CN211006342U - Ladder is hung in bridge floor construction of bridge engineering - Google Patents
Ladder is hung in bridge floor construction of bridge engineering Download PDFInfo
- Publication number
- CN211006342U CN211006342U CN201920695108.5U CN201920695108U CN211006342U CN 211006342 U CN211006342 U CN 211006342U CN 201920695108 U CN201920695108 U CN 201920695108U CN 211006342 U CN211006342 U CN 211006342U
- Authority
- CN
- China
- Prior art keywords
- ladder
- bridge
- operation platform
- construction
- bridge deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a ladder is hung in bridge floor construction of bridge engineering, including hanging fixing device, erecting ladder and safe operation platform, hang fixing device and adopt to link to the pull rod spare with bridge floor embedded bar, pass bridge floor system embedded bar to the pull rod spare and fix, hang fixing device end and adopt scalable screw thread device, can hang the flexible regulation of end. The vertical ladder is composed of a part above the bridge deck and a part below the bridge deck, the part, higher than the bridge deck, of the vertical ladder plays a role in protection, an operator can enter the safe operation platform through the vertical ladder, the safe operation platform is composed of a safety fence and a bottom telescopic device, and the levelness of the operation platform can be adjusted by the bottom telescopic device to create a good construction environment. The whole hanging ladder can be folded, the installation process is simple, the assembly and disassembly are very convenient, the working efficiency of construction operation is greatly improved, and the safety of construction operation personnel is ensured.
Description
Technical Field
The utility model relates to a bridge floor construction technical field especially relates to bridge floor prefabricated T roof beam continuous section stretch-draw engineering hangs ladder.
Background
In highway construction, especially in the high-altitude area of southwest China, mountain and mountains fluctuate, the topography is complicated, mountain area highway bridge pier is generally higher, and is in hillside or valley, and after the installation of bridge T roof beam, when the stretch-draw of bridge floor continuous end, because the position of boundary beam continuous section stretch-draw is in the T roof beam back, the inconvenient operation platform of putting up, in the stretch-draw construction, work efficiency is low, can influence the time limit for a project even.
SUMMERY OF THE UTILITY MODEL
The purpose of the utility model is to solve the shortcoming that exists among the prior art to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: including hanging fixing device, erecting ladder and safe operation platform, hang fixing device and bridge floor embedded steel bar and adopt to link the pull rod spare, pass bridge floor system embedded steel bar to the pull rod spare and fix, hang fixing device end and adopt scalable screw thread device, can hang the flexible regulation of end. The vertical ladder is composed of a part above the bridge deck and a part below the bridge deck, the part, higher than the bridge deck, of the vertical ladder plays a role in protection, an operator can enter the safe operation platform through the vertical ladder, the safe operation platform is composed of a safety fence and a bottom telescopic device, and the levelness of the operation platform can be adjusted by the bottom telescopic device to create a good construction environment. The whole hanging ladder can be folded, the installation process is simple, the assembly and disassembly are very convenient, the working efficiency of construction operation is greatly improved, and the safety of construction operation personnel is ensured.
The utility model discloses a technological effect and advantage: the whole hanging ladder can be folded, the installation process is simple, the assembly and disassembly are very convenient, the working efficiency of construction operation is greatly improved, and the safety of construction operation personnel is ensured.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged view of node a in fig. 1.
Fig. 3 is a schematic view of the attachment of the suspension attachment portion to the bolt.
Fig. 4 is an enlarged view at B in fig. 1.
Fig. 5 is another embodiment at B in fig. 1.
Fig. 6 is an enlarged view at C in fig. 1.
In the figure: 1 vertical ladder, 2 fixed hinge support, 3 bolts, 4 hang connecting portion, 5 second screw rods, 6 pairs of pull rod spare, 7 bridge floor embedded steel bars, 8 oblique steel pipes, 9 horizontal steel pipes, 10 vertical steel pipe one, 11 vertical steel pipe two, 12 operation platform, 13 first screw rods, 14 rubber sleeve, 15T roof beam.
Detailed description of the preferred embodiment 2
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a ladder is hung in bridge engineering bridge floor construction as shown in fig. 1 to 6, including hanging coupling part 4, hang 4 anterior segments of coupling part and be equipped with flexible screw means B and carry out fixed connection with bridge floor system embedded bar 7, 5 accessible spirals of second screw rod shrink and extend in the flexible screw means B. Hang coupling part 4 and be connected through fixed hinge support 2 and perpendicular ladder 1, perpendicular ladder 1 can supply operation personnel business turn over operation platform 12, operation platform 12 comprises oblique steel pipe 8, horizontal steel pipe 9, vertical steel pipe 10, two 11 vertical steel pipes, and the operation platform bottom is equipped with telescoping device C, 13 accessible spirals of first screw rod among the device C shrink and extend, can adjust the operation platform levelness.
Specifically, flexible threaded means B comprises second screw rod 5, adopt in the flexible threaded means B and the bridge floor embedded steel bar to carry out fixed connection to pull rod 6.
Specifically, the C at the tail end of the operating platform 12 is composed of a spiral telescopic device, and the tail end of the operating platform is provided with an anti-skid rubber sleeve 14.
The hanging connecting part 4 in the A is connected by the bolt 3 and can be opened, so that the whole hanging ladder structure is folded.
Specifically, the connecting member in the fixed hinge support 2 is a fixed hinge support, and the rod pieces can rotate in a plane.
Specifically, the top ends of the second vertical steel pipes 11 in the fixed part are positioned at the edge part of the bridge deck T beam 15. Part a in fig. 1 constitutes a node, the horizontal position of which is adjustable by means of a telescopic device B.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.
Claims (4)
1. The utility model provides a ladder is hung in bridge engineering bridge floor construction, includes and hangs coupling part (4) its characterized in that: the front section of the suspension connecting part (4) is provided with a telescopic thread device (B) which is fixedly connected with a bridge deck system embedded steel bar (7), and a second screw (5) in the telescopic thread device (B) can contract and extend through a spiral;
hang linkage part (4) and be connected through fixed hinge support (2) and perpendicular ladder (1), erect ladder (1) and can supply operation personnel business turn over operation platform (12), operation platform (12) comprise oblique steel pipe (8), horizontal steel pipe (9), vertical steel pipe (10), vertical steel pipe two (11), and operation platform (12) bottom is equipped with telescoping device (C), first screw rod (13) accessible spiral in telescoping device (C) is shrink and is extended, can adjust the operation platform levelness.
2. The hanging ladder for bridge deck construction of bridge engineering according to claim 1, characterized in that: the telescopic thread device (B) is composed of a second screw rod (5), and the telescopic thread device (B) and bridge deck embedded steel bars are fixedly connected through pull rods (6).
3. The hanging ladder for bridge deck construction of bridge engineering according to claim 1, characterized in that: the telescopic device (C) at the tail end of the operating platform (12) is composed of a spiral telescopic device, and the tail end of the operating platform is provided with an anti-skid rubber sleeve (14).
4. The hanging ladder for bridge deck construction of bridge engineering according to claim 1, characterized in that: the fixed hinged support is adopted for connection in the fixed hinged support (2), and all rod pieces can rotate in a plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920695108.5U CN211006342U (en) | 2019-05-14 | 2019-05-14 | Ladder is hung in bridge floor construction of bridge engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920695108.5U CN211006342U (en) | 2019-05-14 | 2019-05-14 | Ladder is hung in bridge floor construction of bridge engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211006342U true CN211006342U (en) | 2020-07-14 |
Family
ID=71475480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920695108.5U Expired - Fee Related CN211006342U (en) | 2019-05-14 | 2019-05-14 | Ladder is hung in bridge floor construction of bridge engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211006342U (en) |
-
2019
- 2019-05-14 CN CN201920695108.5U patent/CN211006342U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201598820U (en) | Single point suspension external hanging bracket | |
CN212175496U (en) | Ultra-high gravity type anchorage cantilever template system | |
CN208844546U (en) | Bridge steel support-adjustable multifunctional scissors support truss | |
CN211006342U (en) | Ladder is hung in bridge floor construction of bridge engineering | |
CN206753009U (en) | One kind building fabricated scaffold | |
CN109881585A (en) | A kind of assembly flow shop platform for high pier construction | |
CN210370658U (en) | Size-adjustable component type tunnel trolley | |
CN201284551Y (en) | Suspension type simple platform for work high above ground | |
CN208518307U (en) | A kind of fast pylon easy to install of adjustable platform width | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN214785753U (en) | Scaffold convenient to dismantle installation | |
CN205663282U (en) | Light -duty lattice formula steel column of large capacity | |
CN205591507U (en) | Scaffold frame of easily dismantling | |
CN209653333U (en) | A kind of multifunctional wall body constructing operation frame | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN207110439U (en) | A kind of connection ladder on scaffold | |
CN202882373U (en) | Improved scaffold | |
CN204590553U (en) | Semi-automaticly climb formula exterior wall safeguard structure | |
CN218147827U (en) | Foldable safety platform for hogging moment tensioning construction | |
CN204754212U (en) | Unsettled fire control vestibule hangs mould formwork assembly | |
CN214739699U (en) | Anti-skidding scaffold is used in house construction | |
CN203878952U (en) | Simple telescopic scaffold | |
CN218324961U (en) | Steel cylinder hanging support for collapse repair of draw shaft wall | |
CN214364813U (en) | Large-span splicing type operating platform | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 |