CN210976511U - Construction engineering stand column construction regularization operation platform - Google Patents
Construction engineering stand column construction regularization operation platform Download PDFInfo
- Publication number
- CN210976511U CN210976511U CN201921133447.0U CN201921133447U CN210976511U CN 210976511 U CN210976511 U CN 210976511U CN 201921133447 U CN201921133447 U CN 201921133447U CN 210976511 U CN210976511 U CN 210976511U
- Authority
- CN
- China
- Prior art keywords
- layer
- construction
- operation platform
- upper layer
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The operating platform is a shaped operating platform formed by welding profile steel or steel pipes and divided into three parts, namely a bottom layer, a middle layer and an upper layer, a ladder cage is arranged on the side surface of a frame, an upper layer guard rail and a middle layer guard rail are respectively arranged on the upper layer and the middle layer, a scaffold board is laid on each layer to serve as the platform, and the middle part of each layer is empty; the device is simple, convenient, safe, reliable, low in manufacturing cost, good in practicability, safe in operation of workers and worthy of popularization.
Description
Technical Field
The utility model relates to a building engineering construction apparatus, especially building engineering stand construction regularization operation platform.
Background
At present, in building construction, a scaffold is required to be erected as an operation frame in conventional upright post construction, a scaffold board is laid on a working face, and due to the difference of the levels of operators, the erected operation frame is easy to be irregular, the stability is poor, and the safety coefficient is low; endanger the life safety of construction operation workers.
Disclosure of Invention
In order to avoid in the construction, the scaffold frame of setting up and operation face lay phenomenon such as scaffold board nonstandard, because handling frame that the horizontally difference of operation workman caused is nonstandard, stability is relatively poor, factor of safety is lower, threaten construction workman life safety scheduling problem, the utility model provides a construction engineering stand construction regularization operation platform.
The utility model provides a technical scheme that its technical problem adopted is: construction engineering stand construction regularization operation platform includes: the upper layer, the upper layer guard rail, the middle layer, the bottom layer and the ladder cage; this operation platform is by shaped steel or steel pipe welding one-tenth regularization operation platform, divide into three bottom, middle level, upper strata, is equipped with the ladder cage in the side of frame, is equipped with upper protection railing and middle level protection railing respectively in upper strata and middle level, and the scaffold board is laid as the platform on each layer, and the middle part of each layer is empty, provides the space for operations such as stand reinforcement, founds the template.
The ladder cage is welded with the upper layer, the middle layer and the bottom layer into a whole, integrity and stability are improved, and the ladder cage is made of section steel products.
The upper layer, the middle layer and the bottom layer can be customized to different heights according to the height requirement.
Scaffold boards are laid on the upper layer, the middle layer and the bottom layer, and guard rails are arranged in the empty positions among the laid scaffold boards, so that the personal safety of workers is guaranteed.
The middle parts of the upper layer, the middle layer and the bottom layer are hollow and communicated with each other, and the construction operation can be completed through the communicated structures in the middle.
When the tower crane is used, the whole operation platform can be moved through a tower crane, a truck crane and the like, the operation platform is placed at a position needing operation, and workers stand on the upper layer, the middle layer and the bottom layer according to different heights to perform operation.
The utility model has the advantages that: building engineering stand construction regularization operation platform, whole removal has reduced the work load that the scaffold was taken to the workman, and is simple and convenient, and the cost is with low costs, and the practicality is good, and workman operation safety is worth the product of popularization.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a schematic view of the structure principle of the present invention.
In the figure: 1. the upper layer, 2, the upper layer guard rail, 3, the middle layer guard rail, 4, the middle layer, 5, the bottom layer and 6, the ladder cage.
Detailed Description
The utility model provides a technical scheme that its technical problem adopted is: construction engineering stand construction regularization operation platform includes: the upper layer 1, the upper layer guard rail 2, the middle layer guard rail 3, the middle layer 4, the bottom layer 5 and the ladder cage 6; this operation platform is by shaped steel or steel pipe welding one-tenth regularization operation platform, divide into three bottom 5, middle level 4, upper strata 1, is equipped with ladder cage 6 in the side of frame, is equipped with upper protection railing 2 and middle level protection railing 3 respectively at upper strata 1 and middle level 4, and the scaffold board is laid as the platform in each layer, and the middle part of each layer is empty, provides the space for operations such as stand reinforcement, founding the template.
The ladder cage 6, the upper layer 1, the middle layer 4 and the bottom layer 5 are welded into a whole, integrity and stability are improved, and the material is a section steel product.
The upper layer 1, the middle layer 4 and the bottom layer 5 can be customized to different heights according to the height requirement.
Scaffold boards are laid on the upper layer 1, the middle layer 4 and the bottom layer 5, and guard rails are arranged in the empty positions among the laid scaffold boards, so that the personal safety of workers is guaranteed.
The middle parts of the upper layer 1, the middle layer 4 and the bottom layer 5 are hollow and communicated with each other, and the construction operation can be completed through the communicated structures.
When the device is used, the whole operation platform can be moved through a tower crane, a truck crane and the like, the operation platform is placed at a position needing operation, and workers stand on the upper layer 1, the middle layer 4 and the bottom layer 5 according to different heights to perform operation.
Claims (5)
1. Construction engineering stand construction regularization operation platform includes: the device comprises an upper layer (1), an upper layer guard rail (2), a middle layer guard rail (3), a middle layer (4), a bottom layer (5) and a ladder cage (6); the method is characterized in that: this operation platform is by shaped steel or steel pipe welding one-tenth regularization operation platform, divide into three part bottom (5), middle level (4), upper strata (1), is equipped with ladder cage (6) in the side of frame, is equipped with upper protection railing (2) and middle level protection railing (3) respectively in upper strata (1) and middle level (4), and the scaffold board is laid as the platform in each layer, and the middle part of each layer is empty, provides the space for operations such as stand reinforcement, founding the template.
2. The construction engineering column construction sizing operation platform of claim 1: the method is characterized in that: ladder cage (6) and upper strata (1), well (4) and bottom (5) welding are as an organic whole, increase wholeness and stability, and the material is the shaped steel goods.
3. The construction engineering column construction sizing operation platform of claim 1: the method is characterized in that: the upper layer (1), the middle layer (4) and the bottom layer (5) can be customized to different heights according to the height requirements.
4. The construction engineering column construction sizing operation platform of claim 1: the method is characterized in that: scaffold boards are laid on the upper layer (1), the middle layer (4) and the bottom layer (5), and guard rails are arranged in the empty positions in the middle of the laid scaffold boards, so that the personal safety of workers is guaranteed.
5. The construction engineering column construction sizing operation platform of claim 1: the method is characterized in that: the middle parts of the upper layer (1), the middle layer (4) and the bottom layer (5) are hollow and communicated with each other, and the construction operation can be completed through the communicated structures in the middle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921133447.0U CN210976511U (en) | 2019-07-18 | 2019-07-18 | Construction engineering stand column construction regularization operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921133447.0U CN210976511U (en) | 2019-07-18 | 2019-07-18 | Construction engineering stand column construction regularization operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210976511U true CN210976511U (en) | 2020-07-10 |
Family
ID=71445182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921133447.0U Expired - Fee Related CN210976511U (en) | 2019-07-18 | 2019-07-18 | Construction engineering stand column construction regularization operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210976511U (en) |
-
2019
- 2019-07-18 CN CN201921133447.0U patent/CN210976511U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN108868193B (en) | Construction method for reversely dismantling steel structure building | |
CN102080357B (en) | Integrated beam-falling device and method for steel pipe pier bailey beam cast-in-place bracket | |
CN206986744U (en) | Steel box-girder flange area slidably construction operation platform | |
CN111997342B (en) | Cantilever framework supporting structure protruding out of building and construction method thereof | |
CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
CN103206074A (en) | Elevator shaft template construction method, platform and support | |
CN207142717U (en) | Small-sized hanging device | |
CN201189944Y (en) | Folding borehole work platform | |
CN206233546U (en) | A kind of elevator hoistways workbench | |
CN110565937A (en) | Door type integral lifting steel platform | |
CN210976511U (en) | Construction engineering stand column construction regularization operation platform | |
CN212866793U (en) | Assembled construction elevator stops layer platform | |
CN212957538U (en) | Roof flower frame beam and outer wall decoration construction movable operation platform | |
CN112681138A (en) | Segmented assembling and walking type pushing construction method for high-speed rail crossing line | |
CN203213019U (en) | Cast-in-situ construction bracket system of long cantilever bent cap | |
CN205935746U (en) | Simple and easy terraced barreled is put | |
CN215439421U (en) | Windproof device of tower crane | |
CN210564332U (en) | Movable safety steel cat ladder | |
CN204492133U (en) | A kind of easy insulated column construction tool frame | |
CN113047594A (en) | Movable climbing frame for elevator shaft and erection method thereof | |
CN206091253U (en) | Be suitable for irregular space's simple and easy steel bracket platform | |
CN206737389U (en) | A kind of movable lifting steel pipe frame operating platform | |
CN112173043A (en) | Hyperboloid segmentation bed-jig | |
CN205168844U (en) | Building berth carries and supports pylon with hull |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200710 Termination date: 20210718 |
|
CF01 | Termination of patent right due to non-payment of annual fee |