CN108797368A - The fast aligning method of steel case arch bridge anchor tube - Google Patents

The fast aligning method of steel case arch bridge anchor tube Download PDF

Info

Publication number
CN108797368A
CN108797368A CN201810982320.XA CN201810982320A CN108797368A CN 108797368 A CN108797368 A CN 108797368A CN 201810982320 A CN201810982320 A CN 201810982320A CN 108797368 A CN108797368 A CN 108797368A
Authority
CN
China
Prior art keywords
anchor tube
bridge floor
arch
bridge
arch section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810982320.XA
Other languages
Chinese (zh)
Inventor
黄耀和
郭继舟
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Wuhan Yiye Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd, Wuhan Yiye Steel Structure Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201810982320.XA priority Critical patent/CN108797368A/en
Publication of CN108797368A publication Critical patent/CN108797368A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The invention belongs to steel case Construction of Arch Bridges construction fields, and in particular to a kind of fast aligning method of steel case arch bridge anchor tube includes the following steps:Step 1: in first looking for bridge floor anchor tube and arch section anchor tube, finds bridge floor anchor tube and encircle the axis of section anchor tube;A crystal rope is installed on the axis of bridge floor anchor tube and arch section anchor tube again;Step 2: after the installation of bridge floor anchor tube, a holder is placed above bridge floor anchor tube;A laser level is placed on holder again, and adjusts laser level and the laser that laser level is sent out is overlapped with the crystal rope on bridge floor anchor tube axis;Step 3: installation lifting arch section, and adjusting the position of arch section anchor tube so that the crystal rope on arch section anchor tube axis is overlapped with the laser that laser level is sent out, and completes the fast aligning of anchor tube.This method energy is quick, simple and direct, accurately carries out fast aligning installation to anchor tube.

Description

The fast aligning method of steel case arch bridge anchor tube
Technical field
The invention belongs to steel case Construction of Arch Bridges construction fields, and in particular to a kind of fast aligning side of steel case arch bridge anchor tube Method.
Background technology
With the development of Urban Bridge Construction, more landscape moulding steel arch bridges are more and more, most of project construction side The installation sequencing of case is installation arch section after first installing bridge floor beam.Main arch is hyperbolic irregular box cell structure, and arch rib arch is vertical Face projection line is parabola, and anchor cable not instead of vertical connection is connected with angle tilt.Corresponding band anchor tube(Anchor tube includes bridge Face anchor tube 3 and arch section anchor tube 4)Arch Duan Ruo error is installed, it is wrong to will result in anchor cable installation, the angle of tensioning, or even meeting Lead to have the service life for rubbing and reducing anchor cable between anchor cable and anchor tube, it is therefore desirable to a kind of quick, simple and direct, accurate positioning Installation method, meaning ensure the accuracy of anchor tube anchor cable installation.In the conventional method of anchor tube location and installation, arch section lifting is in place Afterwards, it during high-altitude is looked in installation personnel to arch section, is adjusted using plumb line and floor projection, this method increases installation personnel High-altitude construction risk, increase lifting machine machine-team and construction time.
Invention content
In view of the above technical problems, the purpose of the present invention is to provide a kind of fast aligning method of steel case arch bridge anchor tube, This method can it is quick, simple and direct, accurately to anchor tube carry out fast aligning installation, reduce security risk, reduce construction cost, Shorten the construction period.
To achieve the above object, the technical solution used in the present invention is:
A kind of fast aligning method of steel case arch bridge anchor tube, it is characterised in that include the following steps:
Step 1: in first looking for bridge floor anchor tube and arch section anchor tube, finds bridge floor anchor tube and encircle the axis of section anchor tube;Again in bridge A crystal rope is installed on the axis of face anchor tube and arch section anchor tube;
Step 2: after the installation of bridge floor anchor tube, a holder is placed above bridge floor anchor tube;A laser is placed on holder again Level, and adjust laser level and make the laser that laser level is sent out and the crystal rope weight on bridge floor anchor tube axis It closes;
Step 3: installation lifting arch section, and adjust the position of arch section anchor tube so that crystal rope and laser on arch section anchor tube axis The laser that level is sent out overlaps, and completes the fast aligning of anchor tube.
First in the both ends of anchor tube two crystal ropes diametrically arranged crosswise, the intersection point, that is, center of circle in step 1;One is taken again Crystal rope, both ends are separately connected the intersection point of the two crystal ropes in anchor tube both ends.
The holder includes a panel and four supporting legs, collectively forms desk type, it is big to offer diameter on the panel In the round sight vane of anchor tube diameter;In use, mount is on bridge floor beam, sight vane and bridge floor anchor tube arranged concentric.
Beneficial effects of the present invention are:
1, this method can it is quick, simple and direct, location and installation accurately is carried out to anchor tube, reduce security risk, reduce and be constructed into Originally, the construction period is shortened.
2, this method utilizes the radiating laser beams of laser level, the registration of remote observation laser beam and crystal rope.
3, this method utilizes the stronger crystal rope of translucency, is preferably penetrated convenient for the laser beam of laser level.
Description of the drawings
Fig. 1 is the schematic diagram of steel case arch bridge when this method is constructed.
Schematic diagram at bridge floor anchor tube when Fig. 2 is this method construction.
Fig. 3 is that this method encircles schematic diagram at section anchor tube when constructing.
Fig. 4 is anchor tube when this method is constructed(Including bridge floor anchor tube and arch section anchor tube)Look for middle schematic diagram.
Fig. 5 is the schematic diagram of holder.
Fig. 6 is the schematic diagram of laser level.
In figure:1, bridge floor;2, encircle section;3, bridge floor anchor tube;4, encircle section anchor tube;5, laser level;6, holder;7, laser; 8, crystal rope;9, panel;10, supporting leg;11, sight vane;12, telescopic outrigger.
Specific implementation mode
For a better understanding of the present invention, technical scheme of the present invention is done further with reference to embodiment and attached drawing Explanation(As shown in figures 1 to 6).
A kind of fast aligning method of steel case arch bridge anchor tube, includes the following steps:
Step 1: first to bridge floor anchor tube 3 and arch section anchor tube 4(Bridge floor anchor tube 3 and arch section anchor tube 4 are referred to as anchor tube)In being looked for, It finds bridge floor anchor tube 3 and encircles the axis of section anchor tube 4;A crystal rope is installed on the axis of bridge floor anchor tube 3 and arch section anchor tube 4 again 8;
Step 2: after the installation of bridge floor anchor tube 3, a holder 6 is placed above bridge floor anchor tube 3;Place one on the frame 6 again Laser level 5, and adjust laser level 5(Telescopic outrigger 12)So that laser 7 and bridge floor that laser level 5 is sent out Crystal rope 8 on 3 axis of anchor tube overlaps(With this so that the angle of laser level 2 is consistent with the angle of Cheng Qiaohou anchor cables);
Step 3: installation lifting arch section 2, and adjust the position of arch section anchor tube 4 so that crystal rope 8 on 4 axis of arch section anchor tube with The laser 7 that laser level 5 is sent out overlaps, and completes the fast aligning of anchor tube.
First in the both ends of anchor tube two crystal ropes 8 diametrically arranged crosswise, the intersection point, that is, center of circle in step 1;One is taken again Crystal rope 8, both ends are separately connected the intersection point of the two crystal ropes 8 in anchor tube both ends.
The holder 6 includes a panel 9 and four supporting legs 10, collectively forms desk type, is offered on the panel 9 straight Diameter is more than the round sight vane 11 of anchor tube diameter;In use, holder 6 is placed on bridge floor beam 1, sight vane 11 and bridge floor anchor tube 3 Arranged concentric.It is fixed with magnetite between telescopic outrigger 12 and panel 9.
The making of the holder 6:Square steel plate(t=10mm)As panel 9, and sight vane 11 is opened up on panel 9, have an X-rayed 11 diameter of hole is more than anchor tube diameter 50mm, angle steel(L40)As supporting leg 10, height is slightly above anchor tube.
Described above is only the Application Example of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore according to equivalence changes made by scope of the present invention patent, still belongs to protection scope of the present invention.

Claims (3)

1. a kind of fast aligning method of steel case arch bridge anchor tube, it is characterised in that include the following steps:
Step 1: first to bridge floor anchor tube(3)With arch section anchor tube(4)In being looked for, bridge floor anchor tube is found(3)With arch section anchor tube(4) Axis;Again in bridge floor anchor tube(3)With arch section anchor tube(4)Axis on install a crystal rope(8);
Step 2: in bridge floor anchor tube(3)After installation, in bridge floor anchor tube(3)Place a holder in top(6);Again in holder(6)On Place a laser level(5), and adjust laser level(5)Make laser level(5)The laser sent out(7)With bridge Face anchor tube(3)Crystal rope on axis(8)It overlaps;
Step 3: installation lifting arch section(2), and adjust arch section anchor tube(4)Position so that arch section anchor tube(4)Water on axis Crystalline substance rope(8)With laser level(5)The laser sent out(7)It overlaps, completes the fast aligning of anchor tube.
2. the fast aligning method of steel case arch bridge anchor tube according to claim 1, it is characterised in that:First in anchor in step 1 The two crystal ropes in the both ends of pipe(8)Diametrically arranged crosswise, the intersection point, that is, center of circle;A crystal rope is taken again(8), both ends difference Connect two, both ends of anchor tube crystal rope(8)Intersection point.
3. the fast aligning method of steel case arch bridge anchor tube according to claim 1, it is characterised in that:The holder(6)Packet Include a panel(9)With four supporting legs(10), collectively form desk type, the panel(9)On offer diameter more than anchor tube it is straight The round sight vane of diameter(11);In use, holder(6)It is placed in bridge floor beam(1)On, sight vane(11)With bridge floor anchor tube(3)Together The heart is arranged.
CN201810982320.XA 2018-08-27 2018-08-27 The fast aligning method of steel case arch bridge anchor tube Pending CN108797368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810982320.XA CN108797368A (en) 2018-08-27 2018-08-27 The fast aligning method of steel case arch bridge anchor tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810982320.XA CN108797368A (en) 2018-08-27 2018-08-27 The fast aligning method of steel case arch bridge anchor tube

Publications (1)

Publication Number Publication Date
CN108797368A true CN108797368A (en) 2018-11-13

Family

ID=64080855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810982320.XA Pending CN108797368A (en) 2018-08-27 2018-08-27 The fast aligning method of steel case arch bridge anchor tube

Country Status (1)

Country Link
CN (1) CN108797368A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111426549A (en) * 2020-04-27 2020-07-17 河南省交院工程检测科技有限公司 Rapid centering method of bridge metal support

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101555961A (en) * 2009-05-11 2009-10-14 中天建设集团浙江安装工程有限公司 Construction method of arch pipeline support and hanger laser positioning
CN101925721A (en) * 2008-01-25 2010-12-22 弗雷德尔.伊谢贝克有限责任公司 Anchor tube and manufacture method thereof
WO2012161634A1 (en) * 2011-05-20 2012-11-29 Burstroem Bertil Ingvar Device for achieving single-direction flow in channels, pipes, etc
CN104278641A (en) * 2014-10-16 2015-01-14 中铁七局集团第三工程有限公司 Tied arch bridge hanger rod embedded hole centering device and method
CN104790393A (en) * 2015-04-23 2015-07-22 万军利 Double-anchoring-section prestress anchor cable structure and constructing method thereof
CN205981210U (en) * 2015-11-30 2017-02-22 南京德朔实业有限公司 Scribing device
CN206569919U (en) * 2017-02-17 2017-10-20 国网天津市电力公司 The positioner of mobile platform in a kind of power distribution room

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101925721A (en) * 2008-01-25 2010-12-22 弗雷德尔.伊谢贝克有限责任公司 Anchor tube and manufacture method thereof
CN101555961A (en) * 2009-05-11 2009-10-14 中天建设集团浙江安装工程有限公司 Construction method of arch pipeline support and hanger laser positioning
WO2012161634A1 (en) * 2011-05-20 2012-11-29 Burstroem Bertil Ingvar Device for achieving single-direction flow in channels, pipes, etc
CN104278641A (en) * 2014-10-16 2015-01-14 中铁七局集团第三工程有限公司 Tied arch bridge hanger rod embedded hole centering device and method
CN104790393A (en) * 2015-04-23 2015-07-22 万军利 Double-anchoring-section prestress anchor cable structure and constructing method thereof
CN205981210U (en) * 2015-11-30 2017-02-22 南京德朔实业有限公司 Scribing device
CN206569919U (en) * 2017-02-17 2017-10-20 国网天津市电力公司 The positioner of mobile platform in a kind of power distribution room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111426549A (en) * 2020-04-27 2020-07-17 河南省交院工程检测科技有限公司 Rapid centering method of bridge metal support
CN111426549B (en) * 2020-04-27 2023-05-02 中犇检测认证有限公司 Quick centering method for bridge metal support

Similar Documents

Publication Publication Date Title
US20120131789A1 (en) Installing method for anchor cage and installing method for industrial equipment
CN203603586U (en) Equipment support regulating device
CN205907604U (en) Steel bridge segmental hoisting counterpoint fixing device
CN102080417B (en) Construction method for split burying of large T-shaped sleeve bolt
CN103174302A (en) Construction method for large-diameter barrel cabin top
CN112033363B (en) Tower body inclination measuring method of tower crane
CN106320186B (en) A kind of skewback embedded anchor bar positioning system and construction method
CN108797368A (en) The fast aligning method of steel case arch bridge anchor tube
CN207392771U (en) A kind of guide type steel column locator
CN209509495U (en) High-altitude large-diameter circular steel pipe outsourcing clear-water concrete lightweight steel form
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN103015737B (en) A kind of mounting method of steel containment cofferdam of nuclear power plant
CN106759943A (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
KR20160011464A (en) setting device based towers enclosing, and method using it
CN217149887U (en) Positioning and adjusting system for assembled circular pier
CN205688351U (en) A kind of prefabricated stand column horizontal positioning device
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN106801470A (en) A kind of quick pedestal anchor bolt structure in place
CN108385710B (en) Reusable tower foundation and installation method thereof
CN103306533B (en) Steel column band base construction system and disposable installing and fixing method thereof
CN107830321B (en) Flush type foundation bolt for electrical bracket positions levelling device
CN208733894U (en) Dome installation foundation pedestal
CN216948760U (en) Oval daylighting roof system
CN207642539U (en) A kind of pylon fixation doorframe piece welder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113