CN211340435U - Large-tonnage assembled pier body and pier cap hoisting device - Google Patents

Large-tonnage assembled pier body and pier cap hoisting device Download PDF

Info

Publication number
CN211340435U
CN211340435U CN201921725680.8U CN201921725680U CN211340435U CN 211340435 U CN211340435 U CN 211340435U CN 201921725680 U CN201921725680 U CN 201921725680U CN 211340435 U CN211340435 U CN 211340435U
Authority
CN
China
Prior art keywords
pier
hoisting
cap
secondary beam
tonnage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921725680.8U
Other languages
Chinese (zh)
Inventor
孙辉
张红乾
和辉
潘相辉
薛鸿禧
高敬民
崔文凯
张东林
王伟康
马倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Seventh Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201921725680.8U priority Critical patent/CN211340435U/en
Application granted granted Critical
Publication of CN211340435U publication Critical patent/CN211340435U/en
Priority to DE202020105859.2U priority patent/DE202020105859U1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/142Means in or on the elements for connecting same to handling apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种大吨位装配式桥墩墩身与墩帽吊装装置,属于吊装装置技术领域,解决了现有装置不能够实现大吨位构件的吊装的问题;其技术特征是:包括主横梁、墩帽分配次梁和墩柱分配次梁,所述墩帽分配次梁和墩柱分配次梁均悬挂在主横梁上,墩帽分配次梁和墩柱分配次梁上均设有吊装组件;本实用新型能够用于装配式桥梁施工大吨位墩帽和墩身的吊装,解决大吨位构件的吊装问题,实现墩帽、墩身预制场预制时的翻转和吊运以及安装现场的精调就位吊装等,可以满足现场施工要求,并且吊装效率高,安全可靠。

Figure 201921725680

The utility model discloses a large-tonnage assembled bridge pier pier body and pier cap hoisting device, which belongs to the technical field of hoisting devices, and solves the problem that the existing device cannot realize the hoisting of large-tonnage components; , The pier cap distribution secondary beam and the pier column distribution secondary beam, the pier cap distribution secondary beam and the pier column distribution secondary beam are suspended on the main beam, and the pier cap distribution secondary beam and the pier column distribution secondary beam are provided with hoisting components; The utility model can be used for the hoisting of large-tonnage pier caps and pier bodies in the construction of prefabricated bridges, solves the hoisting problem of large-tonnage components, and realizes the overturning and hoisting of the pier caps and pier bodies during prefabrication in the prefabrication field, as well as the fine adjustment on the installation site. Hoisting, etc., can meet the requirements of on-site construction, and the hoisting efficiency is high, safe and reliable.

Figure 201921725680

Description

一种大吨位装配式桥墩墩身与墩帽吊装装置A large-tonnage assembled bridge pier pier body and pier cap hoisting device

技术领域technical field

本实用新型涉及吊装装置技术领域,尤其涉及一种大吨位装配式桥墩墩身与墩帽吊装装置。The utility model relates to the technical field of hoisting devices, in particular to a large-tonnage assembled bridge pier body and pier cap hoisting device.

背景技术Background technique

在装配式桥梁施工过程中,由于装配式桥梁墩帽和墩柱是由预制场预制,现场安装,在预制和安装过程中,由于墩帽和墩柱的重量较重,移运和安装就位困难,所以需要特制的吊装装置来实现预制时的翻转和安装是的吊装。In the process of prefabricated bridge construction, because the prefabricated bridge pier caps and pier columns are prefabricated by the prefabrication yard and installed on site, during the prefabrication and installation process, due to the heavy weight of the pier caps and pier columns, they are moved and installed in place. It is difficult, so a special hoisting device is required to realize the flipping and installation during prefabrication.

中国专利CN102992203B公开了一种钢结构桥梁安装用简易吊装装置,包括安装在桥面上的立柱、背拉杆和卷扬机,其中所述的背拉杆与立柱相连;所述立柱上分别安装有闭口三轮滑车、斜滑轮;所述立柱与旋转臂一端相连,且旋转臂另一端安装有定滑轮;所述卷扬机上安装有提升钢丝绳,所述提升钢丝绳依次经过斜滑轮、闭口三轮滑车、定滑轮与被吊物相连;但是该装置不能够解决大吨位构件的吊装问题,因此,我们提出一种大吨位装配式桥墩墩身与墩帽吊装装置。Chinese patent CN102992203B discloses a simple hoisting device for steel structure bridge installation, including a column, a back-tie rod and a hoist installed on the bridge deck, wherein the back-tie rod is connected with the column; closed three wheels are respectively installed on the column. A pulley and an inclined pulley; the column is connected to one end of the rotating arm, and the other end of the rotating arm is installed with a fixed pulley; the hoist is installed with a hoisting wire rope, and the hoisting wire rope passes through the inclined pulley, the closed three-wheel pulley, the fixed pulley and the However, this device cannot solve the hoisting problem of large-tonnage components. Therefore, we propose a large-tonnage assembled bridge pier body and pier cap hoisting device.

实用新型内容Utility model content

本实用新型的目的在于提供一种大吨位装配式桥墩墩身与墩帽吊装装置,包括主横梁、墩帽分配次梁和墩柱分配次梁,所述墩帽分配次梁和墩柱分配次梁均悬挂在主横梁上,墩帽分配次梁和墩柱分配次梁上均设有吊装组件,以解决现有装置不能够实现大吨位构件的吊装的问题。The purpose of the utility model is to provide a large-tonnage assembled bridge pier body and pier cap hoisting device, including a main beam, a pier cap distribution secondary beam and a pier column distribution secondary beam, the pier cap distribution secondary beam and the pier column distribution secondary beam The beams are all suspended on the main beam, and the pier cap distribution secondary beam and the pier column distribution secondary beam are provided with hoisting components to solve the problem that the existing device cannot realize the hoisting of large-tonnage components.

为实现上述目的,本实用新型提供如下技术方案:To achieve the above object, the utility model provides the following technical solutions:

一种大吨位装配式桥墩墩身与墩帽吊装装置,包括主横梁、墩帽分配次梁和墩柱分配次梁,所述墩帽分配次梁和墩柱分配次梁均悬挂在主横梁上,墩帽分配次梁和墩柱分配次梁上均设有吊装组件。A large-tonnage assembled bridge pier pier body and pier cap hoisting device includes a main beam, a pier cap distribution secondary beam and a pier column distribution secondary beam, and the pier cap distribution secondary beam and the pier column distribution secondary beam are both suspended on the main beam. , The pier cap distribution secondary beam and the pier column distribution secondary beam are provided with hoisting components.

作为本实用新型进一步的方案:主横梁的上表面对称设有用于吊装主横梁的移动式吊耳,移动式吊耳设有两个,且移动式吊耳和主横梁之间通过螺栓固定连接,主横梁通过移动式吊耳与起重机械吊带及吊钩连接,主横梁的下方设有桥墩墩帽,桥墩墩帽的上表面均布有辅助吊起机构,辅助吊起机构与吊装组件一一对应设置。As a further scheme of the present utility model: the upper surface of the main beam is symmetrically provided with movable lifting lugs for hoisting the main beam, the mobile lifting lugs are provided with two, and the mobile lifting lugs and the main beam are fixedly connected by bolts, The main beam is connected with the hoisting sling and hook through the movable lifting lugs. The pier cap is provided under the main beam, and the upper surface of the pier cap is evenly distributed with auxiliary hoisting mechanisms. The auxiliary hoisting mechanism and the hoisting components are one by one. corresponding settings.

作为本实用新型再进一步的方案:辅助吊起机构包括精轧螺纹钢和锚固螺栓,所述精轧螺纹钢与桥墩墩帽固定连接,精轧螺纹钢上设有锚固螺栓。As a further solution of the present invention, the auxiliary hoisting mechanism includes a finish-rolled threaded steel and an anchor bolt, the finish-rolled threaded steel is fixedly connected with the pier cap of the bridge pier, and an anchor bolt is provided on the finish-rolled threaded steel.

作为本实用新型再进一步的方案:吊装组件包括移动式锚具和旋转销轴,旋转销轴设置在移动式锚具的下方,旋转销轴和移动式锚具固定连接,移动式锚具为可移动件,移动式锚具和主横梁滑动连接。As a further solution of the present invention: the hoisting assembly includes a mobile anchor and a rotating pin, the rotating pin is arranged below the mobile anchor, the rotating pin and the mobile anchor are fixedly connected, and the mobile anchor is a movable anchor. Mobile parts, mobile anchors and main beam sliding connection.

综上所述,本实用新型的有益效果是:本实用新型能够用于装配式桥梁施工大吨位墩帽和墩身的吊装,解决大吨位构件的吊装问题,实现墩帽、墩身预制场预制时的翻转和吊运以及安装现场的精调就位吊装等,可以满足现场施工要求,并且吊装效率高,安全可靠。To sum up, the beneficial effects of the utility model are: the utility model can be used for the hoisting of large-tonnage pier caps and pier bodies in prefabricated bridge construction, solves the problem of hoisting large-tonnage components, and realizes the prefabrication of pier caps and pier bodies in the prefabrication field. It can meet the requirements of on-site construction, and has high hoisting efficiency, safety and reliability.

附图说明Description of drawings

图1为实用新型的结构示意图。Figure 1 is a schematic structural diagram of the utility model.

图2为实用新型的主视图。Figure 2 is a front view of the utility model.

图3为实用新型的侧视图。Figure 3 is a side view of the utility model.

图中:1-主横梁、2-墩帽分配次梁、3-移动式吊耳、4-移动式锚具、5-旋转销轴、6-墩柱分配次梁、7-桥墩墩帽、8-精轧螺纹钢、9-锚固螺栓。In the figure: 1- main beam, 2- pier cap distribution secondary beam, 3- movable lifting lug, 4- movable anchor, 5- rotating pin, 6- pier column distribution secondary beam, 7- pier pier cap, 8-finished rebar, 9-anchor bolts.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

实施例1Example 1

如图1~3所示,本实用新型实施例中,一种大吨位装配式桥墩墩身与墩帽吊装装置,包括主横梁1、墩帽分配次梁2和墩柱分配次梁6,所述墩帽分配次梁2和墩柱分配次梁6均悬挂在主横梁1上,墩帽分配次梁2和墩柱分配次梁6上均设有吊装组件,吊装组件用于墩身和墩帽的吊装;As shown in Figures 1 to 3, in the embodiment of the present utility model, a large-tonnage assembled bridge pier body and pier cap hoisting device includes a main beam 1, a pier cap distribution secondary beam 2 and a pier column distribution secondary beam 6. The pier cap distribution secondary beam 2 and the pier column distribution secondary beam 6 are both suspended on the main beam 1, and the pier cap distribution secondary beam 2 and the pier column distribution secondary beam 6 are provided with hoisting components, and the hoisting components are used for the pier body and the pier. Hoisting of caps;

主横梁1的上表面对称设有用于吊装主横梁1的移动式吊耳3,移动式吊耳3设有两个,且移动式吊耳3和主横梁1之间通过螺栓固定连接,主横梁1通过移动式吊耳3与起重机械吊带及吊钩连接。The upper surface of the main beam 1 is symmetrically provided with movable lifting lugs 3 for hoisting the main beam 1. There are two mobile lifting lugs 3, and the mobile lifting lugs 3 and the main beam 1 are fixedly connected by bolts. 1 Connect with the hoisting sling and hook through the mobile lifting lug 3.

实施例2Example 2

如图1~3所示,本实用新型实施例中,一种大吨位装配式桥墩墩身与墩帽吊装装置,包括主横梁1、墩帽分配次梁2和墩柱分配次梁6,所述墩帽分配次梁2和墩柱分配次梁6均悬挂在主横梁1上,墩帽分配次梁2和墩柱分配次梁6上均设有吊装组件,吊装组件用于墩身和墩帽的吊装;As shown in Figures 1 to 3, in the embodiment of the present utility model, a large-tonnage assembled bridge pier body and pier cap hoisting device includes a main beam 1, a pier cap distribution secondary beam 2 and a pier column distribution secondary beam 6. The pier cap distribution secondary beam 2 and the pier column distribution secondary beam 6 are both suspended on the main beam 1, and the pier cap distribution secondary beam 2 and the pier column distribution secondary beam 6 are provided with hoisting components, and the hoisting components are used for the pier body and the pier. Hoisting of caps;

主横梁1的上表面对称设有用于吊装主横梁1的移动式吊耳3,移动式吊耳3设有两个,且移动式吊耳3和主横梁1之间通过螺栓固定连接,主横梁1通过移动式吊耳3与起重机械吊带及吊钩连接;The upper surface of the main beam 1 is symmetrically provided with movable lifting lugs 3 for hoisting the main beam 1. There are two mobile lifting lugs 3, and the mobile lifting lugs 3 and the main beam 1 are fixedly connected by bolts. 1 Connect with the hoisting sling and hook through the mobile lifting lug 3;

主横梁1的下方设有桥墩墩帽7,桥墩墩帽7的上表面均布有辅助吊起机构,辅助吊起机构与吊装组件一一对应设置;The bottom of the main beam 1 is provided with a pier cap 7, and the upper surface of the bridge pier cap 7 is evenly distributed with auxiliary lifting mechanisms, and the auxiliary lifting mechanisms are arranged in one-to-one correspondence with the hoisting components;

辅助吊起机构包括精轧螺纹钢8和锚固螺栓9,所述精轧螺纹钢8与桥墩墩帽7固定连接,精轧螺纹钢8上设有锚固螺栓9;The auxiliary hoisting mechanism includes a finish-rolled threaded steel 8 and an anchor bolt 9, the finish-rolled threaded steel 8 is fixedly connected with the pier cap 7, and the finish-rolled threaded steel 8 is provided with an anchor bolt 9;

吊装组件包括移动式锚具4和旋转销轴5,所述移动式锚具4为可移动件,移动式锚具4和主横梁1滑动连接,旋转销轴5设置在移动式锚具4的下方,旋转销轴5和移动式锚具4固定连接,且移动式锚具4能够依据吊装物的尺寸来调节自身位置,从而满足不同尺寸墩身和桥墩墩帽7的吊装。The hoisting assembly includes a mobile anchor 4 and a rotating pin 5, the mobile anchor 4 is a movable part, the mobile anchor 4 is slidably connected with the main beam 1, and the rotating pin 5 is arranged on the movable anchor 4. Below, the rotating pin shaft 5 is fixedly connected with the mobile anchor 4, and the mobile anchor 4 can adjust its position according to the size of the hoisting object, so as to meet the hoisting of pier bodies and pier caps 7 of different sizes.

综上所述,本实用新型的工作原理是:本实用新型实施例工作时,根据桥墩墩帽7和墩柱的尺寸和重心位置布置精轧螺纹钢8;待桥墩墩帽7和墩柱达到吊装强度后将吊装装置依据桥墩墩帽7或墩柱的尺寸、精轧螺纹钢8间距的尺寸调节移动式锚具4,调整适合吊装的可调姿态。To sum up, the working principle of the present utility model is as follows: when the embodiment of the present utility model works, the finish-rolled rebar 8 is arranged according to the size of the pier cap 7 and the pier column and the position of the center of gravity; After the hoisting strength, the hoisting device adjusts the mobile anchor 4 according to the size of the pier cap 7 or the pier column, and the size of the spacing of the fine-rolled rebar 8, and adjusts the adjustable posture suitable for hoisting.

将精轧螺纹钢8穿过墩帽分配次梁2和墩柱分配次梁6并用螺栓锚固在吊装装置主横梁1上,调整吊装组件的吊装姿态,使其满足桥墩墩帽7和墩柱的吊装重心及平稳要求,起吊机械通过吊带穿过移动式吊耳3,起吊桥墩墩帽7或墩柱,到达起吊的目的。Pass the finishing rebar 8 through the pier cap distribution secondary beam 2 and the pier column distribution secondary beam 6 and anchor it on the main beam 1 of the hoisting device with bolts. To meet the requirements of the center of gravity and stability of hoisting, the hoisting machine passes through the movable lifting lug 3 through the sling, and lifts the pier cap 7 or the pier column of the bridge to achieve the purpose of hoisting.

本实用新型能够用于装配式桥梁施工大吨位墩帽和墩身的吊装,解决大吨位构件的吊装问题,实现墩帽、墩身预制场预制时的翻转和吊运以及安装现场的精调就位吊装等,可以满足现场施工要求,并且吊装效率高,安全可靠。The utility model can be used for the hoisting of large-tonnage pier caps and pier bodies in the construction of prefabricated bridges, solves the hoisting problem of large-tonnage components, realizes the overturning and hoisting during prefabrication of pier caps and pier bodies in the prefabrication field, and the fine adjustment on the installation site. It can meet the requirements of on-site construction, and has high hoisting efficiency, safety and reliability.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the present invention is not limited to the details of the above-described exemplary embodiments, and that the present invention may be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments are to be considered in all respects as exemplary and not restrictive, and the scope of the present invention is defined by the appended claims rather than the foregoing description, and it is therefore intended that the All changes within the meaning and range of the required equivalents are embraced within the present invention. Any reference signs in the claims shall not be construed as limiting the involved claim.

在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型创造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of the present invention, it should be understood that the terms "center", "longitudinal", "horizontal", "upper", "lower", "front", "rear", "left", "right", The orientations or positional relationships indicated by "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility. The novel creates and simplifies the description, rather than indicating or implying that the indicated device or element must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second", etc., may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described in terms of embodiments, not each embodiment only includes an independent technical solution, and this description in the specification is only for the sake of clarity, and those skilled in the art should take the specification as a whole , the technical solutions in each embodiment can also be appropriately combined to form other implementations that can be understood by those skilled in the art.

Claims (6)

1.一种大吨位装配式桥墩墩身与墩帽吊装装置,包括主横梁(1)、墩帽分配次梁(2)和墩柱分配次梁(6),其特征在于,所述墩帽分配次梁(2)和墩柱分配次梁(6)均悬挂在主横梁(1)上,墩帽分配次梁(2)和墩柱分配次梁(6)上均设有吊装组件。1. A large-tonnage assembled bridge pier body and pier cap hoisting device, comprising a main beam (1), a pier cap distribution secondary beam (2) and a pier column distribution secondary beam (6), characterized in that the pier cap Both the distribution secondary beam (2) and the pier column distribution secondary beam (6) are suspended on the main beam (1), and the pier cap distribution secondary beam (2) and the pier column distribution secondary beam (6) are both provided with hoisting components. 2.根据权利要求1所述的大吨位装配式桥墩墩身与墩帽吊装装置,其特征在于,主横梁(1)的上表面对称设有用于吊装主横梁(1)的移动式吊耳(3),移动式吊耳(3)设有两个,且移动式吊耳(3)和主横梁(1)之间通过螺栓固定连接,主横梁(1)通过移动式吊耳(3)与起重机械吊带及吊钩连接。2. The large-tonnage prefabricated bridge pier pier body and pier cap hoisting device according to claim 1, wherein the upper surface of the main beam (1) is symmetrically provided with a movable lifting lug (1) for hoisting the main beam (1). 3), there are two mobile lifting lugs (3), and the mobile lifting lugs (3) and the main beam (1) are fixedly connected by bolts, and the main beam (1) is connected to the main beam (1) through the mobile lifting lugs (3). Lifting equipment sling and hook connection. 3.根据权利要求1所述的大吨位装配式桥墩墩身与墩帽吊装装置,其特征在于,主横梁(1)的下方设有桥墩墩帽(7),桥墩墩帽(7)的上表面均布有辅助吊起机构,辅助吊起机构与吊装组件一一对应设置。3. The large-tonnage prefabricated pier body and pier cap hoisting device according to claim 1, characterized in that, a pier pier cap (7) is provided below the main beam (1), and the upper part of the pier pier cap (7) is provided. Auxiliary hoisting mechanisms are evenly distributed on the surface, and the auxiliary hoisting mechanisms and the hoisting components are arranged in one-to-one correspondence. 4.根据权利要求3所述的大吨位装配式桥墩墩身与墩帽吊装装置,其特征在于,辅助吊起机构包括精轧螺纹钢(8)和锚固螺栓(9),所述精轧螺纹钢(8)与桥墩墩帽(7)固定连接,精轧螺纹钢(8)上设有锚固螺栓(9)。4. The large-tonnage prefabricated bridge pier pier body and pier cap hoisting device according to claim 3, wherein the auxiliary hoisting mechanism comprises a finish-rolled threaded steel (8) and an anchor bolt (9), and the finish-rolled thread The steel (8) is fixedly connected with the pier cap (7) of the bridge pier, and an anchor bolt (9) is arranged on the finish-rolled threaded steel (8). 5.根据权利要求1-4任一所述的大吨位装配式桥墩墩身与墩帽吊装装置,其特征在于,吊装组件包括移动式锚具(4)和旋转销轴(5),旋转销轴(5)设置在移动式锚具(4)的下方,旋转销轴(5)和移动式锚具(4)固定连接。5. The large-tonnage assembled bridge pier body and pier cap hoisting device according to any one of claims 1-4, wherein the hoisting assembly comprises a mobile anchor (4) and a rotating pin shaft (5), and the rotating pin The shaft (5) is arranged below the movable anchor (4), and the rotating pin shaft (5) is fixedly connected with the movable anchor (4). 6.根据权利要求5所述的大吨位装配式桥墩墩身与墩帽吊装装置,其特征在于,移动式锚具(4)为可移动件,移动式锚具(4)和主横梁(1)滑动连接。6. The large-tonnage assembled bridge pier body and pier cap hoisting device according to claim 5, wherein the mobile anchor (4) is a movable part, and the mobile anchor (4) and the main beam (1 ) sliding connection.
CN201921725680.8U 2019-10-15 2019-10-15 Large-tonnage assembled pier body and pier cap hoisting device Active CN211340435U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201921725680.8U CN211340435U (en) 2019-10-15 2019-10-15 Large-tonnage assembled pier body and pier cap hoisting device
DE202020105859.2U DE202020105859U1 (en) 2019-10-15 2020-10-14 Lifting device for the pier body and cap of an assembled bridge pier of large tonnage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921725680.8U CN211340435U (en) 2019-10-15 2019-10-15 Large-tonnage assembled pier body and pier cap hoisting device

Publications (1)

Publication Number Publication Date
CN211340435U true CN211340435U (en) 2020-08-25

Family

ID=72093914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921725680.8U Active CN211340435U (en) 2019-10-15 2019-10-15 Large-tonnage assembled pier body and pier cap hoisting device

Country Status (2)

Country Link
CN (1) CN211340435U (en)
DE (1) DE202020105859U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774793A (en) * 2021-06-01 2021-12-10 上海宝冶集团有限公司 Turning method for bridge prefabricated pier column of UHPC joint

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152299B (en) * 2021-04-23 2023-07-04 中交第二航务工程局有限公司 Cable-stayed bridge girder segment swinging device and hoisting method
CN114491757B (en) * 2022-01-26 2024-01-23 扬州大学 Center of gravity positioning method for special-shaped piers of prefabricated bridges based on heavy mathematical model
CN114571585B (en) * 2022-02-16 2024-07-12 中铁上海工程局集团有限公司 Automatic cleaning and spraying device for assembled pier outer mold
CN115506258B (en) * 2022-10-17 2026-01-09 山东省公路桥梁建设集团有限公司 A precast cap beam positioning and installation device and method
CN115821799A (en) * 2022-12-06 2023-03-21 中交第一航务工程局有限公司 Steel box girder hoisting air attitude control mechanism and control method
CN120081293B (en) * 2025-05-06 2025-08-12 中铁十局集团有限公司 A bridge crane and construction method for closure of mid-span steel box beams

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113774793A (en) * 2021-06-01 2021-12-10 上海宝冶集团有限公司 Turning method for bridge prefabricated pier column of UHPC joint

Also Published As

Publication number Publication date
DE202020105859U1 (en) 2020-11-23

Similar Documents

Publication Publication Date Title
CN211340435U (en) Large-tonnage assembled pier body and pier cap hoisting device
CN205387439U (en) Mast hoisting accessory
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN101301981A (en) a hoisting method
CN103832933B (en) A kind of group tower tower crane with auxiliary
CN208932801U (en) Tower crane stake bracing means
CN110565937A (en) Door type integral lifting steel platform
CN206799021U (en) A kind of full circle swinging traveling derrick crane
CN110485289A (en) A retractable maintenance platform for the cable area of the pylon column of a double-cable-plane cable-stayed bridge
CN116062626A (en) A super high-rise building tower crown part curtain wall hoisting equipment and hoisting method
CN210084788U (en) Tower crane for building
CN209618736U (en) Jacking apparatus is climbed in a kind of derrick crane
CN103615198A (en) Construction method for using parallel double-mast half-turning method to hoist large box type derrick
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN203269405U (en) Hoisting device for mounting side plates and upright columns of gas cabinet
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN107806239A (en) A kind of climbing type scaffold anti-fall device
CN210369841U (en) Anti-falling device for outer frame lifting frame
CN204778268U (en) A special lifting device for hoist and mount of large -tonnage precast box girder
CN214828569U (en) Portable internal climbing tower crane spandrel girder hoisting device
CN202063655U (en) Anti-tilting safe device of tower type crane
CN110485292A (en) A kind of examination and repair system and repair method of the cable-stayed bridge king-post of falling Y shape
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN204039004U (en) Mechanical and electric equipment installation mechanism of the adjustable bucket of supporting leg basket lifting Dual-locking substation
CN212954042U (en) Lattice formula cable saddle hoist and mount portal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant