CN208733894U CN201821176064.7U CN201821176064U CN208733894U CN 208733894 U CN208733894 U CN 208733894U CN 201821176064 U CN201821176064 U CN 201821176064U CN 208733894 U CN208733894 U CN 208733894U
Authority
CN
China
Prior art keywords
circlewise
basic body
dome
ground
grade level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821176064.7U
Other languages
Chinese (zh)
Inventor
郑云头
郑曾
孙林贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Slow City Photoelectric Technology Co Ltd
Original Assignee
Nanjing Slow City Photoelectric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Slow City Photoelectric Technology Co Ltd filed Critical Nanjing Slow City Photoelectric Technology Co Ltd
Priority to CN201821176064.7U priority Critical patent/CN208733894U/en
Application granted granted Critical
Publication of CN208733894U publication Critical patent/CN208733894U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of dome installation foundation pedestal;The technical issues of solution: the technical issues of installation foundation pedestal of existing astronomical dome mentioned in the background art is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.A kind of technical solution of use: dome installation foundation pedestal, including the circlewise basic body formed using concreting, the grade level formed using concreting is provided in circlewise basic body inner ring, circlewise basic body and grade level constitute the ground that section is in " H " type, the lower part of ground is embedded to construction site below ground, and grade level is located at the pier stud for being used to support grade level piled up using rotary head that the back side of ground or more and grade level is arranged towards below ground.Advantage, this dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, and astronomical dome is directly anchored to the position precision that steel plate guarantees astronomical dome.

Description

Dome installation foundation pedestal
Technical field
The utility model relates to a kind of dome installation foundation pedestals.
Background technique
Astronomical dome makes the machine type roof special for power station designed exclusively for astronomical telescope omnibearing observation, for protecting astronomy to look in the distance The astronomical instruments such as mirror, equipment are from solarization, dust storm, dust invasion.
Since the weight of astronomical dome is big, required pedestal is installed and also allows for supporting astronomical dome while also necessary It is accurate to guarantee that the position of astronomical dome needs.Therefore, the installation foundation pedestal of existing astronomical dome be unable to satisfy Fast Installation and Guarantee the requirement of the position precision of astronomical dome, the installation foundation pedestal of astronomical dome is urgent problem.
Utility model content
The technical problem to be solved by the utility model is to the installation of existing astronomical dome mentioned in the background art The technical issues of sole plate is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.
The purpose of this utility model is to provide a kind of dome installation foundation pedestal, this pedestal uses concrete and steel plate It is made, has effectively achieved the Fast Installation of astronomical dome, astronomical dome is directly anchored to the position that steel plate guarantees astronomical dome Precision.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of dome installation foundation pedestal, including the circlewise basic body formed using concreting, circlewise Basic body inner ring is provided with the grade level formed using concreting, and circlewise basic body and grade level composition section are in The lower part of the ground of " H " type, ground is embedded to construction site below ground, and grade level is located at the back of ground or more and grade level Face the pier stud for being used to support grade level of below ground setting piled up using rotary head, the annular more than grade level The thickness of one section in ground basic body circlewise basic body is greater than the thickness of remaining circlewise basic body, one section of circlewise basic body Arc chord angle be °;The L-shaped envelope of a ring cross-section is set on the lateral surface of circlewise basic body for being located at grade level or more Plate, sealing plate are formed using concreting, and a ring annular groove is formed between the lateral surface of sealing plate and circlewise basic body;In ring Shape basic body top setting using annular mounting platform made of steel plate.
Preferably, annular mounting platform connects annular ground ontology, the upper end of foundation bolt by the foundation bolt of welding It is welded on the back side of annular mounting platform, foundation bolt embedment is circlewise in basic body.
Preferably, it is provided in circlewise basic body and grade level and is connected to the first air flue, the outlet position of the first air flue In the center point of circlewise basic body.
Preferably, the second air flue is provided in circlewise basic body, pier stud is directed toward in the outlet of the second air flue.
Preferably, the through-hole in the setting of the bottom of annular groove for draining.Through-hole is designed for discharge by astronomy circle Rainwater under top row, while it being also used for the skirt on fixed astronomical dome periphery, skirt setting prevents sundries from entering, and it is normal to influence it Rotation;It is close that it is also prevented from idler simultaneously, improves safety.
The circlewise basic body formed using concreting that is referred in technical solutions of the utility model and using coagulation The technique that soil pours the grade level to be formed is common process in the prior art, and the utility model does not elaborate.
The utility model compared with prior art, the beneficial effect is that:
This dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the quick of astronomical dome Installation, astronomical dome are directly anchored to the position precision that steel plate guarantees astronomical dome.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model mechanism.
Specific embodiment
Technical solutions of the utility model are described in detail below, but the protection scope of the utility model is not limited to The embodiment.
To keep the content of the utility model more obvious and easy to understand, done further below in conjunction with attached drawing 1 and specific embodiment Description.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this Utility model is not used to limit the utility model.
As shown in Figure 1, the dome installation foundation pedestal in the present embodiment, is the necessary pedestal of astronomical dome installation.
One of the present embodiment dome installation foundation pedestal, it is circlewise basic including being formed using concreting Body 1 is provided with the grade level 2 formed using concreting in circlewise 1 inner ring of basic body, circlewise basic body 1 and ground Base plane 2 constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, and grade level 2 is located at ground Above and the pier stud 3 for being used to support grade level 2 piled up using rotary head that is arranged towards below ground of the back side of grade level 2, It is circlewise basic that the thickness of one section in the circlewise basic body 1 of 2 or more grade level circlewise basic body 1 is greater than remaining The thickness of body 1, one section circlewise basic body 1 arc chord angle be 180 °;In circlewise basic body 1 for being located at 2 or more grade level Lateral surface on the L-shaped sealing plate 4 of a ring cross-section is set, sealing plate 4 is formed using concreting, sealing plate 4 and annular ground A ring annular groove 5 is formed between the lateral surface of ontology 1;Through-hole 10 of the setting for draining in the bottom of annular groove 5.In ring Shape basic body 1 top setting using annular mounting platform 6 made of steel plate.The lower margin that annular mounting platform 6 passes through welding Bolt 7 connects annular ground ontology 1, and the upper end of foundation bolt 7 is welded on the back side of annular mounting platform 6, and foundation bolt 7 is embedded to Circlewise in basic body 1.
It is connected to the first air flue 8 as shown in Figure 1, being provided in circlewise basic body 1 and grade level 2, the first air flue 8 Outlet is located at the center point of circlewise basic body 1.The second air flue 9 is provided in circlewise basic body 1, the second air flue 9 goes out Mouth is directed toward pier stud 3.
The sole plate of the present embodiment, astronomical dome are directly placed at annular mounting platform 6 and fix;This sole plate, It is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, astronomical dome is directly anchored to steel plate guarantor Demonstrate,prove the position precision of astronomical dome.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (5)

1. a kind of dome installation foundation pedestal, which is characterized in that including the circlewise basic body formed using concreting (1), the grade level (2) formed using concreting is provided in circlewise basic body (1) inner ring, circlewise basic body (1) and grade level (2) constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, grade level (2) it is located at ground or more and the back side of grade level (2) and is used to support ground using what rotary head was piled up towards what below ground was arranged The pier stud (3) of plane (2) is located at one section of circlewise basic body (1) in the circlewise basic body (1) of grade level (2) or more Thickness be greater than the thickness of remaining circlewise basic body (1), the arc chord angle of one section of circlewise basic body (1) is 180 °;It is being located at The L-shaped sealing plate of a ring cross-section (4), sealing plate are set on the lateral surface of circlewise basic body (1) more than grade level (2) (4) it is formed using concreting, forms a ring annular groove between sealing plate (4) and the circlewise lateral surface of basic body (1) (5);At the top of circlewise basic body (1), setting is using annular mounting platform (6) made of steel plate.
2. dome as described in claim 1 installation foundation pedestal, which is characterized in that annular mounting platform (6) passes through welding Foundation bolt (7) connect annular ground ontology (1), the upper end of foundation bolt (7) is welded on the back of annular mounting platform (6) Face, foundation bolt (7) embedment is circlewise in basic body (1).
3. dome as described in claim 1 installation foundation pedestal, which is characterized in that in circlewise basic body (1) and ground Connection the first air flue (8) is provided in plane (2), the outlet of the first air flue (8) is located at the center point of circlewise basic body (1).
4. dome as described in claim 1 installation foundation pedestal, which is characterized in that the setting in circlewise basic body (1) Have the second air flue (9), pier stud (3) are directed toward in the outlet of the second air flue (9).
5. dome as described in claim 1 installation foundation pedestal, which is characterized in that be arranged in the bottom of annular groove (5) Through-hole (10) for draining.
CN201821176064.7U 2018-07-24 2018-07-24 Dome installation foundation pedestal Expired - Fee Related CN208733894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821176064.7U CN208733894U (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821176064.7U CN208733894U (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Publications (1)

Publication Number Publication Date
CN208733894U true CN208733894U (en) 2019-04-12

Family

ID=66028189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821176064.7U Expired - Fee Related CN208733894U (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Country Status (1)

Country Link
CN (1) CN208733894U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867969A (en) * 2018-07-24 2018-11-23 南京慢城光电科技有限公司 Dome installation foundation pedestal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867969A (en) * 2018-07-24 2018-11-23 南京慢城光电科技有限公司 Dome installation foundation pedestal

Similar Documents

Publication Publication Date Title
CN208733894U (en) Dome installation foundation pedestal
CN104164936A (en) Method for reducing roof leakage
CN109930603A (en) A kind of ultra-deep is inverse to make steel pipe column verticality control device and its application method
CN211113806U (en) Building reinforced structure that rectifies
CN108867969A (en) Dome installation foundation pedestal
CN102660965B (en) Construction method for post-pouring settlement belt with simply supported fully-enclosed plate retainer structure
CN205921551U (en) Photovoltaic cell module's installing support
CN105604085B (en) Substation architecture suspension column foundation bolt and its installation method
CN208858027U (en) Dome base frame pedestal
CN205153244U (en) Metal roof waterproof people pore structure
CN201433404Y (en) Screw-in type inspection well cover falling-proof device
CN206385526U (en) A kind of highway subgrade broken stone pile
CN206202600U (en) Block manhole guard ring
CN104831746B (en) Preembedded streetlamp part mounting and positioning device
CN212897232U (en) Roofing pipeline, equipment support antiseep node structure
CN212801167U (en) High wall protection and high stone pad pier structure
CN203905039U (en) Foot binding structure of column foot of outdoor steel pipe
CN210343597U (en) Wind power generation tower cylinder with connecting structure
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN208055861U (en) A kind of water proof and dust proof wind-resistant support
CN219780968U (en) Shallow round bin top cover and shallow round bin
CN218205309U (en) Simple and convenient concrete roof photovoltaic support stand column base node
CN205955248U (en) Construction weather enclosure in open cut foundation ditch
CN220319091U (en) Rear buried plate for wall-riding hanging basket
CN217980330U (en) Dam pump station safety monitoring work base point protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412