CN210947847U - Supporting device for large-span conversion steel truss - Google Patents
Supporting device for large-span conversion steel truss Download PDFInfo
- Publication number
- CN210947847U CN210947847U CN201921295460.6U CN201921295460U CN210947847U CN 210947847 U CN210947847 U CN 210947847U CN 201921295460 U CN201921295460 U CN 201921295460U CN 210947847 U CN210947847 U CN 210947847U
- Authority
- CN
- China
- Prior art keywords
- steel truss
- steel
- jig
- bed
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model discloses a be used for large-span conversion steel truss strutting arrangement, including conversion steel truss, support bed-jig, sleeve pipe, punch jack, hydraulic power unit, stroke sensor, the sleeve pipe sets up in the bottom surface, support the bed-jig bottom and insert in the sleeve pipe to bury the piece with the column foot on the bottom surface and reserve the clearance, conversion steel truss sets up in supporting the bed-jig top, it is equipped with the steel corbel to support the bed-jig below, and the sleeve pipe outside is equipped with the steel buttress, the punch jack sets up between steel corbel and steel buttress, and the punch jack passes through hydraulic pressure oil pipe and is connected with hydraulic power unit, sets up stroke sensor on the punch jack. The utility model has simple structure, convenient use, strong practicability, low investment cost, safety and reliability; the state of the converted steel truss after the construction is finally finished is kept consistent with the design state, and adverse effects such as interface cracks caused by deformation in the construction process are effectively avoided.
Description
Technical Field
The utility model belongs to the technical field of steel construction engineering construction, concretely relates to be used for large-span conversion steel truss strutting arrangement.
Background
The modern building has unique design and complex structure, and the conversion steel truss is suitable for building multi-story high-rise large-span structures due to the characteristics of light weight, high strength, simple and convenient construction, good ductility and seismic performance and the like. And the conversion steel truss inevitably generates downward deflection deformation under the action of large upper load, thereby leading to front and rear construction interface cracks. By preloading and arch eliminating the reasonably arched steel truss, cracks can be avoided from being generated on the weak plane of the boundary. The traditional preloading method is mostly a heavy loading mode such as sand bags, concrete blocks and the like at present, and the mode needs a large amount of substances, has complex procedures and is difficult to operate safely.
Disclosure of Invention
In order to solve the problem, the utility model discloses a be used for large-span conversion steel truss strutting arrangement, design benefit, easy operation, the safety and stability has guaranteed that the state after the final completion of conversion steel truss construction keeps unanimous with the design status, and has solved the adverse effect such as the interface crack that arouses because of warping around the construction.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
the utility model provides a be used for large-span conversion steel truss strutting arrangement, is including conversion steel truss, support bed-jig, sleeve pipe, punching jack, hydraulic power unit, stroke sensor, the sleeve pipe sets up in the bottom surface, support the bed-jig bottom and insert in the sleeve pipe to bury the piece with the column base on the bottom surface and reserve the clearance, the setting of conversion steel truss is in supporting the bed-jig top, it is equipped with the steel corbel to support the bed-jig below, and the sleeve pipe outside is equipped with the steel buttress, punching jack sets up between steel corbel and steel buttress, and punching jack passes through hydraulic pressure oil pipe and is connected with hydraulic power unit, and punching jack sets up stroke sensor.
As an improvement of the utility model, the supporting jig frame is a steel pipe supporting jig frame.
As an improvement of the utility model, the inner diameter of the sleeve is 2-5mm larger than the outer diameter of the supporting jig frame.
As an improvement of the present invention, the number of the center-penetrating jacks is two or four.
As an improvement of the utility model, the gap is 5-20 cm.
The utility model has the advantages that:
the support device for the large-span conversion steel truss has the advantages of simple structure, convenient use, strong practicability, low investment cost, safety and reliability; and adverse effects such as interface cracks caused by deformation in the construction process are effectively solved.
Drawings
Fig. 1 is a schematic view of the support according to the present invention.
Fig. 2 is a sectional view taken along line a-a of fig. 1, in group 2 mode.
Fig. 3 is a cross-sectional view taken along line a-a of fig. 1, in group 4 mode.
List of reference numerals:
the method comprises the following steps of 1, a supporting jig frame, 2, a sleeve, 3, a steel bracket, 4, a steel buttress, 5, an embedded part, 6, a center-penetrating jack, 7, a stroke sensor, 9, a hydraulic pump station, 10, a hydraulic oil pipe, 11, a conversion steel truss and 12, wherein the steel bracket is arranged on the bottom surface of the steel truss.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings and embodiments, which are to be understood as illustrative only and not limiting the scope of the invention. It should be noted that the terms "front," "back," "left," "right," "upper" and "lower" used in the following description refer to directions in the drawings, and the terms "inner" and "outer" refer to directions toward and away from, respectively, the geometric center of a particular component.
As shown in the figure, the utility model discloses a be used for large-span conversion steel truss strutting arrangement, concrete implementation method is:
1. the bottom of the steel pipe supporting jig frame 1 is inserted into the sleeve 2, and a certain gap is reserved between the steel pipe supporting jig frame and the embedded part 5; the gap is larger than the theoretical analysis flexibility value when the truss is preloaded; the inner diameter of the sleeve is 2-5mm larger than the outer diameter of the supporting jig frame.
2. A center-penetrating jack 6 is arranged between the steel corbel 3 and the steel buttress 4, the center-penetrating jack 6 is provided with a stroke sensor 7, synchronous jacking work of the center-penetrating jack 6 can be guaranteed, and the elevation of the splicing supporting point of the steel truss 11 can be accurately controlled and converted. The punching jacks 6 can be symmetrically arranged in 2 groups or 4 groups according to the calculation and analysis requirements, as shown in fig. 2 or fig. 3. The center-penetrating jack 6 is connected with a hydraulic pump station 9 through a hydraulic oil pipe 10, and the hydraulic pump station 9 is controlled by a computer to drive the center-penetrating jack 6 to lift. The state of the converted steel truss after final construction is kept consistent with the design state, and adverse effects such as interface cracks caused by deformation before and after construction are avoided.
The technical means disclosed by the scheme of the present invention is not limited to the technical means disclosed by the above embodiments, but also includes the technical scheme formed by the arbitrary combination of the above technical features.
Claims (5)
1. The utility model provides a be used for large-span conversion steel truss strutting arrangement which characterized in that: including conversion steel truss (11), support bed-jig (1), sleeve pipe (2), punching jack (6), hydraulic power unit (9), stroke sensor (7), sleeve pipe (2) set up in the bottom surface, support bed-jig (1) bottom inserts in sleeve pipe (2) to with embedded part (5) on the bottom surface reserve the clearance, conversion steel truss (11) set up in supporting the bed-jig top, it is equipped with steel corbel (3) to support bed-jig (1) below, is equipped with steel buttress (4) outside sleeve pipe (2), punching jack (6) set up between steel corbel (3) and steel buttress (4), and punching jack (6) are connected with hydraulic power unit (9) through hydraulic pressure oil pipe (10), set up stroke sensor (7) on punching jack (6).
2. The support device for the large-span conversion steel truss according to claim 1, wherein: the supporting jig frame (1) is a steel pipe supporting jig frame.
3. The support device for the large-span conversion steel truss according to claim 1, wherein: the inner diameter of the sleeve (2) is 2-5mm larger than the outer diameter of the support jig frame (1).
4. The support device for the large-span conversion steel truss according to claim 1, wherein: the number of the through jacks (6) is two or four.
5. The support device for the large-span conversion steel truss according to claim 1, wherein: the gap is 5-20 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921295460.6U CN210947847U (en) | 2019-08-12 | 2019-08-12 | Supporting device for large-span conversion steel truss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921295460.6U CN210947847U (en) | 2019-08-12 | 2019-08-12 | Supporting device for large-span conversion steel truss |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210947847U true CN210947847U (en) | 2020-07-07 |
Family
ID=71383559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921295460.6U Active CN210947847U (en) | 2019-08-12 | 2019-08-12 | Supporting device for large-span conversion steel truss |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210947847U (en) |
-
2019
- 2019-08-12 CN CN201921295460.6U patent/CN210947847U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106812328B (en) | The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer | |
CN205348725U (en) | Large -span, bearing structure that encorbelments by a wide margin | |
CN205000974U (en) | A tire formula automatic rising equipment rack for tunnel excavation construction | |
CN105863362A (en) | Deviation rectifying device for inclined transmission tower | |
CN103233588B (en) | With the shift method of raft foundation building | |
CN102953554A (en) | Installation method of large-span honeycomb-shaped double-layer latticed shell structure | |
CN205558237U (en) | Encorbelment board position and encorbelment scaffold frame and exempt from back a structure | |
CN210947847U (en) | Supporting device for large-span conversion steel truss | |
CN110439289B (en) | External tensioning preloading construction method for large-span conversion steel truss | |
CN202000644U (en) | Movable bearing bracket platform | |
CN101633483A (en) | Integral lifting apparatus for steel structure net rack | |
CN103291084A (en) | Construction method of building jacking steel reinforced concrete supporting system | |
CN103061514A (en) | Long-span steel structure corridor construction method | |
CN103075001A (en) | Steel tube fastener slip form platform system | |
CN211081056U (en) | A displacement device that is used for heavy roof structure of heavy slope to slide construction | |
CN210947778U (en) | Be used for large-span conversion steel truss preloading device | |
CN205602927U (en) | Integral type hauler and leading wheel fixing device | |
CN101774516B (en) | Lifting device and construction method for replacing rake crane bridge | |
CN212317541U (en) | Steel corbel shear key structure for jacking and storey adding | |
CN210316534U (en) | Auxiliary device is adhered to 15m layer height frame variable cross section constructional steel stand | |
CN205742990U (en) | A kind of hydraulic lifting form frame system anti-side moves safety device | |
CN205894075U (en) | A pull -out ware for steel pipe retaining pile retrieves | |
CN2775210Y (en) | Adjustable control hydraulic support device for building structure construction | |
CN206800201U (en) | The compound Hanging basket on front support of single cable plane | |
CN104675140B (en) | Newly-increased load-bearing pillar is installed and roof truss load transfer method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |