CN108797368A - The fast aligning method of steel case arch bridge anchor tube - Google Patents
The fast aligning method of steel case arch bridge anchor tube Download PDFInfo
- Publication number
- CN108797368A CN108797368A CN201810982320.XA CN201810982320A CN108797368A CN 108797368 A CN108797368 A CN 108797368A CN 201810982320 A CN201810982320 A CN 201810982320A CN 108797368 A CN108797368 A CN 108797368A
- Authority
- CN
- China
- Prior art keywords
- anchor tube
- bridge floor
- arch
- bridge
- arch section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
The invention belongs to steel case Construction of Arch Bridges construction fields, and in particular to a kind of fast aligning method of steel case arch bridge anchor tube includes the following steps:Step 1: in first looking for bridge floor anchor tube and arch section anchor tube, finds bridge floor anchor tube and encircle the axis of section anchor tube;A crystal rope is installed on the axis of bridge floor anchor tube and arch section anchor tube again;Step 2: after the installation of bridge floor anchor tube, a holder is placed above bridge floor anchor tube;A laser level is placed on holder again, and adjusts laser level and the laser that laser level is sent out is overlapped with the crystal rope on bridge floor anchor tube axis;Step 3: installation lifting arch section, and adjusting the position of arch section anchor tube so that the crystal rope on arch section anchor tube axis is overlapped with the laser that laser level is sent out, and completes the fast aligning of anchor tube.This method energy is quick, simple and direct, accurately carries out fast aligning installation to anchor tube.
Description
Technical field
The invention belongs to steel case Construction of Arch Bridges construction fields, and in particular to a kind of fast aligning side of steel case arch bridge anchor tube
Method.
Background technology
With the development of Urban Bridge Construction, more landscape moulding steel arch bridges are more and more, most of project construction side
The installation sequencing of case is installation arch section after first installing bridge floor beam.Main arch is hyperbolic irregular box cell structure, and arch rib arch is vertical
Face projection line is parabola, and anchor cable not instead of vertical connection is connected with angle tilt.Corresponding band anchor tube(Anchor tube includes bridge
Face anchor tube 3 and arch section anchor tube 4)Arch Duan Ruo error is installed, it is wrong to will result in anchor cable installation, the angle of tensioning, or even meeting
Lead to have the service life for rubbing and reducing anchor cable between anchor cable and anchor tube, it is therefore desirable to a kind of quick, simple and direct, accurate positioning
Installation method, meaning ensure the accuracy of anchor tube anchor cable installation.In the conventional method of anchor tube location and installation, arch section lifting is in place
Afterwards, it during high-altitude is looked in installation personnel to arch section, is adjusted using plumb line and floor projection, this method increases installation personnel
High-altitude construction risk, increase lifting machine machine-team and construction time.
Invention content
In view of the above technical problems, the purpose of the present invention is to provide a kind of fast aligning method of steel case arch bridge anchor tube,
This method can it is quick, simple and direct, accurately to anchor tube carry out fast aligning installation, reduce security risk, reduce construction cost,
Shorten the construction period.
To achieve the above object, the technical solution used in the present invention is:
A kind of fast aligning method of steel case arch bridge anchor tube, it is characterised in that include the following steps:
Step 1: in first looking for bridge floor anchor tube and arch section anchor tube, finds bridge floor anchor tube and encircle the axis of section anchor tube;Again in bridge
A crystal rope is installed on the axis of face anchor tube and arch section anchor tube;
Step 2: after the installation of bridge floor anchor tube, a holder is placed above bridge floor anchor tube;A laser is placed on holder again
Level, and adjust laser level and make the laser that laser level is sent out and the crystal rope weight on bridge floor anchor tube axis
It closes;
Step 3: installation lifting arch section, and adjust the position of arch section anchor tube so that crystal rope and laser on arch section anchor tube axis
The laser that level is sent out overlaps, and completes the fast aligning of anchor tube.
First in the both ends of anchor tube two crystal ropes diametrically arranged crosswise, the intersection point, that is, center of circle in step 1;One is taken again
Crystal rope, both ends are separately connected the intersection point of the two crystal ropes in anchor tube both ends.
The holder includes a panel and four supporting legs, collectively forms desk type, it is big to offer diameter on the panel
In the round sight vane of anchor tube diameter;In use, mount is on bridge floor beam, sight vane and bridge floor anchor tube arranged concentric.
Beneficial effects of the present invention are:
1, this method can it is quick, simple and direct, location and installation accurately is carried out to anchor tube, reduce security risk, reduce and be constructed into
Originally, the construction period is shortened.
2, this method utilizes the radiating laser beams of laser level, the registration of remote observation laser beam and crystal rope.
3, this method utilizes the stronger crystal rope of translucency, is preferably penetrated convenient for the laser beam of laser level.
Description of the drawings
Fig. 1 is the schematic diagram of steel case arch bridge when this method is constructed.
Schematic diagram at bridge floor anchor tube when Fig. 2 is this method construction.
Fig. 3 is that this method encircles schematic diagram at section anchor tube when constructing.
Fig. 4 is anchor tube when this method is constructed(Including bridge floor anchor tube and arch section anchor tube)Look for middle schematic diagram.
Fig. 5 is the schematic diagram of holder.
Fig. 6 is the schematic diagram of laser level.
In figure:1, bridge floor;2, encircle section;3, bridge floor anchor tube;4, encircle section anchor tube;5, laser level;6, holder;7, laser;
8, crystal rope;9, panel;10, supporting leg;11, sight vane;12, telescopic outrigger.
Specific implementation mode
For a better understanding of the present invention, technical scheme of the present invention is done further with reference to embodiment and attached drawing
Explanation(As shown in figures 1 to 6).
A kind of fast aligning method of steel case arch bridge anchor tube, includes the following steps:
Step 1: first to bridge floor anchor tube 3 and arch section anchor tube 4(Bridge floor anchor tube 3 and arch section anchor tube 4 are referred to as anchor tube)In being looked for,
It finds bridge floor anchor tube 3 and encircles the axis of section anchor tube 4;A crystal rope is installed on the axis of bridge floor anchor tube 3 and arch section anchor tube 4 again
8;
Step 2: after the installation of bridge floor anchor tube 3, a holder 6 is placed above bridge floor anchor tube 3;Place one on the frame 6 again
Laser level 5, and adjust laser level 5(Telescopic outrigger 12)So that laser 7 and bridge floor that laser level 5 is sent out
Crystal rope 8 on 3 axis of anchor tube overlaps(With this so that the angle of laser level 2 is consistent with the angle of Cheng Qiaohou anchor cables);
Step 3: installation lifting arch section 2, and adjust the position of arch section anchor tube 4 so that crystal rope 8 on 4 axis of arch section anchor tube with
The laser 7 that laser level 5 is sent out overlaps, and completes the fast aligning of anchor tube.
First in the both ends of anchor tube two crystal ropes 8 diametrically arranged crosswise, the intersection point, that is, center of circle in step 1;One is taken again
Crystal rope 8, both ends are separately connected the intersection point of the two crystal ropes 8 in anchor tube both ends.
The holder 6 includes a panel 9 and four supporting legs 10, collectively forms desk type, is offered on the panel 9 straight
Diameter is more than the round sight vane 11 of anchor tube diameter;In use, holder 6 is placed on bridge floor beam 1, sight vane 11 and bridge floor anchor tube 3
Arranged concentric.It is fixed with magnetite between telescopic outrigger 12 and panel 9.
The making of the holder 6:Square steel plate(t=10mm)As panel 9, and sight vane 11 is opened up on panel 9, have an X-rayed
11 diameter of hole is more than anchor tube diameter 50mm, angle steel(L40)As supporting leg 10, height is slightly above anchor tube.
Described above is only the Application Example of the present invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore according to equivalence changes made by scope of the present invention patent, still belongs to protection scope of the present invention.
Claims (3)
1. a kind of fast aligning method of steel case arch bridge anchor tube, it is characterised in that include the following steps:
Step 1: first to bridge floor anchor tube(3)With arch section anchor tube(4)In being looked for, bridge floor anchor tube is found(3)With arch section anchor tube(4)
Axis;Again in bridge floor anchor tube(3)With arch section anchor tube(4)Axis on install a crystal rope(8);
Step 2: in bridge floor anchor tube(3)After installation, in bridge floor anchor tube(3)Place a holder in top(6);Again in holder(6)On
Place a laser level(5), and adjust laser level(5)Make laser level(5)The laser sent out(7)With bridge
Face anchor tube(3)Crystal rope on axis(8)It overlaps;
Step 3: installation lifting arch section(2), and adjust arch section anchor tube(4)Position so that arch section anchor tube(4)Water on axis
Crystalline substance rope(8)With laser level(5)The laser sent out(7)It overlaps, completes the fast aligning of anchor tube.
2. the fast aligning method of steel case arch bridge anchor tube according to claim 1, it is characterised in that:First in anchor in step 1
The two crystal ropes in the both ends of pipe(8)Diametrically arranged crosswise, the intersection point, that is, center of circle;A crystal rope is taken again(8), both ends difference
Connect two, both ends of anchor tube crystal rope(8)Intersection point.
3. the fast aligning method of steel case arch bridge anchor tube according to claim 1, it is characterised in that:The holder(6)Packet
Include a panel(9)With four supporting legs(10), collectively form desk type, the panel(9)On offer diameter more than anchor tube it is straight
The round sight vane of diameter(11);In use, holder(6)It is placed in bridge floor beam(1)On, sight vane(11)With bridge floor anchor tube(3)Together
The heart is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810982320.XA CN108797368A (en) | 2018-08-27 | 2018-08-27 | The fast aligning method of steel case arch bridge anchor tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810982320.XA CN108797368A (en) | 2018-08-27 | 2018-08-27 | The fast aligning method of steel case arch bridge anchor tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108797368A true CN108797368A (en) | 2018-11-13 |
Family
ID=64080855
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810982320.XA Pending CN108797368A (en) | 2018-08-27 | 2018-08-27 | The fast aligning method of steel case arch bridge anchor tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108797368A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111426549A (en) * | 2020-04-27 | 2020-07-17 | 河南省交院工程检测科技有限公司 | Rapid centering method of bridge metal support |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101555961A (en) * | 2009-05-11 | 2009-10-14 | 中天建设集团浙江安装工程有限公司 | Construction method of arch pipeline support and hanger laser positioning |
CN101925721A (en) * | 2008-01-25 | 2010-12-22 | 弗雷德尔.伊谢贝克有限责任公司 | Anchor tube and manufacture method thereof |
WO2012161634A1 (en) * | 2011-05-20 | 2012-11-29 | Burstroem Bertil Ingvar | Device for achieving single-direction flow in channels, pipes, etc |
CN104278641A (en) * | 2014-10-16 | 2015-01-14 | 中铁七局集团第三工程有限公司 | Tied arch bridge hanger rod embedded hole centering device and method |
CN104790393A (en) * | 2015-04-23 | 2015-07-22 | 万军利 | Double-anchoring-section prestress anchor cable structure and constructing method thereof |
CN205981210U (en) * | 2015-11-30 | 2017-02-22 | 南京德朔实业有限公司 | Scribing device |
CN206569919U (en) * | 2017-02-17 | 2017-10-20 | 国网天津市电力公司 | The positioner of mobile platform in a kind of power distribution room |
-
2018
- 2018-08-27 CN CN201810982320.XA patent/CN108797368A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101925721A (en) * | 2008-01-25 | 2010-12-22 | 弗雷德尔.伊谢贝克有限责任公司 | Anchor tube and manufacture method thereof |
CN101555961A (en) * | 2009-05-11 | 2009-10-14 | 中天建设集团浙江安装工程有限公司 | Construction method of arch pipeline support and hanger laser positioning |
WO2012161634A1 (en) * | 2011-05-20 | 2012-11-29 | Burstroem Bertil Ingvar | Device for achieving single-direction flow in channels, pipes, etc |
CN104278641A (en) * | 2014-10-16 | 2015-01-14 | 中铁七局集团第三工程有限公司 | Tied arch bridge hanger rod embedded hole centering device and method |
CN104790393A (en) * | 2015-04-23 | 2015-07-22 | 万军利 | Double-anchoring-section prestress anchor cable structure and constructing method thereof |
CN205981210U (en) * | 2015-11-30 | 2017-02-22 | 南京德朔实业有限公司 | Scribing device |
CN206569919U (en) * | 2017-02-17 | 2017-10-20 | 国网天津市电力公司 | The positioner of mobile platform in a kind of power distribution room |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111426549A (en) * | 2020-04-27 | 2020-07-17 | 河南省交院工程检测科技有限公司 | Rapid centering method of bridge metal support |
CN111426549B (en) * | 2020-04-27 | 2023-05-02 | 中犇检测认证有限公司 | Quick centering method for bridge metal support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20120131789A1 (en) | Installing method for anchor cage and installing method for industrial equipment | |
CN203603586U (en) | Equipment support regulating device | |
CN205907604U (en) | Steel bridge segmental hoisting counterpoint fixing device | |
CN102080417B (en) | Construction method for split burying of large T-shaped sleeve bolt | |
CN103174302A (en) | Construction method for large-diameter barrel cabin top | |
CN112033363B (en) | Tower body inclination measuring method of tower crane | |
CN106320186B (en) | A kind of skewback embedded anchor bar positioning system and construction method | |
CN108797368A (en) | The fast aligning method of steel case arch bridge anchor tube | |
CN207392771U (en) | A kind of guide type steel column locator | |
CN209509495U (en) | High-altitude large-diameter circular steel pipe outsourcing clear-water concrete lightweight steel form | |
CN206562667U (en) | A kind of quick pedestal anchor bolt structure in place | |
CN103015737B (en) | A kind of mounting method of steel containment cofferdam of nuclear power plant | |
CN106759943A (en) | A kind of pre-assembled Anchor Bolts in Steel Column Bases structure | |
CN105239804A (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
KR20160011464A (en) | setting device based towers enclosing, and method using it | |
CN217149887U (en) | Positioning and adjusting system for assembled circular pier | |
CN205688351U (en) | A kind of prefabricated stand column horizontal positioning device | |
CN106930406A (en) | A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure | |
CN106801470A (en) | A kind of quick pedestal anchor bolt structure in place | |
CN108385710B (en) | Reusable tower foundation and installation method thereof | |
CN103306533B (en) | Steel column band base construction system and disposable installing and fixing method thereof | |
CN107830321B (en) | Flush type foundation bolt for electrical bracket positions levelling device | |
CN208733894U (en) | Dome installation foundation pedestal | |
CN216948760U (en) | Oval daylighting roof system | |
CN207642539U (en) | A kind of pylon fixation doorframe piece welder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |