CN210713788U - Template for building construction - Google Patents

Template for building construction Download PDF

Info

Publication number
CN210713788U
CN210713788U CN201921485120.XU CN201921485120U CN210713788U CN 210713788 U CN210713788 U CN 210713788U CN 201921485120 U CN201921485120 U CN 201921485120U CN 210713788 U CN210713788 U CN 210713788U
Authority
CN
China
Prior art keywords
baffle
fixed
block
side wall
rows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921485120.XU
Other languages
Chinese (zh)
Inventor
方荣良
刘剑萍
金国美
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Kuangsha Construction Co Ltd
Original Assignee
Zhejiang Kuangsha Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Kuangsha Construction Co Ltd filed Critical Zhejiang Kuangsha Construction Co Ltd
Priority to CN201921485120.XU priority Critical patent/CN210713788U/en
Application granted granted Critical
Publication of CN210713788U publication Critical patent/CN210713788U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a template for construction relates to construction's technical field, including two rows of first baffles of end to end connection, the second baffle that all is provided with on two rows of first baffles, be provided with the fixed block on the first baffle and seted up the fixed slot, fixed block on two rows of first baffles sets up opposite direction with the fixed slot, has seted up the fixed orifices on the lateral wall of first baffle, is provided with set screw on the first baffle, is provided with inserting groove and connecting block on the second baffle, sets up threaded hole on the connecting block, sets up the connecting hole on the second baffle. The utility model discloses on pegging graft the constant head tank with the fixed block, then come the first baffle of fixed connection through set screw, peg graft the inserting groove with the fixed block on, then on the constant head tank that pegs graft the connecting block, come fixed connection second baffle and first baffle through set screw after that to make the clearance that exists between first baffle and the second baffle less, reach the purpose that improves the concrete quality of pouring with this.

Description

Template for building construction
Technical Field
The utility model belongs to the technical field of the technique of construction and specifically relates to a template for construction is related to.
Background
With the rapid development of economy, the building industry is rapidly developed, a large number of high-rise buildings, dams and bridges are built every year, auxiliary construction of building templates is often required in engineering buildings, the building templates are necessary construction tools in concrete pouring building structures, and the traditional building templates mainly comprise wood templates and steel templates. The plank sheathing needs link together polylith plank sheathing with the iron nail when the installation, therefore the place that plank sheathing and plank sheathing are connected has great gap, and simultaneously when the pouring concrete, the concrete permeates out from the gap easily, and the concrete roughness that consequently pours out is relatively poor, leads to the concrete quality of pouring to be relatively poor.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a template for construction has reduced the probability that the concrete permeates out from the gap, has improved the planarization of concrete to this reaches the purpose that improves the concrete quality of pouring.
The above object of the present invention is achieved by the following technical solutions:
a template for building construction comprises two rows of first baffle plates connected end to end, wherein a plurality of first baffle plates are arranged in an array along the length direction of the first baffle plates, the head and tail ends of the two rows of first baffle plates are respectively provided with a second baffle plate which has the length direction vertical to the length direction of the first baffle plates and is connected with the two rows of first baffle plates, two opposite side walls in the length direction of the first baffle plates are respectively provided with a fixed block and a fixed groove which is matched with the fixed block in an inserting manner, the fixed blocks on the two rows of first baffle plates are opposite to the fixed groove in arrangement direction, the outer side wall of the first baffle plate is provided with a fixed hole communicated with the fixed groove, the first baffle plate is provided with a fixed screw which passes through the fixed hole and is in threaded connection with the fixed block, the side wall of the second baffle plate close to the first baffle plate is respectively provided with an inserting groove matched with, and the side wall of the second baffle in the width direction is provided with a connecting hole which is communicated with the insertion groove and has the same size as the fixing hole.
By adopting the technical scheme, the fixing block of one first baffle plate is inserted into the fixing groove of the other first baffle plate, then the fixing screw penetrates through the positioning hole and is screwed on the fixing block to fixedly connect a plurality of first baffle plates, then the fixing block on one row of first baffle plates is inserted into the inserting groove on the second baffle plate, then the connecting block on the second baffle plate is inserted into the positioning groove on the other row of first baffle plates, then the two fixing screws respectively penetrate through the connecting hole and the fixing hole and are respectively in threaded connection with the fixing block and the connecting block, and finally the fixing screw is screwed to fixedly connect the second baffle plate and the two rows of first baffle plates, so that the gap between the first baffle plate and the second baffle plate is small, the probability that concrete permeates out from the gap is reduced, the smoothness of the concrete is improved, and the aim of improving the quality of the poured concrete is fulfilled, meanwhile, the first baffle and the second baffle can be detached by reverse operation in the transportation process, so that the purpose of convenient transportation is achieved.
Preferably, two positioning grooves are formed in the outer side wall of the first baffle at intervals along the length direction of the first baffle, two adjacent first baffles are provided with connecting plates on the two adjacent positioning grooves, and positioning columns inserted in the positioning grooves are arranged on the side wall, close to the first baffles, of the connecting plates.
Through adopting above-mentioned technical scheme, before the pouring concrete, with the locating post grafting on the connecting plate to two adjacent first baffles on two constant head tanks that are close to each other to this has reduced the probability that two adjacent first baffles produced the displacement when the pouring, has improved the planarization of pouring concrete.
Preferably, a handle is arranged on the side wall, away from the positioning column, of the connecting plate.
Through adopting above-mentioned technical scheme, through the setting of handle to the staff borrows power when dismantling the connecting plate.
Preferably, the connecting plate is provided with a lifting stud penetrating through the connecting plate and in threaded connection with the connecting plate, and a turntable is arranged at one end, away from the positioning column, of the lifting stud.
By adopting the technical scheme, after concrete is poured, small displacement can be generated between the adjacent first baffles, so that the positioning columns can be very laborious to pull out; therefore, when the connecting plate is pulled difficultly, the rotating disc is rotated, the rotating disc rotates to drive the lifting stud to move towards the first baffle plate, so that the positioning column moves out of the positioning groove, and the purpose of saving time and labor when the connecting plate is disassembled is achieved; simultaneously when using the connecting plate next time, rotate the lift double-screw bolt and flush the use with the connecting plate near the lateral wall of reference column one side.
Preferably, the fixed block is sleeved with a rubber layer with the same section as that of the side wall provided with the fixed block.
Through adopting above-mentioned technical scheme, through the setting on rubber layer, reduced the clearance between two adjacent first baffles, improved the planarization of concrete.
Preferably, a clamping groove is formed in the lower bottom surface of the first baffle and the second baffle, an inserting block which is matched with the clamping groove in an inserting mode is arranged on the upper top surface of the first baffle and the second baffle, and fastening screws which penetrate through the first baffle and the second baffle and are in threaded connection with the inserting block are arranged on the outer side walls of the first baffle and the second baffle.
Through adopting above-mentioned technical scheme, on inserting the joint groove of another first baffle with the grafting piece on the first baffle, then screw up at the grafting piece through fastening screw to fixed connection has good polylith first baffle in vertical direction, then same operation has good polylith second baffle in vertical direction, reaches the purpose that satisfies different height concrete placement with this.
Preferably, a chamfer is formed at one end, far away from the first baffle, of the fixing block.
Through adopting above-mentioned technical scheme, through the setting of chamfer, lead when the fixed block installation for the installation of fixed block is more convenient and swift.
Preferably, one end of the fastening screw, which is far away from the first baffle plate and the second baffle plate, is provided with a star-shaped disc.
Through adopting above-mentioned technical scheme, through the setting of star type disc to reach the purpose that the staff can accomplish installation and dismantlement without the instrument twisting fastening screw.
To sum up, the utility model discloses a beneficial technological effect does:
1. the fixed block of one first baffle is inserted into the positioning groove of the other baffle, then a fixing screw penetrates through the positioning hole and is screwed on the fixed block, so that a plurality of first baffles are fixedly connected, then the fixed blocks on one row of the first baffles are inserted into the insertion groove on the second baffle, then the connecting block on the second baffle is inserted into the positioning groove on the other row of the first baffles, and then the second baffle and the first baffles are fixedly connected through the fixing screw, so that the first baffle and the second baffle are fixedly installed, the gap between the first baffle and the second baffle is smaller, the probability that concrete permeates out of the gap is reduced, the smoothness of the concrete is improved, and the purpose of improving the quality of the poured concrete is achieved;
2. the turntable is rotated when the connecting plate is disassembled, and the turntable rotates to drive the lifting stud to move towards the first baffle plate, so that the positioning column moves out of the positioning groove, and the purpose of rapidly disassembling the connecting plate is achieved;
3. through the setting of rubber layer, reduced the clearance between two adjacent first baffles, improved the planarization of concrete.
Drawings
Fig. 1 is a schematic perspective view of the present invention;
fig. 2 is an exploded view of two adjacent first baffle plates, mainly showing a connecting structure between the two first baffle plates;
FIG. 3 is an exploded view of the first and second baffles, primarily illustrating the connection structure between the first and second baffles;
fig. 4 is an exploded view of the first baffle and the second baffle, respectively, showing the connection structure of the first baffle and the second baffle in the vertical direction.
Reference numerals: 10. a first baffle plate; 11. a fixed block; 111. a rubber layer; 12. fixing grooves; 13. a fixing hole; 14. positioning a groove; 15. a set screw; 20. a second baffle; 21. inserting grooves; 22. connecting blocks; 221. a threaded hole; 23. connecting holes; 30. a connecting plate; 31. a positioning column; 33. a handle; 40. a lifting stud; 41. a turntable; 50. an insertion block; 51. a clamping groove; 52. fastening screws; 60. chamfering; 61. a star-shaped disk.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a template for construction, refers to fig. 1 and fig. 2, includes two rows of end to end connection's first baffle 10, and two are provided with along the length direction array of first baffle 10 to two rows of first baffle 10, and fixed mounting has fixed block 11 and offers on the relative both sides wall on the length direction of first baffle 10 respectively and pegs graft complex fixed slot 12 with fixed block 11, and fixed block 11 on two rows of first baffle 10 sets up opposite direction with fixed slot 12. The head and the tail of the two rows of first baffle plates 10 are provided with second baffle plates 20, the length direction of which is vertical to the length direction of the first baffle plates 10 and is connected with the two rows of first baffle plates 10.
Referring to fig. 2 and 3, a fixing hole 13 communicated with the fixing groove 12 is formed in the outer side wall of the first baffle plate 10, a fixing screw 15 penetrating through the fixing hole 13 and in threaded connection with the fixing block 11 is arranged on the first baffle plate 10, an insertion groove 21 in insertion connection with the fixing block 11 is formed in the side wall, close to the first baffle plate 10, of the second baffle plate 20, a connecting block 22 in insertion connection with the fixing groove 12 is fixedly mounted on the side wall of the second baffle plate 20 provided with the insertion groove 21, a threaded connection threaded hole 221 for the fixing screw 15 is formed in the side wall, corresponding to the fixing hole 13, of the connecting block 22, and a connecting hole 23 which is communicated with the insertion groove 21 and has the same size as the fixing hole 13 is formed in the.
Inserting a fixing block 11 of one first baffle plate 10 into a fixing groove 12 of another first baffle plate 10, then inserting a fixing screw 15 through a positioning hole and screwing the fixing screw on the fixing block 11 to fixedly connect a plurality of first baffle plates 10, then inserting the fixing block 11 on one row of first baffle plates 10 into an inserting groove 21 on a second baffle plate 20, then inserting a connecting block 22 on the second baffle plate 20 into a positioning groove 14 on the other row of first baffle plates 10, then respectively penetrating two fixing screws 15 through a connecting hole 23 and a fixing hole 13, then respectively in threaded connection with the fixing block 11 and the connecting block 22, and finally screwing the fixing screw 15 to fixedly connect the second baffle plate 20 and the two rows of first baffle plates 10, so that a gap between the first baffle plate 10 and the second baffle plate 20 is smaller, the flatness of concrete is improved, and the purpose of improving the quality of poured concrete is achieved, meanwhile, the first baffle 10 and the second baffle 20 can be detached by reverse operation in the transportation process, so that the purpose of convenient transportation is achieved.
The rubber layer 111 with the same cross section as that of the side wall provided with the fixed block 11 is sleeved on the fixed block 11, the rubber layer 111 reduces the gap between two adjacent first baffles 10, and the flatness of concrete is improved. Two locating grooves 14 are formed in the outer side wall of the first baffle 10 along the length direction of the first baffle 10 at intervals, connecting plates 30 are arranged on the two adjacent locating grooves 14 of the two first baffles 10, and locating columns 31 inserted into the locating grooves 14 are fixedly mounted on the side walls, close to the first baffle 10, of the connecting plates 30. The positioning columns 31 on the connecting plate 30 are inserted into the two positioning grooves 14 close to each other on the two adjacent first baffle plates 10, so that the probability of displacement of the two adjacent first baffle plates 10 during casting is reduced.
Referring to fig. 1 and 4, a lifting stud 40 penetrating through the connecting plate 30 and in threaded connection with the connecting plate 30 is arranged on the connecting plate 30, and a turntable 41 is fixedly mounted at one end of the lifting stud 40 far away from the positioning column 31. When the connecting plate 30 is pulled hard, the rotating disc 41 is rotated, the rotating disc 41 rotates to drive the lifting stud 40 to move towards the first baffle 10, so that the positioning column 31 moves out of the positioning groove 14, and the purpose of saving time and labor when the connecting plate 30 is disassembled is achieved; meanwhile, when the connecting plate 30 is used next time, the lifting stud 40 is rotated to be flush with the side wall of the connecting plate 30 close to one side of the positioning column 31 for use; the side wall of the connecting plate 30 far away from the positioning column 31 is fixedly provided with a handle 33, and the handle 33 is convenient for a worker to use when disassembling the connecting plate 30.
The clamping groove 51 has been all seted up on the bottom surface under first baffle 10 and the second baffle 20, and fixed mounting has the grafting piece 50 with the grafting complex of clamping groove 51 on the top surface on first baffle 10 and the second baffle 20, all is provided with on the lateral wall of first baffle 10 and second baffle 20 and passes first baffle 10 and second baffle 20 and with the fastening screw 52 of the 50 threaded connection of grafting piece. The inserting block 50 on one first baffle plate 10 is inserted into the clamping groove 51 of the other first baffle plate 10, and then the inserting block 50 is screwed through the fastening screw 52, so that the first baffle plate 10 is fixedly connected in the vertical direction, and then the second baffle plate 20 is fixedly connected in the vertical direction by the same operation, so that the aim of meeting concrete pouring of different heights is fulfilled.
Referring to fig. 2, a chamfer 60 is formed at one end of the fixing block 11, which is far away from the first baffle 10, and the chamfer 60 guides when the fixing block 11 and the insertion block 50 are installed, so that the installation of the fixing block 11 and the connection block 22 is more convenient and faster. The star-shaped disc 61 is fixedly mounted on one end of the fastening screw 52 far away from the first baffle plate 10 and the second baffle plate 20. The star-shaped disc 61 can be mounted and dismounted without tools when workers screw the fastening screw 52.
The working principle of the embodiment is as follows:
the fixing block 11 of one first baffle plate 10 is inserted into the positioning groove 14 of the other first baffle plate 10, then the first baffle plate 10 is fixedly connected through the fixing screw 15, then the fixing block 11 on one row of the first baffle plate 10 is inserted into the insertion groove 21 on the second baffle plate 20, then the connecting block 22 on the second baffle plate 20 is inserted into the positioning groove 14 on the other row of the first baffle plate 10, then the second baffle plate 20 and the two rows of the first baffle plates 10 are fixedly connected through the fixing screw 15, so that the gap between the first baffle plate 10 and the second baffle plate 20 is small, the probability that concrete permeates out from the gap is reduced, the smoothness of the concrete is improved, and the purpose of improving the quality of poured concrete is achieved.
The inserting block 50 on one first baffle plate 10 is inserted into the clamping groove 51 of the other first baffle plate 10, and then the inserting block 50 is screwed through the fastening screw 52, so that the first baffle plate 10 is fixedly connected in the vertical direction, and then the second baffle plate 20 is fixedly connected in the vertical direction by the same operation, so that the aim of meeting concrete pouring of different heights is fulfilled.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (8)

1. The utility model provides a template for construction which characterized in that: the baffle plate structure comprises two rows of first baffle plates (10) connected end to end, wherein a plurality of blocks are arranged on the two rows of first baffle plates (10) in an array mode along the length direction of the first baffle plates (10), second baffle plates (20) which are vertical to the length direction of the first baffle plates (10) in length direction and are connected with the two rows of first baffle plates (10) are arranged at the head end and the tail end of the two rows of first baffle plates (10), fixed blocks (11) and fixed grooves (12) matched with the fixed blocks (11) in an inserting mode are respectively arranged on two opposite side walls of the first baffle plates (10) in length direction, the fixed blocks (11) on the two rows of first baffle plates (10) are opposite to the fixed grooves (12) in arrangement direction, fixed holes (13) communicated with the fixed grooves (12) are formed in the outer side wall of the first baffle plates (10), and fixed screws (15) which penetrate through the fixed holes (13) and are in threaded connection with the fixed, the side wall of the second baffle plate (20) close to the first baffle plate (10) is respectively provided with an insertion groove (21) in insertion fit with the fixed block (11) and a connecting block (22) in insertion fit with the fixed groove (12) at intervals, the side wall of the connecting block (22) corresponding to the fixed hole (13) is provided with a threaded connection threaded hole (221) for the fixed screw (15), and the side wall of the second baffle plate (20) in the width direction is provided with a connecting hole (23) which is communicated with the insertion groove (21) and has the same size as the fixed hole (13).
2. The form panel for construction according to claim 1, wherein: two locating grooves (14) are formed in the outer side wall of the first baffle (10) along the length direction of the first baffle (10) at intervals, two adjacent first baffles (10) are provided with connecting plates (30) on the two adjacent locating grooves (14), and the side wall, close to the first baffles (10), of each connecting plate (30) is provided with locating columns (31) inserted in the locating grooves (14).
3. The form panel for construction according to claim 2, wherein: and a handle (33) is arranged on the side wall of the connecting plate (30) far away from the positioning column (31).
4. The form panel for construction according to claim 2, wherein: the lifting stud (40) which penetrates through the connecting plate (30) and is in threaded connection with the connecting plate (30) is arranged on the connecting plate (30), and a turntable (41) is arranged at one end, away from the positioning column (31), of the lifting stud (40).
5. The form panel for construction according to claim 1, wherein: the rubber layer (111) with the same cross section as that of the side wall provided with the fixed block (11) is sleeved on the fixed block (11).
6. The form panel for construction according to claim 1, wherein: joint groove (51) have all been seted up on first baffle (10) and second baffle (20) lower bottom surface, be provided with on first baffle (10) and second baffle (20) the top surface with joint groove (51) grafting complex plug block (50), all be provided with on the lateral wall of first baffle (10) and second baffle (20) pass first baffle (10) and second baffle (20) and with plug block (50) threaded connection's fastening screw (52).
7. The form panel for construction according to claim 1, wherein: and a chamfer (60) is formed at one end of the fixing block (11) far away from the first baffle (10).
8. The form panel for construction according to claim 6, wherein: one end of the fastening screw (52) far away from the first baffle plate (10) and the second baffle plate (20) is provided with a star-shaped disc (61).
CN201921485120.XU 2019-09-06 2019-09-06 Template for building construction Active CN210713788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921485120.XU CN210713788U (en) 2019-09-06 2019-09-06 Template for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921485120.XU CN210713788U (en) 2019-09-06 2019-09-06 Template for building construction

Publications (1)

Publication Number Publication Date
CN210713788U true CN210713788U (en) 2020-06-09

Family

ID=70962972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921485120.XU Active CN210713788U (en) 2019-09-06 2019-09-06 Template for building construction

Country Status (1)

Country Link
CN (1) CN210713788U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592682A (en) * 2022-02-23 2022-06-07 中建八局第一建设有限公司 Concrete pouring mould for building construction based on can dismantle fast
CN115075559A (en) * 2022-06-30 2022-09-20 山东锦地建筑工程有限公司 Building construction is with device of buildding of combination formula template

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592682A (en) * 2022-02-23 2022-06-07 中建八局第一建设有限公司 Concrete pouring mould for building construction based on can dismantle fast
CN114592682B (en) * 2022-02-23 2023-07-07 中建八局第一建设有限公司 Quick-detachable-based concrete pouring die for building construction
CN115075559A (en) * 2022-06-30 2022-09-20 山东锦地建筑工程有限公司 Building construction is with device of buildding of combination formula template
CN115075559B (en) * 2022-06-30 2023-12-19 山东锦地建筑工程有限公司 Building device of combined template for building construction

Similar Documents

Publication Publication Date Title
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN205100544U (en) Early system of tearing open of steel framework built -up plate
CN102704672A (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN210713788U (en) Template for building construction
CN104895318A (en) Aluminum alloy template system and construction method of same
CN105133833A (en) Stair formwork and stair construction method adopting same
CN114046041A (en) Formwork reinforcing structure of as-cast finish concrete wall post-cast strip and construction method thereof
CN101280625A (en) Non-welding assembly shuttering system
CN103967268A (en) Building template for aluminum frame wood-plastic plate
CN206538910U (en) The curtain wall construction column template reinforcement system of horn mouth formula
CN209737901U (en) Wood formwork for laboratory based on mortise and tenon technology
CN211114823U (en) Floor falls board construction equipment
CN110984568A (en) Water stop ridge platform template device and construction method
CN109235871B (en) Construction method of variable cross-section structure aluminum alloy template
CN104005535B (en) The beam column of a kind of Anti-electrostatic floor keel, supporting leg and attachment structure thereof
CN215670059U (en) Detachable wooden house
CN203867172U (en) Aluminum alloy building formwork device
CN211736363U (en) Stair template for building construction
CN107060317A (en) A kind of shaped steel frame wooden model and its construction method
CN210976593U (en) Supporting seat of wood formwork
CN204920213U (en) Stair template
CN207017634U (en) A kind of shaped steel frame wooden model
CN202430993U (en) Concrete column pouring template
CN212201280U (en) Stagnant water bank platform template device
CN210369903U (en) Aluminum alloy template for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant