CN110528464A - A kind of fixed device of bilayer sealing belt construction - Google Patents
A kind of fixed device of bilayer sealing belt construction Download PDFInfo
- Publication number
- CN110528464A CN110528464A CN201910869469.1A CN201910869469A CN110528464A CN 110528464 A CN110528464 A CN 110528464A CN 201910869469 A CN201910869469 A CN 201910869469A CN 110528464 A CN110528464 A CN 110528464A
- Authority
- CN
- China
- Prior art keywords
- fixed
- plate
- backboard
- supporting mechanism
- belt construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 238000007789 sealing Methods 0.000 title claims abstract description 25
- 238000009434 installation Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 6
- 239000004927 clay Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000004080 punching Methods 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000033001 locomotion Effects 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02C—SHIP-LIFTING DEVICES OR MECHANISMS
- E02C1/00—Locks or dry-docks; Shaft locks, i.e. locks of which one front side is formed by a solid wall with an opening in the lower part through which the ships pass
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Sewage (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a kind of double-deck fixed devices of sealing belt construction, and including several fixed modules arranged side by side, the fixed module includes fixed frame, fixing clamp and supporting mechanism;The fixed frame includes backboard and is vertically fixed to the end plate of the backboard upper and lower ends;The supporting mechanism is parallel to the centre that the end plate is set to the backboard, and the length of the supporting mechanism is equal to the length of the end plate, and one end far from the backboard of the supporting mechanism is provided with fixed part, and the fixed part is used for fixing concrete template;There are two the fixing clamps, is respectively arranged at the two sides up and down of the supporting mechanism, and the fixing clamp includes limit plate and clamping plate, and the limit plate and the clamping plate can be close to each other or separate.The present apparatus can not only fix the double-deck waterstop of different spacing, and the concrete blinding between waterstop can also be fixed.
Description
Technical field
The present invention relates to the realm of building construction, more particularly, to a kind of double-deck fixed device of sealing belt construction.
Background technique
In hydraulic structure, to prevent infiltration from damaging to works, different structural sections seam director designs has
Between waterstop, such as lock chamber wall segmentation, between lock head or guide wall, between waterway revetment etc..Common sealing has
The number of plies of rubber fastening band or copper sheet waterstop, waterstop determines that some can be set one layer, have according to actual installation environment
A little situations need to be arranged the double-deck waterstop, to guarantee water-stagnating effect.The installation quality of waterstop directly affects water-stagnating effect, to knot
The durability of structure object has larger impact.
When existing bilayer waterstop installation, due to across two-end structure, and pour into structures, it is therefore desirable to coagulation
Clay model plate is split, and in the gap among template after making waterstop protrude into segmentation, and clamps sealing using plank and reinforcing bar
Band is fixed.But when installing for the double-deck waterstop, it often will appear problem below:
1, due to needing for template to be divided into muti-piece, often the concrete blinding between waterstop is not fixed easily, direct shadow
Ring concrete pour and the fixation of waterstop;
2, it needs to punch template using the fixed waterstop of reinforcing bar, destroys the globality of template, make template can not repeatedly
With causing waste of material.
Therefore, it is necessary to a kind of fixed devices of new double-deck waterstop, are able to solve the above problem.
Summary of the invention
It is an object of the present invention to provide a kind of new solutions that the double-deck sealing belt construction is fixed.
According to the first aspect of the invention, a kind of fixed device of the double-deck sealing belt construction is provided, including several is set side by side
The fixed module set, the fixed module include fixed frame, fixing clamp;The fixed frame includes backboard and vertically fixes
Further include supporting mechanism to the end plate of the backboard upper and lower ends, the supporting mechanism be parallel to the end plate be set to it is described
One end far from the backboard of the centre of backboard, the supporting mechanism is provided with fixed part, the positioning end of the fixed part with
The end plate end is located on same vertical plane, and the fixed part is used for fixing concrete template;There are two the fixing clamps, point
Be not set to the two sides up and down of the supporting mechanism, the fixing clamp includes limit plate and clamping plate, the limit plate and
The clamping plate can be adjusted close to each other or separate by bolt.
By this programme, waterstop is fixedly clamped using two fixing clamps, and by the concrete among two waterstops
Template fixes support with supporting mechanism, and present apparatus abutting template is fixed, realizes the fixation of the double-deck waterstop, and facilitates pair
The fixation of intermediate die plate.The present apparatus is structurally reasonable, and installation is simple and convenient, can reuse;Waterstop is fixed without reinforcing bar, from
It is fixed without being punched to all concrete blindings, concrete blinding is reused;The fixing clamp of the present apparatus it
Between distance can adjust, the installation of the double-deck waterstop suitable for different spacing.
Preferably, the clamping plate is bolted on the end plate by first, is held described in first bolt-through
Plate is simultaneously rotatably connected on the end plate, is fixed with the first thread bush on the clamping plate, first thread bush and described the
The connection of one bolt thread.
By this programme, clamping plate is adjusted using the rotation of the first bolt and is moved up and down, high reliablity.
Preferably, every piece of clamping plate passes through at least two described first and is bolted on the end plate.
By this programme, two first bolts are connected on clamping plate simultaneously, when preventing the first bolt from rotating clamping plate with
Turn.
Preferably, the limit plate is slidably connected perpendicular to the backboard and with the backboard;The limit plate with it is described
Lifting body is provided between supporting mechanism, the limit plate is under the drive of the lifting body close to or far from the clamping
Plate.
By this programme, lifting body adjusts the position of limit plate, to adjust the distance between fixing clamp, improves and is applicable in
Range.
Preferably, the lifting body includes the first tilted block and the second tilted block, the inclined surface of first tilted block
It is slidably connected with the inclined surface of second tilted block, the horizontal plane of first tilted block is fixed on the limit plate, institute
The second tilted block horizontal plane is stated to be slidingly attached on the supporting mechanism;Second tilted block is bolted to institute by second
It states on backboard, backboard described in second bolt-through is simultaneously threadedly coupled with the backboard, second tilted block and described the
The rotation connection of two bolts.
By this programme, the adjustment end of lifting body is set on backboard, convenient for the adjusting of lifting body.
Preferably, the fixed part includes plate folder, and the plate folder is for clamping concrete blinding.
By this programme, plate folder clamps concrete blinding, fixes without perforating, further improves the reality of the present apparatus
With property, the integrality of intermediate die plate ensure that, can reuse.
Preferably, the supporting mechanism includes support sleeve, third screw rod and expansion block;Described support sleeve one end is fixed to
On the backboard, the other end of the support sleeve is fixed with fixed plate, and the plate folder includes mutually matched two clamping jaws, described
Clamping jaw is slidingly attached in the fixed plate;Third screw rod one end is fixed with handle, and the other end sequentially passes through the back
It rotates and connects with the expansion block after plate, the support sleeve and the fixed plate;The expansion block is inverted rotary table, described
It expands block two sides and bus is provided with sliding slot, the clamping jaw bottom is slidably connected with the sliding slot.
By this programme, the adjustment mechanism that plate presss from both sides is set on backboard, convenient for the present apparatus after clamping waterstop, to plate
Folder is adjusted, and improves working efficiency.
Preferably, the ends curved inwards of the end plate form steadying plate, the steadying plate and the fixed part outer end face
On same vertical plane, the steadying plate outer end face is provided with anti-slip layer.
By this programme, the stability between the present apparatus and concrete blinding is improved.
Preferably, it is attached between the fixed module by motherboard, the motherboard is fixed on the end plate, described
The through-hole passed through for first bolt is offered on motherboard;It is attached between the motherboard by connecting plate.
By this programme, the stability of this fixation device entirety and the accuracy of position are improved, is prevented between fixed module
Position there is deviation.
It is preferably located at the top of the end plate of top and is provided with several hooks.
By this programme, the present apparatus can directly be hung to concrete blinding, it is easy to use.
According to one embodiment of the disclosure, present apparatus structure is simple, can not only carry out different positions to the double-deck waterstop
The fixation set, additionally it is possible to it is easy to use convenient for the template between waterstop is fixed, it can be improved construction efficiency;This dress
It sets and directly the template of waterstop and sealing interband is fixed, without the fixed waterstop of reinforcing bar, so as to avoid to concrete
The punching of template, enables concrete blinding to reuse, more saving construction cost.
By referring to the drawings to the detailed description of exemplary embodiment of the present invention, other feature of the invention and its
Advantage will become apparent.
Detailed description of the invention
It is combined in the description and the attached drawing for constituting part of specification shows the embodiment of the present invention, and even
With its explanation together principle for explaining the present invention.
Fig. 1 is the side view structure signal of fixed module in the fixed device of the double-deck sealing belt construction of the embodiment of the present invention one
Figure.
Fig. 2 is the structure schematic side view after the fixed module installation of Fig. 1.
Fig. 3 is the mounting structure schematic diagram of clamping plate in the fixed module of Fig. 1.
Fig. 4 is the positional structure schematic diagram of limit plate and supporting mechanism in the fixed module of Fig. 1.
Fig. 5 is the structural schematic diagram of the first tilted block and the second tilted block in the supporting mechanism of Fig. 4.
Fig. 6 is the positive structure diagram of the fixed module of Fig. 1.
Fig. 7 is the positive structure diagram of the fixed device of the double-deck sealing belt construction of the embodiment of the present invention one.
Fig. 8 is the positional structure schematic diagram of limit plate and supporting mechanism in the fixed module of the embodiment of the present invention two.
Fig. 9 is the structure schematic side view after the fixed module installation of the embodiment of the present invention three.
Specific embodiment
Carry out the various exemplary embodiments of detailed description of the present invention now with reference to attached drawing.It should also be noted that unless in addition having
Body explanation, the unlimited system of component and the positioned opposite of step, numerical expression and the numerical value otherwise illustrated in these embodiments is originally
The range of invention.
Be to the description only actually of at least one exemplary embodiment below it is illustrative, never as to the present invention
And its application or any restrictions used.
Technology, method and apparatus known to person of ordinary skill in the relevant may be not discussed in detail, but suitable
In the case of, the technology, method and apparatus should be considered as part of specification.
It is shown here and discuss all examples in, any occurrence should be construed as merely illustratively, without
It is as limitation.Therefore, other examples of exemplary embodiment can have different values.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, then in subsequent attached drawing does not need that it is further discussed.
Embodiment one
As shown in Figures 1 to 7, the fixed device of the double-deck sealing belt construction in the present embodiment, including several arranged side by side
Fixed module 1000, the fixed module 1000 include fixed frame 1100, fixing clamp 1200 and supporting mechanism 1300;It is described
Fixed frame 1100 includes backboard 1110 and the end plate 1120 for being vertically fixed to 1110 upper and lower ends of backboard;The support
Mechanism 1300 is parallel to the centre that the end plate 1120 is set to the backboard 1110, and the length of the supporting mechanism 1300 is equal to
One end far from the backboard 1110 of the length of the end plate 1120, the supporting mechanism 1300 is provided with fixed part 1310,
The positioning end of the fixed part 1310 and 1120 end of end plate are located on same vertical plane, and the fixed part 1310 is for solid
Determine concrete blinding 3000, is located at concrete blinding 3000 and the template of upper and lower two sides on same vertical plane;The fixing clamp
There are two 1200, the two sides up and down of the supporting mechanism 1300 are respectively arranged at, the fixing clamp 1200 includes limit plate 1220
And clamping plate 1210, the limit plate 1220 and the clamping plate 1210 can be close to each other or separate.
Waterstop 4000 is fixedly clamped by the program through this embodiment respectively using two fixing clamps 1200, and by two
The fixed support of supporting mechanism 1300 of concrete blinding 3000 among waterstop 4000, the fixation be, for example, bolt fix or
The modes such as be fixedly clamped;The present apparatus is close to concrete blinding 3000 to fix, realizes the fixation of the double-deck waterstop, and is facilitated
Fixation to intermediate die plate.The present apparatus is structurally reasonable, and installation is simple and convenient, can reuse;Waterstop is fixed without reinforcing bar,
Without punching to all concrete blindings, the integrality of part concrete blinding is maintained, so that concrete blinding
It can reuse, save cost;Distance can be adjusted between the fixing clamp 1200 of the present apparatus, suitable for the double of different spacing
The installation of layer waterstop.
In the present embodiment or other embodiments, the clamping plate 1210 is connected to the end plate by the first bolt 1211
On 1120, first bolt 1211 is through the end plate 1120 and is rotatably connected on the end plate 1120, the clamping plate
The first thread bush 1212 is fixed on 1210, first thread bush 1212 is threadedly coupled with first bolt 1211.It utilizes
The rotation of first bolt 1211 adjusts clamping plate 1210 and moves up and down, high reliablity, and degree of regulation is high.
In the present embodiment or other embodiments, every piece of clamping plate 1210 passes through at least two first bolts
1211 are connected on the end plate 1120.Two first bolts 1211 are connected on clamping plate 1210 simultaneously, prevent the first bolt
1210 transfer of clamping plate when 1211 rotation, convenient for adjusting.
In the present embodiment or other embodiments, the limit plate 1220 perpendicular to the backboard 1110 and with the backboard
1110 are slidably connected;Lifting body, the limit plate are provided between the limit plate 1220 and the supporting mechanism 1300
1220 under the drive of the lifting body close to or far from the clamping plate 1210.The position of lifting body adjusting limit plate 1220
It sets, to adjust the distance between fixing clamp 1200, the present apparatus is made to be suitable for the installation of the double-deck waterstop of different distance.
The sliding groove 1111 of elongate in shape, one end of limit plate 1220 are vertically offered on backboard 1110 in the embodiment
Limit plate 1220 is provided with snap-gauge 1224, two pieces of snap-gauges 1224 are respectively arranged inside and outside sliding groove 1111, from
And keep limit plate 1220 that can slide up and down in sliding groove 1111, without being moved perpendicular to backboard 1110.
In the present embodiment or other embodiments, the lifting body includes the first tilted block 1221 and the second tilted block
1222, the inclined surface of first tilted block 1221 and the inclined surface of second tilted block 1222 are slidably connected, and described first
The horizontal plane of tilted block 1221 is fixed on the limit plate 1220, and 1222 horizontal plane of the second tilted block is slidingly attached to institute
It states on supporting mechanism 1300;Described 1222 pieces of second inclination are connected on the backboard 1110 by the second bolt 1223, described
Second bolt 1223 through the backboard 1110 and being threadedly coupled with the backboard 1110, second tilted block 1222 with it is described
The rotation connection of second bolt 1223.Rotate the second bolt 1223, make the second bolt 1223 relative to backboard 1110 screw out or precession,
To which the second tilted block 1222 of push-and-pull is moved relative to backboard 1110, since the first tilted block 1221 is fixed to limit plate 1220
On, and limit plate 1220 can not be mobile perpendicular to backboard 1110, therefore the first tilted block 1221 and the second tilted block 1222 it
Between generate relative displacement, so that the first tilted block 1221 be made to be moved upwardly or downwardly along the inclined-plane of the second tilted block 1222, drive
Limit plate 1220 is moved up or is moved down, which can be set to the adjustment end of lifting body in 1110 outside of backboard, consequently facilitating
The adjusting of distance between fixing clamp 1200, after especially fixed module 1000 is fixed on concrete blinding 3000, Neng Gougen
It is adjusted according to scene needs.
The bottom of the first tilted block 1221 in the embodiment is provided with sliding slot 1221-1 along its inclined surface, the sliding slot
1221-1 is, for example, "T"-shaped slot, is provided with the sliding block matched with sliding slot 1221-1 on the inclined surface of the second tilted block 1222
1222-1, sliding block 1222-1 and the matching of "T"-shaped slot are combined into "T"-shaped piece, to realize the first tilted block 1221 and the second inclination
Block 1222 is slidably connected, and without departing from preventing the limit plate 1220 for being located at the lower section of supporting mechanism 1300 in gravity
Under move down, thus caused by 1200 position of fixing clamp inaccuracy.
In the present embodiment or other embodiments, the ends curved inwards of the end plate 1120 form steadying plate 1121, institute
It states steadying plate 1121 and 1310 outer end face of fixed part is on same vertical plane, 1121 outer end face of steadying plate is provided with
Anti-slip layer (not shown) improves the stability between the present apparatus and concrete blinding 3000.
In the present embodiment or other embodiments, it is attached between the fixed module 1000 by motherboard 2000, institute
It states motherboard 2000 to be fixed on the end plate 1120, offers on the motherboard 2000 and lead to for what first bolt 1211 passed through
Hole (not shown);It is attached between the motherboard 2000 by connecting plate 2100.Several are consolidated using motherboard 2000
Cover half block 1000 is connected to the accuracy of the stability and position that can be improved this fixation device entirety together, prevents stent
There is deviation in position between block 1000.
Fixed part 1310 in the present embodiment is, for example, fixed block, screw hole is provided on fixed block, by waterstop 4000
Intermediate concrete blinding 3000 is using on the fixed fixed part 1310 of bolt;Then the present apparatus is integrally fixed to concrete blinding
On 3000, the second bolt 1223 is rotated, the distance between two pieces of limit plates 1220 are adjusted, is allowed between the double-deck waterstop 4000
Distance it is consistent, rotate the first bolt 1211, make fixing clamp clamp waterstop 4000.
One beneficial effect of the present embodiment is that present apparatus structure is simple, can not only carry out not to the double-deck waterstop
With the fixation of position, additionally it is possible to it is easy to use convenient for the template between waterstop is fixed, it can be improved construction efficiency;
The present apparatus is directly fixed the template of waterstop and sealing interband, without the fixed waterstop of reinforcing bar, so as to avoid to mixed
The punching of solidifying clay model plate, enables concrete blinding to reuse, more saving construction cost.
Embodiment two
As shown in figure 8, the fixed device of the double-deck sealing belt construction in the present embodiment, compared to the technology in above-described embodiment
Scheme, the difference is that, the fixed part 1310 on supporting mechanism 1300 is pressed from both sides including plate, and the plate folder is for clamping coagulation
Clay model plate 3000.
Concrete blinding is clamped, is fixed on fixed part 1310 without perforation by the program through this embodiment, plate folder,
The practicability of the present apparatus is further improved, ensure that the integrality of intermediate die plate, can be reused.
In the present embodiment or other embodiments, the supporting mechanism include support sleeve 1301, third screw rod 1302 and
Expand block 1303;Described 1301 one end of support sleeve is fixed on the backboard 1110, and the other end of the support sleeve 1301 is fixed
There is fixed plate 1304, the plate folder includes mutually matched two clamping jaws 1311, and the clamping jaw 1311 is slidingly attached to described
In fixed plate 1304;Described 1302 one end of third screw rod is fixed with handle 1305, and the other end sequentially passes through the backboard 1110, institute
It is connected after stating support sleeve 1301 and the fixed plate 1304 with the expansion block 1303 rotation;The third screw rod 1302 and institute
It states support sleeve 1301 or is threadedly coupled with the backboard 1110;The expansion block 1303 is inverted rotary table, the expansion block
1303 two sides are provided with sliding slot (not shown) along bus, and 1311 bottom of clamping jaw is slidably connected with the sliding slot.Two
A about 1311 clamping jaw is placed, convenient for clamping concrete blinding;Swing handle 1305, third screw rod 1302 can be relative to when rotating
Support sleeve 1301 is mobile, to drive the movement of expansion block 1303, clamping jaw 1311 moves down along the inclination bus of expansion block 1303
It is dynamic, realize the purpose of clamp or release concrete blinding;Clamping jaw 1311 since one end vertical sliding motion is connected in fixed plate 1304,
Therefore its end face remains in the same vertical plane.The adjustment mechanism of fixed part 1310 is set on backboard 1110, convenient for this
Device is adjusted plate folder, improves working efficiency after clamping waterstop.
Embodiment three
As shown in figure 9, the fixed device of the double-deck sealing belt construction in the present embodiment, on the basis of above-mentioned two embodiment
It is additionally provided with hook 1130, hook 1130 is set to the top for being located above the end plate 1120.The present apparatus is set directly to hang
If being supported without using equipment such as strut or cushion blocks or fixed to concrete blinding 3000, using simpler convenience.
Although some specific embodiments of the invention are described in detail by example, the skill of this field
Art personnel it should be understood that example above merely to being illustrated, the range being not intended to be limiting of the invention.The skill of this field
Art personnel are it should be understood that can without departing from the scope and spirit of the present invention modify to above embodiments.This hair
Bright range is defined by the following claims.
Claims (10)
1. a kind of fixed device of bilayer sealing belt construction, including several fixed modules (1000) arranged side by side, the stent
Block (1000) includes fixed frame (1100), fixing clamp (1200);The fixed frame (1100) include backboard (1110) and
Vertically it is fixed to the end plate (1120) of the backboard (1110) upper and lower ends, which is characterized in that it further include supporting mechanism (1300),
The supporting mechanism (1300) is parallel to the centre that the end plate (1120) is set to the backboard (1110), the supporting mechanism
(1300) be provided with fixed part (1310) far from the one end of the backboard (1110), the positioning end of the fixed part (1310) with
End plate (1120) end is located on same vertical plane, and the fixed part (1310) is used for fixing concrete template (3000);
There are two the fixing clamps (1200), is respectively arranged at the two sides up and down of the supporting mechanism (1300), the fixing clamp
It (1200) include limit plate (1220) and clamping plate (1210), the limit plate (1220) and the clamping plate (1210) are equal
It can be adjusted by bolt close to each other or separate.
2. the fixed device of bilayer sealing belt construction according to claim 1, which is characterized in that the clamping plate (1210) is logical
It crosses the first bolt (1211) to be connected on the end plate (1120), first bolt (1211) runs through the end plate (1120) simultaneously
It is rotatably connected on the end plate (1120), is fixed with the first thread bush (1212) on the clamping plate (1210), described first
Thread bush (1212) is threadedly coupled with first bolt (1211).
3. the fixed device of bilayer sealing belt construction according to claim 2, which is characterized in that every piece of clamping plate
(1210) it is connected on the end plate (1120) by least two first bolts (1211).
4. the fixed device of bilayer sealing belt construction according to claim 1, which is characterized in that the limit plate (1220) is hung down
Directly it is slidably connected in the backboard (1110) and with the backboard (1110);The limit plate (1220) and the supporting mechanism
(1300) lifting body is provided between, the limit plate (1220) is under the drive of the lifting body close to or far from described
Clamping plate (1210).
5. the fixed device of bilayer sealing belt construction according to claim 4, which is characterized in that the lifting body includes the
One tilted block (1221) and the second tilted block (1222), the inclined surface of first tilted block (1221) and second tilted block
(1222) inclined surface is slidably connected, and the horizontal plane of first tilted block (1221) is fixed on the limit plate (1220),
Second tilted block (1222) horizontal plane is slidingly attached on the supporting mechanism (1300);Second tilted block (1222)
It is connected on the backboard (1110) by the second bolt (1223), second bolt (1223) runs through the backboard (1110)
And be threadedly coupled with the backboard (1110), second tilted block (1222) and second bolt (1223) rotation connect.
6. the fixed device of bilayer sealing belt construction according to claim 1, which is characterized in that fixed part (1310) packet
Rubbing board folder, the plate folder is for clamping concrete blinding (3000).
7. the fixed device of bilayer sealing belt construction according to claim 6, which is characterized in that the supporting mechanism includes branch
Support set (1301), third screw rod (1302) and expansion block (1303);Described support sleeve (1301) one end is fixed to the backboard
(1110) on, the other end of the support sleeve (1301) is fixed with fixed plate (1304), and the plate folder includes mutually matched two
A clamping jaw (1311), the clamping jaw (1311) are slidingly attached on the fixed plate (1304);The third screw rod (1302)
One end is fixed with handle (1305), and third screw rod (1302) other end sequentially passes through the backboard (1110), the support
It covers (1301) and the fixed plate (1304) and rotates connection with the expansion block (1303) afterwards;The third screw rod (1302) with
The support sleeve (1301) or the backboard (1110) are threadedly coupled;The expansion block (1303) is inverted rotary table, the expansion
It opens block (1303) two sides and bus is provided with sliding slot, clamping jaw (1311) bottom is slidably connected with the sliding slot.
8. the fixed device of bilayer sealing belt construction according to claim 1, which is characterized in that the end of the end plate (1120)
Portion curves inwardly to be formed steadying plate (1121), and the steadying plate (1121) and the fixed part (1310) outer end face are in same and hang down
It faces directly.
9. the fixed device of bilayer sealing belt construction according to claim 8, which is characterized in that the fixed module 1000 it
Between be attached by motherboard (2000), the motherboard (2000) is fixed on the end plate (1120), the motherboard (2000)
On offer the through-hole passed through for first bolt (1211);It is carried out between the motherboard (2000) by connecting plate (2100)
Connection.
10. the fixed device of bilayer sealing belt construction according to claim 9, which is characterized in that the end being located above
Several hooks (1130) are provided at the top of plate (1120).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910869469.1A CN110528464B (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910869469.1A CN110528464B (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110528464A true CN110528464A (en) | 2019-12-03 |
CN110528464B CN110528464B (en) | 2024-07-30 |
Family
ID=68668699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910869469.1A Active CN110528464B (en) | 2019-09-16 | 2019-09-16 | Double-deck waterstop construction fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110528464B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113605311A (en) * | 2021-08-21 | 2021-11-05 | 杭州萧山水利建筑工程有限公司 | A template for dyke bank protection waterstop |
CN113863685A (en) * | 2021-09-23 | 2021-12-31 | 山西大学 | Building waterstop fixing device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452143A (en) * | 2013-08-20 | 2013-12-18 | 广西建工集团第三建筑工程有限责任公司 | Post-cast strip tool type template convenient to assemble and disassemble |
CN106869183A (en) * | 2017-03-09 | 2017-06-20 | 中冶建工集团有限公司 | A kind of construction method of underground pipe gallery waterstop |
CN107503382A (en) * | 2017-09-04 | 2017-12-22 | 北京住总集团有限责任公司 | End head formwork fixes rubber water-proof band structure and its construction method |
CN206916774U (en) * | 2017-03-13 | 2018-01-23 | 中国建筑第二工程局有限公司 | Tool type supporting system of deformation joint template of socket joint type pipe gallery and bellmouth |
CN207538233U (en) * | 2017-12-06 | 2018-06-26 | 中建五局华东建设有限公司 | The construction tool of wall containing waterstop |
CN109594662A (en) * | 2019-01-16 | 2019-04-09 | 中建八局第建设有限公司 | A kind of middle buried water stop fixing means and its grip device |
CN209353709U (en) * | 2018-11-14 | 2019-09-06 | 天津中海水利水电工程有限公司 | The waterstop ruggedized construction of template in concreting |
CN211171834U (en) * | 2019-09-16 | 2020-08-04 | 中建筑港集团有限公司 | Double-deck waterstop construction fixing device |
-
2019
- 2019-09-16 CN CN201910869469.1A patent/CN110528464B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452143A (en) * | 2013-08-20 | 2013-12-18 | 广西建工集团第三建筑工程有限责任公司 | Post-cast strip tool type template convenient to assemble and disassemble |
CN106869183A (en) * | 2017-03-09 | 2017-06-20 | 中冶建工集团有限公司 | A kind of construction method of underground pipe gallery waterstop |
CN206916774U (en) * | 2017-03-13 | 2018-01-23 | 中国建筑第二工程局有限公司 | Tool type supporting system of deformation joint template of socket joint type pipe gallery and bellmouth |
CN107503382A (en) * | 2017-09-04 | 2017-12-22 | 北京住总集团有限责任公司 | End head formwork fixes rubber water-proof band structure and its construction method |
CN207538233U (en) * | 2017-12-06 | 2018-06-26 | 中建五局华东建设有限公司 | The construction tool of wall containing waterstop |
CN209353709U (en) * | 2018-11-14 | 2019-09-06 | 天津中海水利水电工程有限公司 | The waterstop ruggedized construction of template in concreting |
CN109594662A (en) * | 2019-01-16 | 2019-04-09 | 中建八局第建设有限公司 | A kind of middle buried water stop fixing means and its grip device |
CN211171834U (en) * | 2019-09-16 | 2020-08-04 | 中建筑港集团有限公司 | Double-deck waterstop construction fixing device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113605311A (en) * | 2021-08-21 | 2021-11-05 | 杭州萧山水利建筑工程有限公司 | A template for dyke bank protection waterstop |
CN113863685A (en) * | 2021-09-23 | 2021-12-31 | 山西大学 | Building waterstop fixing device |
CN113863685B (en) * | 2021-09-23 | 2022-05-31 | 山西大学 | Building waterstop fixing device |
Also Published As
Publication number | Publication date |
---|---|
CN110528464B (en) | 2024-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110528464A (en) | A kind of fixed device of bilayer sealing belt construction | |
CN204565525U (en) | Toilet waste collector suspention hook assembly welding frock | |
CN107160211A (en) | Adjustable-angle inclined-hole part processing tool | |
CN206066255U (en) | A kind of pneumatic self-centering vice | |
CN205927572U (en) | On --spot assembly welding equipment is restrainted to chapped pipe | |
CN211516544U (en) | Clamp for radiator | |
CN108049630A (en) | A kind of civil engineering work formwork connection device | |
CN105369782B (en) | Auxiliary installation device and installation method for radial gate trunnions | |
JP2007009474A (en) | Heavy-load mounting equipment | |
CN215290240U (en) | Pile foundation embedded bolt positioning device | |
CN211171834U (en) | Double-deck waterstop construction fixing device | |
CN206746884U (en) | It is a kind of can spary side clamping device | |
CN210508408U (en) | Concrete pouring workbench for house construction | |
CN210659267U (en) | Connecting and locking device for building template | |
CN215969207U (en) | Drilling positioner for civil engineering | |
CN215889352U (en) | Reinforcing device for bracket template of Chinese-generation antique building | |
CN207127441U (en) | A kind of aluminum alloy pattern plate welding tooling for building | |
CN210614803U (en) | High-efficient perforating device of aluminum alloy ex-trusions | |
CN212201361U (en) | Auxiliary tool for steel structure installation | |
CN207026249U (en) | Rush elongated hole die craft equipment on special-shaped angle steel | |
CN208039251U (en) | Small-sized ecoscape stake pile-sinking machine | |
CN113619451B (en) | High-speed railway contact net double-spliced H-shaped steel column convenient to install | |
CN107598801A (en) | A kind of industrial 3D emulation machine tool structure for being easy to fix workpiece | |
CN213356685U (en) | Clamp for hoisting steel beam | |
CN209647963U (en) | A kind of high-efficient aluminium alloy template welding fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |