CN210869658U - Double-circulation fermentation room - Google Patents

Double-circulation fermentation room Download PDF

Info

Publication number
CN210869658U
CN210869658U CN201921556558.2U CN201921556558U CN210869658U CN 210869658 U CN210869658 U CN 210869658U CN 201921556558 U CN201921556558 U CN 201921556558U CN 210869658 U CN210869658 U CN 210869658U
Authority
CN
China
Prior art keywords
fixed
air guide
room
flabellum
guide cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921556558.2U
Other languages
Chinese (zh)
Inventor
徐福杨
张汉东
曹华模
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Dechen Electromechanical Co ltd
Original Assignee
Guangdong Dechen Electromechanical Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Dechen Electromechanical Co ltd filed Critical Guangdong Dechen Electromechanical Co ltd
Priority to CN201921556558.2U priority Critical patent/CN210869658U/en
Application granted granted Critical
Publication of CN210869658U publication Critical patent/CN210869658U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a room is proofed in dual cycle relates to the room field of proofing, and it includes the room body, and the inboard of the room body is along vertically being equipped with a plurality of circulation subassemblies, the inboard cross sectional shape on the top inner wall of the circulation subassembly including being fixed in the room body is circular shape left inflator, right inflator, is fixed with the installation cover between left inflator, the right inflator, the bottom surface of left side inflator, right inflator looks remote site all is equipped with the inlet port, the dwang in left inflator, right inflator is stretched into respectively to the right-hand member to the installation cover internal rotation, and the left flabellum that is located left inflator is fixed with at the left end of dwang. The utility model discloses not only can be used for carrying out automatic humidification and intensification to the internal room, and through the setting of the driving motor, dwang, left flabellum and the right flabellum that set up, can make the internal gas in room carry out two-way circulation, and then when heating up the air through the electric heat net for the programming rate is fast.

Description

Double-circulation fermentation room
Technical Field
The utility model relates to a room field of proofing especially relates to a two-cycle proofs room.
Background
The proofing is also called final proofing or final fermentation, the dough is sent into a proofing chamber for proofing after shaping (after bread blanks are filled into a die), the proofing temperature is controlled to be about 35-40 ℃, the time is generally 30-60 minutes, the relative humidity is 80-90%, and the volume after proofing is preferably doubled before proofing. The fermentation room is needed in the fermentation process, however, the heating and humidifying speed of the existing fermentation room is slow in heating and humidifying, time is wasted, the fermentation speed is slow, and the production efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a double-circulation proofing house.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a two circulation room of proofing, includes the room body, and the inboard of the room body is equipped with a plurality of circulation subassemblies along vertically, the circulation subassembly is including being fixed in inboard cross sectional shape on the top inner wall of the room body for circular shape left air guide tube, right air guide tube, is fixed with the installation cover between left air guide tube, the right air guide tube, the bottom surface of left air guide tube, right air guide tube looks remote site all is equipped with the inlet port, the installation cover internal rotation is installed left, right-hand member and is stretched into the dwang in left air guide tube, right air guide tube respectively, and the left end of dwang is fixed with the left flabellum that is located left air guide tube, and the right-hand member of dwang is fixed with the right flabellum that is located right air guide tube, and the inlet port is located one side that left flabellum, right flabellum are close to each other, the opposite direction of left flabellum, be, the inboard of left gas cylinder, right gas cylinder all is fixed with the electric heat net, and two electric heat nets are located one side that left flabellum, right flabellum kept away from each other respectively, the side that deviates from of left gas cylinder, right gas cylinder all is fixed with the outlet duct.
Preferably, an atomizer is fixed on the top of the house body, a moisture outlet pipe is fixed at the air outlet end of the atomizer, and the other end of the moisture outlet pipe is arranged in a corresponding air outlet pipe.
Preferably, one side of the room body is fixed with the controller, and the input electric connection of controller has temperature sensor, the humidity transducer who is fixed in the room body, and the output and the equal electric connection of driving motor, atomizer, electric heat net of controller.
Preferably, the lower end of the air outlet pipe is obliquely arranged, and the air outlet pipe is positioned on one side, far away from the corresponding left fan blade or right fan blade, of the electric heating net.
Preferably, the air outlet direction of the left fan blade is consistent with the direction from the right air guide cylinder to the left air guide cylinder, and the air outlet direction of the right fan blade is consistent with the direction from the left air guide cylinder to the right air guide cylinder.
Preferably, the number of the left fan blade and the right fan blade is multiple, a driving belt wheel is fixed at the output end of the driving motor, and the driving belt wheel is connected with a belt wheel ring through synchronous belt transmission.
The utility model discloses in through temperature sensor, humidity transducer, a controller, change the setting of ware and electric heat net, can be used for carrying out automatic humidification and intensification to the internal room, and driving motor through the setting, the dwang, the setting of left flabellum and right flabellum, can make the internal gas in room carry out the two-way cycle, and then when heating up the temperature through the electric heat net to the air, make the programming rate fast, and during the atomizer humidification through setting up, it is internal also to make the moisture distribute the room fast, make the humidification rapidly, whole loop configuration only needs a driving motor can drive the completion, the installation cost is practiced thrift, excellent in use effect.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Reference numbers in the figures: the device comprises a room body 1, a circulation component 2, a left air guide cylinder 3, a right air guide cylinder 4, an air inlet hole 5, a mounting cover 6, a rotating rod 7, a wheel ring 8, a driving motor 9, a left fan blade 10, a right fan blade 11, an electric heating net 12, an air outlet pipe 13, an atomizer 14, a moisture outlet pipe 15, a controller 16, a temperature sensor 17 and a humidity sensor 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, a double-circulation proof room comprises a room body 1, a plurality of circulation assemblies 2 are longitudinally arranged on the inner side of the room body 1, each circulation assembly 2 comprises a left air guide cylinder 3 and a right air guide cylinder 4 which are fixed on the inner wall of the top of the room body 1 and have circular cross sections, a mounting cover 6 is fixed between the left air guide cylinder 3 and the right air guide cylinder 4, air inlet holes 5 are respectively arranged on the bottom surfaces of the opposite ends of the left air guide cylinder 3 and the right air guide cylinder 4, a rotating rod 7 is rotatably arranged in the mounting cover 6, the left end and the right end of the rotating rod 7 respectively extend into the left air guide cylinder 3 and the right air guide cylinder 4, the left end of the rotating rod 7 is fixed with a left fan blade 10 positioned in the left air guide cylinder 3, the right end of the rotating rod 7 is fixed with a right fan blade 11 positioned in the right air guide cylinder 4, the air inlet holes 5 are positioned on the side where the left fan blade 10 and the right fan blade 11 are, the belt wheel ring 8 is connected with a driving motor 9 fixed on one side of the left air guide cylinder 3 in a transmission manner, electric heating nets 12 are fixed on the inner sides of the left air guide cylinder 3 and the right air guide cylinder 4, the two electric heating nets 12 are respectively positioned on one sides, far away from each other, of the left fan blade 10 and the right fan blade 11, and air outlet pipes 13 are fixed on the deviating sides of the left air guide cylinder 3 and the right air guide cylinder 4.
In this embodiment, the top of the room body 1 is fixed with atomizer 14, the outlet end of atomizer 14 is fixed with moisture outlet pipe 15, in the other end house of moisture outlet pipe 15 corresponding outlet pipe 13, one side of the room body 1 is fixed with controller 16, controller 16 ' S input electric connection has the temperature sensor 17 that is fixed in the room body 1, humidity transducer 18, controller 16 ' S model is ATMEGA16, temperature sensor 17 ' S model is pt100, humidity transducer 18 ' S model is HU-10S, controller 16 ' S output and driving motor 9, atomizer 14, the equal electric connection of electric heat net 12, the lower extreme of outlet pipe 13 is the slope setting, and outlet pipe 13 is located electric heat net 12 and keeps away from the one side that corresponds left flabellum 10 or right flabellum 11.
In this embodiment, the air outlet direction of the left fan blade 10 is the same as the direction from the right air guide cylinder 4 to the left air guide cylinder 3, the air outlet direction of the right fan blade 11 is the same as the direction from the left air guide cylinder 3 to the right air guide cylinder 4, the number of the left fan blade 10 and the number of the right fan blade 11 are both multiple, the output end of the driving motor 9 is fixed with a driving pulley, and the driving pulley is connected with the pulley ring 8 through a synchronous belt transmission.
The working principle is as follows: the utility model discloses when using, humidity information and temperature information in the room body 1 can be responded to through the temperature sensor 17 and the humidity transducer 18 that set up to give controller 16 with temperature and humidity information transfer, controller 16 handles the back to information and controls the work of the driving motor 9 that corresponds, atomizer 14, electric heat net 12 respectively, and atomizer 14 is prior art, can produce the fog and be used for the humidification, and electric heat net 12 is used for rising temperature when needs. Can drive transmission dwang 7 through the driving motor 9 that sets up and rotate, order about left flabellum 10 then, right flabellum 11 rotates, left flabellum 10, right flabellum 11 rotates and can order about the internal gas in room 1 and circulate, and can realize the dual cycle, like this when heating the air through electric heat net 12 and rising temperature, make the programming rate fast, and during 14 humidifications of atomizer through setting up, also make the moisture give off the room 1 fast in, make the humidification rapid, whole loop configuration only needs a driving motor 9 can drive the completion, the installation cost is saved, excellent in use effect.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a dual cycle room of proofing, includes the room body (1), and the inboard of the room body (1) is along vertically being equipped with a plurality of circulation subassemblies (2), its characterized in that, circulation subassembly (2) are fixed with between left air guide tube (3), the right air guide tube (4) of circular shape including being fixed in the inboard cross sectional shape on the top inner wall of the room body (1), are fixed with installation cover (6) between left air guide tube (3), the right air guide tube (4), the bottom surface of left air guide tube (3), right air guide tube (4) looks remote site all is equipped with inlet port (5), installation cover (6) internal rotation is installed left, right-hand member and is stretched into dwang (7) in left air guide tube (3), right air guide tube (4) respectively, and the left end of dwang (7) is fixed with left flabellum (10) that are located left air guide tube (3), and the right-hand member of dwang (7) is fixed with right flabell, the air inlet hole (5) is located the one side that left flabellum (10), right flabellum (11) are close to each other, and the opposite direction of left flabellum (10), right flabellum (11), be fixed with on dwang (7) and be located installation cover (6) inboard band pulley ring (8), band pulley ring (8) transmission is connected with driving motor (9) that are fixed in left gas guide cylinder (3) one side, the inboard of left gas guide cylinder (3), right gas guide cylinder (4) all is fixed with electric heat net (12), and two electric heat nets (12) are located one side that left flabellum (10), right flabellum (11) kept away from each other respectively, the side that deviates from of left gas guide cylinder (3), right gas guide cylinder (4) all is fixed with outlet duct (13).
2. A double-circulation proof room as claimed in claim 1, wherein the top of the room body (1) is fixed with an atomizer (14), the outlet end of the atomizer (14) is fixed with a moisture outlet pipe (15), and the other end of the moisture outlet pipe (15) is arranged in the corresponding outlet pipe (13).
3. The dual-cycle fermentation room as claimed in claim 1, wherein a controller (16) is fixed on one side of the room body (1), an input end of the controller (16) is electrically connected with a temperature sensor (17) and a humidity sensor (18) which are fixed in the room body (1), and an output end of the controller (16) is electrically connected with the driving motor (9), the atomizer (14) and the electric heating net (12).
4. A double-circulation proofing house according to claim 1, characterized in that the lower end of the air outlet pipe (13) is inclined, and the air outlet pipe (13) is positioned on the side of the electric heating net (12) far away from the corresponding left fan blade (10) or right fan blade (11).
5. The double-circulation proofing house according to claim 1, wherein the air outlet direction of the left fan blade (10) is consistent with the direction from the right air guide cylinder (4) to the left air guide cylinder (3), and the air outlet direction of the right fan blade (11) is consistent with the direction from the left air guide cylinder (3) to the right air guide cylinder (4).
6. The double-cycle fermentation room as claimed in any one of claims 1 to 5, wherein the number of the left fan blade (10) and the right fan blade (11) is multiple, and a driving pulley is fixed at the output end of the driving motor (9), and the driving pulley is connected with the pulley ring (8) through a synchronous belt drive.
CN201921556558.2U 2019-09-19 2019-09-19 Double-circulation fermentation room Active CN210869658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921556558.2U CN210869658U (en) 2019-09-19 2019-09-19 Double-circulation fermentation room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921556558.2U CN210869658U (en) 2019-09-19 2019-09-19 Double-circulation fermentation room

Publications (1)

Publication Number Publication Date
CN210869658U true CN210869658U (en) 2020-06-30

Family

ID=71326321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921556558.2U Active CN210869658U (en) 2019-09-19 2019-09-19 Double-circulation fermentation room

Country Status (1)

Country Link
CN (1) CN210869658U (en)

Similar Documents

Publication Publication Date Title
CN105230695A (en) Steamed bun leavening, steaming and airing all-in-one machine
CN210869658U (en) Double-circulation fermentation room
CN210168890U (en) Dough standing device for processing manual fine dried noodles
CN211120666U (en) Heat flow circulation type sintering device for producing sintered porous bricks
CN209771364U (en) Spray drying device is used in plasma protein powder production
CN110839593A (en) Energy-saving incubator for crocodile eggs
CN216337584U (en) Edible fungus hypha constant temperature culture apparatus
CN210374561U (en) Sintering device for producing sintered porous bricks
CN107883676A (en) The hot-air circulating drying device of pole piece coiled strip and the hot air circulation drying oven for including it
CN209960877U (en) Novel high-temperature oven
CN210463206U (en) Novel heat storage device for electric heater
CN210569827U (en) Drying treatment device is used in automotive interior part production
CN210242193U (en) Drying box for agricultural product processing
CN209214285U (en) A kind of coating drying oven natural gas direct heater
CN210671879U (en) Single-cycle fermentation room
CN208920742U (en) High temperature oven
CN208707976U (en) A kind of electric heating heating film process units
CN208543698U (en) A kind of poly (methyl methacrylate) plate heat preservation solidification integrated reacting case
CN207635726U (en) The hot-air circulating drying device of pole piece coiled strip and hot air circulation drying oven comprising it
CN205052679U (en) All -in -one of waking up, evaporating, drying in air of steamed bun
CN211717072U (en) Intelligent water control drying equipment for marine products
CN205980688U (en) Automatic transmission drying equipment
CN108516552A (en) A kind of internal heat type absorbent charcoal activation furnace
CN215766370U (en) Hot air generating equipment for drying light bricks
CN210399619U (en) Forced cooling device for zinc-aluminum coating and curing process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A double circulation hair room

Effective date of registration: 20210106

Granted publication date: 20200630

Pledgee: Bank of China Limited Guangzhou Development Zone Branch

Pledgor: Guangdong Dechen electromechanical Co.,Ltd.

Registration number: Y2021980000088

PE01 Entry into force of the registration of the contract for pledge of patent right