CN214785753U - Scaffold convenient to dismantle installation - Google Patents
Scaffold convenient to dismantle installation Download PDFInfo
- Publication number
- CN214785753U CN214785753U CN202120122324.8U CN202120122324U CN214785753U CN 214785753 U CN214785753 U CN 214785753U CN 202120122324 U CN202120122324 U CN 202120122324U CN 214785753 U CN214785753 U CN 214785753U
- Authority
- CN
- China
- Prior art keywords
- fastener
- pole setting
- vertical rod
- rod
- scaffold frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 21
- 230000000903 blocking effect Effects 0.000 claims description 8
- 210000000078 claw Anatomy 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model discloses a scaffold frame convenient to dismantle installation relates to the dismantlement and the installation technical field of scaffold frame, and the bolt to current scaffold frame is lost easily when dismantling, installation reuse, causes extravagant problem, now proposes following scheme, and it includes first pole setting, fender footboard has been placed to first pole setting top, just one side that first pole setting was kept away from to fender footboard is provided with the second pole setting, be provided with the fastener in the first pole setting, just the fastener is the symmetric distribution in first pole setting and second pole setting, it has ordinary screw to run through on the fastener, just ordinary screw is connected with the nut, the fastener of connecting above the first pole setting articulates there is the second down tube, just the fastener of connecting below the first pole setting articulates there is first down tube. The utility model discloses novel structure, and this scaffold frame not only can not lose the part when dismantling the installation, simultaneously can also convenient to detach and installation, reach labour saving and time saving's purpose, improved this scaffold frame's practicality.
Description
Technical Field
The utility model relates to a dismantlement and the installation technical field of scaffold frame especially relate to a scaffold frame convenient to dismantle installation.
Background
Scaffold refers to the general term for workers to operate and solve vertical and horizontal transportation and erect various supports and buildings on a construction site, and refers to a safety net or a peripheral fence and a high-altitude installation member which are mainly used by constructors and operators and cannot be directly constructed inside and outside the construction site or at a higher height, and the scaffold is usually made of the following materials: bamboo, wood, steel or combined material still adopt the scaffold frame when some engineering templates use, in addition in advertising industry, municipal administration, the departments such as mine and traffic road bridge extensively adopt, choose the scaffold frame of different usage in the engineering construction of different grade type, the crane span structure adopts bowl shape scaffold frame many, also has the scaffold frame of using, scaffold frame major structure is fastener formula scaffold frame for building, the vertical interval of scaffold frame pole setting is generally 1.2 ~ 1.8m, the horizontal interval is generally 0.9 ~ 1.5 m.
The existing scaffold which is built adopts a steel pipe and a fastener to be fastened with a bolt, and is time-consuming and labor-consuming due to bolt fixing in the assembling process, the building time is long, the bolt is easy to rust, so that the bolt is not firm in fixing, potential safety hazards exist, the bolt is easy to lose when being disassembled and repeatedly used in installation, waste is caused, and the scaffold is very inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of scaffold frame convenient to dismantle installation, the bolt of having solved current scaffold frame is lost easily when dismantling, installation reuse, causes extravagant problem.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold frame convenient to dismantle installation, includes first pole setting, the fender footboard has been placed to first pole setting top, just one side that first pole setting was kept away from to the fender footboard is provided with the second pole setting, be provided with the fastener in the first pole setting, just the fastener is symmetric distribution in first pole setting and second pole setting, it has ordinary screw to run through on the fastener, just ordinary screw is connected with the nut, the fastener of connecting above the first pole setting articulates there is the second down tube, just the fastener of connecting below the first pole setting articulates there is first down tube, the one end that first pole setting was kept away from to first down tube is provided with the screw thread, just the fastener of connecting in the second pole setting articulates there is the sleeve, the sleeve passes through threaded connection with first down tube.
Preferably, the blocking pedal is provided with clamping jaws below, and the clamping jaws are symmetrically distributed below the blocking pedal.
Preferably, one side of the first inclined rod, which is close to the second vertical rod, is provided with a rope sling, and a traction rope is fixedly connected to the rope sling.
Preferably, one end of the traction rope, which is far away from the rope sling, is connected with a fixing screw, and the fixing screw penetrates through the first inclined rod and the second inclined rod.
Preferably, a ladder is arranged on the first vertical rod, a ladder is arranged on the second vertical rod, and the ladders are symmetrically distributed on the first vertical rod and the second vertical rod.
Preferably, the fastener side is provided with plum blossom handle screw, just the fastener passes through the button head screw and articulates.
The utility model has the advantages that:
1. through setting up the fag end on first down tube, through haulage rope with fixed screw connection on first down tube, prevent to lose, through keeping off the jack catch that the footboard below set up after that to make and keep off the footboard and place and can not slide on the scaffold frame, and be convenient for take off, reached the purpose that can not lose the part when the scaffold frame is dismantled.
2. Through the plum blossom handle screw that sets up on the fastener, can adjust first down tube and second down tube position, it is fixed with the fastener to screw up plum blossom handle screw in suitable position, through telescopic setting after that, can be connected first down tube and second down tube with the second pole setting, has reached the scaffold frame of being convenient for and has dismantled the purpose of installation.
To sum up, this scaffold frame not only can not lose the part when dismantling the installation, simultaneously can also convenient to detach and installation, reaches labour saving and time saving's purpose, has improved this scaffold frame's practicality.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view structure diagram of the present invention.
Fig. 3 is a structural view of the fastener of the present invention.
Fig. 4 is a sleeve structure diagram of the present invention.
Reference numbers in the figures: 1. a pedal block; 2. a first upright rod; 3. a second upright stanchion; 4. a claw; 5. a fastener; 6. a plum blossom handle screw; 7. a common screw; 8. a first diagonal member; 9. a second diagonal member; 10. fixing screws; 11. a hauling rope; 12. rope sleeves; 13. a ladder; 14. a sleeve; 15. a round head screw; 16. a nut; 17. and (4) threading.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, a scaffold convenient for disassembly and assembly comprises a first vertical rod 2, a blocking pedal 1 is placed above the first vertical rod 2, a second vertical rod 3 is arranged on one side of the blocking pedal 1 far away from the first vertical rod 2, a fastener 5 is arranged on the first vertical rod 2, the fasteners 5 are symmetrically distributed on the first vertical rod 2 and the second vertical rod 3, a common screw 7 penetrates through the fastener 5, the common screw 7 is connected with a nut 16, the fastener 5 connected above the first vertical rod 2 is hinged with a second inclined rod 9, the fastener 5 connected below the first vertical rod 2 is hinged with a first inclined rod 8, one end of the first inclined rod 8 far away from the first vertical rod 2 is provided with a thread 17, the fastener 5 connected on the second vertical rod 3 is hinged with a sleeve 14, the sleeve 14 is connected with the first inclined rod 8 through the thread 17, keep off 1 below of footboard and be provided with jack catch 4, just jack catch 4 is the symmetric distribution in keeping off 1 below of footboard, one side that first down tube 8 is close to second pole setting 3 is provided with fag end 12, just fixedly connected with haulage rope 11 on the fag end 12, the one end that haulage rope 11 kept away from fag end 12 is connected with fixed screw 10, just fixed screw 10 runs through in first down tube 8 and second down tube 9, be provided with ladder 13 in first pole setting 2, be provided with ladder 13 in second pole setting 3, just ladder 13 is the symmetric distribution on first pole setting 2 and second pole setting 3, 5 sides of fastener are provided with plum blossom handle screw 6, just fastener 5 is articulated through button head screw 15.
The working principle is as follows: when the scaffold is installed, after the fastener 5 on the first upright 2 is adjusted to a proper position, the plum blossom handle screw 6 is screwed, and then the fastener 5 on the first upright 2 is fixed, then the first diagonal 8 and the second diagonal 9 are fixed through the fixing screw 10, the rope loop 12 on the first diagonal 8 is arranged, the fixing screw 10 is connected through the traction rope 11, the fixing screw 10 is prevented from being lost, the end of the first diagonal 8 far away from the first upright 2 is provided with a thread 17, the sleeve 14 is rotated through the sleeve 14 hinged with the fastener 5 on the second upright 3, and then the first diagonal 8 is connected with the sleeve 14 through the thread 17, the end of the second diagonal 9 far away from the first upright 2 is provided with the thread 17, the sleeve 14 is rotated through the sleeve 14 hinged with the fastener 5 on the second upright 3, and then the second diagonal 9 is connected with the sleeve 14 through the thread 17, after the installation, the plum blossom handle screw 6 on the fastener 5 on the second pole setting 3 is screwed up, will keep off footboard 1 at last and place in first pole setting 2 and second pole setting 3, it is fixed with the scaffold frame through jack catch 4, accomplish the installation procedure promptly, this scaffold frame is when dismantling, earlier take off fender footboard 1, reverse sleeve 14 afterwards, and then with first down tube 8 and second down tube 9 and the separation of second pole setting 3, take off fixed screw 10, and then make first down tube 8 and second down tube 9 pack up, accomplish the dismantlement scaffold frame step promptly, reached the difficult loss of part and the purpose of being convenient for installation dismantlement when scaffold frame installation dismantlement, time saving and labor saving, the practicality of this scaffold frame has been improved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The scaffold convenient to disassemble and install comprises a first vertical rod (2) and is characterized in that a blocking pedal (1) is placed above the first vertical rod (2), a second vertical rod (3) is arranged on one side, far away from the first vertical rod (2), of the blocking pedal (1), a fastener (5) is arranged on the first vertical rod (2), the fastener (5) is symmetrically distributed on the first vertical rod (2) and the second vertical rod (3), a common screw (7) penetrates through the fastener (5), the common screw (7) is connected with a nut (16), a second inclined rod (9) is hinged to the fastener (5) connected above the first vertical rod (2), a first inclined rod (8) is hinged to the fastener (5) connected below the first vertical rod (2), and a thread (17) is arranged at one end, far away from the first vertical rod (2), of the first inclined rod (8), and the fastener (5) connected on the second vertical rod (3) is hinged with a sleeve (14), and the sleeve (14) is connected with the first diagonal rod (8) through a thread (17).
2. A scaffold convenient for disassembly and assembly according to claim 1, wherein the blocking pedal (1) is provided with claws (4) under it, and the claws (4) are symmetrically distributed under the blocking pedal (1).
3. A scaffold convenient to dismantle and install according to claim 1, characterized in that the side of the first diagonal member (8) close to the second vertical member (3) is provided with a rope socket (12), and a traction rope (11) is fixedly connected to the rope socket (12).
4. A scaffold convenient to dismount and mount, according to claim 3, characterized in that a fixing screw (10) is connected to one end of the traction rope (11) far away from the rope sleeve (12), and the fixing screw (10) penetrates through the first diagonal rod (8) and the second diagonal rod (9).
5. A scaffold convenient to dismantle and install according to claim 1, wherein a ladder (13) is arranged on the first vertical pole (2), a ladder (13) is arranged on the second vertical pole (3), and the ladders (13) are symmetrically distributed on the first vertical pole (2) and the second vertical pole (3).
6. A scaffold convenient to dismantle and install according to claim 1, wherein the fastener (5) is provided with plum blossom handle screw (6) on the side, and the fastener (5) is hinged through round head screw (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120122324.8U CN214785753U (en) | 2021-01-18 | 2021-01-18 | Scaffold convenient to dismantle installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120122324.8U CN214785753U (en) | 2021-01-18 | 2021-01-18 | Scaffold convenient to dismantle installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214785753U true CN214785753U (en) | 2021-11-19 |
Family
ID=78747728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120122324.8U Expired - Fee Related CN214785753U (en) | 2021-01-18 | 2021-01-18 | Scaffold convenient to dismantle installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214785753U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114109005A (en) * | 2021-12-09 | 2022-03-01 | 来安县金盛源金属制品有限公司 | Scaffold connecting rod drag hook structure and scaffold |
-
2021
- 2021-01-18 CN CN202120122324.8U patent/CN214785753U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114109005A (en) * | 2021-12-09 | 2022-03-01 | 来安县金盛源金属制品有限公司 | Scaffold connecting rod drag hook structure and scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204386134U (en) | The attached mould scaffold of a kind of concrete cylindrical hoop | |
CN214785753U (en) | Scaffold convenient to dismantle installation | |
CN215253499U (en) | Scaffold device | |
CN213268820U (en) | Pull rod type I-steel cantilever beam | |
CN207110442U (en) | The connector that a kind of scaffold uses | |
CN207003968U (en) | A kind of dismountable scaffold of architectural engineering | |
CN215630118U (en) | Movable aluminum mould board piping lane pours shaping structure in succession | |
CN206220649U (en) | Construction guard fender | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN210529505U (en) | Circulation device is torn open in ann of wet seam template of bridge concatenation formula | |
CN221973125U (en) | Adjustable cat ladder is used in prefabricated staircase construction | |
CN206693066U (en) | One kind, which builds a bridge, safeguards scaffold | |
CN203008409U (en) | Safe and practical tread board for realizing simple and convenient disassembly and assembly of temporary staircase in construction site | |
CN207110439U (en) | A kind of connection ladder on scaffold | |
CN218293100U (en) | Urban road and traffic engineering rail guard | |
CN215717117U (en) | Novel detachable external scaffolding is wall spare even | |
CN218970718U (en) | Outer scaffold inner side horizontal safety net paving support | |
CN211817920U (en) | Banana type scaffold | |
CN217782994U (en) | Be used for old project regularization roofing protector that changes | |
CN213805024U (en) | Building engineering warns protector | |
CN217975495U (en) | Device for hanging safety rope on external scaffold | |
CN216196481U (en) | Temporary fixation draws bearing structure to one side | |
CN213087369U (en) | Assembled module well construction operation platform | |
CN212154113U (en) | Pre-buried connecting device of concrete building scaffold | |
CN217998886U (en) | Narrow space climbing platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211119 |
|
CF01 | Termination of patent right due to non-payment of annual fee |