CN210915043U - Lifting device for tower crane - Google Patents

Lifting device for tower crane Download PDF

Info

Publication number
CN210915043U
CN210915043U CN201921968556.4U CN201921968556U CN210915043U CN 210915043 U CN210915043 U CN 210915043U CN 201921968556 U CN201921968556 U CN 201921968556U CN 210915043 U CN210915043 U CN 210915043U
Authority
CN
China
Prior art keywords
frame
hoist
tower crane
plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921968556.4U
Other languages
Chinese (zh)
Inventor
焦光立
罗念宁
刘玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Guolian Construction Machinery Co ltd
Original Assignee
Xuzhou Guolian Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Guolian Construction Machinery Co ltd filed Critical Xuzhou Guolian Construction Machinery Co ltd
Priority to CN201921968556.4U priority Critical patent/CN210915043U/en
Application granted granted Critical
Publication of CN210915043U publication Critical patent/CN210915043U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a hoisting equipment technical field specifically is a play to rise device for tower crane. The utility model discloses a lifting machine frame, the top of lifting machine frame is equipped with the fixed stay frame, the lower extreme of fixed stay frame is equipped with the hydraulic stem, the lower part of hydraulic stem is equipped with the push pedal, the outside fixedly connected with who pushes away the lifting machine frame puts a mounting platform, the last surface mounting who puts a mounting platform has slide device, the lower extreme of the frame bracing piece of lifting machine frame is equipped with fixed hinge plate, bearing plate and spring catch, the inside roll connection of fixed hinge plate has the buckle post board, the spring catch is fixed respectively on the montant and the buckle post board of lifting machine frame, the inside of spring catch is equipped with the spring, the outside at braced frame is installed to the lifting machine frame, fixedly connected with buckle post frame on braced frame's the bracing piece, the hoisting device lifting speed of tower crane who proposes in solving above-mentioned background art is slow, the.

Description

Lifting device for tower crane
Technical Field
The utility model relates to a hoisting equipment technical field specifically is a play to rise device for tower crane.
Background
The crane is a multi-action hoisting machine for vertically lifting and horizontally carrying heavy objects within a certain range, and is mainly divided into light and small hoisting equipment, a bridge type, an arm frame type and a cable type according to the structural form, wherein the beam type crane mainly comprises a single-beam bridge type crane and a double-beam bridge type crane; with the rapid development of industries such as buildings, railways, roads and the like in recent years in China, various hoisting machines are continuously put into construction, and the lifting device of the tower crane is low in lifting speed and mounting speed at present.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a play to rise device for tower crane to the hoisting device of the tower crane who provides in solving above-mentioned background art promotes the slow problem of speed, installation rate.
In order to achieve the above object, the utility model provides a following technical scheme: comprises a lifter frame, the top end of the lifter frame is provided with a fixed support frame, the lower end of the fixed support frame is provided with a hydraulic rod, a push plate is arranged at the lower part of the hydraulic rod, the push plate is fixedly connected with the inner rod of the hydraulic rod by a pin plate, a frame placing and installing platform is fixedly connected with the outer part of the frame of the lifter, a sliding plate device is arranged on the upper surface of the frame placing and installing platform, the lower end of the frame support rod of the frame of the lifter is provided with a fixed hinge plate, a bearing plate and a spring pin, the fixed hinge plate and the bearing plate are fixedly connected with the lower end of a cross bar of the frame of the elevator, the inside of the fixed hinge plate is connected with a buckling column plate in a rolling way, the spring pin is respectively fixed on the vertical rod and the buckling column plate of the frame of the lifter, a spring is arranged inside the spring pin, the elevator frame is arranged outside the supporting frame, and a buckling column frame is fixedly connected to a supporting rod of the supporting frame.
A lifting device for a tower crane comprises a push plate, wherein the lower surface of the push plate is provided with a push column groove.
Preferably, a cross post is arranged on the upper surface of the buckling post frame.
Preferably, the fixed support frame and the hydraulic rod are connected in a matched mode through a hole shaft.
Preferably, the surface of the fixed hinge plate is provided with a pin hole.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this a play to rise device for tower crane has adopted the knot post board of a spring pressure formula, when the lifting machine promoted through the hydraulic stem to produce power that rises, detained the post board and snatch the spreader, then the hydraulic stem stops rising, and knot post board and bearing plate cooperate mutually to firm the lifting machine frame, it is fast, accelerated the speed that tower crane rises.
2. This a play to rise device for tower crane has set up the slide device on preventing putting up mounting platform, and the braced frame that will prepare the installation places on the slide device, then promotes the slide device, has alleviateed the weight of installation braced frame, has accelerated the speed to the braced frame installation simultaneously, has improved tower crane's play to rise speed.
Drawings
FIG. 1 is a schematic view of the assembly structure of the elevator frame of the present invention;
FIG. 2 is a schematic view of the structure of the elevator frame and the supporting frame;
fig. 3 is a schematic structural view of the position a of the present invention;
fig. 4 is a schematic view of the fitting structure of the post fastening frame and the cross post of the present invention.
In the figure: 1. a hoist frame; 2. fixing a support frame; 3. a hydraulic lever; 4. pushing the plate; 5. a pin plate; 6. placing a frame mounting platform; 7. a slide plate device; 8. a support frame; 9. fixing a hinged plate; 10. a pin hole; 11. a pressure bearing plate; 12. buckling a column plate; 13. a spring pin; 14. a spring; 15. buckling a post frame; 16. a cross post; 17. a post pushing groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be understood that the terms "center", "center line", "longitudinal", "lateral", "length", "width", "thickness", "depth", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplicity of description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be taken as limiting the invention, in the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
Example 1
A lifting device for a tower crane, in order to improve the lifting speed of the tower crane, as a preferred embodiment, as shown in figure 1, figure 2, figure 3 and figure 4, comprises a lifter frame 1, a fixed support frame 2 is arranged at the top end of the lifter frame 1, a hydraulic rod 3 is arranged at the lower end of the fixed support frame 2, a push plate 4 is arranged at the lower part of the hydraulic rod 3, the push plate 4 and the inner rod of the hydraulic rod 3 are fixedly connected by a pin plate 5, a frame placing mounting platform 6 is fixedly connected to the outside of the lifter frame 1, a sliding plate device 7 is arranged on the upper surface of the frame placing mounting platform 6, a fixed hinge plate 9, a bearing plate 11 and a spring pin 13 are arranged at the lower end of the frame support rod of the lifter frame 1, the fixed hinge plate 9 and the bearing plate 11 are fixedly connected at the lower end of the cross rod of the lifter frame 1, a buckling column plate 12 is connected to the inside, the spring pin 13 is respectively fixed on the vertical rod and the buckling column plate 12 of the elevator frame 1, the spring 14 is arranged inside the spring pin 13, the elevator frame 1 is installed outside the supporting frame 8, and the buckling column frame 15 is fixedly connected on the supporting rod of the supporting frame 8.
In this example, the lower surface of push pedal 4 has been seted up and has been pushed away post groove 17, when the lifting machine promoted, can be stable snatch braced frame 8's horizontal pole, improve stability, improve the security ability.
Further, a cross post 16 is placed on the upper surface of the post buckling frame 15, and is used for capturing the post buckling plate 12 during lifting of the elevator to stabilize the elevator frame 1.
Specifically, the fixed support frame 2 and the hydraulic rod 3 are connected in a hole-shaft matching mode, and the hydraulic rod can rock to facilitate timely correction of the lifting direction of the lifting machine.
In addition, the surface of the fixed hinge plate 9 is provided with a pin hole 10, which is convenient for the stud plate 12 to rotate.
When the utility model is used, firstly, the hydraulic rod 3 is opened, the push plate 4 arranged on the hydraulic rod 3 is moved downwards, the push rod groove 17 is contacted with the cross rod of the support frame 8, after the push rod groove 17 is contacted with the cross rod of the support frame 8, the elevator frame 1 can move upwards, after the elevator frame is lifted to a certain height, the cross rod is arranged on the mouth post frame 15, then the hydraulic rod 3 is retracted, the elevator descends, when the elevator frame descends, the buckling post plate 12 starts to catch the cross rod 16, the buckling post plate 12 starts to rotate, after the buckling post plate 12 is contacted and compacted, the hydraulic rod 3 continues to contract, the elevator can not descend, the hydraulic rod 3 is propped by the buckling post plate 12, at the moment, the hydraulic rod 3 retracts to the uppermost, the crane lifts the support frame 8 to the sliding plate device 7 of the placing frame mounting platform 6, then the worker pushes the support frame 8 arranged on the sliding plate device 7, and the support frame 8 enters the elevator frame 1, and fixedly connecting the supporting frame 8 with the supporting frame 8 below, after the connection is finished, pushing the sliding plate device 7, returning to the starting point, opening the hydraulic rod 3, enabling the pushing plate 4 to contact the supporting frame 8 again, enabling the elevator frame 1 to ascend again, taking back the transverse column 16 while ascending, and repeating the operation to finish the installation of the supporting frame 8 of the tower elevator.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. A hoisting device for a tower crane, comprising a hoist frame (1), characterized in that: the top of hoist frame (1) is equipped with outrigger (2), the lower extreme of outrigger (2) is equipped with hydraulic stem (3), the lower part of hydraulic stem (3) is equipped with push pedal (4), push pedal (4) with use cotter (5) fixed connection between the interior pole of hydraulic stem (3), frame mounting platform (6) is put to the outside fixedly connected with of hoist frame (1), the last surface mounting who puts frame mounting platform (6) has slide device (7), the lower extreme of the frame bracing piece of hoist frame (1) is equipped with fixed hinged plate (9), bearing plate (11) and spring catch (13), fixed hinged plate (9) and bearing plate (11) fixed connection are at the lower extreme of the horizontal pole of hoist frame (1), the inside roll connection of fixed hinged plate (9) has buckle board (12), spring catch (13) are fixed respectively on the montant and the buckle board (12) of hoist frame (1), the inside of spring catch (13) is equipped with spring (14), the outside at braced frame (8) is installed in hoist frame (1), fixedly connected with buckle post frame (15) on the bracing piece of braced frame (8).
2. A hoist for a tower crane according to claim 1, wherein: the lower surface of the push plate (4) is provided with a push column groove (17).
3. A hoist for a tower crane according to claim 1, wherein: and a cross post (16) is arranged on the upper surface of the buckling post frame (15).
4. A hoist for a tower crane according to claim 1, wherein: the fixed support frame (2) and the hydraulic rod (3) are connected in a hole-shaft matching mode.
5. A hoist for a tower crane according to claim 1, wherein: the surface of the fixed hinged plate (9) is provided with a pin hole (10).
CN201921968556.4U 2019-11-15 2019-11-15 Lifting device for tower crane Expired - Fee Related CN210915043U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921968556.4U CN210915043U (en) 2019-11-15 2019-11-15 Lifting device for tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921968556.4U CN210915043U (en) 2019-11-15 2019-11-15 Lifting device for tower crane

Publications (1)

Publication Number Publication Date
CN210915043U true CN210915043U (en) 2020-07-03

Family

ID=71368555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921968556.4U Expired - Fee Related CN210915043U (en) 2019-11-15 2019-11-15 Lifting device for tower crane

Country Status (1)

Country Link
CN (1) CN210915043U (en)

Similar Documents

Publication Publication Date Title
CN202023360U (en) Hydraulic climbing die plate for building construction
CN111980391A (en) Integral hoisting platform and building method of building outer facade construction platform
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN211340435U (en) Large-tonnage assembled pier body and pier cap hoisting device
CN206928632U (en) The anti-fall component of scaffold and scaffold
CN202577925U (en) Lifting type platform in elevator shaft
CN207348480U (en) High-order structural glass erecting device
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN205575428U (en) Component hoisting system
CN210915043U (en) Lifting device for tower crane
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN204752012U (en) Wall -hanging miniature hoist
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN205500626U (en) Climbing mechanism in tower crane
CN114955847A (en) A multi-functional hoist for prefabricating subway station construction usefulness
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN203998745U (en) The tower machine suspension hook disconnected rope anti-drop device of rushing to summit
CN210482971U (en) Integral promotion formula construction operation platform of elevartor shaft
CN210032557U (en) Anti-falling device for building climbing frame
CN201794308U (en) Self-climbing device of jacking mechanism
CN202657810U (en) Elevator frame
CN202717534U (en) Climbing frame climbing claw for tower crane
CN201339309Y (en) Attached self-lifting scaffold
CN205419350U (en) General hanging beam of modulization suitable for building industrialization prefabricated component hoist and mount
CN218088843U (en) Construction trolley for repairing bottom of continuous beam pocket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703

Termination date: 20201115