CN108867969A - Dome installation foundation pedestal - Google Patents

Dome installation foundation pedestal Download PDF

Info

Publication number
CN108867969A
CN108867969A CN201810821285.3A CN201810821285A CN108867969A CN 108867969 A CN108867969 A CN 108867969A CN 201810821285 A CN201810821285 A CN 201810821285A CN 108867969 A CN108867969 A CN 108867969A
Authority
CN
China
Prior art keywords
circlewise
basic body
dome
ground
grade level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810821285.3A
Other languages
Chinese (zh)
Inventor
郑云头
郑曾
孙林贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Slow City Photoelectric Technology Co Ltd
Original Assignee
Nanjing Slow City Photoelectric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Slow City Photoelectric Technology Co Ltd filed Critical Nanjing Slow City Photoelectric Technology Co Ltd
Priority to CN201810821285.3A priority Critical patent/CN108867969A/en
Publication of CN108867969A publication Critical patent/CN108867969A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention discloses a kind of dome installation foundation pedestal;The technical issues of solution:The technical issues of installation foundation pedestal of existing astronomical dome mentioned in the background art is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.The technical solution of use:A kind of dome installation foundation pedestal, including the circlewise basic body formed using concreting, the grade level formed using concreting is provided in circlewise basic body inner ring, circlewise basic body and grade level constitute the ground that section is in " H " type, the lower part of ground is embedded to construction site below ground, and grade level is located at the pier stud for being used to support grade level piled up using rotary head that the back side of ground or more and grade level is arranged towards below ground.Advantage, this dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, and astronomical dome is directly anchored to the position precision that steel plate guarantees astronomical dome.

Description

Dome installation foundation pedestal
Technical field
The present invention relates to a kind of dome installation foundation pedestals.
Background technique
Astronomical dome makes the machine type roof special for power station designed exclusively for astronomical telescope omnibearing observation, for protecting astronomy to look in the distance The astronomical instruments such as mirror, equipment are from solarization, dust storm, dust invasion.
Since the weight of astronomical dome is big, required pedestal is installed and also allows for supporting astronomical dome while also necessary It is accurate to guarantee that the position of astronomical dome needs.Therefore, the installation foundation pedestal of existing astronomical dome be unable to satisfy Fast Installation and Guarantee the requirement of the position precision of astronomical dome, the installation foundation pedestal of astronomical dome is urgent problem.
Summary of the invention
The technical problem to be solved by the present invention is to:The installation foundation of existing astronomical dome mentioned in the background art The technical issues of pedestal is unable to satisfy Fast Installation and guarantees the requirement of the position precision of astronomical dome.
It is an object of the present invention to provide a kind of dome installation foundation pedestal, this pedestal is made of concrete and steel plate, The Fast Installation of astronomical dome is had effectively achieved, astronomical dome is directly anchored to the position precision that steel plate guarantees astronomical dome.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of dome installation foundation pedestal, including the circlewise basic body formed using concreting, circlewise Basic body inner ring is provided with the grade level formed using concreting, and circlewise basic body and grade level composition section are in The lower part of the ground of " H " type, ground is embedded to construction site below ground, and grade level is located at the back of ground or more and grade level Face the pier stud for being used to support grade level of below ground setting piled up using rotary head, the annular more than grade level The thickness of one section in ground basic body circlewise basic body is greater than the thickness of remaining circlewise basic body, one section of circlewise basic body Arc chord angle be °;The L-shaped envelope of a ring cross-section is set on the lateral surface of circlewise basic body for being located at grade level or more Plate, sealing plate are formed using concreting, and a ring annular groove is formed between the lateral surface of sealing plate and circlewise basic body;In ring Shape basic body top setting using annular mounting platform made of steel plate.
Preferably, annular mounting platform connects annular ground ontology, the upper end of foundation bolt by the foundation bolt of welding It is welded on the back side of annular mounting platform, foundation bolt embedment is circlewise in basic body.
Preferably, it is provided in circlewise basic body and grade level and is connected to the first air flue, the outlet position of the first air flue In the center point of circlewise basic body.
Preferably, the second air flue is provided in circlewise basic body, pier stud is directed toward in the outlet of the second air flue.
Preferably, the through-hole in the setting of the bottom of annular groove for draining.Through-hole is designed for discharge by astronomy circle Rainwater under top row, while it being also used for the skirt on fixed astronomical dome periphery, skirt setting prevents sundries from entering, and it is normal to influence it Rotation;It is close that it is also prevented from idler simultaneously, improves safety.
What is referred in technical solution of the present invention is poured using the circlewise basic body of concreting formation and using concrete The technique for building the grade level to be formed is common process in the prior art, and the present invention does not elaborate.
Compared with prior art, the present invention the beneficial effect is that:
This dome installation foundation pedestal, is made of concrete and steel plate, has effectively achieved the quick of astronomical dome Installation, astronomical dome are directly anchored to the position precision that steel plate guarantees astronomical dome.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of mechanism of the present invention.
Specific embodiment
Technical solution of the present invention is described in detail below, but protection scope of the present invention is not limited to the implementation Example.
To keep the contents of the present invention more obvious and easy to understand, further retouched below in conjunction with attached drawing 1 and specific embodiment It states.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
As shown in Figure 1, the dome installation foundation pedestal in the present embodiment, is the necessary pedestal of astronomical dome installation.
One of the present embodiment dome installation foundation pedestal, it is circlewise basic including being formed using concreting Body 1 is provided with the grade level 2 formed using concreting in circlewise 1 inner ring of basic body, circlewise basic body 1 and ground Base plane 2 constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, and grade level 2 is located at ground Above and the pier stud 3 for being used to support grade level 2 piled up using rotary head that is arranged towards below ground of the back side of grade level 2, It is circlewise basic that the thickness of one section in the circlewise basic body 1 of 2 or more grade level circlewise basic body 1 is greater than remaining The thickness of body 1, one section circlewise basic body 1 arc chord angle be 180 °;In circlewise basic body 1 for being located at 2 or more grade level Lateral surface on the L-shaped sealing plate 4 of a ring cross-section is set, sealing plate 4 is formed using concreting, sealing plate 4 and annular ground A ring annular groove 5 is formed between the lateral surface of ontology 1;Through-hole 10 of the setting for draining in the bottom of annular groove 5.In ring Shape basic body 1 top setting using annular mounting platform 6 made of steel plate.The lower margin that annular mounting platform 6 passes through welding Bolt 7 connects annular ground ontology 1, and the upper end of foundation bolt 7 is welded on the back side of annular mounting platform 6, and foundation bolt 7 is embedded to Circlewise in basic body 1.
It is connected to the first air flue 8 as shown in Figure 1, being provided in circlewise basic body 1 and grade level 2, the first air flue 8 Outlet is located at the center point of circlewise basic body 1.The second air flue 9 is provided in circlewise basic body 1, the second air flue 9 goes out Mouth is directed toward pier stud 3.
The sole plate of the present embodiment, astronomical dome are directly placed at annular mounting platform 6 and fix;This sole plate, It is made of concrete and steel plate, has effectively achieved the Fast Installation of astronomical dome, astronomical dome is directly anchored to steel plate guarantor Demonstrate,prove the position precision of astronomical dome.
As described above, must not be explained although the present invention has been indicated and described referring to specific preferred embodiment For the limitation to invention itself.It without prejudice to the spirit and scope of the invention as defined in the appended claims, can be right Various changes can be made in the form and details for it.

Claims (5)

1. a kind of dome installation foundation pedestal, which is characterized in that including the circlewise basic body formed using concreting (1), the grade level (2) formed using concreting is provided in circlewise basic body (1) inner ring, circlewise basic body (1) and grade level (2) constitutes the ground that section is in " H " type, and the lower part of ground is embedded to construction site below ground, grade level (2) it is located at ground or more and the back side of grade level (2) and is used to support ground using what rotary head was piled up towards what below ground was arranged The pier stud (3) of plane (2) is located at one section of circlewise basic body (1) in the circlewise basic body (1) of grade level (2) or more Thickness be greater than the thickness of remaining circlewise basic body (1), the arc chord angle of one section of circlewise basic body (1) is 180 °;It is being located at The L-shaped sealing plate of a ring cross-section (4), sealing plate are set on the lateral surface of circlewise basic body (1) more than grade level (2) (4) it is formed using concreting, forms a ring annular groove between sealing plate (4) and the circlewise lateral surface of basic body (1) (5);At the top of circlewise basic body (1), setting is using annular mounting platform (6) made of steel plate.
2. dome as described in claim 1 installation foundation pedestal, which is characterized in that annular mounting platform (6) passes through welding Foundation bolt (7) connect annular ground ontology (1), the upper end of foundation bolt (7) is welded on the back of annular mounting platform (6) Face, foundation bolt (7) embedment is circlewise in basic body (1).
3. dome as described in claim 1 installation foundation pedestal, which is characterized in that in circlewise basic body (1) and ground Connection the first air flue (8) is provided in plane (2), the outlet of the first air flue (8) is located at the center point of circlewise basic body (1).
4. dome as described in claim 1 installation foundation pedestal, which is characterized in that the setting in circlewise basic body (1) Have the second air flue (9), pier stud (3) are directed toward in the outlet of the second air flue (9).
5. dome as described in claim 1 installation foundation pedestal, which is characterized in that be arranged in the bottom of annular groove (5) Through-hole (10) for draining.
CN201810821285.3A 2018-07-24 2018-07-24 Dome installation foundation pedestal Pending CN108867969A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810821285.3A CN108867969A (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810821285.3A CN108867969A (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Publications (1)

Publication Number Publication Date
CN108867969A true CN108867969A (en) 2018-11-23

Family

ID=64304932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810821285.3A Pending CN108867969A (en) 2018-07-24 2018-07-24 Dome installation foundation pedestal

Country Status (1)

Country Link
CN (1) CN108867969A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86202893U (en) * 1986-05-06 1987-09-12 张洪齐 Lightweight dome for astronomical observation
SU1548387A1 (en) * 1987-06-15 1990-03-07 Yakunenkov Sergej M Method and pneumatic forms for erecting solid dome structures
JPH0644816U (en) * 1992-11-17 1994-06-14 鐘淵化学工業株式会社 Structural multifunction panel
JPH06240897A (en) * 1993-02-15 1994-08-30 Takenaka Komuten Co Ltd Dome-shaped structure
JP2000154595A (en) * 1998-07-08 2000-06-06 Patent Island:Kk Execution method of domed construction
US20020124502A1 (en) * 2000-09-27 2002-09-12 Henderson Allan P. Perimeter weighted foundation for wind turbines and the like
JP2003138659A (en) * 2001-10-30 2003-05-14 Ykk Corp Structure in under floor of housing and condensation prevention method
JP2004211443A (en) * 2003-01-06 2004-07-29 Hokko Sogo Kaihatsu Kk Mobile built-up foundation and built-up building
CN2746036Y (en) * 2004-07-13 2005-12-14 李道友 Hommization open type astromomy dome
JP3132690U (en) * 2007-01-22 2007-06-21 國武 忠 Base wall seismic cloth foundation with packing underfloor ventilation hole
JP2010248894A (en) * 2009-03-27 2010-11-04 Iwao Yanase Construction method and device for earthquake avoidance sliding foundation
CN204002833U (en) * 2014-05-30 2014-12-10 中交第二公路勘察设计研究院有限公司 The embed-type passage of many circular arcs arched corrugated steel plate
CN206903025U (en) * 2017-05-08 2018-01-19 南京紫金山光学仪器厂 A kind of astronomical dome
CN208733894U (en) * 2018-07-24 2019-04-12 南京慢城光电科技有限公司 Dome installation foundation pedestal

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86202893U (en) * 1986-05-06 1987-09-12 张洪齐 Lightweight dome for astronomical observation
SU1548387A1 (en) * 1987-06-15 1990-03-07 Yakunenkov Sergej M Method and pneumatic forms for erecting solid dome structures
JPH0644816U (en) * 1992-11-17 1994-06-14 鐘淵化学工業株式会社 Structural multifunction panel
JPH06240897A (en) * 1993-02-15 1994-08-30 Takenaka Komuten Co Ltd Dome-shaped structure
JP2000154595A (en) * 1998-07-08 2000-06-06 Patent Island:Kk Execution method of domed construction
US20020124502A1 (en) * 2000-09-27 2002-09-12 Henderson Allan P. Perimeter weighted foundation for wind turbines and the like
JP2003138659A (en) * 2001-10-30 2003-05-14 Ykk Corp Structure in under floor of housing and condensation prevention method
JP2004211443A (en) * 2003-01-06 2004-07-29 Hokko Sogo Kaihatsu Kk Mobile built-up foundation and built-up building
CN2746036Y (en) * 2004-07-13 2005-12-14 李道友 Hommization open type astromomy dome
JP3132690U (en) * 2007-01-22 2007-06-21 國武 忠 Base wall seismic cloth foundation with packing underfloor ventilation hole
JP2010248894A (en) * 2009-03-27 2010-11-04 Iwao Yanase Construction method and device for earthquake avoidance sliding foundation
CN204002833U (en) * 2014-05-30 2014-12-10 中交第二公路勘察设计研究院有限公司 The embed-type passage of many circular arcs arched corrugated steel plate
CN206903025U (en) * 2017-05-08 2018-01-19 南京紫金山光学仪器厂 A kind of astronomical dome
CN208733894U (en) * 2018-07-24 2019-04-12 南京慢城光电科技有限公司 Dome installation foundation pedestal

Similar Documents

Publication Publication Date Title
AU2013253963B2 (en) Free-standing liner unit and method for building tank
CN203222738U (en) Steel pipe latticed column temporary buttress supporting device
CN208733894U (en) Dome installation foundation pedestal
CN108867969A (en) Dome installation foundation pedestal
CN211113806U (en) Building reinforced structure that rectifies
JP2010281150A (en) Base for facility installation
US4753768A (en) Reactor cavity pool seal
CN102660965B (en) Construction method for post-pouring settlement belt with simply supported fully-enclosed plate retainer structure
CN105604085B (en) Substation architecture suspension column foundation bolt and its installation method
CN205153244U (en) Metal roof waterproof people pore structure
CN105129636A (en) Large-basement baseboard tower-crane installation apparatus
CN108867966A (en) Dome base frame pedestal
CN205444228U (en) Framework column base rag bolt of transformer substation
CN112523258B (en) Portable single-side formwork supporting system and construction method thereof
CN104831746B (en) Preembedded streetlamp part mounting and positioning device
CN111926860B (en) Basement steel column water stop treatment method
KR102210549B1 (en) Waterproof phtovoltaic system of not exposed and construction method
KR20180006037A (en) Bottom Vapour Barrier
CN214614207U (en) Post-cast strip waterproof construction
CN108797368A (en) The fast aligning method of steel case arch bridge anchor tube
CN210195066U (en) Steel construction eaves mouth gutter flashing node structure
CN218205309U (en) Simple and convenient concrete roof photovoltaic support stand column base node
CN218667173U (en) Template supporting structure in bridge deck auxiliary construction
CN109930756A (en) A kind of high-low bay top plate back filled region expansion joint Seepage method and device
CN220319091U (en) Rear buried plate for wall-riding hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination