CN210818586U CN201921532808.9U CN201921532808U CN210818586U CN 210818586 U CN210818586 U CN 210818586U CN 201921532808 U CN201921532808 U CN 201921532808U CN 210818586 U CN210818586 U CN 210818586U
Authority
CN
China
Prior art keywords
positioning
vertical
column
support column
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921532808.9U
Other languages
Chinese (zh)
Inventor
邓凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhou Jietong Railway Machinery Co ltd
Original Assignee
Jinzhou Jietong Railway Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhou Jietong Railway Machinery Co ltd filed Critical Jinzhou Jietong Railway Machinery Co ltd
Priority to CN201921532808.9U priority Critical patent/CN210818586U/en
Application granted granted Critical
Publication of CN210818586U publication Critical patent/CN210818586U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jigs For Machine Tools (AREA)

Abstract

列车集中动力转臂立式加工夹具,包括底板,在底板上设置三根呈品字形布置的支撑柱,在底座上位于左侧支撑柱前方和位于右前方的支撑柱右侧分别设置定位柱,在位于右侧定位柱顶部设置定位块,定位块后端面设有V型定位口,在底座上位于左侧支撑柱后方和位于右侧定位柱后方分别设置立柱,在立柱顶端铰接推杆,且在推杆自由端与立柱之间连接压簧,在底板上位于左侧支撑柱左侧、位于右前方支撑柱前方和位于右后方支撑柱后方分别设置竖直油缸,在竖直油缸的活塞杆顶端铰接压臂,且在压臂中部与对应竖直油缸的缸体之间通过销轴连接连接杆。在定位固定集中动力转臂的过程中,其可缩短定位时间,简化固定操作,缩短固定时间,提高集中动力转臂加工效率。

Figure 201921532808

The train centralized power rotating arm vertical processing fixture includes a base plate, three support columns arranged in a zigzag shape are arranged on the base plate, and positioning columns are respectively set on the base in front of the left support column and on the right side of the right front support column. A positioning block is arranged at the top of the right positioning column, and a V-shaped positioning port is arranged on the rear end of the positioning block. A column is respectively set on the base behind the left support column and behind the right positioning column, and the push rod is hinged at the top of the column, and the A compression spring is connected between the free end of the push rod and the upright column, and vertical oil cylinders are respectively arranged on the bottom plate on the left side of the left support column, in front of the right front support column and behind the right rear support column, and at the top of the piston rod of the vertical oil cylinder The pressing arm is hinged, and the connecting rod is connected by a pin between the middle part of the pressing arm and the cylinder body of the corresponding vertical oil cylinder. In the process of positioning and fixing the centralized power rotating arm, it can shorten the positioning time, simplify the fixing operation, shorten the fixing time, and improve the processing efficiency of the centralized power rotating arm.

Figure 201921532808

Description

列车集中动力转臂立式加工夹具Train centralized power rotary arm vertical machining fixture

技术领域technical field

本实用新型涉及列车集中动力转臂立式加工设备,尤其涉及一种列车集中动力转臂立式加工夹具。The utility model relates to a vertical processing equipment of a train centralized power rotating arm, in particular to a train centralized power rotating arm vertical processing fixture.

背景技术Background technique

集中动力转臂是列车转向架重要组成部分,是连接车轴位置、承载整个车厢车体的关键部件。集中动力转臂加工前需要定位固定在数控机床操作平台,传统的集中动力转臂定位固定方式是首先通过人工划线定位,再通过螺栓紧固多组压板夹持固定集中动力转臂。通过人工划线定位的方式定位时间长,压板数量多,固定操作繁琐,固定时间长,集中动力转臂加工效率低。The concentrated power boom is an important part of the train bogie, and it is a key component that connects the position of the axle and carries the entire car body. The centralized power rotating arm needs to be positioned and fixed on the CNC machine tool operation platform before processing. The traditional centralized power rotating arm positioning and fixing method is to firstly locate the centralized power rotating arm by manual marking, and then fasten multiple sets of pressure plates with bolts to clamp and fix the centralized power rotating arm. The manual scribing and positioning method takes a long time to locate, the number of pressing plates is large, the fixing operation is cumbersome, the fixing time is long, and the processing efficiency of the centralized power rotating arm is low.

发明内容SUMMARY OF THE INVENTION

本实用新型是为了解决上述技术问题,提供一种列车集中动力转臂立式加工夹具,在定位固定集中动力转臂的过程中,其可缩短定位时间,简化固定操作,缩短固定时间,提高集中动力转臂加工效率。In order to solve the above-mentioned technical problems, the utility model provides a vertical processing fixture for a centralized power rotating arm of a train, which can shorten the positioning time, simplify the fixing operation, shorten the fixing time, and improve the concentration during the process of positioning and fixing the centralized power rotating arm. Power jib machining efficiency.

本实用新型的技术解决方案是:The technical solution of the present utility model is:

列车集中动力转臂立式加工夹具,包括底板,其特殊之处在于:在底板上设置三根呈品字形布置的支撑柱,其中一根支撑柱位于底板左侧,其余二根支撑柱前后设置在底板右侧,在底座上位于左侧支撑柱前方和位于右前方的支撑柱右侧分别设置定位柱,在位于右侧定位柱顶部设置定位块,定位块后端面设有V型定位口,在底座上位于左侧支撑柱后方和位于右侧定位柱后方分别设置立柱,在立柱顶端铰接推杆,推杆自由端向前下方倾斜,且在推杆自由端与立柱之间连接压簧,在底板上位于左侧支撑柱左侧、位于右前方支撑柱前方和位于右后方支撑柱后方分别设置竖直油缸,在竖直油缸的活塞杆顶端铰接压臂,所述压臂自由端指向对应支撑柱,且在压臂中部与对应竖直油缸的缸体之间通过销轴连接连接杆。The train centralized power rotating arm vertical machining fixture, including the bottom plate, is special in that: three support columns are arranged on the bottom plate in a zigzag shape, one of which is located on the left side of the bottom plate, and the other two support columns are arranged in the front and rear of the bottom plate. On the right side of the bottom plate, a positioning column is set on the base in front of the left support column and on the right side of the support column at the right front. A positioning block is set on the top of the right positioning column. The base is located behind the left support column and located behind the right positioning column, respectively set up a column, the push rod is hinged at the top of the column, the free end of the push rod is inclined forward and downward, and a compression spring is connected between the free end of the push rod and the column. Vertical oil cylinders are respectively arranged on the bottom plate on the left side of the left support column, in front of the right front support column and behind the right rear support column, and a pressure arm is hinged on the top of the piston rod of the vertical oil cylinder, and the free end of the pressure arm points to the corresponding support The connecting rod is connected by a pin between the middle part of the pressing arm and the cylinder body of the corresponding vertical oil cylinder.

进一步优选,在底座上位于右前方竖直油缸右侧和位于右后方竖直油缸右侧分别设置竖直导向杆,将集中动力转臂吊装到该列车集中动力转臂立式加工夹具过程中,通过二根导向杆导向集中动力转臂,便于集中动力转臂快速定位位置。Further preferably, vertical guide rods are respectively set on the right side of the vertical oil cylinder in the front right and on the right side of the vertical oil cylinder in the right rear on the base, and the centralized power swing arm is hoisted to the train. The concentrated power rotating arm is guided by two guide rods, which is convenient for the rapid positioning of the concentrated power rotating arm.

进一步优选,所述定位块为L型,所述V型定位口设于定位块前侧直角边,在定位块右侧直角边通过螺纹安装垂直于定位块右侧直角边的顶丝。Further preferably, the positioning block is L-shaped, the V-shaped positioning opening is set on the right-angled side of the front side of the positioning block, and the right-angled side of the positioning block is installed with a thread perpendicular to the right-angled side of the positioning block on the right-angled side of the positioning block.

进一步优选,在所述压臂自由端通过螺纹安装垂直于压臂自由端的调节螺栓,通过螺纹调节调节螺栓高度,以便将集中动力转臂紧固夹持。Further preferably, an adjusting bolt perpendicular to the free end of the pressing arm is installed on the free end of the pressing arm through a thread, and the height of the adjusting bolt is adjusted by the thread, so as to fasten and clamp the concentrated power rotating arm.

进一步优选,所述推杆为弧形,提高集中动力转臂与推杆接触时的顺滑性。Further preferably, the push rod is arc-shaped to improve the smoothness of the concentrated power rotating arm in contact with the push rod.

本实用新型的有益效果是:The beneficial effects of the present utility model are:

1、由于设置在底板上的支撑柱,将集中动力转臂放在三个支撑柱上进行水平定位;由于设置在底板上的定位柱,设置在右侧定位柱顶部的定位块后端面设有V型定位口,设置在定位柱后方的立柱顶端铰接推杆,连接在推杆自由端与立柱之间连接压簧,压簧弹力向前顶动推杆自由端,推杆推动集中动力转臂后端面,将集中动力转臂右前方圆弧耳板卡装在V型定位口、将集中动力转臂前端面左侧顶靠位于左侧的定位柱,进行前后方向定位,集中动力转臂右前方圆弧耳板与V型定位口相切,自动完成左右方向定位,集中动力转臂定位操作简单方便,大大的缩短了定位时间,提高了集中动力转臂加工效率。1. Due to the support columns set on the bottom plate, the centralized power rotating arm is placed on the three support columns for horizontal positioning; due to the positioning columns set on the bottom plate, the rear end surface of the positioning block set on the top of the right positioning column is provided with V-shaped positioning port, the push rod is hinged at the top of the column behind the positioning column, and a compression spring is connected between the free end of the push rod and the column. On the rear end face, the right front arc lug plate of the concentrated power rotating arm is clamped to the V-shaped positioning port, and the left side of the front end face of the concentrated power rotating arm is pressed against the positioning column on the left side, and the front and rear directions are positioned. The front arc ear plate is tangent to the V-shaped positioning opening, and the left and right direction positioning is automatically completed. The centralized power arm positioning operation is simple and convenient, which greatly shortens the positioning time and improves the processing efficiency of the centralized power arm.

2、由于设置在左侧支撑柱左侧、右前方支撑柱前方和右后方支撑柱后方的竖直油缸,铰接在竖直油缸的活塞杆顶端的压臂,连接在压臂中部与对应竖直油缸的缸体之间的连接杆,伸长竖直油缸的活塞杆,压臂自由端下压,位于左侧的压臂将集中动力转臂左侧夹持固定、位于右侧的二个压臂将集中动力转臂右侧前后端夹持固定,竖直油缸由通过管路与之连接的油泵驱动,简化了集中动力转臂固定操作,缩短了集中动力转臂固定时间,提高了集中动力转臂的加工效率。2. Due to the vertical oil cylinders arranged on the left side of the left support column, in front of the right front support column and behind the right rear support column, the pressure arm hinged on the top of the piston rod of the vertical oil cylinder is connected to the middle of the pressure arm and the corresponding vertical cylinder. The connecting rod between the cylinder bodies of the oil cylinder extends the piston rod of the vertical oil cylinder, and the free end of the pressing arm is pressed down. The arm clamps and fixes the front and rear ends of the right side of the concentrated power arm, and the vertical oil cylinder is driven by an oil pump connected to it through pipelines, which simplifies the fixation operation of the concentrated power arm, shortens the fixation time of the concentrated power arm, and improves the concentration of power. The machining efficiency of the rotary arm.

附图说明Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the present utility model;

图2是图1中L型定位块的结构示意图;Fig. 2 is the structural representation of L-shaped positioning block in Fig. 1;

图3是图1中推杆与立柱的安装结构图;Fig. 3 is the installation structure diagram of push rod and column in Fig. 1;

图4是本实用新型装夹集中动力转臂的结构示意图;Fig. 4 is the structural representation of the utility model clamping centralized power rotating arm;

图中:1-底板,2-支撑柱,3-定位柱,4-定位块,5-V型定位口,6-顶丝,7-立柱,8-推杆,9-压簧,10-竖直油缸,11-压臂,12-调节螺栓,13-连接杆,14-竖直导向杆。In the picture: 1-base plate, 2-support column, 3-positioning column, 4-positioning block, 5-V-shaped positioning port, 6-top wire, 7-upright column, 8-push rod, 9-compression spring, 10- Vertical oil cylinder, 11-pressing arm, 12-adjusting bolt, 13-connecting rod, 14-vertical guide rod.

具体实施方式Detailed ways

如图1-图3所示,列车集中动力转臂立式加工夹具,包括底板1,在底板1上安装三根呈品字形布置的支撑柱2,其中一根支撑柱2位于底板1左侧,其余二根支撑柱2前后安装在底板1右侧,在底座上位于左侧支撑柱2前方和位于右前方的支撑柱2右侧分别安装定位柱3,在位于右侧定位柱3顶部安装L型定位块4,定位块4前侧直角边后端面设有V型定位口5、定位块4右侧直角边通过螺纹安装垂直于定位块4有侧直角边的顶丝6,在底座上位于左侧支撑柱2后方和位于右侧定位柱3后方分别安装立柱7,在立柱7顶端通过销轴铰接弧形的推杆8,推杆8自由端向前下方倾斜,且在推杆8自由端与立柱7之间连接压簧9,在底板1上位于左侧支撑柱2左侧、位于右前方支撑柱2前方和位于右后方支撑柱2后方分别安装竖直油缸10,在竖直油缸10的活塞杆顶端通过销轴铰接压臂11,在所述压臂11自由端通过螺纹安装垂直于压臂11自由端的调节螺栓12,所述压臂11自由端指向对应支撑柱2,且在压臂11中部与对应竖直油缸10的缸体之间通过销轴连接连接杆13,在底座上位于右前方竖直油缸10右侧和位于右后方竖直油缸10右侧分别设置竖直导向杆14。As shown in Figures 1-3, the train centralized power rotating arm vertical processing fixture includes a base plate 1, and three support columns 2 arranged in the shape of a character are installed on the base plate 1, and one of the support columns 2 is located on the left side of the base plate 1, The other two support columns 2 are installed on the right side of the base plate 1 front and rear, and the positioning column 3 is respectively installed on the right side of the support column 2 located in front of the left support column 2 and the support column 2 located in the right front on the base, and L is installed on the top of the right positioning column 3 Type positioning block 4, the front right-angle side of positioning block 4 is provided with a V-shaped positioning port 5, and the right-angle side of positioning block 4 is screwed to install the top wire 6 perpendicular to the side right-angle side of positioning block 4, which is located on the base. A vertical column 7 is installed behind the left support column 2 and behind the right positioning column 3, respectively. At the top of the vertical column 7, an arc-shaped push rod 8 is hinged through a pin shaft. The free end of the push rod 8 is inclined forward and downward, and the push rod 8 is free A compression spring 9 is connected between the end and the upright column 7, and a vertical oil cylinder 10 is installed on the bottom plate 1 on the left side of the left support column 2, in front of the right front support column 2 and behind the right rear support column 2, respectively. The top end of the piston rod of 10 is hinged to the pressing arm 11 through the pin, and the adjusting bolt 12 perpendicular to the free end of the pressing arm 11 is threaded on the free end of the pressing arm 11. The free end of the pressing arm 11 points to the corresponding support column 2, and is A connecting rod 13 is connected between the middle of the pressing arm 11 and the cylinder body of the corresponding vertical oil cylinder 10 through a pin shaft, and vertical guides are respectively provided on the base on the right side of the right front vertical oil cylinder 10 and on the right side of the right rear vertical oil cylinder 10 Rod 14.

如图4所示,安装操作时,将底板1安装在数控机床操作台,将竖直油缸10通过管路连接油泵。As shown in FIG. 4 , during the installation operation, the base plate 1 is installed on the CNC machine tool console, and the vertical oil cylinder 10 is connected to the oil pump through a pipeline.

装夹集中动力转臂操作时,首先将集中动力转臂吊装在二根导向杆之间进行预定位,然后将集中动力转臂放在三个支撑柱2上进行水平定位,压簧9弹力向前顶动推杆8自由端,推杆8推动集中动力转臂后端面,将集中动力转臂右前方圆弧耳板卡装在V型定位口5、将集中动力转臂前端面左侧顶靠位于左侧的定位柱3,进行前后方向定位,集中动力转臂右前方圆弧耳板与V型定位口5相切,自动完成左右方向定位,同时将顶丝6顶靠集中动力转臂右端面,提高集中动力转臂左右定位结构稳定性,再伸长竖直油缸10的活塞杆,压臂11自由端下压,位于左侧的压臂11将集中动力转臂左侧夹持固定、位于右侧的二个压臂11将集中动力转臂右侧前后端夹持固定,最后启动数控机床,开始加工集中动力转臂。When clamping the centralized power rotating arm, first hoist the centralized power rotating arm between the two guide rods for pre-positioning, and then place the centralized power rotating arm on the three support columns 2 for horizontal positioning. The front pushes the free end of the push rod 8, the push rod 8 pushes the rear end surface of the concentrated power rotating arm, and the right front arc lug plate of the concentrated power rotating arm is clamped to the V-shaped positioning port 5. Relying on the positioning column 3 on the left side, the front and rear direction positioning is performed. The right front circular ear plate of the centralized power rotating arm is tangent to the V-shaped positioning opening 5, and the left and right direction positioning is automatically completed. At the same time, the top wire 6 is pressed against the centralized power rotating arm. On the right end face, improve the stability of the left and right positioning structure of the concentrated power rotating arm, and then extend the piston rod of the vertical oil cylinder 10, the free end of the pressing arm 11 is pressed down, and the pressing arm 11 on the left side clamps and fixes the left side of the concentrated power rotating arm , The two pressing arms 11 located on the right side clamp and fix the front and rear ends of the right side of the concentrated power rotating arm, and finally start the CNC machine tool to start processing the concentrated power rotating arm.

以上仅为本实用新型的具体实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only specific embodiments of the present utility model, and are not intended to limit the present utility model. For those skilled in the art, the present utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims (5)

1. Vertical processing anchor clamps of power rocking arm are concentrated to train, including the bottom plate, its characterized in that: three support columns which are arranged in a shape like a Chinese character 'pin' are arranged on a bottom plate, one support column is positioned on the left side of the bottom plate, the other two support columns are arranged on the right side of the bottom plate in a front-back mode, positioning columns are respectively arranged in front of the left support column and on the right side of the right support column on a base, a positioning block is arranged at the top of the right positioning column, a V-shaped positioning opening is formed in the rear end face of the positioning block, vertical cylinders are respectively arranged on the left side of the left support column and on the right side of the base, push rods are hinged to the top ends of the vertical cylinders, the free ends of the push rods are inclined towards the front lower side, a pressure spring is connected between the free ends of the push rods and the vertical columns, vertical oil cylinders are respectively arranged on the left side of the left support, and the middle part of the pressure arm is connected with the cylinder body of the corresponding vertical oil cylinder through a pin shaft.
2. The train concentrated power swivel arm vertical machining fixture of claim 1, characterized in that: vertical guide rods are respectively arranged on the right side of the right front vertical oil cylinder and the right side of the right rear vertical oil cylinder on the base.
3. The train concentrated power swivel arm vertical machining fixture of claim 1, characterized in that: the positioning block is L-shaped, the V-shaped positioning port is arranged on the right-angle edge of the front side of the positioning block, and the right-angle edge of the right side of the positioning block is provided with a jackscrew perpendicular to the right-angle edge of the positioning block through threads.
4. The train concentrated power swivel arm vertical machining fixture of claim 1, characterized in that: and an adjusting bolt perpendicular to the free end of the pressure arm is mounted at the free end of the pressure arm through threads.
5. The train concentrated power swivel arm vertical machining fixture of claim 1, characterized in that: the push rod is arc-shaped.
CN201921532808.9U 2019-09-16 2019-09-16 Train centralized power rotary arm vertical machining fixture Active CN210818586U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921532808.9U CN210818586U (en) 2019-09-16 2019-09-16 Train centralized power rotary arm vertical machining fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921532808.9U CN210818586U (en) 2019-09-16 2019-09-16 Train centralized power rotary arm vertical machining fixture

Publications (1)

Publication Number Publication Date
CN210818586U true CN210818586U (en) 2020-06-23

Family

ID=71276815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921532808.9U Active CN210818586U (en) 2019-09-16 2019-09-16 Train centralized power rotary arm vertical machining fixture

Country Status (1)

Country Link
CN (1) CN210818586U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114310753A (en) * 2022-01-24 2022-04-12 徐州徐工液压件有限公司 Be used for fixed vertical assembly quality of eccentric cylinder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114310753A (en) * 2022-01-24 2022-04-12 徐州徐工液压件有限公司 Be used for fixed vertical assembly quality of eccentric cylinder

Similar Documents

Publication Publication Date Title
CN205600365U (en) Seamless steel pipe hole milling anchor clamps
CN109103808A (en) A kind of drainage thread insulating bar working system electrification quick access tool
CN101372091A (en) Clamping device for thread tightening
CN210818586U (en) Train centralized power rotary arm vertical machining fixture
CN211805024U (en) Clamp for forged aluminum wheel support
CN210360979U (en) Clamp for testing optical element
CN213148603U (en) A device for testing the flexural strength of an automobile skid plate
CN211840824U (en) Welding training platform
CN208322413U (en) A kind of angle welder convenient for clamping
CN209036363U (en) A kind of stationary fixture for pcb board production
CN217078426U (en) Bridge cable guide pipe positioning device
CN206200318U (en) A kind of I-steel fixture used for submerged arc welding
CN210756584U (en) Shock absorber seat machining fixture for locomotive frame end
CN203236159U (en) Novel repair welding clamp
CN208341551U (en) A kind of automobile connecting plate punching press clamping and positioning device
CN219027265U (en) Frock clamp that diaphragm compressor diaphragm processing was used
CN107598306A (en) A kind of die head threading machine clamping positioning mechanism and die head threading machine
CN113084762A (en) Precision metal plate clamping device
CN108422112B (en) Square oil distribution pipe welding clamp
CN221582543U (en) Quick changing table for clamp
CN210677907U (en) Subway vehicle bogie lifting baffle adds clamping apparatus
CN221774005U (en) Elastic clamping device
CN216706594U (en) Cylinder cap valve collet pressure equipment frock
CN223581652U (en) Insulation track gauge piece hardness check out test set
CN223734374U (en) A jig for machining metal casings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Vertical machining fixture for centralized power arm of train

Granted publication date: 20200623

Pledgee: Industrial Commercial Bank of China Ltd. Jinzhou branch

Pledgor: JINZHOU JIETONG RAILWAY MACHINERY CO.,LTD.

Registration number: Y2025980022677