plate, the length of the support mechanism is equal to the length of the end plate, and the support mechanism is far from the One end of the back plate is provided with a fixing part, and the fixing part is used for fixing the concrete formwork; there are two fixing clips, which are respectively arranged on the upper and lower sides of the supporting mechanism, and the fixing clips include a limit plate and a clamping plate. The plate, the limiting plate and the clamping plate can all approach or move away from each other. The device can not only fix the double-layer waterstops with different spacings, but also fix the concrete formwork between the waterstops.
Description
技术领域technical field
本实用新型涉及建筑施工领域,更具体地,涉及一种双层止水带施工固定装置。The utility model relates to the field of building construction, in particular to a double-layer waterstop construction fixing device.
背景技术Background technique
在水工建筑物中,为防止渗水对结构物造成破坏,不同的结构段接缝处长设计有止水带,例如船闸闸室墙分段之间、闸首或导航墙之间、航道护岸之间等。常用的止水带有橡胶止水带或铜片止水带,止水带的层数根据实际安装环境而决定,有些可以设置一层,有些情况需要设置双层止水带,以保证止水效果。止水带的安装质量直接影响止水效果,对结构物的耐久性有较大影响。In hydraulic structures, in order to prevent water seepage from causing damage to the structure, waterstops are designed at the joints of different structural sections, such as between the sections of the lock chamber wall, between the lock head or navigation wall, and the channel revetment. wait in between. Commonly used waterstops are rubber waterstops or copper sheet waterstops. The number of layers of waterstops is determined according to the actual installation environment. In some cases, one layer can be set, and in some cases, double-layer waterstops are required to ensure water stop. Effect. The installation quality of the waterstop directly affects the waterstop effect and has a great influence on the durability of the structure.
现有的双层止水带安装时,由于跨两端结构,且浇筑至构筑物中,因此需要对混凝土模板进行分割,使止水带伸入分割后的模板中间的缝隙中,并利用木板和钢筋夹住止水带进行固定。但是对于双层止水带安装时,往往会出现以下的问题:When the existing double-layer waterstop is installed, because the structure spans both ends and is poured into the structure, the concrete formwork needs to be divided, so that the waterstop extends into the gap in the middle of the divided formwork, and the use of wooden boards and The rebar clamps the waterstop for fixation. However, when installing a double-layer waterstop, the following problems often occur:
1、由于需要将模板分割为多块,往往止水带之间的混凝土模板不易固定,直接影响混凝土的浇筑以及止水带的固定;1. Due to the need to divide the formwork into multiple pieces, it is often difficult to fix the concrete formwork between the waterstops, which directly affects the pouring of concrete and the fixing of the waterstop;
2、采用钢筋固定止水带需要将模板打孔,破坏模板的整体性,使模板无法多次使用,造成材料浪费。2. The use of steel bars to fix the waterstop requires the formwork to be punched, which destroys the integrity of the formwork, so that the formwork cannot be used multiple times, resulting in material waste.
因此,需要一种新的双层止水带固定装置,能够解决上述问题。Therefore, there is a need for a new double-layer waterstop fixing device that can solve the above problems.
实用新型内容Utility model content
本实用新型的一个目的是提供一种双层止水带施工固定的新技术方案。One purpose of the present utility model is to provide a new technical solution for the construction and fixation of the double-layer waterstop.
根据本实用新型的第一方面,提供了一种双层止水带施工固定装置,包括若干并排设置的固定模块,所述固定模块包括固定框架、固定夹;所述固定框架包括背板以及垂直固定至所述背板上下两端的端板,还包括支撑机构,所述支撑机构平行于所述端板设置于所述背板的中间,所述支撑机构的远离所述背板的一端设置有固定部,所述固定部的定位端与所述端板端部位于同一垂直面上,所述固定部用于固定混凝土模板;所述固定夹有两个,分别设置于所述支撑机构的上下两侧,所述固定夹包括限位板以及夹紧板,所述限位板以及所述夹紧板均能够通过螺栓调节相互靠近或远离。According to the first aspect of the present invention, a double-layer waterstop construction fixing device is provided, which includes a plurality of fixing modules arranged side by side, the fixing modules include a fixing frame and a fixing clip; the fixing frame includes a back plate and a vertical The end plates fixed to the upper and lower ends of the back plate further include a support mechanism, the support mechanism is arranged in the middle of the back plate parallel to the end plate, and the end of the support mechanism away from the back plate is provided with a a fixed part, the positioning end of the fixed part and the end of the end plate are located on the same vertical plane, the fixed part is used for fixing the concrete formwork; there are two fixed clips, which are respectively arranged on the upper and lower parts of the supporting mechanism On both sides, the fixing clip includes a limiting plate and a clamping plate, and both the limiting plate and the clamping plate can be adjusted to approach or move away from each other by means of bolts.
通过本方案,利用两只固定夹将止水带夹紧固定,并将两只止水带中间的混凝土模板用支撑机构固定支撑,将本装置紧贴模板固定,实现双层止水带的固定,并且方便了对中间模板的固定。本装置结构合理,安装简单方便,能够重复利用;无需钢筋固定止水带,从而无需对所有的混凝土模板打孔固定,使得混凝土模板能够重复利用;本装置的固定夹之间距离能够调节,适用于不同间距的双层止水带的安装。Through this scheme, the water stop belt is clamped and fixed by two fixing clips, and the concrete formwork between the two water stop belts is fixed and supported by the supporting mechanism, and the device is fixed closely to the formwork to realize the fixation of the double-layer water stop belt. , and it is convenient to fix the intermediate template. The device has reasonable structure, simple and convenient installation, and can be reused; no steel bars are required to fix the waterstop, so that all concrete formwork does not need to be drilled and fixed, so that the concrete formwork can be reused; the distance between the fixing clips of the device can be adjusted, which is suitable for For the installation of double-layer waterstops with different spacings.
优选地,所述夹紧板通过第一螺栓连接至所述端板上,所述第一螺栓贯穿所述端板并旋转连接至所述端板上,所述夹紧板上固定有第一螺纹套,所述第一螺纹套与所述第一螺栓螺纹连接。Preferably, the clamping plate is connected to the end plate by a first bolt, the first bolt penetrates the end plate and is rotatably connected to the end plate, and the clamping plate is fixed with the first bolt A threaded sleeve, the first threaded sleeve is threadedly connected with the first bolt.
通过本方案,利用第一螺栓的旋转调节夹紧板上下移动,可靠性高。With this solution, the up and down movement of the clamping plate is adjusted by the rotation of the first bolt, and the reliability is high.
优选地,每块所述夹紧板均通过至少两根所述第一螺栓连接至所述端板上。Preferably, each of the clamping plates is connected to the end plate by at least two of the first bolts.
通过本方案,两根第一螺栓同时连接至夹紧板上,防止第一螺栓转动时夹紧板跟转。With this solution, the two first bolts are connected to the clamping plate at the same time, so as to prevent the clamping plate from following rotation when the first bolts are rotated.
优选地,所述限位板垂直于所述背板并与所述背板滑动连接;所述限位板与所述支撑机构之间设置有顶升机构,所述限位板在所述顶升机构的带动下靠近或远离所述夹紧板。Preferably, the limit plate is perpendicular to the back plate and is slidably connected to the back plate; a jacking mechanism is provided between the limit plate and the support mechanism, and the limit plate is on the top Driven by the lifting mechanism, it approaches or moves away from the clamping plate.
通过本方案,顶升机构调节限位板的位置,从而调节固定夹之间的距离,提高适用范围。Through this solution, the jacking mechanism adjusts the position of the limit plate, thereby adjusting the distance between the fixing clips and improving the applicable range.
优选地,所述顶升机构包括第一倾斜块与第二倾斜块,所述第一倾斜块的倾斜面与所述第二倾斜块的倾斜面滑动连接,所述第一倾斜块的水平面固定至所述限位板上,所述第二倾斜块水平面滑动连接至所述支撑机构上;所述第二倾斜块通过第二螺栓连接至所述背板上,所述第二螺栓贯穿所述背板并与所述背板螺纹连接,所述第二倾斜块与所述第二螺栓旋转连接。Preferably, the jacking mechanism includes a first inclined block and a second inclined block, the inclined surface of the first inclined block is slidably connected with the inclined surface of the second inclined block, and the horizontal surface of the first inclined block is fixed to the limiting plate, the second inclined block is horizontally slidably connected to the support mechanism; the second inclined block is connected to the back plate by a second bolt, and the second bolt penetrates the The back plate is threadedly connected with the back plate, and the second inclined block is rotatably connected with the second bolt.
通过本方案,将顶升机构的调整端设置于背板上,便于顶升机构的调节。With this solution, the adjusting end of the jacking mechanism is arranged on the back plate, which facilitates the adjustment of the jacking mechanism.
优选地,所述固定部包括板夹,所述板夹用于夹持混凝土模板。Preferably, the fixing portion includes a plate clamp, and the plate clamp is used to clamp the concrete formwork.
通过本方案,板夹将混凝土模板夹持住,无需穿孔固定,进一步提高了本装置的实用性,保证了中间模板的完整性,能够重复利用。With this solution, the concrete formwork is clamped by the plate clamp without perforating and fixing, which further improves the practicability of the device, ensures the integrity of the intermediate formwork, and can be reused.
优选地,所述支撑机构包括支撑套、第三螺杆以及扩张块;所述支撑套一端固定至所述背板上,所述支撑套的另一端固定有固定板,所述板夹包括相互配合的两个夹爪,所述夹爪均滑动连接至所述固定板上;所述第三螺杆一端固定有把手,另一端依次穿过所述背板、所述支撑套以及所述固定板后与所述扩张块旋转连接;所述扩张块为倒置的圆台,所述扩张块两侧面沿母线设置有滑槽,所述夹爪底部与所述滑槽滑动连接。Preferably, the support mechanism includes a support sleeve, a third screw rod and an expansion block; one end of the support sleeve is fixed to the back plate, the other end of the support sleeve is fixed with a fixing plate, and the plate clips include a mutual fit. The two clamping claws are slidably connected to the fixing plate; one end of the third screw rod is fixed with a handle, and the other end passes through the back plate, the support sleeve and the fixing plate in sequence. The expansion block is rotatably connected with the expansion block; the expansion block is an upside-down circular platform, the two sides of the expansion block are provided with a chute along the generatrix, and the bottom of the clamping claw is slidably connected with the chute.
通过本方案,将板夹的调整机构设置于背板上,便于本装置在夹紧止水带后,对板夹进行调整,提高工作效率。With this solution, the adjusting mechanism of the plate clamp is arranged on the back plate, so that the device can adjust the plate clamp after clamping the water stop belt, thereby improving the work efficiency.
优选地,所述端板的端部向内弯曲形成稳定板,所述稳定板与所述固定部外端面处于同一垂直面上,所述稳定板外端面设置有防滑层。Preferably, the end portion of the end plate is bent inward to form a stabilization plate, the stabilization plate and the outer end surface of the fixing portion are on the same vertical plane, and the outer end surface of the stabilization plate is provided with an anti-skid layer.
通过本方案,提高本装置与混凝土模板之间的稳定性。Through this solution, the stability between the device and the concrete formwork is improved.
优选地,所述固定模块之间通过母板进行连接,所述母板固定至所述端板上,所述母板上开设有供所述第一螺栓穿过的通孔;所述母板之间通过连接板进行连接。Preferably, the fixed modules are connected through a motherboard, the motherboard is fixed to the end plate, and the motherboard is provided with through holes for the first bolts to pass through; the motherboard The connection is made through the connecting plate.
通过本方案,提高本固定装置整体的稳定性和位置的精确性,防止固定模块之间的位置出现偏差。Through this solution, the overall stability and positional accuracy of the fixing device are improved, and the positional deviation between the fixing modules is prevented.
优选地,位于上方的所述端板的顶部设置有若干挂钩。Preferably, several hooks are provided on the top of the upper end plate.
通过本方案,能够将本装置直接挂设至混凝土模板上,使用简单方便。With this solution, the device can be directly hung on the concrete formwork, and the use is simple and convenient.
根据本公开的一个实施例,本装置结构简单,不仅能够对双层止水带进行不同位置的固定,还能够便于对止水带之间的模板进行固定,使用方便,能够提高施工效率;本装置直接对止水带及止水带间的模板进行固定,无需钢筋固定止水带,从而避免了对混凝土模板的打孔,使混凝土模板能够重复使用,更加节省施工成本。According to an embodiment of the present disclosure, the device has a simple structure, not only can fix the double-layer waterstops at different positions, but also facilitates the fixing of the formwork between the waterstops, is convenient to use, and can improve construction efficiency; The device directly fixes the waterstop and the formwork between the waterstops, without the need for steel bars to fix the waterstop, thus avoiding the perforation of the concrete formwork, enabling the concrete formwork to be reused, and saving construction costs.
通过以下参照附图对本实用新型的示例性实施例的详细描述,本实用新型的其它特征及其优点将会变得清楚。Other features and advantages of the present invention will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings.
附图说明Description of drawings
被结合在说明书中并构成说明书的一部分的附图示出了本实用新型的实施例,并且连同其说明一起用于解释本实用新型的原理。The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention.
图1是本实用新型实施例一的双层止水带施工固定装置中固定模块的侧视结构示意图。FIG. 1 is a schematic side view of the structure of the fixing module in the double-layer waterstop construction fixing device according to the first embodiment of the present invention.
图2是图1的固定模块安装后的结构侧视示意图。FIG. 2 is a schematic side view of the structure of the fixed module of FIG. 1 after installation.
图3是图1的固定模块中夹紧板的安装结构示意图。FIG. 3 is a schematic diagram of the installation structure of the clamping plate in the fixing module of FIG. 1 .
图4是图1的固定模块中限位板及支撑机构的位置结构示意图。FIG. 4 is a schematic diagram of the positional structure of the limiting plate and the supporting mechanism in the fixing module of FIG. 1 .
图5是图4的支撑机构中第一倾斜块与第二倾斜块的结构示意图。FIG. 5 is a schematic structural diagram of a first inclined block and a second inclined block in the support mechanism of FIG. 4 .
图6是图1的固定模块的正视结构示意图。FIG. 6 is a schematic front view of the structure of the fixing module of FIG. 1 .
图7是本实用新型实施例一的双层止水带施工固定装置的正视结构示意图。7 is a schematic front view of the structure of the double-layer waterstop construction fixing device according to the first embodiment of the present invention.
图8是本实用新型实施例二的固定模块中限位板及支撑机构的位置结构示意图。8 is a schematic diagram of the positional structure of the limiting plate and the supporting mechanism in the fixing module according to the second embodiment of the present invention.
图9是本实用新型实施例三的固定模块安装后的结构侧视示意图。FIG. 9 is a schematic side view of the structure of the fixed module according to the third embodiment of the present invention after installation.
具体实施方式Detailed ways
现在将参照附图来详细描述本实用新型的各种示例性实施例。应注意到:除非另外具体说明,否则在这些实施例中阐述的部件和步骤的相对布置、数字表达式和数值不限制本实用新型的范围。Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the invention unless specifically stated otherwise.
以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本实用新型及其应用或使用的任何限制。The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application or uses in any way.
对于相关领域普通技术人员已知的技术、方法和设备可能不作详细讨论,但在适当情况下,所述技术、方法和设备应当被视为说明书的一部分。Techniques, methods, and apparatus known to those of ordinary skill in the relevant art may not be discussed in detail, but where appropriate, such techniques, methods, and apparatus should be considered part of the specification.
在这里示出和讨论的所有例子中,任何具体值应被解释为仅仅是示例性的,而不是作为限制。因此,示例性实施例的其它例子可以具有不同的值。In all examples shown and discussed herein, any specific values should be construed as illustrative only and not limiting. Accordingly, other instances of the exemplary embodiment may have different values.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步讨论。It should be noted that like numerals and letters refer to like items in the following figures, so once an item is defined in one figure, it does not require further discussion in subsequent figures.
实施例一Example 1
如图1至图7所示,本实施例中的双层止水带施工固定装置,包括若干并排设置的固定模块1000,所述固定模块1000包括固定框架1100、固定夹1200以及支撑机构1300;所述固定框架1100包括背板1110以及垂直固定至所述背板1110上下两端的端板1120;所述支撑机构1300平行于所述端板1120设置于所述背板1110的中间,所述支撑机构1300的长度等于所述端板1120的长度,所述支撑机构1300的远离所述背板1110的一端设置有固定部1310,所述固定部1310的定位端与所述端板1120端部位于同一垂直面上,所述固定部1310用于固定混凝土模板3000,使混凝土模板3000与上下两侧的模板位于同一垂直面上;所述固定夹1200有两个,分别设置于所述支撑机构1300的上下两侧,所述固定夹1200包括限位板1220以及夹紧板1210,所述限位板1220以及所述夹紧板1210均能够相互靠近或远离。As shown in FIGS. 1 to 7 , the double-layer waterstop construction fixing device in this embodiment includes several fixing
通过本实施例该方案,利用两只固定夹1200分别将止水带4000夹紧固定,并将两只止水带4000中间的混凝土模板3000用支撑机构1300固定支撑,该固定例如是螺栓固定或夹紧固定等方式;将本装置紧贴混凝土模板3000固定,实现双层止水带的固定,并且方便了对中间模板的固定。本装置结构合理,安装简单方便,能够重复利用;无需钢筋固定止水带,从而无需对所有的混凝土模板均打孔,保持了部分混凝土模板的完整性,使得混凝土模板能够重复利用,节省了成本;本装置的固定夹1200之间距离能够调节,适用于不同间距的双层止水带的安装。Through the solution of this embodiment, the
在本实施例或其他实施例中,所述夹紧板1210通过第一螺栓1211连接至所述端板1120上,所述第一螺栓1211贯穿所述端板1120并旋转连接至所述端板1120上,所述夹紧板1210上固定有第一螺纹套1212,所述第一螺纹套1212与所述第一螺栓1211螺纹连接。利用第一螺栓1211的旋转调节夹紧板1210上下移动,可靠性高,并且调节精度高。In this embodiment or other embodiments, the
在本实施例或其他实施例中,每块所述夹紧板1210均通过至少两根所述第一螺栓1211连接至所述端板1120上。两根第一螺栓1211同时连接至夹紧板1210上,防止第一螺栓1211转动时夹紧板1210跟转,便于调节。In this embodiment or other embodiments, each of the
在本实施例或其他实施例中,所述限位板1220垂直于所述背板1110并与所述背板1110滑动连接;所述限位板1220与所述支撑机构1300之间设置有顶升机构,所述限位板1220在所述顶升机构的带动下靠近或远离所述夹紧板1210。顶升机构调节限位板1220的位置,从而调节固定夹1200之间的距离,使本装置适用于不同距离的双层止水带的安装。In this embodiment or other embodiments, the limiting
该实施例中的背板1110上垂直开设有长条形状的滑动槽1111,限位板1220的一端垂直于限位板1220设置有卡板1224,两块卡板1224分别设置于滑动槽1111的内外两侧,从而保持限位板1220能够在滑动槽1111中上下滑动,而不会垂直于背板1110运动。In this embodiment, a long sliding
在本实施例或其他实施例中,所述顶升机构包括第一倾斜块1221与第二倾斜块1222,所述第一倾斜块1221的倾斜面与所述第二倾斜块1222的倾斜面滑动连接,所述第一倾斜块1221的水平面固定至所述限位板1220上,所述第二倾斜块1222水平面滑动连接至所述支撑机构1300上;所述第二倾斜1222块通过第二螺栓1223连接至所述背板1110上,所述第二螺栓1223贯穿所述背板1110并与所述背板1110螺纹连接,所述第二倾斜块1222与所述第二螺栓1223旋转连接。旋转第二螺栓1223,使第二螺栓1223相对于背板1110旋出或旋进,从而推拉第二倾斜块1222相对于背板1110运动,由于第一倾斜块1221固定至限位板1220上,而限位板1220不能够垂直于背板1110移动,因此第一倾斜块1221与第二倾斜块1222之间产生相对位移,从而使第一倾斜块1221沿第二倾斜块1222的斜面向上或向下运动,带动限位板1220上移或下移,该设置能够将顶升机构的调整端设置于背板1110外侧,从而便于固定夹1200之间距离的调节,尤其是将固定模块1000固定至混凝土模板3000上后,能够根据现场需要进行调节。In this embodiment or other embodiments, the jacking mechanism includes a first
该实施例中的第一倾斜块1221的底部沿其倾斜面设置有滑槽1221-1,该滑槽1221-1例如是“T”形槽,第二倾斜块1222的倾斜面上设置有与滑槽1221-1相配合的滑块1222-1,该滑块1222-1与“T”形槽相配合为“T”形块,从而实现第一倾斜块1221与第二倾斜块1222的滑动连接,并且不会脱离,防止位于支撑机构1300下方的限位板1220在重力作用下下移,从而造成的固定夹1200位置不准确。In this embodiment, the bottom of the first
在本实施例或其他实施例中,所述端板1120的端部向内弯曲形成稳定板1121,所述稳定板1121与所述固定部1310外端面处于同一垂直面上,所述稳定板1121外端面设置有防滑层(图中未示出),提高本装置与混凝土模板3000之间的稳定性。In this embodiment or other embodiments, the end of the
在本实施例或其他实施例中,所述固定模块1000之间通过母板2000进行连接,所述母板2000固定至所述端板1120上,所述母板2000上开设有供所述第一螺栓1211穿过的通孔(图中未示出);所述母板2000之间通过连接板2100进行连接。利用母板2000将若干个固定模块1000连接至一起,能够提高本固定装置整体的稳定性和位置的精确性,防止固定模块1000之间的位置出现偏差。In this embodiment or other embodiments, the fixing
本实施例中的固定部1310例如是固定块,固定块上设置有螺丝孔,将止水带4000中间的混凝土模板3000利用螺栓固定固定部1310上;然后将本装置整体固定至混凝土模板3000上,旋转第二螺栓1223,调整两块限位板1220之间的距离,使之与双层止水带4000之间的距离一致,旋转第一螺栓1211,使固定夹夹紧止水带4000。The fixing
本实施例的一个有益效果在于,本装置结构简单,不仅能够对双层止水带进行不同位置的固定,还能够便于对止水带之间的模板进行固定,使用方便,能够提高施工效率;本装置直接对止水带及止水带间的模板进行固定,无需钢筋固定止水带,从而避免了对混凝土模板的打孔,使混凝土模板能够重复使用,更加节省施工成本。One beneficial effect of this embodiment is that the device has a simple structure, not only can fix the double-layer waterstops at different positions, but also facilitate the fixing of the formwork between the waterstops, which is convenient to use and can improve construction efficiency; The device directly fixes the waterstop and the formwork between the waterstops, without the need for steel bars to fix the waterstop, thereby avoiding the perforation of the concrete formwork, enabling the concrete formwork to be reused, and saving construction costs.
实施例二Embodiment 2
如图8所示,本实施例中的双层止水带施工固定装置,相较于上述实施例中的技术方案,不同之处在于,支撑机构1300上的所述固定部1310包括板夹,所述板夹用于夹持混凝土模板3000。As shown in FIG. 8 , compared with the technical solutions in the above-mentioned embodiments, the double-layer waterstop construction fixing device in this embodiment is different in that the fixing
通过本实施例该方案,板夹将混凝土模板夹持住,无需穿孔固定至固定部1310上,进一步提高了本装置的实用性,保证了中间模板的完整性,能够重复利用。With the solution of this embodiment, the concrete formwork is clamped by the plate clamp without perforating and fixed to the fixing
在本实施例或其他实施例中,所述支撑机构包括支撑套1301、第三螺杆1302以及扩张块1303;所述支撑套1301一端固定至所述背板1110上,所述支撑套1301的另一端固定有固定板1304,所述板夹包括相互配合的两个夹爪1311,所述夹爪1311均滑动连接至所述固定板1304上;所述第三螺杆1302一端固定有把手1305,另一端依次穿过所述背板1110、所述支撑套1301以及所述固定板1304后与所述扩张块1303旋转连接;所述第三螺杆1302与所述支撑套1301或与所述背板1110螺纹连接;所述扩张块1303为倒置的圆台,所述扩张块1303两侧面沿母线设置有滑槽(图中未示出),所述夹爪1311底部与所述滑槽滑动连接。两个夹爪1311上下放置,便于夹紧混凝土模板;转动把手1305,第三螺杆1302旋转时会相对于支撑套1301移动,从而带动扩张块1303的移动,夹爪1311沿扩张块1303的倾斜母线上下移动,实现夹紧或松开混凝土模板的目的;夹爪1311由于一端垂直滑动连接至固定板1304上,因此其端面始终保持在同一垂直面上。固定部1310的调整机构设置于背板1110上,便于本装置在夹紧止水带后,对板夹进行调整,提高工作效率。In this embodiment or other embodiments, the support mechanism includes a
实施例三Embodiment 3
如图9所示,本实施例中的双层止水带施工固定装置,在上述两个实施例的基础上还设置有挂钩1130,挂钩1130设置于位于上方所述端板1120的顶部。使本装置能够直接挂设至混凝土模板3000上,无需利用撑杆或垫块等设备支撑或固定,使用更加简单方便。As shown in FIG. 9 , the double-layer waterstop construction fixing device in this embodiment is further provided with a
虽然已经通过例子对本实用新型的一些特定实施例进行了详细说明,但是本领域的技术人员应该理解,以上例子仅是为了进行说明,而不是为了限制本实用新型的范围。本领域的技术人员应该理解,可在不脱离本实用新型的范围和精神的情况下,对以上实施例进行修改。本实用新型的范围由所附权利要求来限定。Although some specific embodiments of the present invention have been described in detail by way of examples, those skilled in the art should understand that the above examples are only for illustration and not for limiting the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921535756.0U CN211171834U (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201921535756.0U CN211171834U (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211171834U true CN211171834U (en) | 2020-08-04 |
Family
ID=71825936
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201921535756.0U Expired - Fee Related CN211171834U (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211171834U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110528464A (en) * | 2019-09-16 | 2019-12-03 | 中建筑港集团有限公司 | A kind of fixed device of bilayer sealing belt construction |
-
2019
- 2019-09-16 CN CN201921535756.0U patent/CN211171834U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110528464A (en) * | 2019-09-16 | 2019-12-03 | 中建筑港集团有限公司 | A kind of fixed device of bilayer sealing belt construction |
| CN110528464B (en) * | 2019-09-16 | 2024-07-30 | 中建筑港集团有限公司 | Double-deck waterstop construction fixing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206571159U (en) | A kind of beam forms support unit and support frame | |
| CN209653387U (en) | A construction formwork fastening device | |
| CN211171834U (en) | Double-deck waterstop construction fixing device | |
| CN110528464B (en) | Double-deck waterstop construction fixing device | |
| CN205119537U (en) | Ramp type solar device's installing support | |
| CN116446664A (en) | Temporary supporting device for overhanging floor slab | |
| CN116816089A (en) | Quick and easy closing-up net supporting device of post-pouring belt | |
| CN108086923A (en) | Workover rig and well workover system | |
| CN208117624U (en) | Experimental rig is adjusted in precast stair plate | |
| CN214144707U (en) | A template anchor clamps for pouring column base | |
| CN204826631U (en) | Building templates consolidates instrument | |
| CN108049630A (en) | A kind of civil engineering work formwork connection device | |
| CN209277535U (en) | A kind of building climbing shuttering system device | |
| CN213774549U (en) | Steel bar positioning frame erecting device | |
| CN219471557U (en) | A construction engineering formwork fixing device | |
| CN116254730A (en) | Installation and adjustment device and construction method for track anchor bolts before secondary grouting | |
| CN211286606U (en) | A wall expansion joint shaped steel formwork | |
| CN112227203A (en) | Multidirectional positioning hydraulic device and control method thereof | |
| CN209523473U (en) | A kind of civil engineering building template connection frame | |
| CN217975390U (en) | A external corner reinforcing apparatus for concrete placement in housing construction | |
| CN222643639U (en) | A welding frame for climbing mold processing | |
| CN109339439B (en) | Constructional column formwork construction device and process | |
| CN207772114U (en) | Solid brick cutting equipment capable of controlling cutting angle | |
| CN204370834U (en) | Supporting tool at the bottom of superposed beam beam | |
| CN219887548U (en) | Impervious concrete water stop table template |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200804 |
|