CN208733894U - Dome installation foundation pedestal - Google Patents
Dome installation foundation pedestal Download PDFInfo
- Publication number
- CN208733894U CN208733894U CN201821176064.7U CN201821176064U CN208733894U CN 208733894 U CN208733894 U CN 208733894U CN 201821176064 U CN201821176064 U CN 201821176064U CN 208733894 U CN208733894 U CN 208733894U
- Authority
- CN
- China
- Prior art keywords
- circlewise
- basic body
- dome
- ground
- grade level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 28
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 4
- 238000007789 sealing Methods 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 description 3
- 239000000428 dust Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a kind of dome installation foundation pedestal;The technical issues of solution: the technical issues of installation foundation pedestal of existing astronomical dome mentioned in the background art is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.A kind of technical solution of use: dome installation foundation pedestal, including the circlewise basic body formed using concreting, the grade level formed using concreting is provided in circlewise basic body inner ring, circlewise basic body and grade level constitute the ground that section is in " H " type, the lower part of ground is embedded to construction site below ground, and grade level is located at the pier stud for being used to support grade level piled up using rotary head that the back side of ground or more and grade level is arranged towards below ground.Advantage, this dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, and astronomical dome is directly anchored to the position precision that steel plate guarantees astronomical dome.
Description
Technical field
The utility model relates to a kind of dome installation foundation pedestals.
Background technique
Astronomical dome makes the machine type roof special for power station designed exclusively for astronomical telescope omnibearing observation, for protecting astronomy to look in the distance
The astronomical instruments such as mirror, equipment are from solarization, dust storm, dust invasion.
Since the weight of astronomical dome is big, required pedestal is installed and also allows for supporting astronomical dome while also necessary
It is accurate to guarantee that the position of astronomical dome needs.Therefore, the installation foundation pedestal of existing astronomical dome be unable to satisfy Fast Installation and
Guarantee the requirement of the position precision of astronomical dome, the installation foundation pedestal of astronomical dome is urgent problem.
Utility model content
The technical problem to be solved by the utility model is to the installation of existing astronomical dome mentioned in the background art
The technical issues of sole plate is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.
The purpose of this utility model is to provide a kind of dome installation foundation pedestal, this pedestal uses concrete and steel plate
It is made, has effectively achieved the Fast Installation of astronomical dome, astronomical dome is directly anchored to the position that steel plate guarantees astronomical dome
Precision.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of dome installation foundation pedestal, including the circlewise basic body formed using concreting, circlewise
Basic body inner ring is provided with the grade level formed using concreting, and circlewise basic body and grade level composition section are in
The lower part of the ground of " H " type, ground is embedded to construction site below ground, and grade level is located at the back of ground or more and grade level
Face the pier stud for being used to support grade level of below ground setting piled up using rotary head, the annular more than grade level
The thickness of one section in ground basic body circlewise basic body is greater than the thickness of remaining circlewise basic body, one section of circlewise basic body
Arc chord angle be °;The L-shaped envelope of a ring cross-section is set on the lateral surface of circlewise basic body for being located at grade level or more
Plate, sealing plate are formed using concreting, and a ring annular groove is formed between the lateral surface of sealing plate and circlewise basic body;In ring
Shape basic body top setting using annular mounting platform made of steel plate.
Preferably, annular mounting platform connects annular ground ontology, the upper end of foundation bolt by the foundation bolt of welding
It is welded on the back side of annular mounting platform, foundation bolt embedment is circlewise in basic body.
Preferably, it is provided in circlewise basic body and grade level and is connected to the first air flue, the outlet position of the first air flue
In the center point of circlewise basic body.
Preferably, the second air flue is provided in circlewise basic body, pier stud is directed toward in the outlet of the second air flue.
Preferably, the through-hole in the setting of the bottom of annular groove for draining.Through-hole is designed for discharge by astronomy circle
Rainwater under top row, while it being also used for the skirt on fixed astronomical dome periphery, skirt setting prevents sundries from entering, and it is normal to influence it
Rotation;It is close that it is also prevented from idler simultaneously, improves safety.
The circlewise basic body formed using concreting that is referred in technical solutions of the utility model and using coagulation
The technique that soil pours the grade level to be formed is common process in the prior art, and the utility model does not elaborate.
The utility model compared with prior art, the beneficial effect is that:
This dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the quick of astronomical dome
Installation, astronomical dome are directly anchored to the position precision that steel plate guarantees astronomical dome.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model mechanism.
Specific embodiment
Technical solutions of the utility model are described in detail below, but the protection scope of the utility model is not limited to
The embodiment.
To keep the content of the utility model more obvious and easy to understand, done further below in conjunction with attached drawing 1 and specific embodiment
Description.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain this
Utility model is not used to limit the utility model.
As shown in Figure 1, the dome installation foundation pedestal in the present embodiment, is the necessary pedestal of astronomical dome installation.
One of the present embodiment dome installation foundation pedestal, it is circlewise basic including being formed using concreting
Body 1 is provided with the grade level 2 formed using concreting in circlewise 1 inner ring of basic body, circlewise basic body 1 and ground
Base plane 2 constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, and grade level 2 is located at ground
Above and the pier stud 3 for being used to support grade level 2 piled up using rotary head that is arranged towards below ground of the back side of grade level 2,
It is circlewise basic that the thickness of one section in the circlewise basic body 1 of 2 or more grade level circlewise basic body 1 is greater than remaining
The thickness of body 1, one section circlewise basic body 1 arc chord angle be 180 °;In circlewise basic body 1 for being located at 2 or more grade level
Lateral surface on the L-shaped sealing plate 4 of a ring cross-section is set, sealing plate 4 is formed using concreting, sealing plate 4 and annular ground
A ring annular groove 5 is formed between the lateral surface of ontology 1;Through-hole 10 of the setting for draining in the bottom of annular groove 5.In ring
Shape basic body 1 top setting using annular mounting platform 6 made of steel plate.The lower margin that annular mounting platform 6 passes through welding
Bolt 7 connects annular ground ontology 1, and the upper end of foundation bolt 7 is welded on the back side of annular mounting platform 6, and foundation bolt 7 is embedded to
Circlewise in basic body 1.
It is connected to the first air flue 8 as shown in Figure 1, being provided in circlewise basic body 1 and grade level 2, the first air flue 8
Outlet is located at the center point of circlewise basic body 1.The second air flue 9 is provided in circlewise basic body 1, the second air flue 9 goes out
Mouth is directed toward pier stud 3.
The sole plate of the present embodiment, astronomical dome are directly placed at annular mounting platform 6 and fix;This sole plate,
It is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, astronomical dome is directly anchored to steel plate guarantor
Demonstrate,prove the position precision of astronomical dome.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not
It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define
Under the premise of, it can various changes can be made in the form and details to it.
Claims (5)
1. a kind of dome installation foundation pedestal, which is characterized in that including the circlewise basic body formed using concreting
(1), the grade level (2) formed using concreting is provided in circlewise basic body (1) inner ring, circlewise basic body
(1) and grade level (2) constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, grade level
(2) it is located at ground or more and the back side of grade level (2) and is used to support ground using what rotary head was piled up towards what below ground was arranged
The pier stud (3) of plane (2) is located at one section of circlewise basic body (1) in the circlewise basic body (1) of grade level (2) or more
Thickness be greater than the thickness of remaining circlewise basic body (1), the arc chord angle of one section of circlewise basic body (1) is 180 °;It is being located at
The L-shaped sealing plate of a ring cross-section (4), sealing plate are set on the lateral surface of circlewise basic body (1) more than grade level (2)
(4) it is formed using concreting, forms a ring annular groove between sealing plate (4) and the circlewise lateral surface of basic body (1)
(5);At the top of circlewise basic body (1), setting is using annular mounting platform (6) made of steel plate.
2. dome as described in claim 1 installation foundation pedestal, which is characterized in that annular mounting platform (6) passes through welding
Foundation bolt (7) connect annular ground ontology (1), the upper end of foundation bolt (7) is welded on the back of annular mounting platform (6)
Face, foundation bolt (7) embedment is circlewise in basic body (1).
3. dome as described in claim 1 installation foundation pedestal, which is characterized in that in circlewise basic body (1) and ground
Connection the first air flue (8) is provided in plane (2), the outlet of the first air flue (8) is located at the center point of circlewise basic body (1).
4. dome as described in claim 1 installation foundation pedestal, which is characterized in that the setting in circlewise basic body (1)
Have the second air flue (9), pier stud (3) are directed toward in the outlet of the second air flue (9).
5. dome as described in claim 1 installation foundation pedestal, which is characterized in that be arranged in the bottom of annular groove (5)
Through-hole (10) for draining.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821176064.7U CN208733894U (en) | 2018-07-24 | 2018-07-24 | Dome installation foundation pedestal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821176064.7U CN208733894U (en) | 2018-07-24 | 2018-07-24 | Dome installation foundation pedestal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208733894U true CN208733894U (en) | 2019-04-12 |
Family
ID=66028189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821176064.7U Expired - Fee Related CN208733894U (en) | 2018-07-24 | 2018-07-24 | Dome installation foundation pedestal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208733894U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867969A (en) * | 2018-07-24 | 2018-11-23 | 南京慢城光电科技有限公司 | Dome installation foundation pedestal |
-
2018
- 2018-07-24 CN CN201821176064.7U patent/CN208733894U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867969A (en) * | 2018-07-24 | 2018-11-23 | 南京慢城光电科技有限公司 | Dome installation foundation pedestal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208733894U (en) | Dome installation foundation pedestal | |
CN104164936A (en) | Method for reducing roof leakage | |
CN109930603A (en) | A kind of ultra-deep is inverse to make steel pipe column verticality control device and its application method | |
CN211113806U (en) | Building reinforced structure that rectifies | |
CN108867969A (en) | Dome installation foundation pedestal | |
CN102660965B (en) | Construction method for post-pouring settlement belt with simply supported fully-enclosed plate retainer structure | |
CN205921551U (en) | Photovoltaic cell module's installing support | |
CN105604085B (en) | Substation architecture suspension column foundation bolt and its installation method | |
CN208858027U (en) | Dome base frame pedestal | |
CN205153244U (en) | Metal roof waterproof people pore structure | |
CN201433404Y (en) | Screw-in type inspection well cover falling-proof device | |
CN206385526U (en) | A kind of highway subgrade broken stone pile | |
CN206202600U (en) | Block manhole guard ring | |
CN104831746B (en) | Preembedded streetlamp part mounting and positioning device | |
CN212897232U (en) | Roofing pipeline, equipment support antiseep node structure | |
CN212801167U (en) | High wall protection and high stone pad pier structure | |
CN203905039U (en) | Foot binding structure of column foot of outdoor steel pipe | |
CN210343597U (en) | Wind power generation tower cylinder with connecting structure | |
CN209874074U (en) | Porous inclined plane slip casting embedded pipe | |
CN208055861U (en) | A kind of water proof and dust proof wind-resistant support | |
CN219780968U (en) | Shallow round bin top cover and shallow round bin | |
CN218205309U (en) | Simple and convenient concrete roof photovoltaic support stand column base node | |
CN205955248U (en) | Construction weather enclosure in open cut foundation ditch | |
CN220319091U (en) | Rear buried plate for wall-riding hanging basket | |
CN217980330U (en) | Dam pump station safety monitoring work base point protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190412 |