CN201189944Y - Folding borehole work platform - Google Patents

Folding borehole work platform Download PDF

Info

Publication number
CN201189944Y
CN201189944Y CNU2008200579029U CN200820057902U CN201189944Y CN 201189944 Y CN201189944 Y CN 201189944Y CN U2008200579029 U CNU2008200579029 U CN U2008200579029U CN 200820057902 U CN200820057902 U CN 200820057902U CN 201189944 Y CN201189944 Y CN 201189944Y
Authority
CN
China
Prior art keywords
bore hole
stackable
underframe
framework
job platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200579029U
Other languages
Chinese (zh)
Inventor
李伟兴
郑昕
张理燕
邹世杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiangnan Changxing Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CNU2008200579029U priority Critical patent/CN201189944Y/en
Application granted granted Critical
Publication of CN201189944Y publication Critical patent/CN201189944Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a superposable work platform for a bore hole, which comprises a base frame, roller wheels pivoted on both sides of the base frame, two guide rails for the sliding of the roller wheels, a frame fixedly connected above the base frame and a top plate fixed connected above the frame. Due to the adoption of the superposable work platform, the safety of construction operation can be ensured, the work efficiency can be improved, and the construction period of a dock can be shortened, thereby the production cost is reduced, the economic benefit is improved and the image of a construction site is greatly improved.

Description

Stackable bore hole job platform
Technical field
The utility model relates to a kind of convenience stackable job platform of using of bore hole operation aloft, and particularly a kind of is the formula that the stacks bore hole job platform of using when carrying out bore hole to oil tanker stern axle system and rudder.
Background technology
During existing dock is built, carry out the bore hole operation at the stern of various boats and ships closely being counted Mi Gaodu apart from ground and add man-hour, what all adopt is that tubular scaffold is built into job platform.Since hull stern or rudder portion generally apart from ground all more than several meters, and the workman carries out the bore hole operation on several meters high tubular scaffold, and is very dangerous.For guaranteeing the precision of bore hole, operation all needs for several times repeatedly simultaneously, and tubular scaffold just need be built and be removed continually like this.The frequent dismounting of tubular scaffold and building, the effort but also very time-consuming of not only having taken a lot of work has strengthened productive costs, has prolonged the dock production cycle.Tubular scaffold itself is both dangerous not attractive in appearance yet simultaneously.
The utility model content
The technical problems to be solved in the utility model is in order to overcome in the existing ship stern bore hole operation processing, tubular scaffold is dangerous not attractive in appearance yet, and the frequent dismounting of tubular scaffold and building, not only taken a lot of work effort but also time-consuming very inconvenient defective provide a kind of stackable bore hole job platform.
The utility model solves above-mentioned technical matters by following technical proposals: a kind of stackable bore hole job platform comprises:
One underframe, this underframe both sides pivot is equipped with roller;
Two guide rails for this roller slip;
One is fixed in the framework of this underframe top;
One is fixed in the top board of this framework top.
Wherein, this underframe is welded with some bonded assembly fixed blocks, and this fixed block is provided with some bolts hole.
Wherein, this framework is provided with the fixed block identical with the fixed block of this underframe.
Wherein, this framework comprises some columns, is connected with plurality of strengthening ribs between each column.
Wherein, an affixed staircase unit on this framework.
Wherein, have on this top board one with the outlet or the cooresponding rectangular opening that enters the mouth of this staircase unit.
The otch that puts in when wherein, this top board one side also has one to supply the workpiece operation.
Wherein, also be connected with guardrail on this top board.
Positive progressive effect of the present utility model is:
1, ensures construction operation safety, lifting work efficiency, shortened the dock production cycle;
2, reduce production costs, increase economic efficiency;
3, reduce the man power and material who builds input, also greatly improved the image of camp site.
Description of drawings
Fig. 1 is the assembly drawing of the utility model one embodiment.
Fig. 2 is the Undercarriage structure figure of the utility model one embodiment.
Fig. 3 is the framed structure front view of the utility model one embodiment.
Fig. 4 is the framed structure birds-eye view of the utility model one embodiment.
Fig. 5 is the top board structure figure of the utility model one embodiment.
Fig. 6 is for having the top board structure figure with the cooresponding rectangular opening of staircase mouth in utility model one embodiment.
Fig. 7 is for there being the top board structure figure of rectangular opening and otch in utility model one embodiment.
The specific embodiment
Lift a preferred embodiment below, and come the clearer the utility model that intactly illustrates in conjunction with the accompanying drawings.
One, the structure of this device
To shown in Figure 7, a kind of stackable bore hole job platform is stacked to left part and the right part placed side by side by several layers of individual layer job platform and to form as Fig. 1.Left part is 5 layers, and right part is 2 layers.As shown in Figure 1, job platform is mainly assembled by underframe 1, framework 3, top board 4, comprising: square frame shape underframe 1 is welded with H shaped steel.A height has been filled up with diamond plate 11 in the bottom of underframe 1 one sides, and roller 12 is equipped with by place, both sides pivot in underframe 1 bottom.Four of welding are used for connecting underframe 1 and framework 3 fixed blocks 13 on underframe 1 surface angle, are drilled with on the every fixed block 13 and are used for bonded assembly bolt hole 14.
Two guide rails 2 are laid along laterally being parallel to ground in the bottom of underframe 1, and the cross-sectional plane of every guide rail 2 is the H type, and every guide rail 1 surface is provided with a groove for roller 12 slips of underframe 1.
Framework 3 is made up of column 31 (available angle steel) and the plurality of strengthening ribs 32 that is welded between the column 31, be welded with on the framework 3 with underframe on identical fixed block 13, in bolt hole 14 is arranged.For safety, also can weld guardrail 6 around in the framework 3.Bolt is penetrated in the bolt hole 14 on underframe 1 and the framework 3 (shown in Fig. 1 to 4), underframe 1 is fixing with framework 3.
As Fig. 5 to Fig. 7, according to actual needs, be welded into as shown in Figure 5 top board 4 with steel plate.
As shown in Figure 6, cutting one rectangular opening 41 on top board 4, and with the outlet of staircase unit 5 or enter the mouth corresponding.With this top board 4 and the platform top 4 of framework 3 assemblings as the present embodiment left side ground floor and the second layer.
As shown in Figure 7, not only have a rectangular opening 41 on the top board 4, in addition,, also be processed with a recessed inside otch 42 at these top board 4 one side surfaces for needs stretch into workpiece operation in the platform.
It more than is exactly the structure of job platform.Shown in Fig. 1 to 7, this structure is divided left and right two parts, and right part is divided into 2 layers, and left part is divided into 5 layers, and its number of plies also can be other number, and floor height can be changed according to actual needs.During practical application, realize the formula that the stacks bore hole job platform of present embodiments by several individual layer platform detail assemblys of framework 3, top board 4 (each layer selection various top boards as shown in Figs. 5 to 7 as required) composition.
Two, the use of present embodiment and installation
During practical application, assemble by several individual layer flat-beds and to realize.As shown in Figure 1, during installation, at first, determine the number of plies and the distribution of required job platform according to the height of the ship stern of intending processing.Then, assemble each layer platform successively.Such as: underframe 1 both sides are placed on the guide rail 2, the roller 12 of underframe 1 can be fixed in framework 3 on the underframe 1 along guide rail 2 parallel sliding, top board 4 is welded on makes the 1st layer of platform of right part as shown in Figure 1 on the framework 3.
By that analogy, install each layer platform of left part and right part as shown in Figure 1 successively, placed side by side and be fixed together, so just finished the whole erection of stackable bore hole job platform.Stackable bore hole job platform is also very convenient when dismounting, can lay down the tie bolt in the fixed block 13 on each layer platform earlier, successively removes successively from high to low to get final product again.
During use, the ship stern mouth of oil tanker aimed at place on the right part second layer platform top 4 of present embodiment, the rudder portion with oil tanker stretches into the cooresponding platform of left part simultaneously, and operating worker can carry out bore hole operation processing to each layer processing platform from the staircase unit 5 in the outside.
In the present embodiment, the pattern of staircase unit and guardrail and fixed position are not limited to pattern shown in this figure and position.
More than having described the preferred specific embodiment of the utility model, is not that design and scope to this practical phenotype limits.Under the prerequisite that does not break away from the utility model design philosophy, common engineering staff can all should fall into protection domain of the present utility model to the technical solution of the utility model with going out various modification and improvement in this area.Protection domain of the present utility model is limited by appended claims.

Claims (8)

1, a kind of stackable bore hole job platform is characterized in that,
One underframe, this underframe both sides pivot is equipped with roller;
Two guide rails for this roller slip;
One is fixed in the framework of this underframe top;
One is fixed in the top board of this framework top.
2, stackable bore hole job platform as claimed in claim 1 is characterized in that this underframe is welded with the plurality of fixed piece, and this fixed block is provided with some bolts hole.
3, stackable bore hole job platform as claimed in claim 2 is characterized in that, this framework is provided with the fixed block identical with the fixed block of this underframe.
4, stackable bore hole job platform as claimed in claim 1 is characterized in that this framework comprises some columns, is connected with plurality of strengthening ribs between each column.
5, as any described stackable bore hole job platform in the claim 1 to 4, it is characterized in that an affixed staircase unit on this framework.
6, stackable bore hole job platform as claimed in claim 5 is characterized in that, have on this top board one with the outlet or the cooresponding rectangular opening that enters the mouth of this staircase unit.
7, stackable bore hole job platform as claimed in claim 1 is characterized in that, the otch that this top board one side puts in when also having to supply the workpiece operation.
8, as claim 1,2,3,4 or 7 described stackable bore hole job platforms, it is characterized in that, also be connected with guardrail on this top board.
CNU2008200579029U 2008-04-30 2008-04-30 Folding borehole work platform Expired - Fee Related CN201189944Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200579029U CN201189944Y (en) 2008-04-30 2008-04-30 Folding borehole work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200579029U CN201189944Y (en) 2008-04-30 2008-04-30 Folding borehole work platform

Publications (1)

Publication Number Publication Date
CN201189944Y true CN201189944Y (en) 2009-02-04

Family

ID=40334099

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200579029U Expired - Fee Related CN201189944Y (en) 2008-04-30 2008-04-30 Folding borehole work platform

Country Status (1)

Country Link
CN (1) CN201189944Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103395473A (en) * 2013-08-01 2013-11-20 中船澄西船舶修造有限公司 Large-scale steering engine conic hole whisking fitting workbench
CN103485522A (en) * 2013-10-12 2014-01-01 江苏耀捷建设工程有限公司 Novel easily-connected scaffold
CN105501408A (en) * 2015-12-29 2016-04-20 广船国际有限公司 Movable type foot stand
WO2019061806A1 (en) * 2017-09-28 2019-04-04 广船国际有限公司 Scaffold platform apparatus
CN110080675A (en) * 2019-05-29 2019-08-02 常石集团(舟山)造船有限公司 A kind of removable floor-type step ladder peculiar to vessel
CN110789679A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship
WO2024021579A1 (en) * 2022-07-28 2024-02-01 三一重型装备有限公司 Tunneling and anchoring integrated machine
RU2818651C1 (en) * 2022-07-28 2024-05-03 Сани Хэви Эквипмент Ко., Лтд. Combined tunneling and anchoring machine

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103395473A (en) * 2013-08-01 2013-11-20 中船澄西船舶修造有限公司 Large-scale steering engine conic hole whisking fitting workbench
CN103395473B (en) * 2013-08-01 2015-08-26 中船澄西船舶修造有限公司 The large-scale bench board of steering wheel taper hole mating
CN103485522A (en) * 2013-10-12 2014-01-01 江苏耀捷建设工程有限公司 Novel easily-connected scaffold
CN105501408A (en) * 2015-12-29 2016-04-20 广船国际有限公司 Movable type foot stand
WO2019061806A1 (en) * 2017-09-28 2019-04-04 广船国际有限公司 Scaffold platform apparatus
CN110080675A (en) * 2019-05-29 2019-08-02 常石集团(舟山)造船有限公司 A kind of removable floor-type step ladder peculiar to vessel
CN110789679A (en) * 2019-09-25 2020-02-14 沪东中华造船(集团)有限公司 Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship
WO2024021579A1 (en) * 2022-07-28 2024-02-01 三一重型装备有限公司 Tunneling and anchoring integrated machine
RU2818651C1 (en) * 2022-07-28 2024-05-03 Сани Хэви Эквипмент Ко., Лтд. Combined tunneling and anchoring machine

Similar Documents

Publication Publication Date Title
CN201189944Y (en) Folding borehole work platform
CN105109939B (en) The transportation technology of longspan structure piece
CN101712444A (en) Method for hoisting large-size workpiece in ordinary plant and hydraulic jacking equipment thereof
CN201771417U (en) Convenient step ladder
CN202213702U (en) Multifunctional stern installing platform for ship
CN206828042U (en) A kind of inspection platform of power station main building rack illuminator
CN202481956U (en) Attached climbing type conventionalized dual-purpose platform
CN203514789U (en) Steel platform for concrete pouring construction in ultra-high-rise steel pipe column
CN202215006U (en) Tool-type fixed ladder for construction
CN206360649U (en) Marine drilling and repairing well double-wellhead derrick
CN100431943C (en) Movable assembled repairing frame
CN204590599U (en) A kind of corner internal corner formwork for aluminum alloy mould plate system
CN104278864B (en) locomotive servicing work platform
CN102921994A (en) Ship stern boring platform
CN202370236U (en) Movable working platform
CN203441380U (en) Novel movable pedestal of marine workover rig
CN202785396U (en) Combined base of tower type crane
CN201155204Y (en) Tools type assembling platform
CN205259574U (en) Quick assembly and disassembly safety protection screen
CN2851235Y (en) Movable assembled repairing frame
CN204098493U (en) The dismantled and assembled input and output material movable platform of a kind of modular for building
CN201843089U (en) Vertical lifting bin for overhauling overpass ramp bridge
CN206846196U (en) Hoist engine fixed platform frock
CN202388183U (en) Lifting equipment for H-shaped steel numerical control cutting machine
CN201720575U (en) Platform for slipway welder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI JIANGNAN CHANGXING SHIPBUILDING CO., LTD.

Free format text: FORMER OWNER: SHANGHAI WAIGAOQIAO SHIPBUILDING CO., LTD.

Effective date: 20100611

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200137 NO.3001, ZHOUHAI ROAD, PUDONG NEW AREA, SHANGHAI CITY TO: 201913 NO.2468, CHANGXING JIANGNAN AVENUE, CHANGXING TOWNSHIP, CHONGMING COUNTY, SHANGHAI CITY

TR01 Transfer of patent right

Effective date of registration: 20100611

Address after: 201913 No. 2468 Jiangnan Road, Changxin Township, Chongming County, Shanghai, Changxin

Patentee after: Shanghai Jiangnan Changxing Shipbuilding Co., Ltd.

Address before: 200137 Shanghai city Pudong New Area Zhouhai Road No. 3001

Patentee before: Shanghai Waigaoqiao Shipbuilding Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090204

Termination date: 20160430