CN210919075U - Full-automatic two lining slip casting platform trucks - Google Patents

Full-automatic two lining slip casting platform trucks Download PDF

Info

Publication number
CN210919075U
CN210919075U CN201921682112.4U CN201921682112U CN210919075U CN 210919075 U CN210919075 U CN 210919075U CN 201921682112 U CN201921682112 U CN 201921682112U CN 210919075 U CN210919075 U CN 210919075U
Authority
CN
China
Prior art keywords
main frame
trolley
automatic
full
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921682112.4U
Other languages
Chinese (zh)
Inventor
张进军
彭凤林
陈明
李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHA INTO MACHINERY Ltd
Original Assignee
CHANGSHA INTO MACHINERY Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA INTO MACHINERY Ltd filed Critical CHANGSHA INTO MACHINERY Ltd
Priority to CN201921682112.4U priority Critical patent/CN210919075U/en
Application granted granted Critical
Publication of CN210919075U publication Critical patent/CN210919075U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a full-automatic two-lining grouting trolley, which comprises a top template, side templates and a trolley main frame; the top template is arranged above the trolley main frame, the top of the trolley main frame is connected with the top template through a steel beam, and the steel beam, the trolley main frame and the top template surround to form an installation space through which a ventilation pipeline can pass; the side templates are arranged at two side ends of the top template and hinged with the top template; be connected with first bracing piece and support cylinder between side form and the platform truck body frame, first bracing piece and support cylinder both ends are articulated with side form and platform truck body frame respectively, its length can be adjusted along its length direction to first bracing piece. This design passes through the girder steel around the pipeline installation space that forms, can make air pipe's installation become convenient, and the pipeline can have better arranging position and bearing structure, and the convenience is erect in the installation of side form board, improves tunnel construction efficiency.

Description

Full-automatic two lining slip casting platform trucks
Technical Field
The utility model relates to a tunnel slip casting equipment especially relates to a full-automatic two lining slip casting platform trucks.
Background
At present, the construction of the tunnel can fill concrete in a closed space formed by a grouting trolley and excavated surrounding rocks, so that the inside of the tunnel is compact, and the surrounding rocks of the tunnel are prevented from settling. Usually, after the tunnel is excavated, two sides of the full-automatic two-lining grouting trolley need to be erected and jacked up, and then ventilation is needed to be inserted so as to conveniently send air into the tunnel, so that oxygen deficiency of operating personnel in the tunnel is prevented. The erection of the side mold and the pipeline arrangement are troublesome, the whole trolley is not convenient to use, and the tunnel excavation construction efficiency is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving above-mentioned technical problem to a certain extent at least. Therefore, the utility model provides a full-automatic two lining slip casting platform trucks.
The utility model provides a technical scheme that its technical problem adopted is: a full-automatic two-lining grouting trolley comprises a top template, side templates and a trolley main frame; the top template is arranged above the trolley main frame, the top of the trolley main frame is connected with the top template through a steel beam, and the steel beam, the trolley main frame and the top template surround to form an installation space through which a ventilation pipeline can pass; the side templates are arranged at two side ends of the top template and hinged with the top template; be connected with first bracing piece and support cylinder between side form and the platform truck body frame, first bracing piece and support cylinder both ends are articulated with side form and platform truck body frame respectively, its length can be adjusted along its length direction to first bracing piece.
Further, the installation space is provided with two sides which are respectively positioned above the trolley main frame.
Further, top template and side form board all are provided with the slip casting mouth, slip casting mouth department all installs the apron that can open or close the slip casting mouth.
Further, still include work platform, work platform corresponds the setting and is inboard at the slip casting mouth.
Further, the side form board lower extreme is provided with articulated seat, the one end of first bracing piece and the one end of support cylinder all articulate on articulated seat.
Further, first bracing piece includes first lead screw and connects the connector at first lead screw both ends, and the connector at both ends is articulated with articulated seat and platform truck body frame respectively, the connector is connected with first lead screw spiral transmission.
Further, a supporting underframe is arranged at the bottom of the trolley main frame and used for being movably installed on the rail.
Further, the supporting bottom frame is provided with a jacking oil cylinder, a top roller and side rollers, the top roller is horizontal in rotating shaft, the side rollers are provided with two rollers and located on two sides below the top roller, and the side rollers are vertical in rotating shaft.
The utility model has the advantages that: the installation of the ventilation pipeline can be facilitated by the pipeline installation space formed by the steel beams in a surrounding manner, the pipeline can be provided with a better arrangement position and a better supporting structure without a troublesome supporting and erecting structure, and in addition, the installation space is arranged between the trolley and the top template, so that redundant space is not occupied; the side templates are hinged with the top template, the first supporting rods are adjusted after the side templates are supported in place through the supporting oil cylinders during installation, the main supporting load is borne by the first supporting rods to support the side templates, installation and erection are convenient, and tunnel construction efficiency is improved.
Drawings
The present invention will be further explained with reference to the drawings and examples.
FIG. 1 is a schematic view of the installation structure of the present invention;
FIG. 2 is a schematic view of the connection between the main frame, the top form and the side forms of the trolley;
fig. 3 is an enlarged view at a of fig. 1.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
Referring to fig. 1 to 3, the utility model discloses a full-automatic two lining slip casting dollies, including cope match-plate pattern 110, side bolster 120 and platform truck body frame 130.
The top formwork 110 is arranged above the trolley main frame 130, the top of the trolley main frame 130 is fixedly connected with the top formwork 110 through a steel beam 131, the steel beam 131 is preferably fixedly connected with the top formwork 110 and the trolley main frame 130 through welding, and in other embodiments, the top formwork can be fixedly connected through bolts. Preferably, the steel beams 131 are disposed at both sides above the bogie main frame 130, and the installation spaces 140 are disposed at both sides above the bogie main frame 130. As shown in FIG. 1, in order to improve the load capacity of vertical support between the top of the main frame 130 and the top formwork 110, vertical support beams 134 are vertically extended upwards from the top of the main frame 130, and the top of the vertical support beams 134 is fixedly connected with the top formwork 110.
The steel beam 131, the trolley main frame 130 and the top template 110 surround to form an installation space 140 through which a ventilation pipeline can pass; usually, installation space 140 is the door opening 141 who occupies the middle of platform truck main frame 130, but like this, door opening 141 space is less, the action of being not convenient for, in addition still need design additional bearing structure with ventilation pipe for the structure is more complicated, and the space is just littleer, and this application directly leans on the support through girder steel 131 and platform truck main frame 130, practices thrift the space, simplifies the structure, practices thrift the cost.
The peripheral profiles of the top die plate 110 and the side die plates 120 are circular arcs with the same diameter, the side die plates 120 are arranged at two side ends of the top die plate 110 and hinged with the top die plate 110, and after the trolley reaches a designated position, the side die plates 120 rotate around the hinged positions to enable the top die plate 110 and the side die plates 120 at two sides to form a large circular arc. Preferably, both the top form 110 and the side form 120 are provided with grouting ports, the grouting ports are provided with cover plates 132 capable of opening or closing the grouting ports, the cover plates 132 are hinged to one side of the grouting ports, the grouting ports can be opened or closed through hinging, and when the grouting ports are closed, the cover plates 132 can be fixedly connected with the top form 110 or the side form 120 through pins or bolts. For slip casting convenient operation, this design still includes work platform 170, work platform 170 corresponds the setting in the slip casting mouth inboard, during the slip casting, fill in the slip casting mouth with the slip casting pipeline can, work platform 170 fixes inboard at side form board 120.
Be connected with first bracing piece 151 and support cylinder 152 between side form 120 and the platform truck main frame 130, first bracing piece 151 and support cylinder 152 both ends are articulated with side form 120 and platform truck main frame 130 respectively, its length can be adjusted along its length direction to first bracing piece 151. Preferably, the lower end of the sideform 120 is provided with a hinge seat 133, and one end of the first supporting rod 151 and one end of the supporting cylinder 152 are both hinged on the hinge seat 133. Preferably, first bracing piece 151 structure is the screw jack, and first bracing piece 151 includes first lead screw and connects the connector at first lead screw both ends, and the connector at both ends is articulated with articulated seat 133 and platform truck body frame 130 respectively, the connector is connected with first lead screw spiral transmission. The fixed side template is supported well by adjusting the screw rod, so that the deformation of the fixed side template is prevented. A plurality of second support rods 150 are further distributed between the side template 120 and the trolley main frame 130 at intervals, two ends of each second support rod 150 are hinged with the side template 120 and the trolley main frame 130 respectively, and the second support rods 150 are structurally spiral screw jacks. During installation, the support cylinder 152 is operated to make the sideform 120 in place, the second support bar 150 and the first support bar 151 are adjusted to support the sideform 120, and then the hydraulic pressure of the support cylinder 152 is released.
In order to facilitate the movement of the trolley, two supporting chassis 160 arranged at intervals are arranged at the bottom of the trolley main frame 130, and the supporting chassis 160 is movably installed on the rail 180. Specifically, the support chassis 160 is provided with a jacking cylinder 162, a jacking roller 161 and a side roller 163, and each support chassis 160 is provided with two jacking cylinders which are located at two sides of the jacking roller 161 and the side roller 163. The rotation axis of the top roller 161 is horizontal, the side rollers 163 are provided with two rollers and located at two sides below the top roller 161, and the rotation axis of the side rollers 163 is vertical. The rail 180 is I-shaped, the rail 180 is embedded between the top roller 161 and the side rollers 163, the top roller 161 rolls on the surface of the rail, the side rollers 163 roll on two side surfaces of the middle vertical part of the rail 180, the left and right limiting of the supporting underframe 160 and the rail 180 is realized, and the trolley can move by the rolling of the rollers on the rail 180. When the inserted rail needs to be laid, the jacking oil cylinder 162 is opened to lift the trolley to a certain height, so that the gravity load of the trolley is on the jacking oil cylinder 162, and then the inserted rail 180 can be used for completing the laying of the rail. The trolley can be moved by pulling the trolley or pushing the trolley. In addition, due to the effect of the side rollers 163, when the rail 180 needs to be moved in the advancing direction so as to continue to advance, only the jacking oil cylinder 162 needs to be lifted, the rollers 163 on the two sides can support the rail 180, and then only the rail 180 needs to be pulled forward, so that the adjustment of the rail 180 is facilitated, the length of the rail 180 is saved, the rail 180 does not need to be paved forwards while advancing like the traditional rail 180, the rail 180 is long, and the paving alignment is troublesome.
In order to adjust the position of the trolley conveniently so that the trolley is positioned at the center of the tunnel and ensure uniform grouting thickness, the trolley main frame 130 is slidably mounted on the support underframe 160, and the trolley main frame 130 is connected with a driving mechanism 164 for driving the trolley main frame to slide; preferably, the driving mechanism 164 is a telescopic cylinder, one end of the telescopic cylinder is hinged to the support chassis 160, and the other end of the telescopic cylinder is hinged to the trolley main frame 130, so that the deformation stress caused by insufficient sliding accuracy of the trolley main frame 130 and the support chassis 160 can be avoided due to the hinge. Preferably, the upper end of the support chassis 160 is provided with a guide rail, the bottom of the trolley main frame 130 is provided with a guide groove matched with the guide rail, and the trolley main frame 130 realizes the directional movement through the cooperation of the guide rail and the guide groove, although in other embodiments, the sliding structure of the trolley main frame 130 and the support chassis 160 has many other forms. Preferably, the sliding direction of the bogie main frame 130 is perpendicular to the moving direction of the support chassis 160 along the rail 180. Thus, the main carriage 130 can move in two axes and can be adjusted in position at will.
The above embodiments are only used for illustrating the technical solutions of the present invention and are not limited thereto, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered by the scope of the technical solutions of the present invention.

Claims (8)

1. The utility model provides a two full-automatic lining slip casting dollies which characterized in that: comprises a top template (110), a side template (120) and a trolley main frame (130);
the top template (110) is arranged above the trolley main frame (130), the top of the trolley main frame (130) is connected with the top template (110) through a steel beam (131), and the steel beam (131), the trolley main frame (130) and the top template (110) surround to form an installation space (140) capable of accommodating a ventilation pipeline;
the side templates (120) are arranged at two side ends of the top template (110) and hinged with the top template (110);
be connected with first bracing piece (151) and support cylinder (152) between side form (120) and platform truck main frame (130), first bracing piece (151) and support cylinder (152) both ends are articulated with side form (120) and platform truck main frame (130) respectively, its length can be adjusted along its length direction in first bracing piece (151).
2. The full-automatic two-lining grouting trolley according to claim 1, characterized in that: the two installation spaces (140) are arranged on two sides above the trolley main frame (130).
3. The full-automatic two-lining grouting trolley according to claim 1, characterized in that: the top formwork (110) and the side formwork (120) are provided with grouting ports, and cover plates (132) capable of opening or closing the grouting ports are mounted at the grouting ports.
4. The full-automatic two-lining grouting trolley according to claim 3, characterized in that: the grouting device further comprises a working platform (170), and the working platform (170) is correspondingly arranged on the inner side of the grouting opening.
5. The full-automatic two-lining grouting trolley according to claim 1, characterized in that: the side form board (120) lower extreme is provided with articulated seat (133), the one end of first bracing piece (151) and the one end of platform truck body frame (130) all articulate on articulated seat (133).
6. The full-automatic two-lining grouting trolley according to claim 5, characterized in that: first bracing piece (151) include first lead screw and connect the connector at first lead screw both ends, the connector at both ends is articulated with articulated seat (133) and platform truck body frame (130) respectively, the connector is connected with first lead screw spiral transmission.
7. The full-automatic two-lining grouting trolley according to claim 1, characterized in that: the bottom of the trolley main frame (130) is provided with a supporting underframe (160), and the supporting underframe (160) is movably arranged on a track (180).
8. The full-automatic two-lining grouting trolley according to claim 7, characterized in that: the supporting chassis (160) is provided with a jacking oil cylinder (162), a jacking roller (161) and side rollers (163), the rotating shaft of the jacking roller (161) is horizontal, the side rollers (163) are provided with two rollers and located on two sides below the jacking roller (161), and the rotating shafts of the side rollers (163) are vertical.
CN201921682112.4U 2019-10-09 2019-10-09 Full-automatic two lining slip casting platform trucks Active CN210919075U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921682112.4U CN210919075U (en) 2019-10-09 2019-10-09 Full-automatic two lining slip casting platform trucks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921682112.4U CN210919075U (en) 2019-10-09 2019-10-09 Full-automatic two lining slip casting platform trucks

Publications (1)

Publication Number Publication Date
CN210919075U true CN210919075U (en) 2020-07-03

Family

ID=71362414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921682112.4U Active CN210919075U (en) 2019-10-09 2019-10-09 Full-automatic two lining slip casting platform trucks

Country Status (1)

Country Link
CN (1) CN210919075U (en)

Similar Documents

Publication Publication Date Title
CN109538238B (en) Tunnel arch prefabricated segment construction device and control method
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN110844832B (en) Lifting device for vehicle
CN100489269C (en) Full automatic hydraulic lining trolley
CN106593469A (en) Trolley for construction of inverted arch
CN205936645U (en) A full liquid die plate system for culvert is pour
CN210919075U (en) Full-automatic two lining slip casting platform trucks
WO2013013525A1 (en) Device and method for dismounting agd pipe of reduction furnace
CN108149589B (en) Bridge girder erection machine with large span and tunnel box girder
CN110700858A (en) Full-automatic two lining slip casting platform trucks
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN210919076U (en) Slip casting platform truck with adjusting device
CN111794099A (en) Bogie replacing system
CN206636581U (en) A kind of shield tunnel Second Lining Construction chassis
BRPI0606689A2 (en) device for moving a race channel
WO2023070257A1 (en) Intelligent hoisting robot
CN212316711U (en) Culvert trolley
CN210046270U (en) Pipe mould automatic correction translation device
CN220768069U (en) Portable bearing structure of superelevation breakwater template
CN110985062A (en) Hydraulic oil cylinder pushing tunnel trolley transverse centering mechanism for tunnel trolley
CN201695287U (en) Ballastless track pouring trolley
CN210975557U9 (en) Steel arch frame supporting and transverse moving system for construction of deck type box arch bridge
CN209942838U (en) Whole hydraulic template platform truck of full closed loop of inclined shaft construction landing stage formula
CN215672253U (en) Secondary lining trolley for hydraulic diversion tunnel
CN205400755U (en) Disconnect -type platform truck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant