CN211149745U - Rope comprehensive simulation training facility - Google Patents

Rope comprehensive simulation training facility Download PDF

Info

Publication number
CN211149745U
CN211149745U CN201921971967.9U CN201921971967U CN211149745U CN 211149745 U CN211149745 U CN 211149745U CN 201921971967 U CN201921971967 U CN 201921971967U CN 211149745 U CN211149745 U CN 211149745U
Authority
CN
China
Prior art keywords
rescue
simulation
rope
vertical
ladder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921971967.9U
Other languages
Chinese (zh)
Inventor
李旺
粟平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan bright tomorrow Safety Education Technology Co.,Ltd.
Hunan kelawei Intelligent Equipment Co.,Ltd.
Original Assignee
Hunan Kelawei Intelligent Equipment Co ltd
Hunan Bright Tomorrow Education Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Kelawei Intelligent Equipment Co ltd, Hunan Bright Tomorrow Education Development Co ltd filed Critical Hunan Kelawei Intelligent Equipment Co ltd
Priority to CN201921971967.9U priority Critical patent/CN211149745U/en
Application granted granted Critical
Publication of CN211149745U publication Critical patent/CN211149745U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a rope comprehensive simulation training facility, rope comprehensive simulation training facility includes the total frame, the total frame includes from last multilayer workstation that sets up extremely down, rope comprehensive simulation training facility still includes the multiple rescue simulation structure that sets up at the workstation that matches the corresponding height, and at least part rescue simulation structure is provided with at least one in ladder frame and the rope. The rope comprehensive simulation training facility aims to solve the technical problem that various rescue skills which are helpful for comprehensively training rescuers do not exist in the prior art.

Description

Rope comprehensive simulation training facility
Technical Field
The utility model relates to a simulation training equipment technical field especially relates to a rope comprehensive simulation training facility.
Background
The mountain scenic spot mountain valley is deep, the terrain is severe, behind tourists who weave, rescue workers face huge pressure which can come at any time, the requirement of practical requirements on mountain rescue skills of fire-fighting troops is higher and higher, the improvement of mountain rescue level is determined by ordinary training conditions to a great extent, and in the prior art, a rope comprehensive simulation training facility is not provided at present, so that various rescue skills of the rescue workers can be trained comprehensively.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Based on this, the utility model provides a rope comprehensive simulation training facility, this rope comprehensive simulation training facility aim at solving and do not have among the prior art and help training rescue personnel's various rescue technical problem of ability comprehensively.
(II) technical scheme
For solving the technical problem, the utility model provides a rope comprehensive simulation training facility, wherein, including total, total includes from last multilayer workstation to setting up down, rope comprehensive simulation training facility still includes the multiple rescue simulation structure of setting up at the workstation that matches corresponding height, and at least part rescue simulation structure is provided with at least one in ladder frame and the rope.
Preferably, multiple rescue simulation structure includes the fire fighter structure of saving oneself promptly, the fire fighter structure of saving oneself promptly is in including setting up the window of fleing of the simulation of the high-rise workstation of multilayer workstation, the assembly frame is in it is provided with at least one in ladder frame and the rope to flee the window outside.
Preferably, the plurality of rescue simulation structures includes a slope rescue structure including a simulated slope frame extending obliquely downward from a high-rise work bench of the multi-story work bench to the ground.
Preferably, the multiple rescue simulation structures comprise a tower crane rescue structure, and the tower crane rescue structure comprises a simulation tower crane jib arranged at the highest-layer workbench of the multilayer workbench and a vertical rescue ladder extending downwards to the ground from the simulation tower crane jib.
Preferably, the plurality of rescue simulation structures include a shaft rescue structure, and the shaft rescue structure includes a simulation shaft extending vertically from a high-rise workbench of the multi-story workbench to the ground, a guard rail disposed in the simulation shaft, and a vertical lifeline.
Preferably, the plurality of rescue simulation structures include a chimney rescue structure including a simulation chimney extending vertically from a high-rise work bench of the multi-story work bench to the ground and a vertical lifeline provided to the simulation chimney.
Preferably, multiple rescue simulation structure including set up in the narrow and small space rescue structure of assembly, narrow and small space rescue structure is including simulating narrow and small space storehouse, the simulation narrow and small space storehouse has the mouth of fleing, narrow and small space rescue structure still include slidable install with dismantling in the closure plate of the department of fleing of simulation narrow and small space storehouse to seal when simulating narrow and small space rescue training the mouth of fleing.
Preferably, the plurality of rescue simulation structures comprise a crossing training structure, and the crossing training structure is arranged on a horizontal life line of a high-rise workbench of the multi-layer workbench.
Preferably, the plurality of rescue simulation structures include a helicopter rescue simulation structure provided on a high-rise working platform of the multi-story working platform, and the helicopter rescue simulation structure includes a simulation rescue platform and a rope hoist provided at the simulation rescue platform.
Preferably, the multiple rescue simulation structures comprise a wind power vertical ladder rescue structure, a wind power tooth ladder rescue structure, a tooth mouth cliff rescue structure, a vertical cantilever rescue structure, a rock climbing training rescue structure, a trust back falling platform structure, a rope ladder rescue structure and a vertical conveying structure, and the wind power vertical ladder rescue structure comprises a vertical ladder and a vertical lifeline which extend from a high-rise workbench of the multi-layer workbench to the ground; the wind power tooth ladder rescue structure comprises a tooth ladder and a vertical lifeline, wherein the tooth ladder extends to the ground from a high-rise workbench of the multi-layer workbench; the tooth mouth cliff rescue structure comprises a simulated tooth cliff platform arranged on a high-rise workbench of the multi-layer workbench; the vertical cantilever rescue structure comprises a simulated vertical cantilever arranged on the general frame; the rock climbing training and rescuing structure comprises a rock climbing wall structure arranged on the outer side of the general frame, the rock climbing wall structure comprises a rock wall extending downwards from the upper part of the general frame, a top platform arranged on the top of the rock wall, and a vertical life line extending downwards from the top platform, and a rock climbing support and a rock climbing fulcrum are arranged on the rock wall; the trust back-falling table structure comprises a trust back-falling table arranged on the table surface of the workbench; the rope ladder rescue structure comprises a rope ladder extending to the ground from a high-rise workbench of the multi-layer workbench, and a guard rail and a vertical lifeline which are arranged corresponding to the rope ladder; the vertical transport structure includes a vertical lifeline extending from a high-rise workstation of the multi-level workstation to the ground.
(III) advantageous effects
The utility model discloses compare with prior art, the beneficial effects of the utility model include:
because rope comprehensive simulation training facility includes from last to the multilayer workstation that sets up down and the multiple rescue analog structure who sets up at the workstation that matches the corresponding height, at least partial rescue analog structure is provided with at least one in ladder frame and the rope to conveniently simulate various rescue projects of various heights, some need simulate the eminence rescue, some probably need simulate moderate height rescue even low, the utility model discloses a multiple rescue analog structure who sets up at the workstation that matches the corresponding height can satisfy diversified rescue demand, can greatly help training rescue personnel's various rescue skills comprehensively, follow-up will expand the various concrete rescue projects of detailed description.
Other advantageous effects of the present invention will be described in the following embodiments one by one.
Drawings
The features and advantages of the invention will be more clearly understood by reference to the accompanying drawings, which are schematic and should not be understood as imposing any limitation on the invention, in which:
fig. 1 is a view showing a perspective of a rope integrated simulation training facility according to an embodiment of the present invention;
fig. 2 is a view of a rope integrated simulation training facility according to an embodiment of the present invention;
FIG. 3 is an enlarged view taken at A in FIG. 2;
fig. 4 is a view of a rope integrated simulation training facility according to an embodiment of the present invention;
fig. 5 is a view showing a structure of a rope integrated simulation training facility according to an embodiment of the present invention.
Description of reference numerals:
1. general frame, 2, firemen's emergency self-rescue structure, 3, simulation window of fleing, 4, cross training structure, 5, rope ladder rescue structure, 6, vertical cliff rescue structure, 7, tower crane rescue structure, 8, simulation tower davit, 9, vertical rescue ladder, 10, helicopter rescue simulation structure, 11, wind-powered electricity generation vertical ladder rescue structure, 12, wind-powered electricity generation tooth ladder rescue structure, 13, tooth mouth cliff rescue structure, 14, shaft rescue structure, 15, narrow and small space rescue structure, 16, simulation narrow and small space storehouse, 17, closure plate, 18, rock climbing training rescue structure, 19, top platform, 20, chimney rescue structure, 21, trust back of the body to fall a platform structure, 22, vertical transport structure, 23, slope rescue structure.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
Referring to fig. 1 to 5, the utility model discloses a rope comprehensive simulation training facility, wherein, rope comprehensive simulation training facility includes always puts up 1, always puts up 1 and includes from last to the multilayer workstation that sets up down, and rope comprehensive simulation training facility still includes the multiple rescue simulation structure that sets up at the workstation that matches corresponding height, and at least part rescue simulation structure is provided with at least one in ladder frame and the rope.
According to the utility model discloses a concrete implementation mode, multiple rescue analog structure includes that the fireman promptly saves oneself structure 2, and the fireman promptly saves oneself structure 2 including setting up the simulation window of fleing 3 at the high-rise workstation of multilayer workstation to conveniently train the first-aid staff to escape, total 1 is provided with at least one in ladder frame and the rope outside the window of fleing.
In addition, multiple rescue analog structure can include slope rescue structure 23, and slope rescue structure 23 includes the simulation slope frame that extends to ground from the high-rise workstation slope of multi-rise workstation downwards, conveniently trains first-aid staff to carry out the slope rescue.
In addition, multiple rescue analog structure can include tower crane rescue structure 7, and tower crane rescue structure 7 is including setting up simulation tower davit 8 and the vertical rescue ladder 9 that extends to ground downwards from simulation tower davit 8 at the highest layer workstation of multilayer workstation, conveniently trains first-aid staff and carries out the tower crane rescue training, and simulation tower davit 8 transversely sets up inside the outline of total frame 1, has rationally utilized finite space, does not influence the outward appearance outline of whole total frame 1.
Certainly, multiple rescue simulation structures can also include shaft rescue structure 14, and shaft rescue structure 14 includes the simulation shaft that extends to ground from the high-rise workstation of multilayer workstation is vertical, sets up in the rail guard and the vertical lifeline of simulation shaft, conveniently trains rescue personnel to carry out the shaft rescue.
In addition, multiple rescue simulation structure can also include chimney rescue structure 20, and chimney rescue structure 20 includes the simulation chimney that extends to ground from the high-rise workstation of multilayer workstation is vertical with set up in the vertical lifeline of simulation chimney, conveniently trains the rescue personnel and carries out the chimney rescue.
According to the utility model discloses a preferred embodiment, multiple rescue simulation structure is including setting up in the narrow and small space rescue structure 15 of general frame 1, and narrow and small space rescue structure 15 is including simulating narrow and small space storehouse 16, and the simulation narrow and small space storehouse 16 has the mouth of escaping, and narrow and small space rescue structure 15 still includes to install in the closure plate 17 of the department of escaping of the narrow and small space storehouse 16 of simulation with slidable dismantlement to seal the mouth of escaping when simulating narrow and small space rescue training. The closing plate 17 can be conveniently replaced, so that rescuers can conveniently and continuously replace the closing plate 17, the aim of repeated training is fulfilled, and the simulated training can be used for rescuing people trapped in narrow spaces, can be plates with various proper structures, and is convenient for simulating narrow spaces under various conditions. Preferably, the simulated tight space cabin 16 may be connected to a chimney rescue structure 20, such that a tight space rescue program may be quickly trained after a chimney rescue is trained.
In addition, the various rescue simulation structures can further comprise a crossing training structure 4, and the crossing training structure 4 is arranged on a horizontal life line of a high-rise workbench of the multi-layer workbench. Of course, the cross training structure 4 may also be equipped with protective equipment, and the protective equipment should include members such as steel wire ropes for protection, safety ropes, safety belts, and roller skates.
In addition, various rescue simulation structures can include helicopter rescue simulation structure 10 arranged on a high-rise workbench of a multi-layer workbench, helicopter rescue simulation structure 10 includes a simulation rescue platform and a rope winch arranged on the simulation rescue platform, and the simulation helicopter can conveniently extend out of the rope rescue at high altitude or low altitude.
According to the utility model discloses a specific embodiment, multiple rescue simulation structure can also include wind-powered electricity generation vertical ladder rescue structure 11, wind-powered electricity generation tooth ladder rescue structure 12, tooth mouth cliff rescue structure 13, perpendicular hanging wall rescue structure 6, rock climbing training rescue structure 18, trust the back of the body and fall a structure 21, rope ladder rescue structure 5 and perpendicular transport structure 22.
Specific examples of the above structure may be: the wind power vertical ladder rescue structure 11 comprises a vertical ladder and a vertical lifeline, wherein the vertical ladder and the vertical lifeline extend from a high-rise workbench of a multi-rise workbench to the ground; the wind power tooth ladder rescue structure 12 comprises a tooth ladder and a vertical lifeline, wherein the tooth ladder extends from a high-rise workbench of a multi-rise workbench to the ground; the tooth mouth cliff rescue structure 13 comprises a simulated tooth cliff platform arranged on a high-rise workbench of a multi-layer workbench; the vertical cantilever rescue structure 6 comprises a simulated vertical cantilever arranged on the general frame 1; the rock climbing training and rescuing structure 18 comprises a rock climbing wall structure arranged on the outer side of the general frame 1, the rock climbing wall structure comprises a rock wall extending downwards from the upper part of the general frame 1, a top platform 19 arranged on the top of the rock wall and a vertical life line extending downwards from the top platform 19, and a rock climbing support and a rock climbing fulcrum are arranged on the rock wall; the trust back-falling table structure 21 comprises a trust back-falling table arranged on the table surface of the workbench; the rope ladder rescue structure 5 comprises a rope ladder extending from a high-rise workbench of the multi-rise workbench to the ground, and a guard rail and a vertical lifeline which are arranged corresponding to the rope ladder; vertical transport structure 22 includes a vertical lifeline extending from a high-rise platform of the multi-rise platform to the ground.
It should be noted that, the utility model discloses be not limited to above-mentioned specific structural style, each rescue analog structure can carry out reasonable configuration increase and combination completely, and each rescue analog structure all is provided with protection device (for example can be members such as wire rope, safety belt and skidding for the protection, but is not limited to these members) and all can to can replace ladder frame, rope ladder, various combination replacement schemes and add the scheme of specific protection component for every rescue analog structure and all will fall into the protection scope of the utility model, this paper is no longer expanded the description one by one, the utility model discloses each rescue analog structure is through reasonable and compact spatial layout, and is integrated in total frame 1, greatly saves space, has created very big training possibility in limited space.
Of course, as a more specific example, the rope integrated simulation training facility may include a first floor (ground floor) framework, a second floor framework and a third floor framework arranged from bottom to top, wherein the simulation narrow space cabin is arranged on the ground floor and can train without climbing to the upper floor, the fireman emergency self-rescue structure 2 is preferably arranged on the second floor framework, the helicopter rescue simulation structure 10 and the tooth mouth cliff rescue structure 13 are arranged on the outermost side of the third floor framework without affecting various training inside the total frame 1, the rope ladder rescue structure 5, the tower crane rescue structure 7, the wind power vertical ladder rescue structure 11, the wind power tooth ladder rescue structure 12, the shaft rescue structure 14, the rock climbing training rescue structure 18 and the chimney rescue structure 20 are preferably extended from the third floor framework to the ground floor, thereby realizing that the heights of the rescue structures are extended as far as possible in a limited height space to improve the simulation effect, in addition, the trusted back-falling platform structure 21 can be arranged on a platform of a third-layer framework, so that people can conveniently arrive at any time, the vertical conveying structure 22 and the slope rescue structure 23 can extend from the second-layer framework to a ground floor, the vertical suspended wall rescue structure 6 can also be arranged on the second-layer framework and connected with the upper end of the slope rescue structure 23, and the vertical suspended wall rescue structure 6 is adjacent to the firefighter emergency self-rescue structure 2. However, it should be understood that the present invention is not limited thereto, that is, the scheme of reasonably changing the position arrangement relationship of the rescue simulation structures will fall within the protection scope of the present invention.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations fall within the scope defined by the appended claims.

Claims (10)

1. The utility model provides a rope comprehensive simulation training facility which characterized in that, includes the assembly frame, the assembly frame includes from last multilayer workstation that sets up down, rope comprehensive simulation training facility still includes the multiple rescue simulation structure that sets up at the workstation that matches corresponding height, and at least part rescue simulation structure is provided with at least one in ladder frame and the rope.
2. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a firefighter emergency self-rescue structure comprising a simulated escape window provided at a high-rise work bench of the multi-story work bench, the assembly frame being provided with at least one of a ladder frame and a rope outside the escape window.
3. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a slope rescue structure comprising a simulated ramp frame extending obliquely downward from a high-rise workbench of the multi-story workbench to the ground.
4. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a tower crane rescue structure comprising a simulated tower boom disposed at a highest level of the multi-level workbench and a vertical rescue ladder extending downward from the simulated tower boom to the ground.
5. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a shaft rescue structure comprising a simulation shaft extending vertically from a high-rise working platform of the multi-story working platform to the ground, a guard rail provided to the simulation shaft, and a vertical lifeline.
6. A rope ensemble simulation training facility according to claim 1, wherein said plurality of rescue simulation structures includes a chimney rescue structure including a simulation chimney extending vertically from a high-rise platform of said multi-level platform to the ground and a vertical lifeline disposed on said simulation chimney.
7. The rope integrated simulation training facility according to claim 1, wherein the plurality of rescue simulation structures include a narrow space rescue structure provided in the headframe, the narrow space rescue structure includes a simulated narrow space cabin having an escape opening, and the narrow space rescue structure further includes a closing plate slidably and detachably mounted at the escape opening of the simulated narrow space cabin to close the escape opening when simulating narrow space rescue training.
8. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a cross-over training structure disposed on a horizontal lifeline of a high-rise workbench of the multi-story workbench.
9. The rope integrated simulation training facility of claim 1, wherein the plurality of rescue simulation structures comprise a helicopter rescue simulation structure disposed at a high-rise working platform of the multi-rise working platform, the helicopter rescue simulation structure comprising a simulation rescue platform, a rope hoist disposed at the simulation rescue platform.
10. The rope comprehensive simulation training facility according to any one of claims 1 to 9, wherein the plurality of rescue simulation structures comprise a wind power vertical ladder rescue structure, a wind power tooth ladder rescue structure, a tooth mouth cliff rescue structure, a vertical hanging wall rescue structure, a rock climbing training rescue structure, a trusted back drop platform structure, a rope ladder rescue structure and a vertical conveying structure, and the wind power vertical ladder rescue structure comprises a vertical ladder and a vertical lifeline extending from a high-rise platform of the multi-story platform to the ground; the wind power tooth ladder rescue structure comprises a tooth ladder and a vertical lifeline, wherein the tooth ladder extends to the ground from a high-rise workbench of the multi-layer workbench; the tooth mouth cliff rescue structure comprises a simulated tooth cliff platform arranged on a high-rise workbench of the multi-layer workbench; the vertical cantilever rescue structure comprises a simulated vertical cantilever arranged on the general frame; the rock climbing training and rescuing structure comprises a rock climbing wall structure arranged on the outer side of the general frame, the rock climbing wall structure comprises a rock wall extending downwards from the upper part of the general frame, a top platform arranged on the top of the rock wall, and a vertical life line extending downwards from the top platform, and a rock climbing support and a rock climbing fulcrum are arranged on the rock wall; the trust back-falling table structure comprises a trust back-falling table arranged on the table surface of the workbench; the rope ladder rescue structure comprises a rope ladder extending to the ground from a high-rise workbench of the multi-layer workbench, and a guard rail and a vertical lifeline which are arranged corresponding to the rope ladder; the vertical transport structure includes a vertical lifeline extending from a high-rise workstation of the multi-level workstation to the ground.
CN201921971967.9U 2019-11-15 2019-11-15 Rope comprehensive simulation training facility Active CN211149745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921971967.9U CN211149745U (en) 2019-11-15 2019-11-15 Rope comprehensive simulation training facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921971967.9U CN211149745U (en) 2019-11-15 2019-11-15 Rope comprehensive simulation training facility

Publications (1)

Publication Number Publication Date
CN211149745U true CN211149745U (en) 2020-07-31

Family

ID=71772497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921971967.9U Active CN211149745U (en) 2019-11-15 2019-11-15 Rope comprehensive simulation training facility

Country Status (1)

Country Link
CN (1) CN211149745U (en)

Similar Documents

Publication Publication Date Title
CN203620134U (en) Multifunctional high-altitude rescue fire fighting truck
CN104196279B (en) A kind of nuclear power station personal security technical ability combined training scene
CN2768112Y (en) Multifunctional integrated training tower for fire fighting
CN102886107A (en) Firefighting and lifesaving device for high-rise building
CN103691072B (en) rescue system for high-rise building
CN201855512U (en) High-rise fire and earthquake escape device
CN101041103B (en) Pipe for escaping from high building on fire
CN202236923U (en) Fire-fighting life saving device for high-rise building
CN204447017U (en) A kind of self-rescuing balcony passway for escaping of elastic buffer
CN103007453A (en) Firefighting rescue system for high-rise building
CN202289241U (en) Fire control escape lifesaving device
CN203998530U (en) A kind of high building personnel are escape system fast and safely
CN110782733A (en) Rope comprehensive simulation training facility
CN205011332U (en) Multi -functional high -rise building intelligence is equipped
CN211149745U (en) Rope comprehensive simulation training facility
CN203291405U (en) Rescuing system for high-rise building
CN206971760U (en) A kind of full steel structure assembled climbs material platform
CN111816047A (en) Comprehensive emergency rescue training facility
CN207462490U (en) A kind of high-rise building fire-fighting rescue
CN207667003U (en) A kind of rescuing from fire for buildings system
CN103007444A (en) Reciprocal cable type escape device
CN204428640U (en) A kind of quick self-help escape passage of balcony of elastic buffer
CN203075490U (en) High-rise building fire rescue system
CN102094574A (en) Emergency floor escape (rescue) ladder
CN205011338U (en) Novel hang ship device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 410000 floor 17, bonded building, Qingzhuhu street, Kaifu District, Changsha City, Hunan Province

Patentee after: Hunan bright tomorrow Safety Education Technology Co.,Ltd.

Patentee after: Hunan kelawei Intelligent Equipment Co.,Ltd.

Address before: 410000 floor 17, bonded building, Qingzhuhu street, Kaifu District, Changsha City, Hunan Province

Patentee before: Hunan bright tomorrow Education Development Co.,Ltd.

Patentee before: Hunan kelawei Intelligent Equipment Co.,Ltd.