CN210737296U - Paving device for steel box girder bridge deck construction - Google Patents

Paving device for steel box girder bridge deck construction Download PDF

Info

Publication number
CN210737296U
CN210737296U CN201921628759.9U CN201921628759U CN210737296U CN 210737296 U CN210737296 U CN 210737296U CN 201921628759 U CN201921628759 U CN 201921628759U CN 210737296 U CN210737296 U CN 210737296U
Authority
CN
China
Prior art keywords
mating formation
shop
roller
dust
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921628759.9U
Other languages
Chinese (zh)
Inventor
李清富
匡一航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201921628759.9U priority Critical patent/CN210737296U/en
Application granted granted Critical
Publication of CN210737296U publication Critical patent/CN210737296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses a steel box girder bridge floor construction is with device of mating formation, including the car of mating formation, be used for the feeding mechanism of transported substance material, the cloth mechanism that is used for the material of mating formation, install feeding mechanism on the car of mating formation, feeding mechanism installs cloth mechanism in the below, still including the dust removal mechanism that is used for the material of mating formation and the mechanism of mating formation that is used for the material of mating formation, dust removal mechanism installs car one side of mating formation, and dust removal mechanism one side is provided with the mechanism of mating formation, and the mechanism of mating formation includes first roller, clay dust strip, second roller, mounting bracket, installation pole, telescopic cylinder, scraper blade of mating formation, and first roller of mating formation is installed in the car of mating formation below, is fixed with the clay dust strip on the first roller of mating formation, and second roller is installed to first roller one side of mating formation, and the mounting bracket is installed. The utility model discloses utilize dust removal mechanism to advance clean dust removal to the bridge floor of mating formation, and then guarantee the bridge floor quality of mating formation and the level and smooth of road, pave the mechanism and carry out machinery to the bridge floor of mating formation and just level, accurate and the napping is handled, improves construction speed and efficiency.

Description

Paving device for steel box girder bridge deck construction
Technical Field
The utility model relates to a bridge deck pavement equipment technical field especially relates to steel box girder bridge face construction is with device of mating formation.
Background
The bridge deck pavement is characterized in that a protective layer is paved on a bridge deck slab, the protective layer is used for protecting the bridge deck slab from directly wearing a wheel or a crawler, a main beam is protected from being corroded by rainwater, and concentrated loads of the wheels are dispersed. At present, concrete pavement construction of a bridge deck is finished manually, the construction speed is low, the efficiency is low, and the conventional bridge deck pavement device lacks cleaning and dust removal for the bridge deck, so that the bridge deck pavement quality is poor and the road flatness is insufficient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the above-mentioned proposition and all leaning on artifical the completion at the bridge deck concrete pavement construction at present, not only construction speed is slow, inefficiency, and current bridge deck pavement device lacks clean dust removal to the bridge floor, and then causes the relatively poor, the not enough problem of road roughness of bridge deck pavement quality.
The utility model discloses a following technical scheme realizes above-mentioned purpose:
the paving device for the construction of the bridge deck of the steel box girder comprises a paving vehicle, a feeding mechanism for conveying materials and a distributing mechanism for paving the materials, wherein the feeding mechanism is installed on the paving vehicle, the distributing mechanism is installed below the feeding mechanism, the paving device also comprises a dust removing mechanism for paving the materials and a paving mechanism for paving the materials, the dust removing mechanism is installed on one side of the paving vehicle, the paving mechanism is arranged on one side of the dust removing mechanism, the paving mechanism comprises a first paving roller, a dust sticking strip, a second paving roller, a mounting frame, a mounting rod, a telescopic cylinder and a scraper, the first paving roller is installed below the paving vehicle, the dust sticking strip is fixed on the first paving roller, the second paving roller is installed on one side of the first paving roller, the mounting frame is installed on one side of the paving vehicle, and a rotating shaft below the mounting frame is connected with the mounting rod, the scraper blade is installed to installation pole one end, installation pole one side pivot is connected telescopic cylinder, the telescopic cylinder other end is installed car one side of mating formation.
Preferably, the dust removal mechanism comprises a blower, an air box, a dust screen, a dust collection box, a dust collection fan and a dust collection pipeline, wherein the air box is installed on one side of the paving vehicle, the blower is installed in the installation air box, the dust screen is installed above the blower, the dust collection box is installed in the paving vehicle, and the dust collection pipeline is communicated with the dust collection box and the dust collection fan.
According to the arrangement, the blower is started to blow dust on the bridge floor, the dust floats along with the air flow, and the dust collection fan is started to generate a suction force to suck the dust floating in the air into the dust collection box, so that the dust removal of the bridge floor is completed.
Preferably, the dust removing mechanism comprises a water tank, a water guide pipe, an adjusting rotary seat, a water spraying head and a water pump, the water tank is installed in the paving vehicle, the water guide pipe is communicated with the adjusting rotary seat, the water tank and the water pump, and the water spraying head is installed on the adjusting rotary seat.
So set up, the water in the water tank forms powerful rivers because the effect of water pump is spouted by the sprinkler bead, and rivers spout to the bridge floor, and the dust of bridge floor is cleared up owing to the rivers effect.
Preferably, the paving vehicle comprises a control room and a vehicle body, and the control room is installed on the vehicle body.
So set up, the workman passes through convenient controlling means of control room.
Preferably, feeding mechanism includes feeding box, income hopper, first stirring roller, conveyer belt, support, sieve, feeding box installs on the shop loading car, feeding box installs the below go into the hopper, install two in going into the hopper first stirring roller, it installs to go into the hopper bottom the sieve, go into the hopper below and install the conveyer belt, the conveyer belt both sides are provided with the support, the support mounting be in on the shop loading car.
So set up, the process the material process of first stirring roller stirring large-scale material is filtered to the sieve, guarantees the quality of material.
Preferably, the distributing mechanism comprises a distributing hopper, a second stirring roller, an adjusting baffle, an adjusting rod, a distributing roller and a distributing pipeline, wherein the distributing hopper is internally provided with two second stirring rollers, the adjusting baffle is arranged above the second stirring rollers, the adjusting baffle is arranged on the adjusting rod, the distributing hopper is connected with the distributing pipeline below, and the distributing roller is arranged at the outlet end of the distributing hopper.
So set up, adjust the angle of pole rotation regulation adjusting flap, the flow of convenient control cloth to control bridge deck pavement's thickness.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. cleaning and dedusting the paved bridge deck by using a dedusting mechanism, thereby ensuring the pavement quality of the bridge deck and the smoothness of the road;
2. the paving mechanism is utilized to perform mechanical primary leveling, fine leveling and napping treatment on the paved bridge deck, so that the construction speed and efficiency are improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a cross-sectional view of an embodiment 1 of the paving device for steel box girder bridge deck construction of the present invention;
FIG. 2 is a cross-sectional view of an embodiment 2 of the paving device for steel box girder bridge deck construction of the present invention;
FIG. 3 is a cross-sectional view of the distributing mechanism of the paving device for the construction of the bridge deck of the steel box girder;
FIG. 4 is a cross-sectional view of the paving mechanism of the paving device for the steel box girder bridge deck construction of the utility model;
fig. 5 is the construction of steel box girder bridge floor is with the structural schematic diagram of the first flat roller of spreading of device of mating formation.
The reference numerals are explained below:
1. paving and loading a vehicle; 11. a control room; 12. a vehicle body; 2. a feeding mechanism; 21. a feeding box; 22. feeding into a hopper; 23. a first stirring roller; 24. a conveyor belt; 25. a support; 26. a sieve plate; 3. a material distribution mechanism; 31. paving a hopper; 32. a second stirring roller; 33. adjusting the baffle; 34. adjusting a rod; 35. a distributing roller; 36. paving a material pipeline; 4. a dust removal mechanism; 41. a blower; 42. an air box; 43. a dust screen; 44. a dust collection box; 45. a dust collecting fan; 46. a dust collecting duct; 411. a water tank; 412. a water conduit; 413. adjusting the rotary seat; 414. a sprinkler head; 415. a water pump; 5. a paving mechanism; 51. a first lay-flat roller; 52. a dust sticking strip; 53. a second leveling roller; 54. a mounting frame; 55. mounting a rod; 56. a telescopic cylinder; 57. a scraper.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be further explained with reference to the accompanying drawings:
the paving device for the steel box girder bridge floor construction comprises a paving vehicle 1, a feeding mechanism 2 for conveying materials and a distributing mechanism 3 for paving the materials, wherein the feeding mechanism 2 is installed on the paving vehicle 1, the distributing mechanism 3 is installed below the feeding mechanism 2, the paving device further comprises a dust removing mechanism 4 for paving the materials and a paving mechanism 5 for paving the materials, the dust removing mechanism 4 is installed on one side of the paving vehicle 1, the paving mechanism 5 is arranged on one side of the dust removing mechanism 4, the paving mechanism 5 comprises a first paving roller 51, a dust adhering strip 52, a second paving roller 53, an installation frame 54, an installation rod 55, a telescopic cylinder 56 and a scraper 57, the first paving roller 51 is installed below the paving vehicle 1, the dust adhering strip 52 is fixed on the first paving roller 51, the dust adhering strip 52 is used for clearing dust adhered to a bridge floor, the second paving roller 53 is installed on one side of the first paving roller 51, the installation frame 54 is installed on one side of the paving vehicle 1, the installation pole 55 is connected to the pivot below mounting bracket 54, and scraper blade 57 is installed to installation pole 55 one end, and telescopic cylinder 56 is connected to installation pole 55 one side pivot, and telescopic cylinder 56 can control the telescopic cylinder 56 other end of scraper blade 57 and install in shop loading car 1 one side.
Example 1
As shown in fig. 1, 3, 4 and 5, the dust removing mechanism 4 includes a blower 41, an air box 42, a dust screen 43, a dust collection box 44, a dust collection fan 45 and a dust collection pipeline 46, the air box 42 is installed at one side of the paving vehicle 1, the blower 41 is installed in the air box 42, the dust screen 43 is installed above the blower 41, the dust collection box 44 is installed in the paving vehicle 1, the dust collection box 44 is used for collecting dust, the dust collection pipeline 46 is communicated with the dust collection box 44 and the dust collection fan 45, the paving vehicle 1 includes a control room 11 and a vehicle body 12, the control room 11 is installed on the vehicle body 12, the feeding mechanism 2 includes a feeding box 21, a feeding hopper 22, first stirring rollers 23, a conveyer belt 24, a bracket 25 and a sieve plate 26, the feeding box 21 is installed on the paving vehicle 1, the feeding hopper 22 is installed below the feeding box 21, two first stirring rollers 23 are installed in the feeding hopper 22, the bottom end of the hopper 22 is installed with, the two sides of the conveying belt 24 are provided with the supports 25, the supports 25 are installed on the paving vehicle 1, the distributing mechanism 3 comprises a paving hopper 31, second stirring rollers 32, adjusting baffles 33, adjusting rods 34, distributing rollers 35 and a paving pipeline 36, the two second stirring rollers 32 are arranged in the paving hopper 31, the adjusting baffles 33 are arranged above the second stirring rollers 32, the adjusting baffles 33 are installed on the adjusting rods 34, the paving pipeline 36 is connected to the lower portion of the paving hopper 31, and the distributing rollers 35 are installed at the outlet end of the paving hopper 31.
The working principle and the using process are as follows: the materials are fed from the feeding box 21 to the spreading hopper 21 through the feeding hopper 22 by the conveyer belt 24, are stirred again by the second stirring roller 32 and are spread on the bridge floor through the spreading pipeline 36, in the process, the blower 41 is started to blow dust on the bridge floor, the dust floats along with air flow, the dust collection fan 45 is started to generate a suction force to suck the dust floating in the air into the dust collection box 44, the dust removal of the bridge floor is completed, the first spreading roller 51 and the second spreading roller 53 perform primary and fine leveling treatment on the bridge floor, and the scraper 57 performs napping treatment on the spread bridge floor.
Example 2
As shown in fig. 2, 3, 4 and 5, the difference between the embodiment 2 and the embodiment 1 is that the blower 41, the wind box 42, the dust screen 43, the dust box 44, the dust collection fan 45 and the dust collection pipe 46 are replaced by the water tank 411, the water conduit 412, the adjusting screw seat 413, the water spray head 414 and the water pump 415, when the water tank works, the adjusting screw seat 413 adjusts the angle of the water spray head 414, the water in the water tank 411 forms a strong water flow by the action of the water pump 415 and is sprayed out by the water spray head 414, the water flow is sprayed to the bridge floor, and the dust on the bridge floor is cleaned by the water flow action.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (6)

1. Steel box girder bridge floor construction is with device of mating formation, including shop's chariot (1), feeding mechanism (2) for carrying the material, cloth mechanism (3) for mating formation material, install on shop's chariot (1) feeding mechanism (2), install feeding mechanism (2) below cloth mechanism (3), its characterized in that: still include dust removal mechanism (4) that are used for the material of mating formation and spread mechanism (5) that are used for the material of mating formation, dust removal mechanism (4) are installed shop's flat roller (1) one side, dust removal mechanism (4) one side is provided with shop's flat mechanism (5), shop's flat mechanism (5) are including first shop's flat roller (51), dust binding strip (52), second shop's flat roller (53), mounting bracket (54), installation pole (55), telescopic cylinder (56), scraper blade (57), first shop's flat roller (51) is installed shop's car (1) below, be fixed with on first shop's flat roller (51) dust binding strip (52), install first shop's flat roller (51) one side second shop's flat roller (53), mounting bracket (54) are installed shop's car (1) one side, mounting bracket (54) below pivot is connected installation pole (55), install installation pole (55) one end scraper blade (57), installation pole (55) one side pivot is connected telescopic cylinder (56), telescopic cylinder (56) other end is installed shop loading car (1) one side.
2. The paving device for the construction of the steel box girder bridge deck according to claim 1, characterized in that: dust removal mechanism (4) include hair-dryer (41), bellows (42), dust screen (43), dust collection box (44), collection dirt fan (45), dust collection pipeline (46), bellows (42) are installed pave dress car (1) one side, install in bellows (42) hair-dryer (41), install hair-dryer (41) top dust screen (43), install dust collection box (44) in pave dress car (1), dust collection pipeline (46) intercommunication dust collection box (44) with collection dirt fan (45).
3. The paving device for the construction of the steel box girder bridge deck according to claim 1, characterized in that: dust removal mechanism (4) include water tank (411), aqueduct (412), adjust and revolve seat (413), sprinkler bead (414), water pump (415), water tank (411) are installed in the shop's dress car (1), aqueduct (412) intercommunication adjust revolve seat (413), water tank (411) and water pump (415), it installs on revolving seat (413) to adjust sprinkler bead (414).
4. The paving device for the construction of the steel box girder bridge deck according to claim 1, characterized in that: the paving vehicle (1) comprises a control room (11) and a vehicle body (12), wherein the control room (11) is installed on the vehicle body (12).
5. The paving device for the construction of the steel box girder bridge deck according to claim 1, characterized in that: feeding mechanism (2) are including throwing workbin (21), go into hopper (22), first stirring roller (23), conveyer belt (24), support (25), sieve (26), it installs to throw workbin (21) on the shop's chariot (1), it installs to throw workbin (21) below go into hopper (22), install two in going into hopper (22) first stirring roller (23), it installs to go into hopper (22) bottom sieve (26), it installs to go into hopper (22) below conveyer belt (24), conveyer belt (24) both sides are provided with support (25), install support (25) on shop's chariot (1).
6. The paving device for the construction of the steel box girder bridge deck according to claim 1, characterized in that: cloth mechanism (3) are including spreading hopper (31), second stirring roller (32), adjusting plate (33), regulation pole (34), cloth roller (35), stone material pipeline (36), be provided with two in spreading hopper (31) second stirring roller (32), second stirring roller (32) top is provided with adjusting plate (33), adjusting plate (33) are installed on adjusting pole (34), spreading hopper (31) below is connected stone material pipeline (36), install cloth roller (35) spread hopper (31) exit end.
CN201921628759.9U 2019-09-27 2019-09-27 Paving device for steel box girder bridge deck construction Expired - Fee Related CN210737296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921628759.9U CN210737296U (en) 2019-09-27 2019-09-27 Paving device for steel box girder bridge deck construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921628759.9U CN210737296U (en) 2019-09-27 2019-09-27 Paving device for steel box girder bridge deck construction

Publications (1)

Publication Number Publication Date
CN210737296U true CN210737296U (en) 2020-06-12

Family

ID=70989764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921628759.9U Expired - Fee Related CN210737296U (en) 2019-09-27 2019-09-27 Paving device for steel box girder bridge deck construction

Country Status (1)

Country Link
CN (1) CN210737296U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281596A (en) * 2020-09-17 2021-01-29 山东交通职业学院 Device for spreading a spreading material on a ground or base material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112281596A (en) * 2020-09-17 2021-01-29 山东交通职业学院 Device for spreading a spreading material on a ground or base material

Similar Documents

Publication Publication Date Title
US6733086B1 (en) Vacuum system for milling machine
CN206855274U (en) Aluminum alloy pattern plate Special shot blast machine
CN211256614U (en) Highway gap prosthetic devices
CN106638416A (en) Road surface vacuum sweeper
CN210737296U (en) Paving device for steel box girder bridge deck construction
CN210766319U (en) Highway bridge maintains prosthetic devices
CN109078885B (en) Road roller grinding wheel foreign matter scraping equipment based on air current clearance
CN208965379U (en) A kind of pavement milling machine dedusting removes milling waste material device
CN210116950U (en) Belt cleaning device of grit conveyer belt
CN108797291A (en) A kind of pavement milling machine dedusting removes milling waste material device
CN112059840A (en) Environment-friendly water permeable brick grinding and polishing device with drying function
CN210854176U (en) Belt conveyor adhesion granule collection device
CN216193824U (en) High efficiency pitch unloading paving equipment
CN112047655B (en) Preparation method of high-strength green recycled concrete
CN113026504B (en) Concrete milling equipment for building construction
CN114808611A (en) Paving device for municipal engineering road construction and construction method thereof
CN209452284U (en) Airflow screen
CN114164733A (en) Road maintenance pitch laying device that municipal works were used
CN220908065U (en) Broken sorting unit of rubble for road construction
CN113338132A (en) Milling machine integrating sweeping and recycling system
CN216663700U (en) Foundation structure curing means is used in road and bridge construction
CN110777712A (en) Sweeping device for road sweeper
CN218813412U (en) Road surface cleaning mechanism for highway construction
CN218840815U (en) Grit one-level crushing sorting type device
CN216188744U (en) Segmented adjustable dead section sweeper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200612

Termination date: 20210927