CN210947440U - SBS waterproof coiled material for flashing part of roof parapet - Google Patents

SBS waterproof coiled material for flashing part of roof parapet Download PDF

Info

Publication number
CN210947440U
CN210947440U CN201920789481.7U CN201920789481U CN210947440U CN 210947440 U CN210947440 U CN 210947440U CN 201920789481 U CN201920789481 U CN 201920789481U CN 210947440 U CN210947440 U CN 210947440U
Authority
CN
China
Prior art keywords
layer
adhesive
flashing
parapet
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920789481.7U
Other languages
Chinese (zh)
Inventor
张勇
袁东
田亮
邱锐
徐享国
陈强
徐序
余绍雍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Huangshantou Waterproof Material Co ltd
China Railway Construction Group Co Ltd
Hubei Construction Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
Wuhan Huangshantou Waterproof Material Co ltd
China Railway Construction Group Co Ltd
Hubei Construction Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Huangshantou Waterproof Material Co ltd, China Railway Construction Group Co Ltd, Hubei Construction Co Ltd of China Railway Construction Group Co Ltd filed Critical Wuhan Huangshantou Waterproof Material Co ltd
Priority to CN201920789481.7U priority Critical patent/CN210947440U/en
Application granted granted Critical
Publication of CN210947440U publication Critical patent/CN210947440U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a SBS waterproofing membrane for roof parapet flashing, which comprises a plurality of repeating units, wherein each repeating unit comprises a second bonding layer, a second dipping covering layer, a base layer, a first dipping covering layer and a first bonding layer which are arranged from bottom to top in sequence, and the first dipping covering layer and the first bonding layer are aligned with the base layer; the second impregnated cover layer is aligned with the second adhesive layer, and the second impregnated cover layer and the second adhesive layer are staggered with the base tire layer; the base layer of the repeating unit and the second impregnated cover layer of the adjacent repeating unit are fixedly connected by a fastener; the utility model discloses utilize the fastener restriction to take place the displacement between the adjacent repeating unit for in the use, the difficult perk of repeating unit, the difficult fracture of seam crossing, thereby make the water-proof effects of roofing parapet department of flashing better, water-proof effects are more lasting.

Description

SBS waterproof coiled material for flashing part of roof parapet
Technical Field
The utility model relates to a building engineering waterproof material technical field particularly, relates to a SBS waterproofing membrane for roofing parapet department of flashing.
Background
The SBS modified asphalt waterproof coiled material is prepared by using SBS rubber modified asphalt as a dipping covering layer, using polyester fiber non-woven fabric, jute cloth, glass fiber felt and the like as a base and using a plastic film as an anti-sticking isolating layer through the working procedures of material selection, material proportioning, co-melting, dipping, composite forming, curling and the like.
Generally, the protective layer at the flashing part of the parapet wall of the roof is cement mortar or anti-cracking mortar, and the protective layer is easy to crack and fall off in the using process.
In order to improve the waterproof effect of the flashing part of the parapet wall, a waterproof coiled material is usually paved at the flashing part of the parapet wall, the waterproof coiled material in the prior art is usually of a structure with two flush ends, and the joint of the waterproof coiled material is usually overlapped in a partially overlapping mode. The waterproof coiled material with the structure has the problem that the joint is easy to crack in the using process, so that the waterproof effect of the flashing part of the parapet wall of the roof is poor.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned technical problem among the correlation technique, the utility model provides a SBS waterproofing membrane for roofing parapet department of flashing can overcome the above-mentioned not enough of prior art.
In order to achieve the technical purpose, the technical scheme of the utility model is realized as follows:
the SBS waterproof coiled material for the flashing position of the roof parapet comprises a plurality of repeating units, wherein each repeating unit comprises a second bonding layer, a second dipping covering layer, a base course layer, a first dipping covering layer and a first bonding layer which are sequentially arranged from bottom to top, the lengths of the first dipping covering layer, the first bonding layer, the second dipping covering layer and the second bonding layer are equal to that of the base course layer, and the first dipping covering layer and the first bonding layer are aligned to the base course layer; the second impregnated cover layer is aligned with the second adhesive layer, and the second impregnated cover layer and the second adhesive layer are staggered with the base tire layer; the end surfaces of the base layers of two adjacent repeating units are mutually abutted, and the base layers of the repeating units and the second impregnated covering layers of the adjacent repeating units are fixedly connected through fasteners; the base tire layer is attached to the first dipping covering layer and the second dipping covering layer in a hot pressing mode, the first bonding layer is coated on the surface of the first dipping covering layer, and the second bonding layer is coated on the surface of the second dipping covering layer.
Furthermore, the first dipping covering layer and the second dipping covering layer are both SBS colloidal layers, and the tire base layer is a polyester tire.
Furthermore, the tire base layer, the first dipping covering layer and the first bonding layer are provided with through holes which are communicated with each other, the second dipping covering layer is provided with first blind holes, the through holes are aligned with the first blind holes of the adjacent repeating units, and the fasteners are bonding columns which can be embedded into the through holes and the first blind holes.
Further, the through hole first blind hole all is the frustum form, the lateral wall of bonding post with the lateral wall of through hole the lateral wall laminating of first blind hole.
Furthermore, at least two through holes and at least two first blind holes are formed in the width direction of the repeating unit.
Furthermore, a second blind hole is formed in the side wall of the first blind hole, and the bonding column is a cylinder made of asphalt.
Furthermore, the first adhesive layer is far away from one side of the tire base layer is provided with a first anti-sticking isolation layer, and the second adhesive layer is far away from one side of the tire base layer is provided with a second anti-sticking isolation layer.
Furthermore, first antiseized isolation layer is polyethylene film or copper foil, second antiseized isolation layer is the silicone oil paper.
Furthermore, a slate layer or a sand-lime layer is arranged between the first bonding layer and the first anti-sticking isolation layer.
The utility model has the advantages that:
(1) the first adhesive layer and the tire base layer are staggered, then the tire base layers, the first impregnation covering layers and the first adhesive layers of the adjacent repeating units are mutually abutted, and the tire base layer of one repeating unit and the second impregnation covering layer of the adjacent repeating unit are fixed through a fastener; the first bonding layer is bonded with the pavement material on the roof, the second bonding layer is bonded with the mounting surface, and the fasteners are used for limiting the displacement between the adjacent repeating units, so that the repeating units are not easy to tilt and the joints are not easy to crack in the using process, and the waterproof effect of the flashing part of the parapet wall of the roof is better and more durable;
(2) through with the through-hole, first blind hole and bonding post all set up to the frustum form for after the bonding post inlays to establish into through-hole and first blind hole, the bonding post produces the trend towards the diapire direction motion of first blind hole under self action of gravity, thereby chucking between messenger bonding post and through-hole and the first blind hole, and then the difficult fracture of seam crossing between the messenger adjacent repeating unit, the water-proof effects who makes roofing parapet department of flashing is better, water-proof effects is more lasting.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic cross-sectional view of an SBS waterproof roll for flashing of a parapet wall of a roof in an embodiment of the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
in the figure: 1. a base layer; 11. a through hole; 12. a first blind hole; 13. a second blind hole; 14. a binding post; 2. a first impregnated blanket layer; 3. a first adhesive layer; 4. a second impregnated cover layer; 5. a second adhesive layer; 6. a first anti-sticking isolation layer; 7. a second anti-sticking isolation layer; 8. a schist layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
As shown in fig. 1-2, according to the embodiment of the present invention, the SBS waterproof roll for flashing of roof parapet includes a plurality of repeating units, the repeating units include a second adhesive layer 5, a second dipping cover layer 4, a base layer 1, a first dipping cover layer 2, and a first adhesive layer 3, which are sequentially arranged from bottom to top, the first dipping cover layer 2, the first adhesive layer 3, the second dipping cover layer 4, and the second adhesive layer 5 are equal to the length and width of the base layer 1, and the first dipping cover layer 2 and the first adhesive layer 3 are aligned to the base layer 1; the second impregnated cover layer 4 is aligned with the second adhesive layer 5, and the second impregnated cover layer 4 and the second adhesive layer 5 are staggered with the base tire layer 1; the end surfaces between two adjacent repeating units are aligned, wherein the end surfaces of the base layers 1 of the two adjacent repeating units are mutually butted, and the base layers 1 of the repeating units and the second impregnated covering layers 4 of the adjacent repeating units are fixedly connected through fasteners; the base tire layer 1 is attached to the first dipping covering layer 2 and the second dipping covering layer 4 in a hot pressing mode, the first adhesive layer 3 is coated on the surface of the first dipping covering layer 2, and the second adhesive layer 5 is coated on the surface of the second dipping covering layer 4. The first dipping covering layer 2 and the second dipping covering layer 4 are both SBS colloidal layers, and the tire base layer 1 is a polyester tire.
The tire base layer 1, first flooding overburden 2 with be equipped with the through-hole 11 of mutual intercommunication on the first adhesive linkage 3, be equipped with first blind hole 12 on the second flooding overburden 4, through-hole 11 aligns with adjacent repeating unit first blind hole 12, the fastener is for can imbedding through-hole 11 reaches adhesive column 14 in the first blind hole 12, adhesive column 14 is the cylinder that pitch was made.
The through hole 11 first blind hole 12 all is the frustum form that the big lower extreme is big in upper end, and the less one end of area of through hole 11 coincides with the great one end of area of first blind hole 12, the lateral wall of bonding post 14 with the lateral wall of through hole 11 the lateral wall laminating of first blind hole 12. Three through holes 11 and three first blind holes 12 are arranged in the width direction of the repeating unit, second blind holes 13 are arranged on the side walls of the first blind holes 12, and the axes of the second blind holes 13 are perpendicular to the axes of the first blind holes 12.
First adhesive linkage 3 keeps away from one side of child basic unit 1 is equipped with first antiseized isolation layer 6, second adhesive linkage 5 keeps away from one side of child basic unit 1 is equipped with antiseized isolation layer 7 of second. First antiseized isolation layer 6 is polyethylene film or copper foil, second antiseized isolation layer 7 is the silicone oil paper. A slate layer 8, such as a quartz layer, is provided between the first adhesive layer 3 and the first anti-adhesive isolation layer 6.
For the convenience of understanding the above technical solutions of the present invention, the above technical solutions of the present invention are explained in detail through specific use modes below.
When specifically using, utilize first adhesive linkage 3 and roofing shop front material to bond each other, utilize second adhesive linkage 5 and installation face to bond each other, because through-hole 11, first blind hole 12 and bonding column 14 all are the frustum form, after inlaying bonding column 14 and establishing into through-hole 11 and first blind hole 12, bonding column 14 produces the trend of the diapire direction motion towards first blind hole 12 under self action of gravity, thereby make the chucking between bonding column 14 and through-hole 11 and the first blind hole 12, further make the difficult fracture of seam crossing between the adjacent repeating unit.
Because the second blind hole 13 is arranged on the side wall of the first blind hole 12, the bonding column 14 made of asphalt is gradually filled into the second blind hole 13 along with the time under the flowing action of the asphalt, so that the adjacent repeating units are difficult to move relatively in the horizontal direction and also difficult to move relatively in the vertical direction, and further the joint between the adjacent repeating units is difficult to crack.
Three through holes 11 and three first blind holes 12 are arranged in the width direction of the repeating units, so that the joints between the adjacent repeating units are further not easy to crack, and the waterproof effect of the flashing part of the parapet wall of the roof is better and more durable; in other embodiments, two, four, five or six through holes 11 and first blind holes 12 may be opened in the width direction of the repeating unit.
The first anti-sticking isolation layer 6 and the second anti-sticking isolation layer 7 enable the SBS waterproof coiled material used at the flashing position of the roof parapet wall to be not easy to stick sundries in the storage process of the storage box, so that the storage and transportation are more convenient; a slate layer 8 is arranged between the first bonding layer 3 and the first anti-sticking isolation layer 6, so that the adhesion effect of the SBS waterproof coiled material used for the flashing part of the roof parapet wall is better in the construction process, and the waterproof effect of the flashing part of the roof parapet wall is better and more durable; in other embodiments, a layer of sand and lime may be disposed between the first adhesive layer and the first release layer.
In summary, with the aid of the technical solution of the present invention, by staggering the first adhesive layer 3 and the base layer 1, the base layers 1, the first dipping cover layers 2 and the first adhesive layers 3 of the adjacent repeating units are abutted against each other, and the base layer 1 of one repeating unit and the second dipping cover layer 4 of the adjacent repeating unit are fixed by fasteners; utilize the shop front material on first adhesive linkage 3 and the roofing to bond each other, utilize second adhesive linkage 5 and installation face to bond each other, utilize the fastener to restrict and take place the displacement between the adjacent repeating unit for in the use, the difficult perk of repeating unit, the difficult fracture of seam crossing, thereby make the water-proof effects of roofing parapet department better, water-proof effects is more lasting.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The SBS waterproof coiled material for the flashing part of the roof parapet is characterized by comprising a plurality of repeating units, wherein each repeating unit comprises a second bonding layer (5), a second dipping covering layer (4), a base layer (1), a first dipping covering layer (2) and a first bonding layer (3) which are sequentially arranged from bottom to top,
the first dipping cover layer (2), the first adhesive layer (3), the second dipping cover layer (4), the second adhesive layer (5) and the tyre base layer (1) have the same length,
the first impregnated cover layer (2) and the first adhesive layer (3) are both aligned with the base layer (1);
the second impregnated cover layer (4) is aligned with the second adhesive layer (5), and the second impregnated cover layer (4) and the second adhesive layer (5) are staggered with the tire base layer (1);
the end surfaces of the base layers (1) of two adjacent repeating units are mutually abutted, and the base layers (1) of the repeating units are fixedly connected with the second impregnated covering layers (4) of the adjacent repeating units through fasteners;
child basic unit (1) with first flooding overburden (2), second flooding overburden (4) are laminated through the hot pressfitting mode, first adhesive linkage (3) coating is on first flooding overburden (2) surface, second adhesive linkage (5) coating is on second flooding overburden (4) surface.
2. SBS waterproofing membrane for flashing of parapet roofs according to claim 1 wherein the first and second dip coverlays (2, 4) are both SBS glue layers and the matrix layer (1) is polyester.
3. SBS waterproofing membrane for flashing of parapet roofs according to claim 1 wherein the matrix layer (1), the first impregnated cover layer (2) and the first adhesive layer (3) are provided with through holes (11) communicating with each other, the second impregnated cover layer (4) is provided with first blind holes (12), the through holes (11) are aligned with the first blind holes (12) of the adjacent repeating units, the fasteners are adhesive studs (14) insertable into the through holes (11) and the first blind holes (12).
4. The SBS waterproofing membrane for flashing of parapet walls on roofs according to claim 3, wherein the through hole (11) and the first blind hole (12) are both frustum-shaped, and the side wall of the bonding column (14) is attached to the side wall of the through hole (11) and the side wall of the first blind hole (12).
5. SBS waterproofing membrane for flashing of parapet roofs according to claim 3, wherein the width direction of the repeating units is provided with at least two through holes (11) and at least two first blind holes (12).
6. SBS waterproofing membrane for flashing of parapet roofs according to claim 3 wherein the side walls of the first blind holes (12) are provided with second blind holes (13) and the adhesive posts (14) are cylinders made of bitumen.
7. SBS waterproofing membrane for flashing of parapet roofs according to claim 1 wherein the side of the first adhesive layer (3) remote from the base course layer (1) is provided with a first anti-adhesive isolation layer (6) and the side of the second adhesive layer (5) remote from the base course layer (1) is provided with a second anti-adhesive isolation layer (7).
8. SBS waterproofing membrane for flashing of parapet roofs according to claim 7 wherein the first anti-adhesive isolation layer (6) is a polyethylene film or copper foil and the second anti-adhesive isolation layer (7) is silicone oil paper.
9. SBS waterproofing membrane for flashing of parapet roofs according to claim 7 wherein there is a slate layer (8) between the first adhesive layer (3) and the first anti-adhesive isolation layer (6).
CN201920789481.7U 2019-05-29 2019-05-29 SBS waterproof coiled material for flashing part of roof parapet Active CN210947440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920789481.7U CN210947440U (en) 2019-05-29 2019-05-29 SBS waterproof coiled material for flashing part of roof parapet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920789481.7U CN210947440U (en) 2019-05-29 2019-05-29 SBS waterproof coiled material for flashing part of roof parapet

Publications (1)

Publication Number Publication Date
CN210947440U true CN210947440U (en) 2020-07-07

Family

ID=71375277

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920789481.7U Active CN210947440U (en) 2019-05-29 2019-05-29 SBS waterproof coiled material for flashing part of roof parapet

Country Status (1)

Country Link
CN (1) CN210947440U (en)

Similar Documents

Publication Publication Date Title
KR100680555B1 (en) Waterproof sheet and its manufacturing method
JP2001521840A (en) Sealing sheet assembly for structure surface and method of manufacturing and applying the same
KR100278173B1 (en) Double waterproof sheet for concrete structure
US4469731A (en) Composite insulating article for making prefabricated coverings
KR20060136038A (en) Waterproof sheet and its manufacturing method
KR20010018221A (en) Improved Waterproof Sheet and Method for Constructing Hybrid Membranes Using the Same
KR100875893B1 (en) The waterproof construct method with waterproof-sheet
KR101431380B1 (en) Triple composite waterproofing method applied loose laying joint type
CN201474099U (en) Three-layer waterproof structure for deformation joint
KR200233893Y1 (en) Waterproof sheet for concrete structure
CN210947440U (en) SBS waterproof coiled material for flashing part of roof parapet
KR100412935B1 (en) Waterproofing combined sheet and waterproofing method thereby
KR20170025054A (en) The water proofing layers for the concrete structures
KR200406964Y1 (en) Waterproof sheet
KR200396919Y1 (en) Waterproof sheet
CN205951417U (en) Fire -retardant environment -friendly waterproofing membrane
KR101298794B1 (en) A waterproofing member on the surface of roads and bridge
CN213199058U (en) Fire-retardant fire prevention waterproof intergral template
KR20050056306A (en) Non-exposure complex waterproofing system of insulating partial block type and construction structure using embossing polyvinyl sheet porous ceramic-thermoplastic resin-asphalt membrane waterproofing material
KR100323119B1 (en) Shingle structure, waterproofing structure of asphalt sheet and the method using the same
JP3018209B2 (en) Insulated waterproof roof and roofing material
CN207466040U (en) A kind of water proof roofing sheet
JP3645627B2 (en) Reinforcement waterproof sheet and construction method of waterproof sheet
KR200189604Y1 (en) Composite floor construction
CN205674627U (en) Welding ethylene propylene diene rubber adhesive waterproof coil is strengthened in a kind of white

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant