CN203514789U - Steel platform for concrete pouring construction in ultra-high-rise steel pipe column - Google Patents
Steel platform for concrete pouring construction in ultra-high-rise steel pipe column Download PDFInfo
- Publication number
- CN203514789U CN203514789U CN201320592829.6U CN201320592829U CN203514789U CN 203514789 U CN203514789 U CN 203514789U CN 201320592829 U CN201320592829 U CN 201320592829U CN 203514789 U CN203514789 U CN 203514789U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe column
- platform
- steel pipe
- main load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 199
- 239000010959 steel Substances 0.000 title claims abstract description 199
- 238000010276 construction Methods 0.000 title claims abstract description 57
- 238000003466 welding Methods 0.000 claims description 10
- 230000002093 peripheral effect Effects 0.000 claims description 4
- 239000002023 wood Substances 0.000 claims description 4
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 claims description 3
- 230000003449 preventive effect Effects 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 7
- 230000002787 reinforcement Effects 0.000 description 6
- 230000009467 reduction Effects 0.000 description 4
- 230000001680 brushing effect Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 230000008092 positive effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000037452 priming Effects 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000003756 stirring Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a steel platform for concrete pouring construction in an ultra-high-rise steel pipe column. The steel platform is characterized in that the steel platform comprises a #-shaped main weight bearing framework, sub-joists are connected to form the periphery of the plane of the #-shaped main weight bearing framework, and an octagonal plane is formed; a riffled plate is laid on the #-shaped main weight bearing framework and connected with the main weight bearing framework and the sub-joists in a welded mode, a steel pipe column locating hole is formed in the center of the riffed plate, and a horizontal working table is formed; handrails are fixed to the tail end of the main weight bearing framework in the mode of being perpendicular to the working table and guardrails are arranged between the handrails; detachable adjusting steel channels are arranged on the main weight bearing framework in a welded mode and the two ends of each detachable adjusting steel channel are connected with end plates through bolts; fixed lug plates are arranged in the middles of the parts, located all around the steel pipe column locating hole, of the main weight bearing framework and the middles of the detachable adjusting steel channels in a welded mode and the fixed lug plates are fixedly connected with lifting lug plates of the steel pipe column through connecting steel plates and bolts. The steel platform for concrete pouring construction in the ultra-high-rise steel pipe column is simple in structure, simple and convenient to manufacture and high in universality.
Description
Technical field
The utility model belongs to building engineering field, particularly a kind of Super High steel pipe column inner concrete pouring construction steel platform, simple in structure, highly versatile.
Background technology
Along with being showing improvement or progress day by day of society, urban construction develop rapidly, people all the more pay close attention to quality of life attention degree.Building design stage, in Super High structure, more and more steel structure system, especially frame column members of adopting adopt steel pipe column form, to reduce column section, increase usable floor area, thereby reduce engineering comprehensive cost, promote green construction, environmental protection simultaneously.
Present stage, for super highrise building steel pipe column, construction has strict requirement in design, and steel pipe column construction, to certain number of plies, after concrete, can be carried out the construction of next step structure in the steel pipe column that must install in perfusion.Under regular situation, structural steel design is according to story height by every section of steel column length of two to three layers of design, and every section of steel column top mark height can exceed Gai Duan the superiors floor face absolute altitude.In Pre-tensioned Steel Structures, generally after every construction section (general three intervals) steel column, steel girder erection, carry out again floor plates construction, after Ruo Mei construction section the superiors floor plates, water again concrete in this construction section steel pipe column, by serious engineering constraint progress; If set up operating platform from every construction section bottom, nearly 10 meters of high steel pipe columns, every pillar all needs to set up, one, take and tear artificial and circulation material open and take for a long time, its consumption is very big, and they are two years old, support body is taken and is torn process restriction construction speed open, and the shared position influence floor plates of operating platform construction working face, its three, for side column, construct, putting up platform has certain difficulty of construction, has larger potential safety hazard.
Summary of the invention
In order to overcome the deficiency of existing operating platform, the utility model provides a kind of Super High steel pipe column inner concrete pouring construction steel platform, its simple in structure, highly versatile.Adopt this construction steel platform, to effectively solve in steel pipe column concrete builds each floor laminate construction of bottom is brought to interference, mutually can intert construction, side column concrete pouring construction convenience and intermediolateral column construction difference are little, can also reduce artificial and circulation material consumption, reduction of erection time, reduction potential safety hazard, thereby reduction engineering comprehensive cost is had to positive effect.
A Super High steel pipe column inner concrete pouring construction steel platform, is characterized in that, comprise the main load-bearing skeleton of groined type, the planar peripheral of the main load-bearing skeleton of groined type is connected by secondary joist, forms octagon plane; Checkered steel plate is layed on the main load-bearing skeleton of groined type, is welded to connect with main load-bearing skeleton and secondary joist, and its center is provided with steel pipe column locating hole, forms the work top of level; Railing is fixed on the end of main load-bearing skeleton perpendicular to work top, be provided with guardrail between railing; On main load-bearing skeleton, be welded with detachable and regulate channel-section steel, detachable regulates channel-section steel two ends to be bolted end plate; The main load-bearing skeleton mid point of surrounding of steel pipe column locating hole and detachable regulate channel-section steel midpoint to be welded with fixedly otic placode, fixedly between the lifting otic placode of otic placode and steel pipe column, by junction steel plate, are fixedly connected with bolt.
Further, the main load-bearing skeleton of described groined type is formed by four 12# channel-section steel welding.Steel pipe column locating hole is reserved in skeleton middle part, and its size determines according to steel pipe column largest cross-sectional sized, and channel-section steel rises length outward and is not less than 500 ㎜ outside locating hole.
Described secondary joist is 5# angle steel.Angle steel welds with main load-bearing skeleton channel-section steel on one side, and another side along flat upper surface outermost straight up, forms flange, between the angle steel of surrounding edge corner, is welded to connect.
It is 12# channel-section steel that described detachable regulates channel-section steel.
The bottom of described railing is provided with wood skirting board.Baseboard can prevent that article from causing security incident from high falling.
Described main load-bearing skeleton is provided with lifting otic placode.After a steel column inner concrete waters and smashes, can with tower crane, be lifted into an other steel column by the lifting otic placode on steel operating platform main joist frame and construct, steel platform can Reusability.
The steel member of described steel platform is coated with rust preventive coating.
Steel platform of the present utility model can be lifted to steel column end face and be laid by tower crane.The load-bearing skeleton of steel platform is the main load-bearing skeleton of groined type, planar peripheral adopts secondary joist and main load-bearing skeleton to connect in succession the integral rigidity that increases main load-bearing skeleton, on main load-bearing skeleton, lay checkered steel plate working platform is provided, the center of this work top is stayed and is established steel pipe column locating hole for casting and compacting of concrete.Railing is fixed on the end of main joist perpendicular to work top, be provided with guardrail between railing, plays safety protection function.Constructor may stand in the circular hole that guides tower crane handling hopper that concrete is pushed up by steel column on steel platform and is transported in steel column, and with vibrating spear, steel column inner concrete is carried out to vibration compacting.
According to the difference of steel pipe column sectional dimension, the utility model is welded with detachable and regulates channel-section steel on main load-bearing skeleton, forms type variable locating hole and positions; Detachable regulates channel-section steel two ends to be bolted end plate; The main load-bearing skeleton mid point of surrounding of steel pipe column locating hole and detachable regulate channel-section steel midpoint to be welded with fixedly otic placode, fixedly between the lifting otic placode of otic placode and steel pipe column, by junction steel plate, are fixedly connected with bolt.Can be for the concreting of 400*400 ~ 800*800 steel column.
The utility model steel platform provides constructor's operating surface, and the face of putting that provides the construction tools such as vibrating spear, spade to need, and has guaranteed that workman waters the safety in the process of smashing at steel column inner concrete.
Construction of Steel Structure steel platform of the present invention solved the steel pipe column on different cross section size existing in prior art position, on other working procedures disturb, circulation material holding time is long, recruitment loss is large, affect the duration, the problems such as security incident of generation falling object from high altitude, cardinal principle is: (1) is by arranging detachable channel-section steel in steel structure platform locating hole, steel pipe column concrete pouring construction applicability to each cross section is strong, and peace is torn open easy; (2) utilize steel pipe column top lifting otic placode and Construction of Steel Structure platform to be effectively connected and fixed, guaranteed the reliability of steel platform in work progress; (3) steel platform is torn open conveniently with adopting junction steel plate joint bolt, its peace being connected of steel pipe column, material saving, time and labour saving; (4) steel platform can independently be fixed on steel pipe column upper end, does not affect the construction of bottom floor plates, mutually can intert construction.
The present invention has the following advantages: 1. equipment is simple, and cost of manufacture is low, utilizes on-the-spot existing conventional material can complete Construction of Steel Structure platform and makes; 2. Construction of Steel Structure platform applicability is strong, can adjust flexibly corresponding locating hole size according to steel pipe column sectional dimension, makes its coupling; 3. between Construction of Steel Structure platform and steel pipe column, connective stability is good, and peace is torn open convenient, fast, greatly reduces the consumption of artificial and circulation material, has saved the duration; 4. the use of Construction of Steel Structure platform, has guaranteed the safety of steel pipe column concrete pouring construction, and especially side column construction, has positive effect; 5. steel platform can independently be fixed on steel pipe column upper end, does not affect the construction of bottom floor plates, mutually can intert construction, can the reduction of erection time.
Accompanying drawing explanation
Fig. 1: Construction of Steel Structure platform plane figure.
Fig. 2: Construction of Steel Structure platform elevation.
Fig. 3: Construction of Steel Structure platform and steel pipe column connection diagram.
Wherein, the main load-bearing skeleton of 1-groined type; 2-secondary joist; 3-checkered steel plate; 4-steel pipe column locating hole; 5-railing; 6-guardrail; 7-detachable regulates channel-section steel; 8-end plate; 9-fixing otic placode; 10-wood skirting board; 11-lifting otic placode; 12-junction steel plate; 13-steel pipe column lifting otic placode.
Below in conjunction with accompanying drawing, the utility model is described in detail.
The specific embodiment
Super High steel pipe column inner concrete pouring construction steel platform as Figure 1-3, comprise the main load-bearing skeleton 1 of groined type, by four 12# channel-section steel welding, formed its peripheral secondary joist 2(5# angle steel that adopts) be welded to connect with main load-bearing skeleton the integral rigidity that increases main load-bearing skeleton.
On main load-bearing skeleton 1, be equipped with the thick checkered steel plate 3 of 4mm, its center is provided with steel pipe column locating hole 4, checkered steel plate 3 and main load-bearing skeleton 1 and secondary joist 2 welding, the work top of formation level; Can be used as constructor's operating surface, and for putting the construction tools such as vibrating spear, spade.
On main load-bearing skeleton 1, be welded with detachable and regulate channel-section steel 7, detachable regulates channel-section steel 7 two ends to be bolted end plate 8; The main load-bearing skeleton mid point of surrounding of steel pipe column locating hole 4 and detachable regulate channel-section steel midpoint to be welded with fixedly otic placode 9, fixedly between the lifting otic placode 13 of otic placode 9 and steel pipe column, by junction steel plate 12, are fixedly connected with bolt.
On main load-bearing skeleton 1, be also provided with lifting otic placode 11, it is 10 ㎜ steel plates that lifting otic placode 11 adopts thickness, and otic placode is of a size of long 250 ㎜, wide 100 ㎜, and top arranges the circular hole of diameter 30 ㎜, and three limits, circular hole back gauge otic placode upper end are 35 ㎜; Two jiaos suitable for reading of otic placode carries out chamfered.
The construction method that Super High steel pipe column concrete of the present utility model is built Construction of Steel Structure platform is described in detail as follows:
1, Construction of Steel Structure platform is made and is installed
1.1 main load-bearing skeletons adopt four 12# channel-section steels, and welding forms groined type, and steel pipe column locating hole reserve in skeleton middle part, and its size is definite according to steel pipe column largest cross-sectional sized, and channel-section steel rises length outward and is not less than 500 ㎜ outside locating hole.
1.2 main load-bearing skeleton peripheries adopt L50*50*3 angle steel surrounding edge to form eight limit type planes, and angle steel welds with main load-bearing skeleton channel-section steel on one side, and another side along flat upper surface outermost straight up, forms flange, between the angle steel of surrounding edge corner, is welded to connect.
In the middle of 1.3 main load-bearing skeletons, stay and establish steel pipe column locating hole, in it, perpendicular to the long limit of locating hole (being parallel to short side direction), detachable channel-section steel is set, specification is 12#, the thick end plate of 10 ㎜ is all welded in these channel-section steel both sides, end plate arranges two diameters, 20 ㎜ bolts hole, correspondingly in long limit channel-section steel web position, according to steel pipe column length limit, change respective bolt holes is set, adopt 2 D=16 ㎜ bolts to be connected wearing with detachable channel-section steel.
In the middle of 1.4 main load-bearing skeletons, stay the every limit of steel pipe column locating hole surrounding of establishing to fix (or detachable) channel-section steel middle part, all perpendicular to channel-section steel, be welded and fixed otic placode, otic placode adopts 10 ㎜ steel plates, and with channel-section steel web and frange plate three side welding, otic placode middle part arranges a diameter 20 ㎜ bolts hole; The every limit of locating hole fixedly adopts junction steel plate joint bolt to fix between otic placode and steel pipe column four limits liftings otic placodes suitable for reading, junction steel plate thickness is 10 ㎜, long 300 ㎜, wide 100 ㎜, on junction steel plate, according to fixing otic placode and the steel pipe column lifting otic placode bolt hole position relative set diameter 20 ㎜ bolts hole of channel-section steel, between three, adopt 2 D=16 ㎜ bolts to wearing connection.
1.5 main load-bearing skeletons are except the locating hole that keep somewhere steel pipe column maximum cross-section, and the thick checkered steel plate of 4 ㎜ is all laid at other positions of plane, steel plate and skeleton channel-section steel and the welding of surrounding edge angle steel.
1.6 steel platform plane rotation angle positions and plane surrounding edge longest edge middle part arrange vertical reinforcement as vertical railing, and vertical reinforcement adopts diameter 20 ㎜ screw-thread steels, and length is 1000 ㎜, vertical reinforcement and skeleton channel-section steel and the welding of surrounding edge angle steel; Twice horizontal reinforcement is set as front rail between vertical rod and vertical rod, is located at respectively vertical rod top and vertical rod middle part, horizontal reinforcement adopts diameter 12 ㎜ screw-thread steels, with vertical reinforced-bar-welding; The high wooden screen of 500 ㎜ is set at the following position of by-level reinforcing bar, adopts galvanized wire colligation on vertical and transverse reinforcement railing.
1.7 main bearing frame minor face channel-section steel terminations all arrange steel platform lifting otic placode, and it is 10 ㎜ steel plates that otic placode adopts thickness, and otic placode is of a size of long 250 ㎜, wide 100 ㎜, and top arranges the circular hole of diameter 30 ㎜, and three limits, circular hole back gauge otic placode upper end are 35 ㎜; Two jiaos suitable for reading of otic placode carries out chamfered; Otic placode and minor face channel-section steel and the welding of surrounding edge angle steel.
The foreign material such as the iron rust on the steel platform steel member in 1.8, weld seam coating, spatter thing, greasy dirt, dust are cleaned out; Blending red lead anti-corrosive paint, controls viscosity, denseness, the dilution of painting, and during exchange, should stir fully; During brush first floor priming paint, brushing direction should be consistent, connects raft neat; After first pass is dry, then brush second time, second time brushing direction should be vertical with first pass brushing direction; After doing for second time, brush the 3rd time, direction is vertical with second time direction.
Steel operating platform of the present utility model can be lifted to steel column end face and be laid by tower crane.
Adopt the utility model Construction of Steel Structure platform, carry out smoothly Super High steel pipe column concrete pouring construction, guaranteed construction safety, shortened the duration, reduced engineering comprehensive cost.
Claims (7)
1. a Super High steel pipe column inner concrete pouring construction steel platform, is characterized in that, comprises the main load-bearing skeleton of groined type, and the planar peripheral of the main load-bearing skeleton of groined type is connected by secondary joist, forms octagon plane; Checkered steel plate is layed on the main load-bearing skeleton of groined type, is welded to connect with main load-bearing skeleton and secondary joist, and its center is provided with steel pipe column locating hole, forms the work top of level; Railing is fixed on the end of main load-bearing skeleton perpendicular to work top, be provided with guardrail between railing; On main load-bearing skeleton, be welded with detachable and regulate channel-section steel, detachable regulates channel-section steel two ends to be bolted end plate; The main load-bearing skeleton mid point of surrounding of steel pipe column locating hole and detachable regulate channel-section steel midpoint to be welded with fixedly otic placode, fixedly between the lifting otic placode of otic placode and steel pipe column, by junction steel plate, are fixedly connected with bolt.
2. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, the main load-bearing skeleton of described groined type is formed by four 12# channel-section steel welding.
3. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, described secondary joist is 5# angle steel.
4. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, it is 12# channel-section steel that described detachable regulates channel-section steel.
5. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, the bottom of described railing is provided with wood skirting board.
6. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, described main load-bearing skeleton is provided with lifting otic placode.
7. concrete pouring construction steel platform as claimed in claim 1, is characterized in that, the steel member of described steel platform is coated with rust preventive coating.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320592829.6U CN203514789U (en) | 2013-09-24 | 2013-09-24 | Steel platform for concrete pouring construction in ultra-high-rise steel pipe column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320592829.6U CN203514789U (en) | 2013-09-24 | 2013-09-24 | Steel platform for concrete pouring construction in ultra-high-rise steel pipe column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203514789U true CN203514789U (en) | 2014-04-02 |
Family
ID=50373743
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320592829.6U Expired - Lifetime CN203514789U (en) | 2013-09-24 | 2013-09-24 | Steel platform for concrete pouring construction in ultra-high-rise steel pipe column |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203514789U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110107072A (en) * | 2019-05-24 | 2019-08-09 | 浙江中天恒筑钢构有限公司 | Adjustable collapsible steel column welding mounting platform and its construction method |
| CN110642139A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | A multifunctional spreader for hoisting steel bar parts |
| CN112878654A (en) * | 2019-11-29 | 2021-06-01 | 中冶(上海)钢结构科技有限公司 | Building method of corridor type safe operation platform for installing core tube steel rib column |
| CN115492353A (en) * | 2022-09-28 | 2022-12-20 | 中建八局西北建设有限公司 | An assembled operating platform attached to the top of a steel pipe column and its attachment method |
| CN116290706A (en) * | 2023-04-06 | 2023-06-23 | 中建八局第四建设有限公司 | A kind of operation platform for steel column welding of outer frame |
-
2013
- 2013-09-24 CN CN201320592829.6U patent/CN203514789U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110107072A (en) * | 2019-05-24 | 2019-08-09 | 浙江中天恒筑钢构有限公司 | Adjustable collapsible steel column welding mounting platform and its construction method |
| CN110642139A (en) * | 2019-10-14 | 2020-01-03 | 中交武汉港湾工程设计研究院有限公司 | A multifunctional spreader for hoisting steel bar parts |
| CN112878654A (en) * | 2019-11-29 | 2021-06-01 | 中冶(上海)钢结构科技有限公司 | Building method of corridor type safe operation platform for installing core tube steel rib column |
| CN115492353A (en) * | 2022-09-28 | 2022-12-20 | 中建八局西北建设有限公司 | An assembled operating platform attached to the top of a steel pipe column and its attachment method |
| CN116290706A (en) * | 2023-04-06 | 2023-06-23 | 中建八局第四建设有限公司 | A kind of operation platform for steel column welding of outer frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107100358B (en) | Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body | |
| CN102995743B (en) | Multi-high-rise assembly type steel structure system | |
| CN114232805B (en) | Construction method of ultrahigh-height large-span steel concrete beam hanging structure | |
| CN111411687A (en) | A new assembly system | |
| CN104261232B (en) | Lifting device attached to special-shaped section and installation method thereof | |
| CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
| CN102535845A (en) | Construction method of bearing frame of corridor structure | |
| CN205558304U (en) | Hoist and mount system of large -scale steel gallery truss | |
| CN207739436U (en) | A kind of assembled steel reinforced concrete shear walls structure | |
| CN101871259B (en) | Construction method of integral sliding scaffold for steel grid construction | |
| CN103243912B (en) | Multilayer is without plate framework construction method | |
| CN105756380B (en) | A kind of multilayer large-span assembled integral space steel lattice box structure construction of hydropower method | |
| CN111576832A (en) | A construction system and construction method for cantilevered multi-bow | |
| CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
| CN104831928A (en) | Construction method for high-altitude large-span concrete connected structure formwork supporting steel platform | |
| CN203307733U (en) | Construction platform system of concrete pier of viaduct | |
| CN102619335A (en) | Construction method of large-height small-sized cast-in-place concrete beam slab | |
| CN202627214U (en) | Beam-column connecting structure for steel reinforced concrete composite structure of high-rise building | |
| CN207228330U (en) | A kind of prefabricated assembled frame combined using steel core concrete column and girder steel | |
| CN212866793U (en) | A prefabricated construction elevator parking platform | |
| CN219931554U (en) | A cantilevered steel structure construction platform with formwork system | |
| CN208152549U (en) | A kind of monoblock type large-scale composite form system | |
| CN201843089U (en) | Vertical lifting bin for overhauling overpass ramp bridge | |
| CN208202224U (en) | A kind of prefabricated steel reinforced concrete shear wall structure of multilayer | |
| CN206220547U (en) | A kind of operating platform for steel structure column installation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140402 |