CN210655915U - 爬架与吊塔连通装置 - Google Patents
爬架与吊塔连通装置 Download PDFInfo
- Publication number
- CN210655915U CN210655915U CN201920189257.4U CN201920189257U CN210655915U CN 210655915 U CN210655915 U CN 210655915U CN 201920189257 U CN201920189257 U CN 201920189257U CN 210655915 U CN210655915 U CN 210655915U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- frame
- support plate
- climbing frame
- climbing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 48
- 229910000831 Steel Inorganic materials 0.000 claims description 14
- 239000010959 steel Substances 0.000 claims description 14
- 230000001681 protective effect Effects 0.000 claims description 9
- 241000219098 Parthenocissus Species 0.000 claims 5
- 238000000034 method Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000007306 turnover Effects 0.000 abstract description 3
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 230000000630 rising effect Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000005034 decoration Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920189257.4U CN210655915U (zh) | 2019-01-31 | 2019-01-31 | 爬架与吊塔连通装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920189257.4U CN210655915U (zh) | 2019-01-31 | 2019-01-31 | 爬架与吊塔连通装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210655915U true CN210655915U (zh) | 2020-06-02 |
Family
ID=70840449
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920189257.4U Expired - Fee Related CN210655915U (zh) | 2019-01-31 | 2019-01-31 | 爬架与吊塔连通装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210655915U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113044741A (zh) * | 2021-04-02 | 2021-06-29 | 浙江城建建设集团有限公司 | 一种连接集成爬架和塔吊的安全通道及其提升方法 |
-
2019
- 2019-01-31 CN CN201920189257.4U patent/CN210655915U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113044741A (zh) * | 2021-04-02 | 2021-06-29 | 浙江城建建设集团有限公司 | 一种连接集成爬架和塔吊的安全通道及其提升方法 |
CN113044741B (zh) * | 2021-04-02 | 2023-12-01 | 浙江城建建设集团有限公司 | 一种连接集成爬架和塔吊的安全通道及其提升方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202324571U (zh) | 一种悬挑式双排脚手架 | |
KR100777937B1 (ko) | 외벽마감공사용 가이드 브라켓 | |
CN208814562U (zh) | 一种可视化单元式玻璃幕墙板块垂直运输系统 | |
CN105088979B (zh) | 一种大型桥梁爆破拆除方法 | |
CN206707237U (zh) | 用于电梯安装的斜拉式顶层施工平台 | |
JP2000282691A (ja) | 塔状高層構造物内壁への部材取付け施工法及び足場装置 | |
CN210655915U (zh) | 爬架与吊塔连通装置 | |
CN109095319B (zh) | 一种施工电梯与爬架一体化运行系统 | |
CN213418443U (zh) | 一种自爬式电梯井道作业平台 | |
CN206971760U (zh) | 一种全钢结构装配式爬升物料平台 | |
CN202990427U (zh) | 一种爬升式卸料平台 | |
CN212103679U (zh) | 一种用于装配式塔架安装的施工平台 | |
CN205000656U (zh) | 自升降式物料周转平台 | |
CN110817709A (zh) | 一种高层塔吊司机攀爬装置 | |
CN210239201U (zh) | 一种推车式电梯井口与井道防护装置 | |
JP3950800B2 (ja) | つり足場 | |
CN211366866U (zh) | 一种安全环保脚手架钢管自动提升装置 | |
CN212154622U (zh) | 钢结构厂房外墙板安装爬梯 | |
CN211946009U (zh) | 塔吊上人通道装置 | |
CN210561720U (zh) | 一种墩柱养护修补操作平台 | |
CN110206331B (zh) | 一种推车式电梯井口与井道防护装置及施工方法 | |
CN210530360U (zh) | 一种新型爬升式卸料平台 | |
CN2578461Y (zh) | 升降式脚手架 | |
CN210914908U (zh) | 一种施工电梯的翻板 | |
CN214831948U (zh) | 垂直钢塔斜拉桥安装支架平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chang Cheng Inventor after: Yue Jiaqing Inventor after: Liao Zuolong Inventor after: Xiong Yan Inventor after: Wang Shuangting Inventor before: Chang Cheng Inventor before: Yue Jiaqing Inventor before: Zhu Xingyu Inventor before: Huang Chaoheng Inventor before: Liao Zuolong Inventor before: Xiong Yan Inventor before: Wang Shuangting Inventor before: Shi Kun |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220622 Address after: 430000 between Yongkang road and Jiangbei Road, Tuanfeng Town, Tuanfeng County, Huanggang City, Hubei Province (shop 101, building B-01, Shanhe Wanli) Patentee after: Hubei Zhuhe Construction Engineering Co.,Ltd. Address before: 430070 Shanhe enterprise building at the intersection of Zhongbei road and Xudong street, Wuhan City, Hubei Province Patentee before: SHANHE CONSTRUCTION GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200602 |
|
CF01 | Termination of patent right due to non-payment of annual fee |