CN113863685B - Building waterstop fixing device - Google Patents

Building waterstop fixing device Download PDF

Info

Publication number
CN113863685B
CN113863685B CN202111112189.XA CN202111112189A CN113863685B CN 113863685 B CN113863685 B CN 113863685B CN 202111112189 A CN202111112189 A CN 202111112189A CN 113863685 B CN113863685 B CN 113863685B
Authority
CN
China
Prior art keywords
flexible clamping
sets
waterstop
support
strut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111112189.XA
Other languages
Chinese (zh)
Other versions
CN113863685A (en
Inventor
张海霞
李海华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi University
Original Assignee
Shanxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi University filed Critical Shanxi University
Priority to CN202111112189.XA priority Critical patent/CN113863685B/en
Publication of CN113863685A publication Critical patent/CN113863685A/en
Application granted granted Critical
Publication of CN113863685B publication Critical patent/CN113863685B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention provides a building waterstop fixing device, which belongs to the technical field of building construction and comprises a support piece, an adjusting part, a top supporting part, a flexible clamping part and an extruding part, wherein the flexible clamping part is arranged on one side of the support piece and used for clamping the end part of a waterstop, the top supporting part and the extruding part are both slidably arranged on one side of the support piece, the top supporting part and the extruding part are distributed oppositely, the adjusting part is used for driving the top supporting part and the extruding part to move oppositely, and the extruding part can act on the flexible clamping part when moving so as to drive the flexible clamping part to deform and tighten the waterstop. Compared with the prior art, the water stop strip fixing device has the advantages that the water stop strip can be effectively fixed in the building expansion joint, the water stop strip tearing displacement phenomenon caused by subsequent concrete pouring can be greatly eliminated, and the structure is simple and the construction is convenient.

Description

一种建筑止水带固定装置A construction waterstop fixing device

技术领域technical field

本发明属于建筑施工技术领域,具体是一种建筑止水带固定装置。The invention belongs to the technical field of building construction, in particular to a fixing device for a building water stop.

背景技术Background technique

橡胶止水带或塑料止水带普遍用于超长地下结构伸缩缝,处理伸缩缝部位有防水要求的渗漏问题。Rubber waterstops or plastic waterstops are commonly used in ultra-long underground structure expansion joints to deal with leakage problems that require waterproofing at the expansion joints.

现有技术中,止水带的安装大多是通过销钉穿插止水带边缘位置,然后将销钉与剪力墙的钢筋结构通过扎丝绑定或直接焊接,以便于销钉对止水带的边缘形成牵拉,这种方式会对止水带造成损伤,后续混泥土浇筑凝结过程中,止水带受到混凝土的拉应力影响,止水带被销钉贯穿部位容易撕裂,使得止水带容易发生位移,进而影响止水带使用效果。In the prior art, most of the waterstops are installed by inserting pins into the edge of the waterstop, and then the dowels are bound to the reinforcement structure of the shear wall by wire binding or directly welded, so that the pins can be formed on the edge of the waterstop. Pulling, this method will cause damage to the waterstop. During the subsequent concrete pouring and setting process, the waterstop is affected by the tensile stress of the concrete, and the waterstop is easily torn by the pin penetration, which makes the waterstop prone to displacement. , which in turn affects the use of the waterstop.

发明内容SUMMARY OF THE INVENTION

针对上述现有技术的不足,本发明实施例要解决的技术问题是提供一种建筑止水带固定装置。In view of the above-mentioned deficiencies of the prior art, the technical problem to be solved by the embodiments of the present invention is to provide a fixing device for a building water stop.

为解决上述技术问题,本发明提供了如下技术方案:In order to solve the above-mentioned technical problems, the present invention provides the following technical solutions:

一种建筑止水带固定装置,包括支撑件、调节部、顶撑部、柔性夹持部以及挤压部,A building waterstop fixing device, comprising a support, an adjustment part, a top support, a flexible clamping part and an extrusion part,

所述柔性夹持部设置在所述支撑件一侧,用于对止水带端部进行夹持,The flexible clamping part is arranged on one side of the support and is used for clamping the end of the waterstop,

所述顶撑部与所述挤压部均滑动安装在所述支撑件一侧,且所述顶撑部与所述挤压部相对分布,The top support portion and the pressing portion are both slidably installed on one side of the support member, and the top support portion and the pressing portion are distributed relative to each other,

所述调节部用于带动所述顶撑部与所述挤压部相向移动,所述挤压部移动时可作用于所述柔性夹持部,以驱使所述柔性夹持部变形,以对所述止水带涨紧,The adjusting part is used to drive the top support part and the pressing part to move toward each other, and the pressing part can act on the flexible clamping part when moving, so as to drive the flexible clamping part to deform, so as to adjust the pressure of the flexible clamping part. The waterstop is tightened,

所述顶撑部移动时可作用于所述止水带端部,驱使所述止水带位于所述柔性夹持部内部的部分弯曲折叠。When the top support part moves, it can act on the end of the water-stop belt to drive the part of the water-stop belt inside the flexible clamping part to bend and fold.

作为本发明进一步的改进方案:所述挤压部包括两组相对分布的第二撑杆以及转动设置在两组所述第二撑杆相对一端的滚轮,As a further improvement scheme of the present invention: the extrusion part includes two sets of oppositely distributed second struts and rollers rotatably arranged at opposite ends of the two sets of second struts,

两组所述第二撑杆相互远离的一端分别与所述支撑件滑动配合,The ends of the two sets of second struts that are far away from each other are respectively slidingly matched with the support members,

所述调节部包括两组调节杆,两组所述调节杆上均设有第一螺纹段,两组所述调节杆分别贯穿两组所述第二撑杆,且两组所述第一螺纹段分别与两组所述第二撑杆螺纹配合。The adjusting part includes two sets of adjusting rods, the two sets of adjusting rods are both provided with first thread segments, the two sets of adjusting rods respectively pass through the two sets of the second strut rods, and the two sets of the first threads The segments are respectively threaded with the two sets of the second struts.

作为本发明进一步的改进方案:所述顶撑部包括第一撑杆、顶撑杆以及顶撑块,As a further improvement scheme of the present invention: the top support portion includes a first support rod, a top support rod and a top support block,

所述第一撑杆端部与所述支撑件滑动配合,所述顶撑杆固定设置在所述第一撑杆一侧,所述顶撑杆远离所述第一撑杆的一端延伸至所述柔性夹持部内部并与所述顶撑块固定连接,The end of the first strut is slidably matched with the support member, the top strut is fixedly arranged on one side of the first strut, and the end of the top strut away from the first strut extends to the inside the flexible clamping part and fixedly connected with the top support block,

两组所述调节杆贯穿所述第一撑杆,两组所述调节杆上还设置有第二螺纹段,所述第二螺纹段与第一螺纹段旋向相反,两组第二螺纹段与第一撑杆螺纹配合。The two sets of adjusting rods pass through the first struts, and the two sets of adjusting rods are also provided with second threaded sections, the second threaded sections are opposite to the first threaded sections, and the two sets of second threaded sections It is threaded with the first strut.

作为本发明进一步的改进方案:所述支撑件侧壁固定设置有支架,所述调节杆贯穿所述支架并与所述支架转动配合,所述调节杆上固定设置有调节块,所述调节块呈六角形结构。As a further improvement of the present invention, a bracket is fixedly arranged on the side wall of the support member, the adjustment rod penetrates through the bracket and rotates with the bracket, and an adjustment block is fixed on the adjustment rod, and the adjustment block Hexagonal structure.

作为本发明再进一步的改进方案:所述支撑件侧壁固定安装有导轨,所述第一撑杆以及第二撑杆端部均安装有滑块,所述滑块与所述导轨滑动配合。As a further improvement scheme of the present invention, a guide rail is fixedly installed on the side wall of the support member, and sliding blocks are installed on the ends of the first support rod and the second support rod, and the sliding blocks are slidably matched with the guide rails.

作为本发明再进一步的改进方案:所述顶撑杆上设置有第一挡块与第二挡块,所述第一挡块与所述顶撑杆固定连接,且第一挡块设置在所述柔性夹持部外侧,所述第二挡块螺纹套设于所述顶撑杆上,且第二挡块设置在所述柔性夹持部内侧。As a further improvement scheme of the present invention, a first stopper and a second stopper are arranged on the top support rod, the first stopper is fixedly connected with the top support rod, and the first stopper is arranged at the On the outer side of the flexible clamping portion, the second stopper is threadedly sleeved on the top strut, and the second stopper is arranged at the inner side of the flexible clamping portion.

作为本发明再进一步的改进方案:所述柔性夹持部呈C型结构或U型结构,所述柔性夹持部采用橡胶或塑料制成。As a further improvement scheme of the present invention, the flexible clamping portion is in a C-shaped structure or a U-shaped structure, and the flexible clamping portion is made of rubber or plastic.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

本发明实施例中,安装止水带时,将止水带置于支撑件一侧,使得止水带端部嵌入至柔性夹持部内部,通过调节部带动顶撑部以及挤压部相向移动,在挤压部移动时,可作用于柔性夹持部变形,从而对止水带进行涨紧处理,在顶撑部移动时,可作用于止水带端部,进而驱使止水带位于柔性夹持部内部的部分进行弯曲折叠,以增大止水带在柔性夹持部内部的体积,配合挤压部对于柔性夹持部的挤压效果,从而实现止水带的固定,相较于现有技术,能够实现止水带在建筑伸缩缝内的有效固定,可极大程度的消除因后续浇筑混凝土而导致的止水带撕裂位移现象,具有结构简单以及施工便利的优点。In the embodiment of the present invention, when installing the waterstop, place the waterstop on one side of the support, so that the end of the waterstop is embedded in the flexible clamping portion, and the top support portion and the extrusion portion are driven to move toward each other by the adjusting portion. , when the extrusion part moves, it can act on the deformation of the flexible clamping part, so as to tighten the waterstop; when the top support part moves, it can act on the end of the waterstop, thereby driving the waterstop to the flexible The inner part of the clamping part is bent and folded to increase the volume of the water stop belt inside the flexible clamping part, and the extrusion effect of the extrusion part on the flexible clamping part is matched to realize the fixing of the water stop belt. The prior art can realize the effective fixation of the waterstop in the expansion joint of the building, can greatly eliminate the tearing and displacement phenomenon of the waterstop caused by the subsequent pouring of concrete, and has the advantages of simple structure and convenient construction.

附图说明Description of drawings

图1为一种建筑止水带固定装置的结构示意图;Fig. 1 is the structural representation of a kind of building waterstop fixing device;

图2为一种建筑止水带固定装置中顶撑部的结构示意图;Fig. 2 is a kind of structural schematic diagram of the top support part in the fixing device of the building water stop;

图3为图1中A区域放大示意图;Fig. 3 is the enlarged schematic diagram of A region in Fig. 1;

图中:1-支撑件、11-导轨、12-支架、2-调节部、21-调节杆、22-调节块、23-第一螺纹段、24-第二螺纹段、3-顶撑部、31-第一撑杆、32-滑块、33-顶撑杆、34-顶撑块、35-第一挡块、36-第二挡块、4-柔性夹持部、5-挤压部、51-第二撑杆、52-滚轮、6-止水带。In the figure: 1-support, 11-rail, 12-support, 2-adjustment, 21-adjustment rod, 22-adjustment block, 23-first thread segment, 24-second thread segment, 3-top support , 31-first strut, 32-slider, 33-top strut, 34-top strut, 35-first stop, 36-second stop, 4-flexible clamping part, 5-extrusion part, 51-second strut, 52-roller, 6-waterstop.

具体实施方式Detailed ways

下面结合具体实施方式对本专利的技术方案作进一步详细地说明。The technical solution of the present patent will be described in further detail below in conjunction with specific embodiments.

下面详细描述本专利的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本专利,而不能理解为对本专利的限制。Embodiments of the present patent are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present patent, but should not be construed as a limitation on the present patent.

请参阅图1,本实施例提供了一种建筑止水带固定装置,包括支撑件1、调节部2、顶撑部3、柔性夹持部4以及挤压部5,所述柔性夹持部4设置在所述支撑件1一侧,用于对止水带6端部进行夹持,所述顶撑部3与所述挤压部5均滑动安装在所述支撑件1一侧,且所述顶撑部3与所述挤压部5相对分布,所述调节部2用于带动所述顶撑部3与所述挤压部5相向移动,所述挤压部5移动时可作用于所述柔性夹持部4,以驱使所述柔性夹持部4变形,以对所述止水带6涨紧,所述顶撑部3移动时可作用于所述止水带6端部,驱使所述止水带6位于所述柔性夹持部4内部的部分弯曲折叠。Referring to FIG. 1 , this embodiment provides a fixing device for a building water stop, including a support 1 , an adjustment part 2 , a top support 3 , a flexible clamping part 4 and a pressing part 5 . The flexible clamping part 4 is arranged on one side of the support member 1 for clamping the end of the water stop 6, the top support portion 3 and the pressing portion 5 are both slidably installed on one side of the support member 1, and The top support portion 3 and the pressing portion 5 are distributed relative to each other, and the adjusting portion 2 is used to drive the top support portion 3 and the pressing portion 5 to move toward each other, and the pressing portion 5 can act when moving. At the flexible clamping portion 4, to drive the flexible clamping portion 4 to deform, so as to tighten the water stop belt 6, and the top support portion 3 can act on the end of the water stop belt 6 when moving. , to drive the part of the waterstop 6 inside the flexible clamping portion 4 to bend and fold.

安装止水带6时,将止水带6置于支撑件1一侧,使得止水带6端部嵌入至柔性夹持部4内部,通过调节部2带动顶撑部3以及挤压部5相向移动,在挤压部5移动时,可作用于柔性夹持部4变形,从而对止水带6进行涨紧处理,在顶撑部3移动时,可作用于止水带6端部,进而驱使止水带6位于柔性夹持部4内部的部分进行弯曲折叠,以增大止水带6在柔性夹持部4内部的体积,配合挤压部5对于柔性夹持部4的挤压效果,从而实现止水带6的固定。When installing the water stop 6, place the water stop 6 on the side of the support 1, so that the end of the water stop 6 is embedded in the flexible clamping part 4, and the top support part 3 and the extrusion part 5 are driven by the adjustment part 2 Move toward each other, when the pressing part 5 moves, it can act on the deformation of the flexible clamping part 4, so that the water stop belt 6 is tightened, and when the top support part 3 moves, it can act on the end of the water stop belt 6, Then, the part of the waterstop 6 located inside the flexible clamping part 4 is driven to bend and fold, so as to increase the volume of the waterstop 6 inside the flexible clamping part 4, and cooperate with the extrusion part 5 to squeeze the flexible clamping part 4. Therefore, the fixing of the water stop belt 6 is realized.

请参阅图1,在一个实施例中,所述挤压部5包括两组相对分布的第二撑杆51以及转动设置在两组所述第二撑杆51相对一端的滚轮52,两组所述第二撑杆51相互远离的一端分别与所述支撑件1滑动配合,所述调节部2包括两组调节杆21,两组所述调节杆21上均设有第一螺纹段23,两组所述调节杆21分别贯穿两组所述第二撑杆51,且两组所述第一螺纹段23分别与两组所述第二撑杆51螺纹配合。Referring to FIG. 1 , in one embodiment, the pressing portion 5 includes two sets of oppositely distributed second struts 51 and rollers 52 rotatably disposed at opposite ends of the two sets of second struts 51 . The ends of the second struts 51 that are far away from each other are in sliding fit with the support member 1, respectively. The adjusting portion 2 includes two sets of adjusting rods 21. The two sets of adjusting rods 21 are provided with first threaded sections 23. The two sets of the adjusting rods 21 penetrate through the two sets of the second support rods 51 respectively, and the two sets of the first threaded segments 23 are threadedly engaged with the two sets of the second support rods 51 respectively.

通过转动两组调节杆21,通过第一螺纹段23与第二撑杆51的螺纹配合,进而带动第二撑杆51移动,以带动滚轮52移动,利用滚轮52作用于柔性夹持部4外壁,进而驱使柔性夹持部4向止水带6方向形变,利用滚轮52的支撑作用,从而实现止水带6的夹持。By rotating the two sets of adjusting rods 21 , the first threaded section 23 cooperates with the threads of the second strut 51 , thereby driving the second strut 51 to move, so as to drive the roller 52 to move, and the roller 52 acts on the outer wall of the flexible clamping portion 4 Then, the flexible clamping portion 4 is driven to deform in the direction of the water-stop belt 6 , and the support function of the roller 52 is used to realize the clamping of the water-stop belt 6 .

请参阅图1、图2和图3,在一个实施例中,所述顶撑部3包括第一撑杆31、顶撑杆32以及顶撑块34,所述第一撑杆31端部与所述支撑件1滑动配合,所述顶撑杆32固定设置在所述第一撑杆31一侧,所述顶撑杆32远离所述第一撑杆31的一端延伸至所述柔性夹持部4内部并与所述顶撑块34固定连接,两组所述调节杆21贯穿所述第一撑杆31,两组所述调节杆21上还设置有第二螺纹段24,所述第二螺纹段24与第一螺纹段23旋向相反,两组第二螺纹段24与第一撑杆31螺纹配合。Please refer to FIG. 1 , FIG. 2 and FIG. 3 , in one embodiment, the top support part 3 includes a first support rod 31 , a top support rod 32 and a top support block 34 , and the end of the first support rod 31 is connected to the The support 1 is slidably fitted, the top support rod 32 is fixedly arranged on one side of the first support rod 31 , and the end of the top support rod 32 away from the first support rod 31 extends to the flexible clamping The two sets of adjustment rods 21 penetrate through the first support rods 31, and the two sets of adjustment rods 21 are also provided with second threaded sections 24. The two threaded sections 24 and the first threaded section 23 have opposite directions of rotation, and the two sets of second threaded sections 24 are threadedly engaged with the first strut 31 .

在转动两组调节杆21的同时,可通过第二螺纹段24与第一撑杆31的螺纹配合,以带动第一撑杆31移动,进而带动顶撑杆32以及顶撑块34移动,利用顶撑块34顶撑至止水带6端部,以驱使止水带发生弯曲折叠,配合两组滚轮52对于止水带6的夹紧效果,实现止水带6边缘位置的固定。When the two sets of adjustment rods 21 are rotated, the second threaded section 24 can cooperate with the threads of the first support rod 31 to drive the first support rod 31 to move, thereby driving the top support rod 32 and the top support block 34 to move. The top support block 34 is supported to the end of the waterstop 6 to drive the waterstop to bend and fold, and cooperate with the clamping effect of the two sets of rollers 52 on the waterstop 6 to achieve the fixation of the edge position of the waterstop 6 .

在另一实施例中,所述挤压部5还可包括两组摆杆,两组所述摆杆相对分布,两组所述摆杆相互远离的一端与所述支撑件1铰接相连,所述调节部2还可包括两组螺杆、螺纹套设于两组所述螺杆外部的第一套筒以及铰接在两组所述第一套筒侧壁的第一连杆,两组所述第一连杆远离对应所述第一套筒的一端与分别与两组第一摆杆铰接相连,两组所述螺杆贯穿所述支撑件1并与支撑件1转动配合。In another embodiment, the pressing portion 5 may further include two groups of swing rods, the two groups of swing rods are relatively distributed, and the ends of the two groups of swing rods away from each other are hingedly connected to the support member 1, so The adjusting part 2 may further include two sets of screws, a first sleeve threadedly sleeved on the outside of the two sets of screws, and a first connecting rod hinged on the side walls of the two sets of the first sleeves, and the two sets of the first sleeves. One end of a connecting rod away from the corresponding first sleeve is hingedly connected to two sets of first swing rods respectively, and the two sets of the screws penetrate through the support member 1 and are rotatably matched with the support member 1 .

通过转动两组螺杆,通过两组螺杆与对应第一套筒的螺纹配合,进而带动第一套筒沿螺杆移动,通过第一连杆带动摆杆进行摆动,摆杆摆动时,两组摆杆相对的一端可分别作用于柔性夹持部4两侧,随着摆杆摆动的持续,柔性夹持部4受力向止水带6方向形变,进而对止水带6进行夹紧。By rotating the two sets of screws, the two sets of screws are matched with the threads of the corresponding first sleeve, and then the first sleeve is driven to move along the screws, and the first link drives the swing rod to swing. When the swing rod swings, the two sets of swing rods The opposite ends can act on both sides of the flexible clamping portion 4 respectively. As the swing of the pendulum rod continues, the flexible clamping portion 4 is forced to deform in the direction of the water stop belt 6 , and then the water stop belt 6 is clamped.

在另一实施例中,所述顶撑部3还可包括滑杆以及固定设置在所述滑杆一端的压杆,所述压杆远离所述滑杆的一端延伸至所述柔性夹持部4内部,所述滑杆远离所述压杆的一端与所述支撑件1滑动连接,其中一组所述螺杆上固定设置有齿轮,所述滑杆一侧固定设置有齿条,所述齿轮与所述齿条啮合。In another embodiment, the top support portion 3 may further include a sliding rod and a pressing rod fixed at one end of the sliding rod, and the end of the pressing rod away from the sliding rod extends to the flexible clamping portion 4. Inside, the end of the sliding rod away from the pressing rod is slidably connected to the supporting member 1, wherein a group of the screws is fixedly provided with a gear, and one side of the sliding rod is fixedly provided with a rack, and the gear mesh with the rack.

在转动螺杆时,可带动齿轮同步转动,利用齿轮与齿条的啮合作用带动滑杆移动,进而带动压杆移动,利用压杆对止水带6边缘进行挤压,以使得止水带6在柔性夹持部4内部的部分呈弯曲折叠结构,进而增大止水带6位于柔性夹持部4内部的体积,配合两组摆杆对于止水带6的夹持效果,实现止水带6端部的固定。When the screw is rotated, the gear can be driven to rotate synchronously, the sliding rod is driven to move by the meshing effect of the gear and the rack, and then the pressure rod is driven to move, and the pressure rod is used to squeeze the edge of the water stop belt 6, so that the water stop belt 6 is in the The inner part of the flexible clamping portion 4 is in a curved and folded structure, thereby increasing the volume of the water-stop belt 6 inside the flexible clamping portion 4, and with the clamping effect of the two sets of swing bars on the water-stop belt 6, the water-stop belt 6 is realized. Fixing of the ends.

请参阅图1,在一个实施例中,所述支撑件1侧壁固定设置有支架12,所述调节杆21贯穿所述支架12并与所述支架12转动配合,所述调节杆21上固定设置有调节块22,所述调节块22呈六角形结构,以便于配合扳手使用,便于对调节杆21进行拧动操作。Referring to FIG. 1 , in one embodiment, a bracket 12 is fixedly disposed on the side wall of the support member 1 , the adjustment rod 21 penetrates through the bracket 12 and rotates with the bracket 12 , and the adjustment rod 21 is fixed on the bracket 12 . An adjustment block 22 is provided, and the adjustment block 22 is in a hexagonal structure, so as to be used with a wrench and to facilitate the operation of twisting the adjustment rod 21 .

请参阅图1,在一个实施例中,所述支撑件1侧壁固定安装有导轨11,所述第一撑杆31以及第二撑杆51端部均安装有滑块33,所述滑块33与所述导轨11滑动配合。Referring to FIG. 1 , in one embodiment, a guide rail 11 is fixedly installed on the side wall of the support member 1 , and a sliding block 33 is installed on the ends of the first support rod 31 and the second support rod 51 , and the sliding block 33 is slidingly matched with the guide rail 11 .

通过滑块33与导轨11的滑动配合,以便于在调节杆21转动时,第一撑杆31与第二撑杆51能够顺利的相向移动。Through the sliding cooperation between the slider 33 and the guide rail 11 , when the adjusting rod 21 rotates, the first support rod 31 and the second support rod 51 can smoothly move toward each other.

请参阅图1,在一个实施例中,所述支撑件1包括两组相对分布的杆体或板体,所述柔性夹持部4、顶撑部3以及挤压部5均设置在两组所述杆体或板体之间,两组所述杆体或板体可与建筑结构的横筋或竖筋固定连接。Referring to FIG. 1 , in one embodiment, the support member 1 includes two sets of rod bodies or plate bodies that are relatively distributed, and the flexible clamping portion 4 , the top support portion 3 and the pressing portion 5 are all disposed in the two sets of rod bodies or plates. Between the rod bodies or the plate bodies, the two groups of the rod bodies or the plate bodies can be fixedly connected with the horizontal bars or vertical bars of the building structure.

请参阅图3,在一个实施例中,所述顶撑杆32上设置有第一挡块35与第二挡块36,所述第一挡块35与所述顶撑杆32固定连接,且第一挡块35设置在所述柔性夹持部4外侧,所述第二挡块36螺纹套设于所述顶撑杆32上,且第二挡块36设置在所述柔性夹持部4内侧。Referring to FIG. 3 , in one embodiment, the top strut 32 is provided with a first block 35 and a second block 36 , the first block 35 is fixedly connected to the top strut 32 , and The first stopper 35 is arranged on the outer side of the flexible clamping portion 4 , the second stopper 36 is threadedly sleeved on the top strut 32 , and the second stopper 36 is arranged on the flexible clamping portion 4 inside.

安装时,可将顶撑杆32穿插进柔性夹持部4内部,然后将第二挡块36至顶撑杆32位于柔性夹持部4内部的一端套入,转动第二挡块36,第二挡块36可带动柔性夹持部4沿顶撑杆32移动,直至将柔性夹持部4压紧在第一挡块35一侧,以将柔性夹持部4固定在顶撑杆32上,在顶撑杆32随第一撑杆31移动时,可带动柔性夹持部4发生形变,从而使得柔性夹持部4内部空间增大,以便于顶撑杆32作用于止水带6端部时,止水带6能够具有足够的弯曲折叠空间,从而提高止水带6的固定效果。During installation, the top strut 32 can be inserted into the interior of the flexible clamping portion 4, and then the second stopper 36 can be inserted to the end of the top strut 32 inside the flexible clamping portion 4, and the second stopper 36 can be rotated. The second block 36 can drive the flexible clamping portion 4 to move along the top strut 32 until the flexible clamping portion 4 is pressed against the side of the first block 35 to fix the flexible clamping portion 4 on the top strut 32 When the top strut 32 moves with the first strut 31, the flexible clamping portion 4 can be driven to deform, so that the internal space of the flexible clamping portion 4 is increased, so that the top strut 32 can act on the water stop 6 At the end, the waterstop 6 can have enough space for bending and folding, so as to improve the fixing effect of the waterstop 6 .

请参阅图2,在一个实施例中,所述柔性夹持部4呈C型结构或U型结构,所述柔性夹持部4采用橡胶或塑料制成。Referring to FIG. 2 , in one embodiment, the flexible clamping portion 4 has a C-shaped structure or a U-shaped structure, and the flexible clamping portion 4 is made of rubber or plastic.

本发明实施例中,安装止水带6时,将止水带6置于支撑件1一侧,使得止水带6端部嵌入至柔性夹持部4内部,通过调节部2带动顶撑部3以及挤压部5相向移动,在挤压部5移动时,可作用于柔性夹持部4变形,从而对止水带6进行涨紧处理,在顶撑部3移动时,可作用于止水带6端部,进而驱使止水带6位于柔性夹持部4内部的部分进行弯曲折叠,以增大止水带6在柔性夹持部4内部的体积,配合挤压部5对于柔性夹持部4的挤压效果,从而实现止水带6的固定,相较于现有技术,能够实现止水带6在建筑伸缩缝内的有效固定,可极大程度的消除因后续浇筑混凝土而导致的止水带6撕裂位移现象,具有结构简单以及施工便利的优点。In the embodiment of the present invention, when installing the waterstop 6, place the waterstop 6 on one side of the support member 1, so that the end of the waterstop 6 is embedded in the flexible clamping portion 4, and the top support portion is driven by the adjusting portion 2 3 and the pressing part 5 move toward each other, when the pressing part 5 moves, it can act on the deformation of the flexible clamping part 4, so that the water stop belt 6 can be tightened, and when the top support part 3 moves, it can act on the stop The end of the water belt 6, and then drive the part of the water stop belt 6 inside the flexible clamping part 4 to bend and fold, so as to increase the volume of the water stop belt 6 inside the flexible clamping part 4, and cooperate with the extrusion part 5 for the flexible clamping part. The squeezing effect of the holding part 4 can realize the fixing of the waterstop 6. Compared with the prior art, the effective fixing of the waterstop 6 in the expansion joint of the building can be realized, and the subsequent pouring of concrete can be eliminated to a great extent. The resulting phenomenon of tearing and displacement of the waterstop 6 has the advantages of simple structure and convenient construction.

上面对本专利的较佳实施方式作了详细说明,但是本专利并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本专利宗旨的前提下做出各种变化。The preferred embodiments of the present patent have been described in detail above, but the present patent is not limited to the above-mentioned embodiments. Within the scope of knowledge possessed by those of ordinary skill in the art, the present invention can also be made without departing from the purpose of the present patent. Various changes.

Claims (7)

1.一种建筑止水带固定装置,其特征在于,包括支撑件、调节部、顶撑部、柔性夹持部以及挤压部,1. A building waterstop fixing device is characterized in that, comprising a support piece, an adjustment part, a top support part, a flexible clamping part and an extrusion part, 所述柔性夹持部设置在所述支撑件一侧,用于对止水带端部进行夹持,The flexible clamping part is arranged on one side of the support and is used for clamping the end of the waterstop, 所述顶撑部与所述挤压部均滑动安装在所述支撑件一侧,且所述顶撑部与所述挤压部相对分布,The top support portion and the pressing portion are both slidably installed on one side of the support member, and the top support portion and the pressing portion are distributed relative to each other, 所述调节部用于带动所述顶撑部与所述挤压部相向移动,所述挤压部移动时可作用于所述柔性夹持部,以驱使所述柔性夹持部变形,以对所述止水带涨紧,The adjusting part is used to drive the top support part and the pressing part to move toward each other, and the pressing part can act on the flexible clamping part when moving, so as to drive the flexible clamping part to deform, so as to adjust the pressure of the flexible clamping part. The waterstop is tightened, 所述顶撑部移动时可作用于所述止水带端部,驱使所述止水带位于所述柔性夹持部内部的部分弯曲折叠。When the top support part moves, it can act on the end of the water-stop belt to drive the part of the water-stop belt inside the flexible clamping part to bend and fold. 2.根据权利要求1所述的一种建筑止水带固定装置,其特征在于,所述挤压部包括两组相对分布的第二撑杆以及转动设置在两组所述第二撑杆相对一端的滚轮,2 . The device for fixing a building water stop according to claim 1 , wherein the pressing portion comprises two sets of relatively distributed second struts and two sets of second struts that are rotatably arranged opposite to each other. 3 . roller at one end, 两组所述第二撑杆相互远离的一端分别与所述支撑件滑动配合,The ends of the two sets of second struts that are far away from each other are respectively slidingly matched with the support members, 所述调节部包括两组调节杆,两组所述调节杆上均设有第一螺纹段,两组所述调节杆分别贯穿两组所述第二撑杆,且两组所述第一螺纹段分别与两组所述第二撑杆螺纹配合。The adjusting part includes two sets of adjusting rods, the two sets of adjusting rods are both provided with first thread segments, the two sets of adjusting rods respectively pass through the two sets of the second strut rods, and the two sets of the first threads The segments are respectively threaded with the two sets of the second struts. 3.根据权利要求2所述的一种建筑止水带固定装置,其特征在于,所述顶撑部包括第一撑杆、顶撑杆以及顶撑块,3. A construction waterstop fixing device according to claim 2, wherein the top support portion comprises a first support rod, a top support rod and a top support block, 所述第一撑杆端部与所述支撑件滑动配合,所述顶撑杆固定设置在所述第一撑杆一侧,所述顶撑杆远离所述第一撑杆的一端延伸至所述柔性夹持部内部并与所述顶撑块固定连接,The end of the first strut is slidably matched with the support member, the top strut is fixedly arranged on one side of the first strut, and the end of the top strut away from the first strut extends to the inside the flexible clamping part and fixedly connected with the top support block, 两组所述调节杆贯穿所述第一撑杆,两组所述调节杆上还设置有第二螺纹段,所述第二螺纹段与第一螺纹段旋向相反,两组第二螺纹段与第一撑杆螺纹配合。The two sets of adjusting rods pass through the first struts, and the two sets of adjusting rods are also provided with second threaded sections, the second threaded sections are opposite to the first threaded sections, and the two sets of second threaded sections It is threaded with the first strut. 4.根据权利要求2所述的一种建筑止水带固定装置,其特征在于,所述支撑件侧壁固定设置有支架,所述调节杆贯穿所述支架并与所述支架转动配合,所述调节杆上固定设置有调节块,所述调节块呈六角形结构。4. The device for fixing a building water stop according to claim 2, wherein a bracket is fixedly arranged on the side wall of the support member, and the adjusting rod penetrates through the bracket and is rotatably matched with the bracket. An adjustment block is fixed on the adjustment rod, and the adjustment block is in a hexagonal structure. 5.根据权利要求3所述的一种建筑止水带固定装置,其特征在于,所述支撑件侧壁固定安装有导轨,所述第一撑杆以及第二撑杆端部均安装有滑块,所述滑块与所述导轨滑动配合。5. A construction waterstop fixing device according to claim 3, characterized in that, a guide rail is fixedly installed on the side wall of the support member, and sliding rails are installed at the ends of the first support rod and the second support rod. The sliding block is slidably matched with the guide rail. 6.根据权利要求3所述的一种建筑止水带固定装置,其特征在于,所述顶撑杆上设置有第一挡块与第二挡块,所述第一挡块与所述顶撑杆固定连接,且第一挡块设置在所述柔性夹持部外侧,所述第二挡块螺纹套设于所述顶撑杆上,且第二挡块设置在所述柔性夹持部内侧。6 . The fixing device for a building water stop according to claim 3 , wherein a first stopper and a second stopper are arranged on the top strut, and the first stopper and the top The struts are fixedly connected, and the first stopper is arranged on the outside of the flexible clamping portion, the second stopper is threadedly sleeved on the top strut, and the second stopper is arranged on the flexible clamping portion inside. 7.根据权利要求1所述的一种建筑止水带固定装置,其特征在于,所述柔性夹持部呈C型结构或U型结构,所述柔性夹持部采用橡胶或塑料制成。7 . The fixing device for a building waterstop according to claim 1 , wherein the flexible clamping portion has a C-shaped structure or a U-shaped structure, and the flexible clamping portion is made of rubber or plastic. 8 .
CN202111112189.XA 2021-09-23 2021-09-23 Building waterstop fixing device Active CN113863685B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111112189.XA CN113863685B (en) 2021-09-23 2021-09-23 Building waterstop fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111112189.XA CN113863685B (en) 2021-09-23 2021-09-23 Building waterstop fixing device

Publications (2)

Publication Number Publication Date
CN113863685A CN113863685A (en) 2021-12-31
CN113863685B true CN113863685B (en) 2022-05-31

Family

ID=78993290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111112189.XA Active CN113863685B (en) 2021-09-23 2021-09-23 Building waterstop fixing device

Country Status (1)

Country Link
CN (1) CN113863685B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0050985A1 (en) * 1980-10-24 1982-05-05 M.T. Loughborough Method of splicing strips of thermoplastic material and apparatus therefor
DE29805511U1 (en) * 1998-03-26 1998-05-28 Obernolte, Sven, 32545 Bad Oeynhausen Joint tape
CN106948503A (en) * 2017-04-27 2017-07-14 中国建筑第八工程局有限公司 Waterstop stationary fixture and its clamping method
CN106988270A (en) * 2017-05-13 2017-07-28 徐州新南湖科技有限公司 The auxiliary holding device and its application method of waterstop fixing device
CN107700538A (en) * 2017-08-30 2018-02-16 中交公路规划设计院有限公司 A kind of portable composite water-stop system and its application method
CN108086147A (en) * 2018-01-31 2018-05-29 单国珠 A kind of long-life freedom from repairs bridge extension joint and waterstop
CN208220822U (en) * 2018-04-26 2018-12-11 中国路桥工程有限责任公司 A kind of constructing tunnel abutment wall sealing ancillary equipment
CN110528464A (en) * 2019-09-16 2019-12-03 中建筑港集团有限公司 A kind of fixed device of bilayer sealing belt construction
KR20190143702A (en) * 2018-06-21 2019-12-31 주식회사 다마가산업 Supporting member for waterstop and installation structure of waterstop including the same
CN211547824U (en) * 2019-11-25 2020-09-22 中铁三局集团华东建设有限公司 Device for fixing flexible water stop
CN212376673U (en) * 2020-03-24 2021-01-19 金钰 Reinforcing apparatus of tunnel waterstop
CN213539337U (en) * 2020-09-30 2021-06-25 北京易成市政工程有限责任公司 Fixing device of rubber waterstop

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0050985A1 (en) * 1980-10-24 1982-05-05 M.T. Loughborough Method of splicing strips of thermoplastic material and apparatus therefor
DE29805511U1 (en) * 1998-03-26 1998-05-28 Obernolte, Sven, 32545 Bad Oeynhausen Joint tape
CN106948503A (en) * 2017-04-27 2017-07-14 中国建筑第八工程局有限公司 Waterstop stationary fixture and its clamping method
CN106988270A (en) * 2017-05-13 2017-07-28 徐州新南湖科技有限公司 The auxiliary holding device and its application method of waterstop fixing device
CN107700538A (en) * 2017-08-30 2018-02-16 中交公路规划设计院有限公司 A kind of portable composite water-stop system and its application method
CN108086147A (en) * 2018-01-31 2018-05-29 单国珠 A kind of long-life freedom from repairs bridge extension joint and waterstop
CN208220822U (en) * 2018-04-26 2018-12-11 中国路桥工程有限责任公司 A kind of constructing tunnel abutment wall sealing ancillary equipment
KR20190143702A (en) * 2018-06-21 2019-12-31 주식회사 다마가산업 Supporting member for waterstop and installation structure of waterstop including the same
CN110528464A (en) * 2019-09-16 2019-12-03 中建筑港集团有限公司 A kind of fixed device of bilayer sealing belt construction
CN211547824U (en) * 2019-11-25 2020-09-22 中铁三局集团华东建设有限公司 Device for fixing flexible water stop
CN212376673U (en) * 2020-03-24 2021-01-19 金钰 Reinforcing apparatus of tunnel waterstop
CN213539337U (en) * 2020-09-30 2021-06-25 北京易成市政工程有限责任公司 Fixing device of rubber waterstop

Also Published As

Publication number Publication date
CN113863685A (en) 2021-12-31

Similar Documents

Publication Publication Date Title
CN111442023B (en) Auxiliary device for bonding and fixing pipeline connector
CN113863685B (en) Building waterstop fixing device
EP2116683A3 (en) Connection profile for components bordering insulating layers with plaster
CN211228952U (en) A fixing device for steel edge rubber waterstop
CN218758388U (en) Roof waterproof node construction equipment
CN106667222A (en) Window curtain track device
CN106948503B (en) Water stop fixing clamp and clamping method thereof
CN108571069A (en) A kind of frame column connected node suitable for prefabrication and assembly construction building
CN212985243U (en) Tunnel external wall template reinforcing frame without through-wall bolts
CN218593669U (en) Automobile sealing rubber strip unevenness repairing device
CN212876935U (en) Novel greenhouse top windowing structure
CN209690030U (en) A kind of waterproof roll test bending instrument
CN114439239A (en) Prefabricated shear force wall grout sleeve hole aligns auxiliary device with ground joint bar
CN209194510U (en) It is a kind of for connecting the tool of sheet pile
CN110387876A (en) Diaphram wall automatic collapsible type connector case installs rubber fastening band construction method
CN217175240U (en) Novel stagnant water steel sheet
CN214491008U (en) Concrete prefabricated component curing means
CN218971047U (en) Sealed steel fire window
CN222390668U (en) A rubber water stop fixing device
CN221524062U (en) A heat insulation and anti-corrosion structure for a building
CN220619890U (en) Adjustable road construction guardrail
CN221098583U (en) Boiler steel construction convenient to installation
CN111453635B (en) Water-stopping lifting device
CN221780273U (en) A pressure-resistant floor heating pipe
CN222419818U (en) Stress detection equipment for building shear wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant