CN210659245U - Non-dismantling forming column template containing reinforcement cage and template structure - Google Patents

Non-dismantling forming column template containing reinforcement cage and template structure Download PDF

Info

Publication number
CN210659245U
CN210659245U CN201921342425.5U CN201921342425U CN210659245U CN 210659245 U CN210659245 U CN 210659245U CN 201921342425 U CN201921342425 U CN 201921342425U CN 210659245 U CN210659245 U CN 210659245U
Authority
CN
China
Prior art keywords
column
cage
template
reinforcement
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921342425.5U
Other languages
Chinese (zh)
Inventor
刘晓晨
盛雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Tai (guangde) Intelligent Assembly Building Ltd By Share Ltd
Original Assignee
Chen Tai (guangde) Intelligent Assembly Building Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chen Tai (guangde) Intelligent Assembly Building Ltd By Share Ltd filed Critical Chen Tai (guangde) Intelligent Assembly Building Ltd By Share Ltd
Priority to CN201921342425.5U priority Critical patent/CN210659245U/en
Application granted granted Critical
Publication of CN210659245U publication Critical patent/CN210659245U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a contain steel reinforcement cage and exempt from to tear open shaping post template and template structure, includes: the column fixing frame comprises four fixing column angle bars which vertically extend and are arranged at four corners, and column connecting pieces which are transversely arranged between the adjacent fixing column angle bars; the column reinforcement cage is fixedly arranged in the column fixing frame, and the thickness of a protective layer is reserved between the column reinforcement cage and the column fixing frame; and the column plate pieces are fixedly paved outside the four side surfaces of the column fixing frame. The utility model discloses a set up the post mount that forms with fixed column angle bar and post connection spare combination in post reinforcing bar cage periphery, one is convenient for the column plate spare fixed, two come to provide stable frame construction between post reinforcing bar cage and column plate spare, can increase the structural strength of post template, reduce the installation or pour the skew of in-process center pillar reinforcing bar cage or column plate spare to guarantee to pour the concrete protective layer thickness after accomplishing.

Description

Non-dismantling forming column template containing reinforcement cage and template structure
Technical Field
The utility model relates to a concrete building template field.
Background
In the traditional building construction process, the template engineering is always a working procedure which consumes a long time and has high engineering cost. In the construction process of the formwork engineering, the whole wood formwork and the supporting rod piece need to be cut according to the variable sizes of cast-in-place concrete components, a large amount of raw materials are wasted, the formwork construction process is complex, the whole wood formwork and the supporting rod piece need to be dismantled for the second time after the concrete pouring is finished, and a large amount of labor cost and time cost can be generated.
Therefore, in order to simplify the construction process, a non-dismantling formwork structure appears in the prior art, the formwork plate is used as a decorative surface after the pouring is finished, and the non-dismantling formwork structure is not required to be dismantled.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a contain steel reinforcement cage and exempt from to tear open shaping post template to solve at least one in the above-mentioned problem.
According to the utility model discloses an aspect provides an exempt from to tear open into profiled pole template containing reinforcing bar cage, include:
the column fixing frame comprises four fixing column angle bars which vertically extend and are arranged at four corners, and column connecting pieces which are transversely arranged between the adjacent fixing column angle bars;
the column reinforcement cage is fixedly arranged in the column fixing frame, and the thickness of a protective layer is reserved between the column reinforcement cage and the column fixing frame;
and the column plate pieces are fixedly paved outside the four side surfaces of the column fixing frame.
The utility model discloses a set up the post mount that forms with fixed column angle bar and post connection spare combination in post reinforcing bar cage periphery, one is convenient for the column plate spare fixed, two come to provide stable frame construction between post reinforcing bar cage and column plate spare, can increase the structural strength of post template, reduce the installation or pour the skew of in-process center pillar reinforcing bar cage or column plate spare to guarantee to pour the concrete protective layer thickness after accomplishing.
In some embodiments, the column support frame is detachably disposed at the periphery of the column plate member, and comprises support column angle bars vertically extending to be disposed at four corners of the column plate member, and column support members horizontally disposed and surrounding the support column angle bars.
Therefore, the column supporting frame formed by combining the supporting column angle bars and the column supporting pieces is additionally arranged on the periphery of the column plate piece, and the column supporting frame and the column fixing frame form an inner-outer double-layer frame structure, so that the structural strength of the column template is further improved.
In some embodiments, the post connectors are equidistantly spaced apart and the post supports are equidistantly spaced apart and the post connectors are staggered from the post supports.
Therefore, the column formwork can be stressed more uniformly due to the equidistant arrangement of the column connectors and the column supports, and complementary structures can be formed between the column connectors and the column supports due to the staggered arrangement of the column connectors and the column supports, so that the side stress pressure from concrete during pouring can be better resisted.
In some embodiments, the fixed column angle adopts a 70 x 2mm angle, and the column connecting piece adopts a 60 x 2mm column connecting piece; the supporting column angle adopts 30-3 mm angle, and the column supporting piece adopts a fixing hoop with the thickness of 2 mm; the column connectors are arranged at intervals of 500-600mm, and the column supports are arranged at intervals of 500-600 mm.
Therefore, the structure with the size and the interval is adopted, the structural strength of the column formwork can be reasonably increased, and meanwhile, the weight and the transportation cost of the column formwork cannot be excessively increased.
In some embodiments, the lower part of the reinforcement-containing cage non-dismantling molding column template is provided with an operation position left empty or a column plate member detachable operation position, wherein the operation position is not provided with a column plate member.
Therefore, through a reserved operation position, an operation position is reserved for the steel bar welding of the column base, and the operation position is used as a concrete vibrating operation position and also used as an observation position for checking the concrete column pouring forming condition after the pouring is finished.
In some embodiments, the upper part of the reinforcement-containing cage non-dismantling forming column formwork is provided with a reserved beam mounting opening.
Therefore, the butt joint of the beam template is facilitated, and the strength of the whole structure can be improved by the butt joint mode.
In some embodiments, embedded screws for mounting the columns are embedded in the column plate.
From this, the installation of the stand of being convenient for to realize the simplification and the high efficiency of prefabricated wallboard installation.
In some embodiments, a column split bolt mounted horizontally through the column rebar cage, the column plate member, and the column support is also included.
Thereby, the structural strength of the column template is further increased.
The utility model also provides an exempt from to tear open moulded board structure, include:
the column template is any one of the column templates formed by the reinforcement-containing cage without dismantling;
the upright post is fixed on the side surface of the post template;
the prefabricated wall board is provided with a top groove and a side groove, and the prefabricated wall board is clamped with the stand column through the side groove so as to be arranged between the column templates;
the bottom is fixed with the roof beam template of circle roof beam on, thereby the both ends of roof beam template stretch into the top of column form respectively and are fixed with the column form, thereby go up circle roof beam and the top recess block of prefabricated wallboard is fixed with prefabricated wallboard.
From this, can realize the installation between column form and the prefabricated wallboard through the stand simply and conveniently high-efficiently fixed, realize the installation between roof beam form and the column form through the upper ring roof beam simply and conveniently high-efficiently fixed.
In some embodiments, the floor slab is a profiled steel plate or a steel bar truss floor bearing plate and is laid between the beam templates; the column plate member is made of asbestos-free fiber cement board.
Therefore, the profiled steel plates or the steel bar truss floor bearing plates are used as the floor slabs, so that the structural strength can be further increased; the non-asbestos fiber cement board adopted as the column plate has the performance advantages of low density, high strength, low heat conductivity coefficient, excellent weather resistance (low humidity deformation, low expansion rate) and the like.
Drawings
FIG. 1 is a front view of a non-dismantling forming template structure of the present invention;
3 FIG. 32 3 is 3 a 3 cross 3- 3 sectional 3 view 3 of 3 the 3 column 3 template 3 shown 3 in 3 FIG. 31 3 at 3 A 3- 3 A 3; 3
FIG. 3 is a front view of the post holder of the present invention;
fig. 4 is a side view of the column formwork of the present invention;
FIG. 5 is a cross-sectional view of the beam form shown in FIG. 1 at B-B, with structures other than the beam form omitted;
FIG. 6 is a cross-sectional view of the disassembly-free form template structure shown at B-B in FIG. 1, with sleepers and support rods added as temporary support structures.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 schematically shows exempting from to tear open forming die plate structure according to an embodiment of the utility model, it includes post template 1, beam forms 2, prefabricated wallboard subassembly and floor. The column formwork 1 and the beam formwork 2 are formed formworks which contain reinforcement cages and are free of disassembly, the formworks are manufactured in advance, then the formworks are conveyed to the site to be installed together with prefabricated wallboard assemblies and floors, then concrete is poured, and after the concrete is dried, the supporting structures in the formworks are disassembled to be completed.
The prefabricated wall panel assembly adopts the prior art, and in this embodiment, adopts a wall panel structure similar to that in chinese patent application CN105064551A, and specifically, as shown in fig. 1, the prefabricated wall panel assembly includes a prefabricated wall panel 31, a vertical column 32 and an upper ring beam 33, a top groove capable of being engaged by the upper ring beam 33 is provided at the top of the prefabricated wall panel 31, and side grooves capable of being engaged by the vertical column 32 are respectively provided at two side edges thereof.
The floor adopts prior art, including profiled sheet 4, installs the furred ceiling fossil fragments in profiled sheet 4 below to and the gypsum board of laying through the furred ceiling fossil fragments. As shown in fig. 6, the side edge of the profiled steel sheet 4 is fixed with the beam formwork 2, so that the installation of the profiled steel sheet does not need too many temporary supports, and a full hall frame does not need to be built. The profiled steel sheet is cut to a good installation size during design, and is directly installed after arriving at a site, so that the site construction amount is reduced. In other embodiments, profiled steel sheets may be replaced with steel truss floor decks.
As shown in fig. 2 to 4, the column formwork 1 includes a column reinforcement cage 11, a column auxiliary 12, a column fixing bracket 13, a column plate 14, a column support bracket 15, a column split bolt, and a pre-embedded screw 16. Wherein, this post steel reinforcement cage 11, post mount 13, post plate 14 and post support frame 15 set up from inside to outside in proper order.
The post fixing bracket 13 includes four fixing post angles 131 and a plurality of post connectors 132. The fixed column angle 131 extends vertically, is equal to the height of the column, and is arranged at four corners. The post connecting member 132 is welded transversely between the adjacent fixed post angle bars 131 to form a square frame connecting the four fixed post angle bars 131. The plurality of post connectors 132 are equally spaced apart, with a spacing of 500-600mm being used in this embodiment. Two positions of the column holder 13 need to be left empty: one is to leave an operation position 17 at the lower part of the column fixing frame 13, as shown in fig. 3, an operation position is reserved for the steel bar welding of the column base, and as a concrete vibrating operation position, and also as an observation position for checking the concrete column pouring molding condition after the pouring is completed, the operation positions 17 are arranged at two opposite side surfaces, and the positions can be between the height of 100mm to 400mm from the ground. Secondly, beam mounting openings 18 are reserved at the positions where the upper parts of the column fixing pieces need to be in butt joint with the beam formwork 2, as shown in fig. 4. In this embodiment, the fixed column angle 131 is a cold-bending member with a length of 70 × 2mm, specifically, a galvanized cold-bending thin-wall section bar may be used, and the column connecting member 132 is a 60 × 2 metal plate with a height of 60mm and a thickness of 2 mm.
This post steel reinforcement cage 11 collimates according to the standard to handle upper portion butt joint reinforcing bar and lower part butt joint reinforcing bar, reserve butt joint length, reinforcing bar misconnection. After the binding is completed, the column reinforcement cage 11 is placed inside the column fixing frame 13, the positional relationship between the column reinforcement cage 11 and the column fixing frame 13 is adjusted, the thickness of the protective layer is left around the column reinforcement cage 11, and the column reinforcement cage 11 is welded to the fixed column angle 131 and the column connecting member 132 by using the column auxiliary member 12 having a corresponding length. In order to ensure the stability of the column reinforcement cage 11 and to share the side stress on the column fixing bracket 13 during concrete pouring, each column connecting member 132 in this embodiment is welded and fixed to the column reinforcement cage 11 by the column auxiliary member 12. The column aid 12 may be embodied as a relatively short length of steel reinforcement.
After the welding of the column fixing frame 13 and the column reinforcement cage 11 is completed, the closing plate is performed, that is, the column plate members 14 are laid out of the four side surfaces of the column fixing frame 13, and the column plate members 14 and the column fixing frame 13 are fixed to each other by mounting fittings such as screws. Specifically, the column panel 14 and the column connector 132 may be secured to each other with self-tapping screws that are screwed in, and after casting, the self-tapping screws will be partially fixed in the concrete, enhancing structural stability. The column plate members 14 are not disassembled after the construction is completed, but are reserved for decoration, and good sealing measures are needed among the column plate members 14, for example, structural glue is adopted for seam filling, so that the slurry leakage is prevented. The column plate member 14 in this embodiment is made of asbestos-free fiber cement board, and preferably has a thickness of 15 mm. The asbestos-free fiber cement board has the performance advantages of low density, high strength, low thermal conductivity, excellent weather resistance (low humidity deformation, low expansion rate) and the like. Need leave empty in two positions during the shrouding: firstly, reserve operation position 17 (the same with the operation position that column mount 13 reserved) in the lower part of whole post template 1 in wherein two relative sides, this operation position 17 is for the steel bar welding of column base, concrete vibration, and the observation usefulness of inspection concrete column pouring shaping condition, and this operation position 17 department does not carry out the shrouding, or installs column plate spare 14 with detachable mode, only carries out simple fixed for example, takes off again when arriving the scene. Secondly, a beam mounting opening 18 is reserved at the position, which is required to be in butt joint with the beam template 2, of the upper part of the column template 1, and a certain mounting gap is widened left and right.
After the closure plate is completed, post support brackets 15 are removably mounted to the exterior of the post members 14. The column support frame 15 plays a role in supporting the column plate 14, the column reinforcement cage inside the column plate and the column fixing frame, and prevents the phenomena of mold explosion and mold expansion during pouring. The post support frame 15 and the post plate member 14 do not need to be fixed particularly, in order to prevent displacement or slipping during transportation, the post support frame 15 and the post plate member 14 can be temporarily fixed by using screws, and after transportation to the site, the screws can be detached before pouring. Specifically, the column support frame 15 includes four support column angle bars 151 and a plurality of column supports 152. The support post angle 151 extends vertically, corresponds to the height of the post, and is disposed at the four corners of the post plate 14. The pillar brace 152 is disposed laterally and surrounds the pillar angle 151, and is fixed by welding to form a directional frame connecting the four pillar angle 151. The plurality of post supports 152 are equally spaced apart, with a spacing of 500-600mm being used in this embodiment. The post supports 152 are preferably offset from the post connectors 132 to form a complementary structure with the post connectors 132 to better resist side stresses from the concrete during casting. When the column supporting piece 152 is installed, operation positions 17 (the same as operation positions reserved for the column plate piece 14 and the column fixing frame 13) are reserved at two opposite side faces of the lower portion of the column supporting frame 15 and used for steel bar welding and concrete vibration of a column foundation and observation of concrete column pouring forming conditions, the column supporting piece 152 is not installed at the operation positions 17, after the column steel bar cage 11 and the steel bar of the column foundation are welded in the field installation process, the column plate piece 14 is sealed, and then two column supporting pieces 152 are installed for reinforcement. In this embodiment, the support post angle 151 is 30 × 3 angle iron, and the post support 152 is a 2mm thick fixing hoop. The column support 15 needs to be removed after the pouring is completed.
In the case of a large-sized column, it is also necessary to use a column split bolt to pass through the column reinforcement cage 11, the column fixing bracket 13, the column plate member 14, and the column support bracket 15 (disposed through the support member 152) for reinforcement. The column split bolt needs to be dismantled after pouring is finished.
Embedded screws 16 for installing the vertical columns 32 are embedded at the junction of the columns and the wall according to the position of the prefabricated wall panel 31, as shown in fig. 4. This embedded screw 16 passes column plate 14 and post connecting piece 132 setting to with post connecting piece 132 welded fastening, reserve out one section length that outwards stretches out, be equipped with the hole that corresponds with embedded screw 16 on the stand 32, it can be fixed to install the nut after embedded screw 16 passes the hole on the stand 32. The column 32 can be fixed directly to the column formwork 1 at this point or can be installed only on site.
As shown in fig. 5, the beam formwork 2 includes a beam reinforcement cage 21, a beam auxiliary 22, a beam fixing bracket 23, a beam plate 24, a beam support 25, and a beam split bolt 26. Wherein, the beam reinforcement cage 21, the beam fixing frame 23, the beam plate 24 and the beam support 25 are sequentially arranged from inside to outside.
The beam fixing frame 23 includes four fixing beam angles 231 and a plurality of beam connectors 232. The fixed beam angle 231 extends in the lateral direction, corresponds to the length of the beam, and is arranged at four corners. The two lower fixed beam angles 231 face inward, and the two upper fixed beam angles 231 face differently according to the center beam or the side beam. For the middle beam with floors on both sides, the two fixed beam angle bars 231 located above are both outward for welding with the profiled steel sheet 4 of the floor, respectively. For the edge beam with the floor on only one side, one of the two fixing beam angle bars 231 positioned above faces outwards and is used for being welded with the profiled steel sheet 4 of the floor, and the other fixing beam angle bar 231 faces inwards and is higher than the fixing beam angle bar 231 facing outwards to be used for sealing the edge of the floor. The beam connector 232 is welded vertically between adjacent fixed beam angles 231 to form a rectangular frame connecting the four fixed beam angles 231. A plurality of beam connectors 232 are disposed equidistantly therebetween. In this embodiment, the fixed beam angle 231 is a 70 × 2mm long cold-bending member, and the beam connecting member 232 is a 60 × 2 metal plate, and has a height of 60mm and a thickness of 2 mm.
The beam reinforcement cage 21 is bound according to the standard, and the beam end reinforcement is directly anchored. After the binding is completed, the beam reinforcement cage 21 is placed inside the beam fixing frame 23, the position relation between the beam reinforcement cage 21 and the beam fixing frame 23 is adjusted, the thickness of the protective layer is reserved around the beam reinforcement cage 21, and the beam reinforcement cage 21 is welded to the fixed beam angle 231 and the beam connecting piece 232 by using the beam auxiliary piece 22 with the corresponding length. The beam auxiliary 22 may be embodied by a relatively short reinforcing bar.
After the beam fixing frame 23 and the beam reinforcement cage 21 are welded, sealing plates are arranged, namely, beam plates 24 are laid outside the bottom and two sides of the beam fixing frame 23, and the beam plates 24 and the beam fixing frame 23 are fixed with each other by mounting accessories such as screws. Specifically, the beam plate 24 and the beam connector 232 can be fixed to each other by self-tapping screws, the self-tapping screws are screwed inwards, and after pouring is completed, the self-tapping screws are fixed to the concrete by a part of length, so that structural stability is enhanced. The beam plate pieces 24 are not disassembled after the construction is finished, but are reserved for decoration, and good sealing measures are needed among the beam plate pieces 24, for example, structural glue is adopted for seam filling, so that the slurry leakage is prevented. The beam-slab member 24 in this embodiment is made of asbestos-free fiber cement board, preferably 15mm in thickness. The asbestos-free fiber cement board has the performances of low density, high strength, low thermal conductivity, excellent weather resistance (low humidity deformation, low expansion rate) and the like.
After the plate is closed, beam supports 25 are removably mounted to the beam plate members 24. The beam supports 25 are vertically equally spaced and preferably offset from the beam connectors 232 to form a complementary structure with the beam connectors 232 to better resist lateral stresses from the concrete during casting. The beam support 25 may be made of metal or sleeper, and the metal may be selected from a square pipe. One or two of a plurality of beam split bolts 26 arranged transversely and equidistantly are selected according to the height of the beam and are installed through the beam reinforcement cage 21, the beam plate member 24 and the beam support member 25. The beam supports 25 and the beam split bolts 26 are removed after casting.
After the beam supports 25 and the tie bolts are installed, the upper ring beam 33 of the prefabricated wall panel assembly is fixed to the bottom of the beam formwork 2, i.e., the bottom surface of the beam plate member 24 located at the bottom of the beam fixing frame 23. In other embodiments, the upper ring beam 33 may be installed only on site.
And after the column template 1 and the beam template 2 are manufactured, the column template and the beam template are boxed and transported according to the column number and the beam number, and are installed according to the following steps after arriving at a site.
And installing the column template 1. Firstly, the butt-jointed reinforcing steel bars at the lower part of the column reinforcing cage 11 are welded with the column foundation reinforcing steel bars on site through the reserved operation positions 17. After the welding is completed, the column plate 14 is closed at this operating position 17. After the post members 14 are closed, two post supports 152 are installed for reinforcement. If the studs 32 were not installed at the time of making the stud formwork 1, the studs 32 are now fixed to the side of the studs where the prefabricated wall panels 31 are to be installed, as shown in fig. 1.
Prefabricated wall panels 31 are installed between the column formworks 1. As shown in fig. 1, the prefabricated wall panel 31 is fixed to the vertical column 32 of the column form 1 by means of side grooves. Prefabricated wall panels 31 are also fastened to each other by means of vertical columns 32. After the prefabricated wallboard 31 between two post templates 1 is installed, support fixedly (can specifically adopt square pipe to carry out bearing diagonal) to prefabricated wallboard 31 of whole face and post template 1, the straightness that hangs down of prefabricated wallboard 31 and post template 1 is adjusted.
And beam formworks 2 are installed above the prefabricated wall panels 31 and between the column formworks 1. As shown in fig. 1, two ends of the beam form 2 respectively extend into the reserved beam mounting opening 18 at the top of the column form 1, the extending depth is about 10mm-20mm, two ends of the beam reinforcement cage 21 are respectively welded or bound with the butt-joint reinforcement at the upper part of the column reinforcement cage 11, and the beam plate 24 and the column plate 14 are sealed by structural adhesive. The upper ring beam 33 at the bottom of the beam template 2 is clamped into the top groove of the prefabricated wall panel 31 and is fixed by self-tapping screws. Prefabricated wallboard 31 has certain compressive capacity, and prefabricated wallboard 31 can evenly bear the concrete including roof beam template 2 and the watering along length direction, increases the stability of structure. If the prefabricated wall panel 31 cannot be located at the center of the beam formwork 2 due to the design of the wall surface position, and eccentric stress is caused, a sleeper 5 needs to be additionally arranged at the bottom of the beam formwork 2, and then the beam formwork 2 is temporarily supported through the sleeper 5 by the support rod 6.
And a floor slab is laid between the beam formworks 2. First, as shown in fig. 6, the profiled steel sheet 4 is connected and fixed to the two outward edges of the two fixing beam angle members 231 located above by using self-tapping screws, and edge sealing is performed. And a ceiling keel is welded at the bottom of the profiled steel sheet 4, and the ceiling keel can be a galvanized square tube. The ceiling keel is supported by the support rods 6, and the profiled steel sheet 4 is supported by the sleepers 5 and the support rods 6.
Pouring concrete into the column formwork 1, the beam formwork 2 and the profiled steel sheet 4, removing temporary support structures such as the support rods 6 and the sleepers 5 after the concrete is dried, removing the column support frames 15 and the column split bolts in the column formwork 1, and removing the beam support members 25 and the beam split bolts 26 in the beam formwork 2. And paving a gypsum board on the ceiling keel.
What has been described above are only some embodiments of the invention. For those skilled in the art, without departing from the inventive concept of the present invention, several modifications and improvements can be made, or the above technical solutions can be freely combined, which all belong to the protection scope of the present invention.

Claims (10)

1. The utility model provides a contain steel reinforcement cage and exempt from to tear open shaping post template which characterized in that includes:
a column fixing frame (13) including four fixing column angle bars (131) extending vertically and arranged at four corner positions, and column connecting members (132) disposed horizontally between the adjacent fixing column angle bars (131);
a column reinforcement cage (11) fixedly arranged inside the column fixing frame (13), and the thickness of a protective layer is reserved between the column reinforcement cage (11) and the column fixing frame (13);
and the column plate parts (14) are fixedly laid outside the four side surfaces of the column fixing frame (13).
2. The non-dismantling forming column formwork for a reinforcement-containing cage according to claim 1, wherein: the column support frame is characterized by further comprising a column support frame (15) which is detachably arranged on the periphery of the column plate part (14), wherein the column support frame (15) comprises support column angle bars (151) which vertically extend to be arranged at four corners of the column plate part (14), and column support pieces (152) which are transversely arranged and surround the support column angle bars (151).
3. The non-dismantling forming column formwork for a reinforcement-containing cage according to claim 2, wherein: the column connectors (132) are equidistantly spaced apart, the column supports (152) are equidistantly spaced apart, and the column connectors (132) are staggered from the column supports (152).
4. The non-dismantling formed column formwork for a reinforcement-containing cage according to claim 3, wherein: the fixed column angle (131) adopts a 70 x 2mm angle, and the column connecting piece (132) adopts a 60 x 2mm column connecting piece (132); the supporting column angle bar (151) adopts a 30-3 mm angle bar, and the column supporting piece (152) adopts a fixed hoop with the thickness of 2 mm; the post connectors (132) are arranged at intervals of 500-600mm, and the post supports (152) are arranged at intervals of 500-600 mm.
5. The reinforcement-cage-containing disassembly-free forming column template as claimed in any one of claims 1 to 4, wherein: the lower part of the non-dismantling forming column formwork of the reinforcement cage is provided with operation positions (17) which are left empty and are not provided with column plate pieces (14) or operation positions (17) which are detachable from the column plate pieces, wherein the two opposite side surfaces of the lower part of the non-dismantling forming column formwork of the reinforcement cage are provided with operation positions (17) which are left empty and are not provided with the column plate.
6. The reinforcement-cage-containing disassembly-free forming column template as claimed in any one of claims 1 to 4, wherein: and a reserved beam mounting opening (18) is formed in the upper part of the steel reinforcement cage disassembly-free forming column template.
7. The reinforcement-cage-containing disassembly-free forming column template as claimed in any one of claims 1 to 4, wherein: and embedded screws (16) for mounting the upright posts (32) are embedded in the column plate pieces (14).
8. The reinforcement-cage-containing disassembly-free forming column template as claimed in any one of claims 2 to 4, wherein: and the column split bolt horizontally penetrates through the column reinforcement cage (11), the column plate piece (14) and the column support piece (152) to be installed.
9. A disassembly-free forming template structure is characterized by comprising:
column formwork (1) being a reinforcement-cage-containing non-demolition-free profiled column formwork according to any one of claims 1 to 8;
a pillar (32) fixed at a side of the pillar form (1);
prefabricated wall panels (31) provided with top grooves and side grooves, wherein the prefabricated wall panels (31) are clamped with the upright columns (32) through the side grooves so as to be arranged between the column formworks (1);
the bottom of the beam formwork (2) is fixed with an upper ring beam (33), two ends of the beam formwork (2) extend into the top of the column formwork (1) respectively to be fixed with the column formwork (1), and the upper ring beam (33) is clamped with a groove in the top of the prefabricated wall plate (31) to be fixed with the prefabricated wall plate (31).
10. The disassembly-free forming template structure of claim 9, wherein: the floor slab is laid between the beam templates (2) and is a profiled steel sheet (4) or a steel bar truss floor bearing plate; the column plate member (14) is made of asbestos-free fiber cement board.
CN201921342425.5U 2019-08-16 2019-08-16 Non-dismantling forming column template containing reinforcement cage and template structure Active CN210659245U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921342425.5U CN210659245U (en) 2019-08-16 2019-08-16 Non-dismantling forming column template containing reinforcement cage and template structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921342425.5U CN210659245U (en) 2019-08-16 2019-08-16 Non-dismantling forming column template containing reinforcement cage and template structure

Publications (1)

Publication Number Publication Date
CN210659245U true CN210659245U (en) 2020-06-02

Family

ID=70838992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921342425.5U Active CN210659245U (en) 2019-08-16 2019-08-16 Non-dismantling forming column template containing reinforcement cage and template structure

Country Status (1)

Country Link
CN (1) CN210659245U (en)

Similar Documents

Publication Publication Date Title
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
US10837166B2 (en) Building structure and construction method for same
CN105888108A (en) Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
CN108678193B (en) Post-cast strip and construction method thereof
JP2016198909A (en) Method for manufacturing precast concrete member
CN102605902A (en) Penetrating rib and clamping hook combined steel mesh template and application method
KR100631365B1 (en) Steel Concrete Structure Using Angle Shapes
CN209620330U (en) A kind of non-dismantling formwork concrete shear wall structure building
CN114482375A (en) Integral joint type reinforced concrete laminated slab and construction method
CN210659245U (en) Non-dismantling forming column template containing reinforcement cage and template structure
CN111549951A (en) Profiled steel assembled composite floor and construction method thereof
CN210659251U (en) Non-dismantling formed beam template containing reinforcement cage and template structure
CN212388856U (en) Cast-in-place clear water concrete batter post structure of prestressing force
WO2015051551A1 (en) Building and construction method thereof
CN210597794U (en) Connecting device of prefabricated plate
CN112127501A (en) Combined wall structure and construction method thereof
KR101140627B1 (en) Construction method of concrete building
CN111424883A (en) Prestressed cast-in-place clear water concrete inclined column structure and construction method thereof
CN214364434U (en) Assembled constructional column suitable for prefabricated wallboard of frame construction
CN217974502U (en) Basement post-cast strip retaining wall structure
CN214531318U (en) Cast-in-place partition wall template structure
CN215670176U (en) Detachable outer wall waterproof deformation joint construction structures
CN216516343U (en) Structure integration exempts from to tear open prefabricated hollow wall of mould
CN215749811U (en) Lightweight end-sealing structure of prefabricated box girder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant