CN211034805U - Device for combining rod piece and logistics channel of construction elevator - Google Patents

Device for combining rod piece and logistics channel of construction elevator Download PDF

Info

Publication number
CN211034805U
CN211034805U CN201920400970.9U CN201920400970U CN211034805U CN 211034805 U CN211034805 U CN 211034805U CN 201920400970 U CN201920400970 U CN 201920400970U CN 211034805 U CN211034805 U CN 211034805U
Authority
CN
China
Prior art keywords
construction elevator
logistics channel
floor
longitudinal
longitudinal main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920400970.9U
Other languages
Chinese (zh)
Inventor
杨书海
李文龙
徐岗
吕桂元
马兴东
匡丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201920400970.9U priority Critical patent/CN211034805U/en
Application granted granted Critical
Publication of CN211034805U publication Critical patent/CN211034805U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Elevator Door Apparatuses (AREA)

Abstract

本实用新型公开了一种施工电梯附着杆件与物流通道相结合装置,涉及涉及建筑工程领域,包括本层结构楼板,本层结构楼板底部设置有本层结构钢梁,本层结构楼板上连接有若干纵向主梁和纵向次梁,纵向主梁和纵向次梁依次与横向次梁连接组成物流通道平台,物流通道平台两侧分别设置有防护结构,纵向主梁采用卸扣连接有钢丝绳,钢丝绳另一端通过可拆卸式吊耳与上层结构钢梁相连接,可拆卸式吊耳采用卸扣与上一楼层纵向主梁末端相连接,物流通道平台通过构件与施工电梯连接。本实用新型安装效率高,不影响施工电梯正常运行,且拆除后的主次梁、面板、防护结构、电梯楼层门、钢丝绳、吊耳和呼叫器等均可重复利用,材料利用率高,践行了绿色施工的理念。

Figure 201920400970

The utility model discloses a device for combining a construction elevator attachment rod and a logistics channel, which relates to the field of construction engineering and includes a structure floor slab of this layer, a steel beam of the structure layer is arranged at the bottom of the structure floor plate of this layer, and the structural floor plate of this layer is connected There are several longitudinal main beams and longitudinal sub-beams. The longitudinal main beams and the longitudinal sub-beams are connected with the transverse sub-beams in turn to form a logistics channel platform. There are protective structures on both sides of the logistics channel platform. The longitudinal main beams are connected with wire ropes by shackles. The other end is connected with the steel beam of the superstructure through a detachable lifting lug, the detachable lifting lug is connected with the end of the longitudinal main beam on the upper floor by a shackle, and the logistics channel platform is connected with the construction elevator through components. The utility model has high installation efficiency, does not affect the normal operation of the construction elevator, and the dismantled primary and secondary beams, panels, protective structures, elevator floor doors, wire ropes, lifting ears and pagers can be reused, and the utilization rate of materials is high. The concept of green construction has been carried out.

Figure 201920400970

Description

一种施工电梯附着杆件与物流通道相结合装置A combination device of construction elevator attachment rod and logistics channel

技术领域technical field

本实用新型涉及建筑工程领域,特别是一种施工电梯附着杆件与物流通道相结合装置。The utility model relates to the field of construction engineering, in particular to a combination device of a construction elevator attachment rod and a logistics channel.

背景技术Background technique

随着超高层建筑不断突破新高度,外立面造型新颖,建筑平面随高度增加不断缩失、突变,成就了建筑功能的多样性,不再是单一的居住使用功能,更多的倾向于环保、节能以及艺术性等,造成结构外形越来越有个性,越来越不规则。在传统规则立面建筑中,施工电梯附着在楼板面或者楼面梁上,施工简单,安全性高。As super high-rise buildings continue to break new heights, the exterior facades are novel in shape, and the building planes continue to shrink and mutate with increasing heights, resulting in the diversity of architectural functions. It is no longer a single residential use function, and more inclined to environmental protection. , energy saving and artistry, etc., resulting in more and more individual and irregular structure and appearance. In traditional regular facade buildings, the construction elevator is attached to the floor surface or floor beam, which is simple in construction and high in safety.

但对板面结构外形变化较大且楼面逐层内收,部分楼层边缘缺失,传统的施工电梯附着考虑安全,附着长度被严格限制。如采用通道塔或者超长附墙杆件,则需大量场地和型材,且搭设过程安全风险极大,花费大量的时间、人力、物力进行额外的安全防护以及支撑等措施,不仅增加了成本,也给工期履约带来了极大的风险、However, the shape of the slab structure changes greatly, the floor is retracted layer by layer, and some floor edges are missing. The traditional construction elevator is attached to consider safety, and the attachment length is strictly limited. If channel towers or super-long wall-attached rods are used, a large number of sites and profiles are required, and the safety risk in the erection process is extremely high. It also brings great risks to the performance of the construction period,

实用新型内容Utility model content

本实用新型要解决的技术问题是克服现有的缺陷,提供一种施工电梯附着杆件与物流通道相结合装置,以解决上述背景技术中提出的对板面结构外形变化较大且楼面逐层内收,部分楼层边缘缺失,传统的施工电梯附着考虑安全,附着长度被严格限制的问题。The technical problem to be solved by the utility model is to overcome the existing defects, and to provide a combination device of a construction elevator attachment rod and a logistics channel, so as to solve the problem of the large change in the shape of the board surface structure and the gradual change of the floor surface proposed in the above-mentioned background technology. The floor is retracted, and some floors are missing. The traditional construction elevator attaches to safety considerations, and the attachment length is strictly limited.

为实现上述目的,本实用新型提供如下技术方案:一种施工电梯附着杆件与物流通道相结合装置,包括本层结构楼板,所述本层结构楼板底部设置有本层结构钢梁,所述本层结构楼板上连接有纵向主梁和若干纵向次梁,所述纵向主梁和纵向次梁与横向次梁连接组成物流通道平台,物流通道平台上水平铺设有面板,所述物流通道平台两侧分别设置有防护结构,所述纵向主梁采用卸扣连接有钢丝绳,钢丝绳另一端通过可拆卸式吊耳与上层结构钢梁相连接,可拆卸式吊耳采用卸扣与上层结构楼板的纵向主梁末端相连接,所述物流通道平台底部构件与施工电梯附着杆件相连接,所述物流通道平台在右侧设置有施工电梯楼层门,施工电梯楼层门上设置有施工电梯呼叫器,所述物流通道平台通过构件与施工电梯连接,所述构件与物流通道平台上的纵向主梁焊接连接,且设置有加腋,所述施工电梯附着杆件与构件焊接连接。In order to achieve the above purpose, the present utility model provides the following technical solutions: a device for combining a construction elevator attachment rod and a logistics channel, comprising a floor structure of this layer, and a steel beam of this layer is arranged at the bottom of the floor structure of this layer, and the There are longitudinal main beams and several longitudinal secondary beams connected to the structural floor of this layer. The longitudinal main beams, the longitudinal secondary beams and the horizontal secondary beams are connected to form a logistics channel platform. Panels are laid horizontally on the logistics channel platform. The sides are respectively provided with protective structures, the longitudinal main beams are connected with steel wire ropes by shackles, and the other end of the wire ropes are connected with the superstructure steel beams through detachable lifting lugs, and the detachable lifting lugs use shackles to connect the longitudinal direction of the superstructure floor slabs. The end of the main beam is connected, the bottom member of the logistics channel platform is connected with the attachment rod of the construction elevator, the logistics channel platform is provided with the construction elevator floor door on the right side, and the construction elevator floor door is provided with a construction elevator pager. The logistics channel platform is connected with the construction elevator through components, the components are welded and connected with the longitudinal main beams on the logistics channel platform, and are provided with haunches, and the construction elevator attachment rods are welded and connected with the components.

优选的,所述纵向主梁为工字钢或H型钢,所述纵向次梁为工字钢或H 型钢或方管或矩管,所述横向次梁为工字钢或H型钢,所述构件为H型钢或工字钢或槽钢。Preferably, the longitudinal main beams are I-beams or H-beams, the longitudinal secondary beams are I-beams or H-beams or square tubes or rectangular tubes, the transverse secondary beams are I-beams or H-beams, and the transverse secondary beams are I-beams or H-beams. The components are H-beam or I-beam or channel steel.

优选的,所述面板为防滑花纹钢板,所述面板与纵向主梁间、纵向次梁和横向次梁间均通过焊接连接。Preferably, the panel is an anti-skid checkered steel plate, and the panel is connected with the longitudinal main beam, the longitudinal secondary beam and the transverse secondary beam by welding.

优选的,所述防护结构包括横向方管,横向方管焊接连接有立柱,立柱插在插口上,插口与纵向主梁焊接,横向方管内侧固定设有侧边冲孔钢板网片,所述防护结构底部设有挡脚板。Preferably, the protective structure includes a horizontal square tube, the horizontal square tube is welded and connected with a column, the column is inserted into the socket, the socket is welded with the longitudinal main beam, and the inner side of the lateral square tube is fixed with a side punched steel mesh sheet. The bottom of the protective structure is provided with a foot guard.

优选的,所述施工电梯楼层门设置在楼层内,施工电梯楼层门为双开门,所述施工电梯楼层门由施工电梯司机向楼层内打开。Preferably, the floor door of the construction elevator is arranged in the floor, the floor door of the construction elevator is a double door, and the floor door of the construction elevator is opened to the floor by the driver of the construction elevator.

优选的,其特征在于,所述纵向主梁前后共设有8个螺栓固定,每个螺栓均穿过纵向主梁翼缘,所述螺栓螺丝下设有钢垫片,所述纵向主梁翼缘设有加劲肋。Preferably, the longitudinal girder is provided with 8 bolts at the front and rear, each bolt passes through the longitudinal girder flange, the bolt screw is provided with a steel washer, and the longitudinal girder flange is provided with stiffening rib.

优选的,所述纵向主梁、纵向次梁和横向次梁三者之间采用焊接或螺栓连接。Preferably, the longitudinal main beam, the longitudinal secondary beam and the transverse secondary beam are connected by welding or bolts.

优选的,所述可拆卸吊式耳由两片工具式钢板组合而成,其中两片钢板采用螺栓紧固连接,两片所述工具式钢板上均设有吊耳螺栓孔,其中一个所述工具式钢板上设有吊耳钢丝绳孔。Preferably, the detachable lifting lug is composed of two tool steel plates, wherein the two steel plates are fastened with bolts, and the two tool steel plates are provided with lifting lug bolt holes, and one of the tool steel plates is provided with lifting lug bolt holes. There are wire rope holes for lifting lugs on the tool steel plate.

优选的,所述物流通道平台在楼层内按1:5-1:7放坡。Preferably, the logistics channel platform is graded on the floor at 1:5-1:7.

与现有技术相比,本实用新型提供了一种施工电梯附着杆件与物流通道相结合装置,具备以下有益效果:Compared with the prior art, the utility model provides a combination device of a construction elevator attachment rod and a logistics channel, which has the following beneficial effects:

本实用新型本实用新型施工工序简单,安装效率高,不影响施工电梯正常运行,且拆除后的主次梁、面板、防护结构、电梯楼层门、钢丝绳、吊耳和呼叫器等均可重复利用,安全性能高,材料利用率高,践行了绿色施工的理念。本实用新型解决了当板面结构外形变化较大且楼面逐层内收,部分楼层边缘缺失,传统的施工电梯附着考虑安全,附着长度被严格限制的问题。The utility model The utility model has the advantages of simple construction procedure and high installation efficiency, does not affect the normal operation of the construction elevator, and the dismantled primary and secondary beams, panels, protective structures, elevator floor doors, steel wire ropes, lifting ears and pagers can be reused , high safety performance, high material utilization rate, and practice the concept of green construction. The utility model solves the problem that when the structural shape of the slab changes greatly and the floor is retracted layer by layer, some floor edges are missing, and the traditional construction elevator is attached with consideration of safety and the attachment length is strictly limited.

该装置中未涉及部分均与现有技术相同或可采用现有技术加以实现,本实用新型结构科学合理,使用安全方便,为人们提供了很大的帮助。The parts not involved in the device are the same as the existing technology or can be realized by using the existing technology. The utility model has a scientific and reasonable structure, is safe and convenient to use, and provides great help to people.

附图说明Description of drawings

图1是本实用新型的剖面示意图;Fig. 1 is the sectional schematic diagram of the present utility model;

图2是本实用新型的平面示意图;2 is a schematic plan view of the present utility model;

图3是本实用新型防护结构的正视图;Fig. 3 is the front view of the protective structure of the present utility model;

图4是本实用新型防护结构的侧视图;4 is a side view of the protective structure of the present invention;

图5是本实用新型构件与施工电梯附着杆件连接结构示意图(无加腋);5 is a schematic diagram of the connection structure between the component of the present utility model and the attachment rod of the construction elevator (without the addition of haunches);

图6是本实用新型构件与施工电梯附着杆件连接结构示意图(有加腋);6 is a schematic diagram of the connection structure between the component of the present utility model and the attachment rod of the construction elevator (with axillary);

图7是本实用新型可拆卸式吊耳的结构示意图;Fig. 7 is the structural representation of the detachable lifting lug of the present utility model;

图8是本实用新型卸扣的结构图;Fig. 8 is the structural diagram of the shackle of the present utility model;

图9是本实用新型施工电梯楼层门正面示意图。Fig. 9 is the front schematic diagram of the elevator floor door under construction of the present invention.

图中所示:1、上层结构楼板;2、上层结构钢梁;3、可拆卸吊耳;4、钢丝绳;5、施工电梯楼层门;6、本层结构楼板;7、本层结构钢梁;8、螺栓;9、钢垫片;10、纵向主梁;11、加劲肋;12、横向次梁;13、卸扣;14、构件;15、施工电梯附着杆件;16、施工电梯;17、纵向次梁;18、施工电梯呼叫器;19、吊耳钢丝绳孔;20、面板;21、横向方管;22、立柱;23、插口;24、侧边冲孔钢板网片;25、挡脚板;26、加腋;27、吊耳螺栓孔;28、吊耳钢丝绳孔。As shown in the picture: 1. Superstructure floor; 2. Superstructure steel beam; 3. Removable lifting lug; 4. Steel wire rope; 5. Construction elevator floor door; 8. Bolts; 9. Steel gaskets; 10. Longitudinal main beams; 11. Stiffeners; 12. Lateral secondary beams; 13. Shackles; 14. Components; 15. Construction elevator attachment rods; 16. Construction elevators; 17. Longitudinal secondary beam; 18. Construction elevator caller; 19. Lifting lug wire rope hole; 20. Panel; 21. Horizontal square pipe; 22. Upright column; 23. Socket; 24. Side punched steel mesh; 25. Foot guard; 26, add axillary; 27, lifting lug bolt hole; 28, lifting lug wire rope hole.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-9,本实用新型提供一种技术方案:一种施工电梯附着杆件与物流通道相结合装置,包括本层结构楼板6,本层结构楼板6底部设置有本层结构钢梁7,本层结构楼板6上连接有纵向主梁10和若干纵向次梁17,纵向主梁10和纵向次梁17与横向次梁12连接组成物流通道平台,物流通道平台上水平铺设有面板20,物流通道平台两侧分别设置有防护结构,纵向主梁10 采用卸扣13连接有钢丝绳4,钢丝绳4另一端通过可拆卸式吊耳3与上层结构钢梁2相连接,可拆卸式吊耳3采用卸扣13与上层结构楼板1的纵向主梁 10末端相连接,物流通道平台底部构件14与施工电梯附着杆件15相连接;物流通道平台在右侧设置有施工电梯楼层门5,施工电梯楼层门5上设置有施工电梯呼叫器18,物流通道平台通过构件14与施工电梯16连接,构件14与物流通道平台上的纵向主梁10焊接连接,且设置有加腋26,施工电梯附着杆件15与构件14焊接连接。Please refer to FIGS. 1-9 , the present utility model provides a technical solution: a device for combining a construction elevator attachment rod with a logistics channel, comprising a structural floor 6 of this layer, and a steel beam of this layer is arranged at the bottom of the structural floor 6 of this layer 7. A longitudinal main beam 10 and several longitudinal secondary beams 17 are connected to the structural floor 6 of this layer. The longitudinal main beam 10 and the longitudinal secondary beam 17 are connected with the transverse secondary beam 12 to form a logistics channel platform, and a panel 20 is horizontally laid on the logistics channel platform. , There are protective structures on both sides of the logistics channel platform, the longitudinal main beam 10 is connected with a wire rope 4 by a shackle 13, and the other end of the wire rope 4 is connected with the superstructure steel beam 2 through a detachable lifting lug 3. 3. The shackle 13 is used to connect with the end of the longitudinal main beam 10 of the superstructure floor 1, and the bottom member 14 of the logistics channel platform is connected with the construction elevator attachment rod 15; the logistics channel platform is provided with a construction elevator floor door 5 on the right side, and the construction The elevator floor door 5 is provided with a construction elevator caller 18, the logistics passage platform is connected with the construction elevator 16 through the component 14, and the component 14 is connected with the longitudinal main beam 10 on the logistics passage platform by welding, and is provided with a haunch 26, and the construction elevator is attached. The rod 15 is welded to the member 14 .

防护结构包括横向方管21,横向方管21焊接连接有立柱22,立柱22插在插口23上,插口23与纵向主梁10焊接,横向方管21内侧采用铆钉固定有侧边冲孔钢板网片24,防护结构底部设有挡脚板25。The protective structure includes a horizontal square tube 21, the horizontal square tube 21 is welded and connected with a column 22, the column 22 is inserted into the socket 23, the socket 23 is welded with the longitudinal main beam 10, and the inner side of the lateral square tube 21 is fixed with a side punched steel mesh by rivets. Sheet 24, the bottom of the protective structure is provided with a foot guard 25.

纵向主梁10前后共有8个螺栓8固定,每个螺栓8均穿过纵向主梁10 翼缘,螺栓8螺丝下设有钢垫片9,纵向主梁10翼缘设有加劲肋11。The longitudinal girder 10 is fixed with eight bolts 8 at the front and rear. Each bolt 8 passes through the flange of the longitudinal girder 10 .

可拆卸式吊耳3由两片工具式钢板组合而成,其中两片钢板采用螺栓紧固连接,两片工具式钢板上均设有吊耳螺栓孔27,其中一个工具式钢板上设有吊耳钢丝绳孔19。The detachable lifting lug 3 is composed of two tool steel plates, wherein the two steel plates are fastened and connected by bolts, the two tool steel plates are provided with lifting lug bolt holes 27, and one of the tool steel plates is provided with a lifting lug bolt hole 27. Ear wire rope hole 19.

如图1所示,纵向主梁10可采用工字钢或H型钢,纵向次梁17可采用工字钢或H型钢或方管或矩管,横向次梁12为工字钢或H型钢;As shown in Figure 1, the longitudinal main beam 10 can be made of I-beam or H-beam, the longitudinal secondary beam 17 can be made of I-beam or H-beam or square tube or rectangular tube, and the transverse secondary beam 12 is I-beam or H-beam;

如图2所示,纵向主梁10设置有3根,纵向次梁17和横向次梁12约500mm 一根;As shown in Figure 2, there are three longitudinal main beams 10, one longitudinal sub-beam 17 and one transverse sub-beam 12 about 500 mm;

如图5-6所示,物流通道底部构件14为H型钢或工字钢或槽钢;As shown in Figures 5-6, the bottom member 14 of the logistics channel is H-beam or I-beam or channel steel;

如图7-8所示,可拆卸吊耳3由两片工具式钢板组合而成,工具式钢板底部根据钢丝绳4大小调整吊耳钢丝绳孔28大小,吊耳螺栓孔27大小以及位置根据上层结构钢梁大小调节;As shown in Figure 7-8, the detachable lifting lug 3 is composed of two tool steel plates. The bottom of the tool steel plate can adjust the size of the wire rope hole 28 of the lifting lug according to the size of the wire rope 4, and the size and position of the bolt hole 27 of the lifting lug according to the superstructure. Steel beam size adjustment;

如图9所示,施工电梯楼层门5为双开门,且只能由施工电梯司机向楼层内打开,两楼层门之间有防护结构,在防护结构之上安装有电梯呼叫器29;As shown in Figure 9, the floor door 5 of the construction elevator is a double door, and can only be opened to the floor by the construction elevator driver, there is a protective structure between the two floor doors, and an elevator caller 29 is installed on the protective structure;

如图2所示,物流通道平台与施工电梯16间距约50-100mm,施工电梯 16内的自动翻板可放置在物流通道平台上;As shown in Figure 2, the distance between the logistics channel platform and the construction elevator 16 is about 50-100mm, and the automatic flap in the construction elevator 16 can be placed on the logistics channel platform;

如图4所示,物流通道平台在楼层内可按1:5-1:7放坡。As shown in Figure 4, the logistics channel platform can be graded at 1:5-1:7 in the floor.

综上所述,本实用新型提供的施工电梯附着与物流通道相结合装置,施工工序简单、安装效率高,不影响施工电梯正常运行,且拆除后的主次梁、面板、防护结构、电梯楼层门、钢丝绳和呼叫器等均可重复利用,材料利用率高,大大降低了施工成本,践行了绿色施工的理念。另外,本施工电梯附着与物流通道相结合装置大多采用型钢制作,安全可靠。同时,既可以通过深化设计构件尺寸在工厂里加工制作,现场安装,也可以在楼层内进行组装安装。To sum up, the device for combining the attachment of the construction elevator with the logistics passage provided by the utility model has simple construction procedures and high installation efficiency, does not affect the normal operation of the construction elevator, and removes the primary and secondary beams, panels, protective structures, and elevator floors. Doors, wire ropes and pagers can be reused, and the material utilization rate is high, which greatly reduces the construction cost and implements the concept of green construction. In addition, most of the elevator attachment and logistics channel combination devices in this construction are made of section steel, which is safe and reliable. At the same time, it can be processed in the factory by deepening the design of the component size, installed on site, or assembled and installed on the floor.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (9)

1. A combined device of a construction elevator attachment rod and a logistics channel comprises a floor (6) with a structure, and is characterized in that a steel beam (7) with the structure is arranged at the bottom of the floor (6) with the structure, a longitudinal main beam (10) and a plurality of longitudinal secondary beams (17) are connected to the floor (6) with the structure, the longitudinal main beam (10) and the longitudinal secondary beams (17) are connected with transverse secondary beams (12) to form a logistics channel platform, a panel (20) is horizontally laid on the logistics channel platform, protective structures are respectively arranged on two sides of the logistics channel platform, the longitudinal main beam (10) is connected with a steel wire rope (4) through a shackle (13), the other end of the steel wire rope (4) is connected with a steel beam (2) with the structure through a detachable shackle (3), the detachable shackle (13) is connected with the tail end of the longitudinal main beam (10) of a floor (1) with the structure through the shackle (3), logistics channel platform bottom component (14) are connected with construction elevator adheres to member (15), logistics channel platform is provided with construction elevator floor door (5) on the right side, is provided with construction elevator calling set (18) on construction elevator floor door (5), logistics channel platform passes through member (14) and is connected with construction elevator (16), member (14) and the vertical girder (10) welded connection on the logistics channel platform, and be provided with haunches (26), construction elevator adheres to member (15) and member (14) welded connection.
2. The device for combining the attachment bar of the construction elevator with the logistics channel as claimed in claim 1, wherein the longitudinal main beam (10) is i-beam or H-beam, the longitudinal sub-beam (17) is i-beam or H-beam or square tube or rectangular tube, the transverse sub-beam (12) is i-beam or H-beam, and the member (14) is H-beam or i-beam or channel.
3. The device for combining the attachment rod piece of the construction elevator with the logistics channel as claimed in claim 1, wherein the panel (20) is a skid-proof steel plate, and the panel (20) is welded with the longitudinal main beam (10), the longitudinal secondary beam (17) and the transverse secondary beam (12).
4. The device for combining the attachment rod piece with the logistics channel of the construction elevator as claimed in claim 1, wherein the protection structure comprises a transverse square pipe (21), the transverse square pipe (21) is connected with a vertical column (22) in a welding manner, the vertical column (22) is inserted into an insertion opening (23), the insertion opening (23) is welded with the longitudinal main beam (10), a side punching steel plate mesh (24) is fixedly arranged on the inner side of the transverse square pipe (21), and a foot blocking plate (25) is arranged at the bottom of the protection structure.
5. The device for combining the attachment rod piece of the construction elevator with the logistics channel as claimed in claim 1, wherein the construction elevator landing door (5) is arranged in a floor, the construction elevator landing door (5) is a double door, and the construction elevator landing door (5) is opened into the floor by a construction elevator driver.
6. The device for combining the attachment rod of the construction elevator with the logistics channel as claimed in claim 1, wherein the longitudinal main beam (10) is fixed by 8 bolts (8) arranged at the front and the rear, each bolt (8) penetrates through the flange of the longitudinal main beam (10), a steel gasket (9) is arranged below the bolt (8) through a screw, and a stiffening rib (11) is arranged on the flange of the longitudinal main beam (10).
7. The device for combining the attachment rod of the construction elevator with the logistics channel as claimed in claim 1, wherein the longitudinal main beam (10), the longitudinal secondary beam (17) and the transverse secondary beam (12) are welded or bolted.
8. The device for combining the attachment rod of the construction elevator with the logistics channel as claimed in claim 1, wherein the detachable lifting lug (3) is formed by combining two tool-type steel plates, wherein the two steel plates are fastened and connected by 3 bolts, lifting lug bolt holes (27) are formed in both the two tool-type steel plates, and a lifting lug wire rope hole (19) is formed in one of the tool-type steel plates.
9. The device for combining the attachment rod piece of the construction elevator with the logistics channel as claimed in claim 1, wherein the logistics channel platform is pitched at 1:5-1:7 in a floor.
CN201920400970.9U 2019-03-27 2019-03-27 Device for combining rod piece and logistics channel of construction elevator Active CN211034805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920400970.9U CN211034805U (en) 2019-03-27 2019-03-27 Device for combining rod piece and logistics channel of construction elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920400970.9U CN211034805U (en) 2019-03-27 2019-03-27 Device for combining rod piece and logistics channel of construction elevator

Publications (1)

Publication Number Publication Date
CN211034805U true CN211034805U (en) 2020-07-17

Family

ID=71528154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920400970.9U Active CN211034805U (en) 2019-03-27 2019-03-27 Device for combining rod piece and logistics channel of construction elevator

Country Status (1)

Country Link
CN (1) CN211034805U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116443698A (en) * 2023-04-28 2023-07-18 中铁建工集团有限公司 Construction elevator channel equipment and working method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116443698A (en) * 2023-04-28 2023-07-18 中铁建工集团有限公司 Construction elevator channel equipment and working method thereof
CN116443698B (en) * 2023-04-28 2025-10-24 中铁建工集团有限公司 Construction elevator passage equipment and working method thereof

Similar Documents

Publication Publication Date Title
CN101759098B (en) Crane beam frame construction method
CN204781887U (en) Prefabricated assembly type structure's no outrigger construction platform
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN209780193U (en) Suspension type scaffold
CN214786179U (en) A tool type cantilever horizontal safety net
CN211034805U (en) Device for combining rod piece and logistics channel of construction elevator
CN205955213U (en) Mortar stirring canopy can be had enough to meet need in job site
CN218912194U (en) Portable safe operation platform for elevator shaft of high-rise building
CN112796528A (en) Construction method for high-altitude in-situ splicing of large-span steel truss
CN205314242U (en) Job site ground many function combination formula protection canopy
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN214614570U (en) Assembled steel truss beam column connection part
CN106320699B (en) The fast assembling-disassembling method of truss type formwork strutting system
CN218912192U (en) Clamp type operation platform suitable for box girder
CN206448505U (en) Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN207794690U (en) The assembled steel reinforced machining shed that can be had enough to meet the need
CN218149656U (en) Operating platform in lighting well
CN206220547U (en) A kind of operating platform for steel structure column installation
CN214614569U (en) Steel beam column connection node for fine construction
CN209653548U (en) A kind of horizontal protective device of modularization for construction
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN209468980U (en) A kind of platform board of construction operation steel platform
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN217325831U (en) U-shaped clamp and mounting structure for construction of steel structure connecting pair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant