CN211080720U - Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure - Google Patents

Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure Download PDF

Info

Publication number
CN211080720U
CN211080720U CN201921371651.6U CN201921371651U CN211080720U CN 211080720 U CN211080720 U CN 211080720U CN 201921371651 U CN201921371651 U CN 201921371651U CN 211080720 U CN211080720 U CN 211080720U
Authority
CN
China
Prior art keywords
keel
circular tube
fixed
curtain wall
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921371651.6U
Other languages
Chinese (zh)
Inventor
朱宝君
陈国光
胡家忠
张志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201921371651.6U priority Critical patent/CN211080720U/en
Application granted granted Critical
Publication of CN211080720U publication Critical patent/CN211080720U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a hyperbolic aluminum plate curtain wall keel installation device and a hyperbolic aluminum plate keel structure, which belong to the technical field of building construction, the hyperbolic aluminum plate curtain wall keel installation device comprises a main structure steel truss adapter and an arc-shaped circular tube adapter, one end of the main structure steel truss adapter is fixed on the main structure steel truss, and the other end is fixed with a vertical main keel; the arc-shaped circular tube switching assembly comprises a connecting piece A and a connecting piece B, the connecting piece A comprises an arc-shaped plate and a circular tube A, the radian of the curved surface of the arc-shaped plate is the same as the radian of the circumference of the main keel, the inner side surface of the arc-shaped plate is attached to the main keel, and the horizontal circular tube A is fixed on the outer side surface; the connecting piece B comprises a circular tube B and a connecting seat, one end of the circular tube B is fixed with the connecting seat, the other end of the circular tube B is in plug-in fit with the circular tube A, and the connecting seat is matched with the auxiliary keel. The utility model discloses the construction is simple and convenient, and maneuverability is strong, and connection stability is high, and construction quality obtains guaranteeing easily.

Description

Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure
Technical Field
The utility model belongs to the technical field of the construction technology and specifically relates to a hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure.
Background
At present to the construction of aluminum curtain wall fossil fragments, the fossil fragments adopt the adaptor welding mostly, because the complexity of two-sided heterotypic curtain, the welding quality of fossil fragments and the position of location relapse, cause welding efficiency low on the contrary, the big and quality of high altitude welding volume can not obtain the assurance in addition, cause the production that fossil fragments mounted position is not conform to quality problems such as requirement.
Disclosure of Invention
The technical task of the utility model is to above weak point, provide a hyperbolic aluminum curtain wall fossil fragments installation device and a hyperbolic aluminum plate fossil fragments structure, the construction is simple and convenient, and maneuverability is strong, and connection stability is high, and construction quality obtains guaranteeing easily.
The utility model provides a technical scheme that its technical problem adopted is:
a double-curve aluminum plate curtain wall keel mounting device comprises a main structure steel truss adapter and an arc-shaped circular tube adapter assembly,
one end of the main structure steel truss adapter is fixed on the main structure steel truss, and the other end of the main structure steel truss adapter is fixed with the vertical main keel;
the arc-shaped circular tube switching assembly comprises a connecting piece A and a connecting piece B, the connecting piece A comprises an arc-shaped plate and a circular tube A, the radian of the curved surface of the arc-shaped plate is the same as the radian of the circumference of the main keel, the inner side surface of the arc-shaped plate is attached to the main keel, and the horizontal circular tube A is fixed on the outer side surface; the connecting piece B comprises a circular tube B and a connecting seat, one end of the circular tube B is fixed with the connecting seat, the other end of the circular tube B is in plug-in fit with the circular tube A, and the connecting seat is matched with the auxiliary keel.
The installation of the hyperbolic aluminum plate curtain wall keel is realized through the use of the device, and the field measurement is performed through the paying-off → the installation of the main structural steel truss adapter → the installation of the curtain wall main keel → the installation of the arc circular tube adapter assembly → the installation of the secondary keel circular tube adapter → the installation of the secondary keel in place → the installation of the aluminum plate decorative surface layer.
Wherein the installation of arc pipe switching subassembly, position and angle through connecting piece A and connecting piece B adjustment installation, the hookup location of arc and curtain main joist can be confirmed according to the angle needs of curtain false keel or horizontal fossil fragments and main joist, and the rotation through pipe B and pipe A changes the angle of connecting seat, the position of curtain false keel or horizontal fossil fragments and main joist still can be adjusted through the length that changes pipe B and pipe A, connection stability is high, construction quality obtains guaranteeing easily.
Preferably, the main structural steel truss adapter is
Figure BDA0002176110880000021
The two ends of the seamless steel pipe are respectively welded and fixed with the main structure steel truss and the main keel. Arc-shaped openings are formed in two ends of the seamless steel pipe, and the seamless steel pipe is attached to the main structure steel truss and the main keel at the two ends through the arc-shaped openings and is fixed in a full-welding mode.
Preferably, the assembly end of the round tube A is provided with a notch, and the notch is fully welded after the round tube A and the round tube B are fixed. The opening is arranged to be beneficial to the assembly and adjustment of the round pipe A and the round pipe B, the round pipe B is convenient to rotate, after the position is adjusted, the round pipe B is fixed through spot welding, after the size is rechecked, the opening is filled by full welding, and the welding strength is further increased.
Furthermore, the four notches are uniformly arranged on the pipe wall of the assembly end of the circular pipe A along the circumferential direction, so that the welding is firm, and the stress is uniform.
Preferably, for guaranteeing joint strength, the arc is 1/4 arc, and the arc covers the 1/4 lateral wall along curtain main joist circumferencial direction, guarantees construction convenience, makes to connect more reliably.
Preferably, the edges of the joint of the arc-shaped plates and the main keel are welded and fixed. Four edges of arc are fixed with curtain main joist lateral wall laminating department full weld, guarantee joint strength.
Preferably, the connecting seat is a groove-shaped steel plate, the back of the notch of the groove-shaped steel plate is fixed with the circular tube B, and the notch is used for connecting the auxiliary keel. The back of the groove-shaped steel plate is welded and fixed with the round pipe B, and the direction of the notch can be changed by rotating the round pipe B.
Preferably, the arc-shaped plate is welded and fixed with the round pipe A, and the round pipe B is welded and fixed with the connecting seat.
The utility model also discloses a hyperbolic aluminum plate keel structure, which comprises a curtain wall main keel and an auxiliary keel, wherein the curtain wall main keel is fixed on the main structural steel truss, the auxiliary keel is fixed on the curtain wall main keel, the keel structure adopts the installation device for construction,
the main keel of the curtain wall is fixed on the main structure steel truss through the main structure steel truss adapter; the auxiliary keel is fixed on the curtain wall main keel through the arc-shaped circular tube switching assembly.
Preferably, the length and the angle of the circular tube A are determined by a vertical curtain wall main keel and a horizontal oblique curtain wall keel, and the angle is determined by the fixed position of the arc-shaped plate on the curtain wall main keel; and after the rechecking size of the connecting piece A is correct, the connecting piece A is fixed by full welding, then the connecting piece B is installed, the circular tube B and the circular tube A are matched and fixed by welding according to the matching depth of the auxiliary keel position and the angle adjusting circular tube B and the angle of the connecting seat, and the auxiliary keel is installed through the connecting seat.
And (4) determining an installation fixed point by using a total station according to the pay-off positioning diagram. According to the positioning fixing point, the main structure steel truss adapter is welded with the main body steel structure, the main structure steel truss adapter is controlled to be on the same straight line, and the elevation and the angle are accurate during installation. After the positioning is confirmed, the main structure steel truss adapter is temporarily fixed, namely spot-welded on the main structure steel. And after the rechecking size is correct, the main structure steel truss adaptor of the checked folding grid is subjected to full-welding fixation.
And hoisting the welded main structure steel truss to the base by using a crane, and performing spot welding on the base from top to bottom. And (5) rechecking the vertical main keel by using a total station, and fully welding and fixing after the adjustment is finished.
Confirm pipe A length and angle through vertical curtain main joist and horizontal slant curtain fossil fragments, spot weld pipe A and arc on curtain main joist, carry out full weld fixedly to the qualified connecting piece A of acceptance check after the recheck size is errorless. And sleeving the round pipe B into the round pipe A, adjusting the angle, and then fully welding and fixing. The curtain wall auxiliary keel is arranged on the connecting seat of the connecting piece B.
The utility model discloses a hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum plate keel structure compare with prior art, have following beneficial effect:
adopt this hyperbolic aluminum curtain wall fossil fragments installation device, coupling assembling is rotatable, and the connection angle when can adjusting the installation avoids causing the fixed quality hidden danger such as firm of welding repeatedly of fossil fragments because of the position uncertainty that fossil fragments are connected. Meanwhile, the construction structure is simple and convenient to construct, strong in operability, high in connection stability and easy to guarantee construction quality, and installation efficiency and construction quality of the hyperbolic aluminum plate curtain wall can be greatly improved.
Drawings
FIG. 1 is a schematic view of a keel mounting structure of a hyperbolic aluminum plate curtain wall in an embodiment;
FIG. 2 is a connection relation diagram of the arc round pipe adapter assembly and a main keel of the curtain wall;
fig. 3 is an installation drawing of the arc round pipe adapter assembly and the curtain wall main keel.
In the figure, 1, a main structure steel truss, 2, a main structure steel truss adaptor, 3, a curtain wall main keel, 4, an arc-shaped plate, 5, round pipes A, 6, a notch, 7, round pipes B, 8 and a connecting seat.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Example one
A hyperbolic aluminum curtain wall keel installation device comprises a main structure steel truss adapter 2 and an arc-shaped circular tube adapter assembly.
One end of the main structure steel truss adapter 2 is fixed on the main structure steel truss 1, and the other end is fixed with the vertical curtain wall main keel 3. The main structure steel truss adaptor 2 is
Figure BDA0002176110880000031
The two ends of the seamless steel tube are respectively welded and fixed with the main structural steel truss 1 and the curtain wall main keel 3. The two ends of the seamless steel pipe are provided with arc-shaped openings through whichAnd the main structural steel truss 1 and the curtain wall main keel 3 at two ends are attached and fixed by full welding.
The arc round tube switching assembly comprises a connecting piece A and a connecting piece B, wherein the connecting piece A comprises an arc plate 4 and a round tube A5, and the connecting piece A is selected
Figure BDA0002176110880000032
Arc-shaped steel plate and
Figure BDA0002176110880000033
the radian of the curved surface of the arc plate 4 is the same as the radian of the circumference of the curtain wall main keel 3, the inner side surface of the arc plate 4 is attached to the curtain wall main keel 3, and a horizontal round pipe A5 is fixed on the outer side surface; the connecting piece B comprises a circular tube B7 and a connecting seat 8, one end of the circular tube B7 is fixed with the connecting seat 8, the other end of the circular tube B7 is in plug-in fit with the circular tube A5, and the connecting seat 8 is matched with the auxiliary keel.
The arc-shaped plate 4 is welded and fixed with the round tube A5, and the round tube B7 is welded and fixed with the connecting seat 8.
For guaranteeing joint strength, arc 4 is 1/4 arc, and arc 4 covers the 1/4 lateral wall along 3 circumferencial direction of curtain main joist, guarantees construction convenience, makes to connect more reliably. The arc-shaped plate 4 is welded and fixed with the edge of the joint of the curtain wall main keel 3. Four edges of arc 4 are fixed with 3 lateral walls laminating departments of curtain main joist full weld, guarantee joint strength.
The assembly end of the round tube A5 is provided with a notch 6, and the notch 6 is fully welded after the round tube A5 and the round tube B7 are fixed. The notch 6 is arranged to be beneficial to the assembly and adjustment of the round tube A5 and the round tube B7, the round tube B7 is convenient to rotate, after the position is adjusted, the round tube is fixed by spot welding, after the size is rechecked, the notch 6 is filled by full welding, and the welding strength is further increased. In order to ensure that the welding is firm and the stress is uniform, four notches 6 are uniformly arranged on the wall of the assembly end of the circular tube A5 along the circumferential direction.
The connecting seat 8 is a groove-shaped steel plate, the back of the notch of the groove-shaped steel plate is fixed with the circular tube B7, and the notch is used for connecting the auxiliary keel. The back of the channel steel plate is welded and fixed with the round tube B7, and the direction of the notch can be changed by rotating the round tube B7.
The installation of hyperbolic aluminum curtain wall fossil fragments is realized through the use of the device, and concrete implementation mode is as follows:
the method comprises the steps of on-site measurement and paying-off → installation of a main structural steel truss adapter 2 → installation of a curtain wall main keel 3 → installation of an arc-shaped circular tube adapter assembly (connector A) → installation of a secondary keel circular tube adapter (connector B) → installation of a secondary keel in place → installation of an aluminum plate decorative surface layer.
Through the position and the angle of connecting piece A and connecting piece B adjustment installation, the hookup location of arc 4 and curtain main joist 3 can be confirmed according to the angle needs of curtain false keel or horizontal fossil fragments and curtain main joist 3, and the rotation through pipe B7 and pipe A5 changes the angle of connecting seat 8, curtain false keel or horizontal fossil fragments and curtain main joist 3's position still can be adjusted through the length that changes pipe B7 and pipe A5, connection stability is high, construction quality obtains guaranteeing easily.
Example two
The utility model provides a hyperbolic aluminum plate keel structure, includes curtain main joist 3 and false keel, and curtain main joist 3 is fixed in main structure steel truss 1, and the false keel is fixed in curtain main joist 3, and this keel structure adopts the installation device of embodiment one description to construct. The curtain wall main keel 3 is fixed on the main structure steel truss 1 through the main structure steel truss adapter 2; the auxiliary keel is fixed on the curtain wall main keel 3 through the arc-shaped circular tube switching assembly.
The length and the angle of the circular tube A5 are determined by the vertical curtain wall main keel 3 and the horizontal oblique curtain wall keel, and the angle is determined by the fixed position of the arc-shaped plate 4 on the curtain wall main keel 3; and after the rechecking size of the connecting piece A is correct, the connecting piece A is fixed by full welding, then the connecting piece B is installed, the matching depth of the circular tube B7 and the angle of the connecting seat 8 are adjusted according to the position and the angle of the auxiliary keel, the circular tube B7 and the circular tube A5 are matched and fixed by welding, and the auxiliary keel is installed through the connecting seat 8.
The concrete construction process is as follows:
and (4) determining an installation fixed point by using a total station according to the pay-off positioning diagram. According to the positioning fixed point
Figure BDA0002176110880000051
Figure BDA0002176110880000052
The main structure steel truss adapter 2 is welded with the main structure steel truss 1, the main structure steel truss adapter 2 is controlled to be on the same straight line, and elevation and angle are accurate during installation. After the positioning is confirmed, the main structure steel truss adapter 2 is temporarily fixed, i.e. spot welded on the main structure steel. And after the rechecking size is correct, the main structure steel truss adaptor 2 which is qualified in acceptance is fixed in a full-welding mode.
Installing the main structure steel truss 1, hoisting the main structure steel truss 1 after welding to a base by using a crane, and performing spot welding from top to bottom on the base. And (5) rechecking the vertical main keel by using a total station, and fully welding and fixing after the adjustment is finished.
Then, the arc-shaped circular tube switching assembly is installed, the length and the angle of a circular tube A5 are determined through the vertical curtain wall main keel 3 and the horizontal oblique curtain wall keel, the circular tube A5 and the arc-shaped plate 4 are spot-welded on the curtain wall main keel 3, and the qualified connecting piece A5 is subjected to full-welding fixation after the recheck size is correct. The round tube B7 is sleeved into the round tube A5, the angle is adjusted, and then the round tube B7 is fixed by full welding through four notches 6. The curtain wall auxiliary keel 3 is arranged on the connecting seat 8 of the connecting piece B.
Through the above detailed description, the person skilled in the art can easily realize the present invention. It should be understood, however, that the intention is not to limit the invention to the particular embodiments described. On the basis of the disclosed embodiments, a person skilled in the art can combine different technical features at will, thereby implementing different technical solutions.
In addition to the technical features described in the specification, the technology is known to those skilled in the art.

Claims (10)

1. A keel mounting device for a hyperbolic aluminum plate curtain wall is characterized by comprising a main structure steel truss adapter and an arc-shaped circular tube adapter assembly,
one end of the main structure steel truss adapter is fixed on the main structure steel truss, and the other end of the main structure steel truss adapter is fixed with the vertical main keel;
the arc-shaped circular tube switching assembly comprises a connecting piece A and a connecting piece B, the connecting piece A comprises an arc-shaped plate and a circular tube A, the radian of the curved surface of the arc-shaped plate is the same as the radian of the circumference of the main keel, the inner side surface of the arc-shaped plate is attached to the main keel, and the horizontal circular tube A is fixed on the outer side surface; the connecting piece B comprises a circular tube B and a connecting seat, one end of the circular tube B is fixed with the connecting seat, the other end of the circular tube B is in plug-in fit with the circular tube A, and the connecting seat is matched with the auxiliary keel.
2. The hyperbolic aluminum curtain wall keel mounting device according to claim 1, wherein the main structure steel truss adapter is a seamless steel pipe with a diameter of 180 mm by 10mm, and two ends of the seamless steel pipe are respectively welded and fixed with the main structure steel truss and the main keel.
3. The hyperbolic aluminum curtain wall keel mounting device according to claim 1, wherein the assembling end of the circular tube A is provided with a notch, and the notch is fully welded after the circular tube A and the circular tube B are fixed.
4. The hyperbolic aluminum curtain wall keel mounting device according to claim 3, wherein the number of the openings is four, and the openings are uniformly arranged on the pipe wall of the circular pipe A assembly end along the circumferential direction.
5. The keel mounting device for hyperbolic aluminum plate curtain walls according to claim 1, wherein the arc plate is 1/4 circular arc plate.
6. The hyperbolic aluminum curtain wall keel mounting device of claim 1 or 5, wherein the edges of the joint of the arc-shaped plate and the main keel of the curtain wall are welded and fixed.
7. The hyperbolic aluminum curtain wall keel mounting device of claim 1, wherein the connecting seat is a groove-shaped steel plate, and the back of the notch of the groove-shaped steel plate is fixed with the circular tube B.
8. The hyperbolic aluminum curtain wall keel mounting device of claim 1, 5 or 7, wherein the arc plate is welded and fixed with the circular tube A, and the circular tube B is welded and fixed with the connecting seat.
9. A hyperbolic aluminum plate keel structure comprises a curtain wall main keel and a false keel, the curtain wall main keel is fixed on a main structure steel truss, the false keel is fixed on the curtain wall main keel, characterized in that the keel structure is constructed by adopting the installation device of any one of claims 1-8,
the main keel of the curtain wall is fixed on the main structure steel truss through the main structure steel truss adapter; the auxiliary keel is fixed on the curtain wall main keel through the arc-shaped circular tube switching assembly.
10. The hyperbolic aluminum plate keel structure of claim 9, wherein the length and angle of the circular tube a are determined by the vertical curtain wall main keel and the horizontal oblique curtain wall keel, and the angle is determined by the fixing position of the arc plate on the curtain wall main keel; and after the rechecking size of the connecting piece A is correct, the connecting piece A is fixed by full welding, then the connecting piece B is installed, the circular tube B and the circular tube A are matched and fixed by welding according to the matching depth of the auxiliary keel position and the angle adjusting circular tube B and the angle of the connecting seat, and the auxiliary keel is installed through the connecting seat.
CN201921371651.6U 2019-08-22 2019-08-22 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure Active CN211080720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921371651.6U CN211080720U (en) 2019-08-22 2019-08-22 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921371651.6U CN211080720U (en) 2019-08-22 2019-08-22 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure

Publications (1)

Publication Number Publication Date
CN211080720U true CN211080720U (en) 2020-07-24

Family

ID=71630963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921371651.6U Active CN211080720U (en) 2019-08-22 2019-08-22 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure

Country Status (1)

Country Link
CN (1) CN211080720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN115370052B (en) * 2022-09-07 2023-09-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Similar Documents

Publication Publication Date Title
CN211080720U (en) Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure
CN211775899U (en) Support system for one-time embedded box in masonry
CN211010160U (en) Vertical pipeline fixing device
CN115030378B (en) Installation structure and construction method of space bending-torsion building hyperbolic glass curtain wall
CN206140052U (en) Elbow welding jig frock is responsible for to nuclear power
CN213859243U (en) 90-degree welding and paying-off device for circular steel pipe
CN215263278U (en) Concrete structure defect detection device in building body
CN210232107U (en) Special butt-joint device for welding small-bore pipeline
CN210468153U (en) Novel grounding structure suitable for steel pipe pole
CN207636766U (en) Multi-beam transducer attitude regulation and calibrating installation
CN210024235U (en) Robot welding hand for pipeline welding
CN209229142U (en) A kind of clamping hoop type pipeline rotary fixing device
CN214639828U (en) Angle adjusting device for reinforcing steel bar
CN215066261U (en) Walking support for X-ray machine 10-inch-14-inch pipe diameter pipeline
CN111058613B (en) Auxiliary device is connected to pipe
CN106078054B (en) Passenger doors sill welds positioning tool before a kind of car
CN220203371U (en) Scaffold tie device under full cast-in-situ mode of outer wall
CN210658829U (en) Section bar foot connecting piece of prefabricated fast-assembling pipeline integrated interior wall body keel system
CN216344507U (en) Major diameter steel pipe butt joint auxiliary device
CN218875452U (en) Novel multi-functional quick pipeline laying-out instrument
CN210221858U (en) Special rack for ray detection
CN108797368A (en) The fast aligning method of steel case arch bridge anchor tube
CN216692457U (en) Pipeline fixing device and leveling layer structure
CN212848836U (en) Gps antenna structure for outdoor base station
CN212478312U (en) Anti-leakage roof cable sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant