CN210624675U - Fixing device that warm siphunculus of building engineering was laid - Google Patents

Fixing device that warm siphunculus of building engineering was laid Download PDF

Info

Publication number
CN210624675U
CN210624675U CN201921658671.1U CN201921658671U CN210624675U CN 210624675 U CN210624675 U CN 210624675U CN 201921658671 U CN201921658671 U CN 201921658671U CN 210624675 U CN210624675 U CN 210624675U
Authority
CN
China
Prior art keywords
layer
water pipe
pipe
fixing layer
warm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921658671.1U
Other languages
Chinese (zh)
Inventor
夏金钟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhongdeshun Construction Engineering Co Ltd
Original Assignee
Jiangxi Zhongdeshun Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhongdeshun Construction Engineering Co Ltd filed Critical Jiangxi Zhongdeshun Construction Engineering Co Ltd
Priority to CN201921658671.1U priority Critical patent/CN210624675U/en
Application granted granted Critical
Publication of CN210624675U publication Critical patent/CN210624675U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a fixing device for laying a warm through pipe in building engineering, belonging to the technical field of laying and installing the warm through pipe, and the key point of the technical scheme is that the fixing device comprises a suspended ceiling layer, a water pipe fixing layer and an air pipe fixing layer which are fixed in a layering way by bolts and are all in a U shape from top to bottom, and expansion bolts are connected at both ends of the top of the suspended ceiling layer in a penetrating way; transversely offer the opening that is "rectangular" form on the bottom surface of water pipe fixed bed, a plurality of pipe strap are installed along the open-ended position to the inboard of water pipe fixed bed, and the bottom of pipe strap is provided with the supporting shoe, and the supporting shoe supports the pipe strap and sets up on the bottom surface of water pipe fixed bed, and the bottom fixed mounting of supporting shoe has positioning bolt. This kind of fixing device that building engineering warm siphunculus was laid occupation space is little, and the labour saving and time saving is got up in loading and unloading to can make corresponding regulation according to arranging of the tube pitch and the pipeline of warm siphunculus fast conveniently.

Description

Fixing device that warm siphunculus of building engineering was laid
Technical Field
The utility model relates to an installation technical field is laid to warm siphunculus specifically is a fixing device that warm siphunculus of building engineering was laid.
Background
The heating and ventilation pipeline is an indispensable component of a building heating and ventilation part, has a very wide application range and comprises a water supply and return pipe of a central air conditioner, a purification system air supply and return pipe, a central air conditioner ventilation pipe, an industrial air supply and exhaust ventilation pipe, an environmental protection system air suction and exhaust pipe, a mine gas drainage pipe, a mine rubberized fabric air duct and the like. The installation of the heating and ventilation pipeline needs to position and reinforce the pipeline by means of a fixing device, which is necessary.
The warm logical pipeline is mostly all including water pipe and tuber pipe simultaneously, and current fixing device often all fixes water pipe and tuber pipe respectively, but this kind of fixed approach occupation space is bigger, and current fixing device loading and unloading are got up and are wasted time and energy moreover to can not be convenient make corresponding regulation according to arranging of the tube pitch and the pipeline of warm siphunculus fast.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fixing device that warm siphunculus of building engineering was laid, this kind of fixing device occupation space that warm siphunculus of building engineering was laid is little, and the loading and unloading labour saving and time saving to can be convenient make corresponding regulation according to arranging of the tube pitch and the pipeline of warm siphunculus fast.
The above technical purpose of the present invention can be achieved by the following technical solutions: a fixing device for laying a warm through pipe in building engineering comprises a suspended ceiling layer, a water pipe fixing layer and an air pipe fixing layer which are sequentially fixed in a layered mode through bolts from top to bottom and are all in a U shape, wherein expansion bolts are connected to two ends of the top of the suspended ceiling layer in a penetrating mode; transversely seted up on the bottom surface of water pipe fixed layer and being the opening of "rectangular" form, the inboard of water pipe fixed layer along a plurality of pipe clamps are installed to open-ended position, the bottom of pipe clamp is provided with the supporting shoe, the supporting shoe will the pipe clamp supports the setting on the bottom surface of water pipe fixed layer, the bottom fixed mounting of supporting shoe has positioning bolt, positioning bolt keeps away from the one end of supporting shoe is followed the opening runs through to the outside of water pipe fixed layer and is equipped with the nut, just positioning bolt can along horizontal slip is carried out to the opening.
Furthermore, the ceiling layer, the water pipe fixing layer and the air pipe fixing layer are located on the same vertical surface, and the sizes and the shapes of the bottom surfaces of the ceiling layer, the water pipe fixing layer and the air pipe fixing layer are completely consistent.
Furthermore, a rubber pad is attached to the inner side of the pipe clamp, and the supporting block is made of rubber.
Furthermore, the positioning bolt is composed of two sections of cylinders with different diameters, the axes of the two sections of cylinders are welded together in a collinear manner, the cylinder with the large diameter is positioned on the outer side of the water pipe fixing layer, the outer wall of the cylinder with the large diameter is provided with threads, the length of the cylinder with the small diameter is equal to the thickness of the bottom surface of the water pipe fixing layer, the cylinder with the small diameter is clamped in the opening of the water pipe fixing layer in a sliding manner, and the outer wall of the cylinder is smooth.
Furthermore, a plurality of damping springs are fixedly mounted on the bottom surface of the air pipe fixing layer, a supporting plate is placed at the upper ends of the damping springs, and the supporting plate is parallel to the bottom surface of the air pipe fixing layer.
Furthermore, the bottom of the outer wall of the two sides of the suspended ceiling layer, the water pipe fixing layer and the bottom and the top of the outer wall of the two sides of the air pipe fixing layer are both fixedly provided with convex edges.
To sum up, the utility model discloses following beneficial effect has:
this kind of fixing device that building engineering warm siphunculus was laid is through with the furred ceiling layer, water pipe fixed bed and tuber pipe fixed bed are the layering installation in proper order, can fix tuber pipe and water pipe simultaneously, need not to fix water pipe and tuber pipe respectively, occupation space is little, and also can the layering be gone on in proper order at installation and dismantlement in-process step by step, loading and unloading labour saving and time saving, the position of water pipe fixed bed and tuber pipe fixed bed can freely be changed simultaneously, and the interval of pipe strap also can carry out the regulation of freely sliding, thereby can make corresponding regulation according to the pipe pitch of warm siphunculus and arranging of pipeline fast conveniently.
Drawings
FIG. 1 is a general structural diagram of the present invention;
FIG. 2 is a side view of the pipe clamp, the support block and the positioning bolt of the present invention;
fig. 3 is an appearance structure view of the positioning bolt of the present invention.
In the figure: 1. hanging a top layer; 101. an expansion bolt; 2. a water pipe fixing layer; 201. a pipe clamp; 202. a rubber pad; 203. a support block; 204. positioning the bolt; 3. an air pipe fixing layer; 301. a support plate; 302. a damping spring; 4. a convex edge.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a fixing device for laying a warm-up pipe in building engineering comprises a suspended ceiling layer 1, a water pipe fixing layer 2 and an air pipe fixing layer 3 which are fixed layer by layer through bolts from top to bottom and are all in a U shape, wherein expansion bolts 101 are connected to both ends of the top of the suspended ceiling layer 1 in a penetrating manner; transversely offer the opening that is "rectangular" form on the bottom surface of water pipe fixed layer 2, a plurality of pipe strap 201 are installed along the open-ended position to the inboard of water pipe fixed layer 2, the bottom of pipe strap 201 is provided with supporting shoe 203, supporting shoe 203 supports pipe strap 201 and sets up on the bottom surface of water pipe fixed layer 2, the bottom fixed mounting of supporting shoe 203 has positioning bolt 204, positioning bolt 204 keeps away from the one end of supporting shoe 203 and runs through to the outside of water pipe fixed layer 2 and be equipped with the nut from the opening, and positioning bolt 204 can carry out horizontal slip along the opening.
Through the technical scheme, when in installation, the suspended ceiling layer 1 is fixedly installed on a wall surface right above a required fixed pipeline through two expansion bolts 101, then the pipe clamp 201 is opened, the water pipe fixing layer 2 is moved to be positioned right below the required fixed water pipe, the position of the water pipe fixing layer 2 is finely adjusted to enable the water pipe to pass through the pipe clamp 201, then the pipe clamp 201 is closed and screwed, the pipe clamp 201 hoops the water pipe, meanwhile, the water pipe fixing layer 2 and the suspended ceiling layer 1 positioned above the water pipe fixing layer are fixed through the bolts, at the moment, the water pipe is fixed by the pipe clamp 201 and is fixedly supported on the bottom surface of the water pipe fixing layer 2 through the supporting block 203, so that the water pipe is fixed, then, the air pipe fixing layer 3 is moved to be positioned right below the required fixed air pipe, the air pipe is supported by utilizing the bottom surface of the air pipe fixing layer 3, and the air pipe fixing layer 3 and the water pipe fixing layer 2 above the air pipe fixing layer are fixed through the bolts, thereby fixing the air pipe; according to the above, it can be clearly known that the utility model adopts the layered structure to fix the water pipe and the air pipe simultaneously, the water pipe and the air pipe do not need to be fixed respectively, the occupied space is small, and for the structure, the method of layered and stepwise sequential installation can be adopted on the installation method, and the assembly and disassembly are time-saving and labor-saving; in order to make the pipe strap 201 corresponding with the position of water pipe, the nut on the accessible unscrew positioning bolt 204, make supporting shoe 203 not fix on the bottom surface of water pipe fixed bed 2 by positioning bolt 204, can carry out free slip along the opening of water pipe fixed bed 2 bottom surfaces this moment with supporting shoe 203, thereby drive pipe strap 201 and slide, adjust the position of pipe strap 201 from this, make pipe strap 201 corresponding with the position of water pipe, and the utility model discloses a water pipe fixed bed 2 and tuber pipe fixed bed 3 dismouting alone, the upper and lower position in the face of some buildings of tuber pipe and water pipe is different, the upper and lower mounted position of water pipe fixed bed 2 and tuber pipe fixed bed 3 also can freely change, thereby the utility model discloses can be convenient make corresponding regulation according to arranging of the pipe spacing and the pipeline of warm siphunculus fast.
Further, please refer to fig. 1, the ceiling layer 1, the water pipe fixing layer 2 and the air pipe fixing layer 3 are located on the same vertical plane, and the sizes and the shapes of the bottom surfaces of the three are completely consistent, so that the water pipe fixing layer 2 and the air pipe fixing layer 3 can be installed normally after being replaced, and the bottom surfaces of the three have the function of blocking dust for the lower layer, so that the structure saves the installation space and plays a good dustproof function for the lower layer.
Further, referring to fig. 1, a rubber pad 202 is attached to the inner side of the pipe clamp 201, and the supporting block 203 is made of rubber, so that the vibration damping performance of the water pipe fixing layer 2 is improved.
Further, referring to fig. 2 and 3, the positioning bolt 204 is composed of two sections of cylinders with different diameters, the axes of the two sections of cylinders are welded together in a collinear manner, wherein the cylinder with the larger diameter is located outside the water pipe fixing layer 2, the outer wall of the positioning bolt is provided with threads and is provided with a nut, the length of the cylinder with the smaller diameter is equal to the thickness of the bottom surface of the water pipe fixing layer 2, the positioning bolt 204 is slidably clamped in the opening of the bottom of the water pipe fixing layer 2, and the outer wall of the positioning bolt is smooth, so that the whole positioning bolt 204 can be stably slidably clamped in the opening of the bottom of the water pipe fixing layer 2, when the nut on the positioning bolt 204 is screwed, the positioning bolt 204 and the bottom surface of the water pipe fixing layer 2 are fixed together and cannot move, and when the nut is unscrewed, the positioning bolt 204 can freely slide, so.
Further, referring to fig. 1, a plurality of damping springs 302 are fixedly mounted on the bottom surface of the air duct fixing layer 3, a supporting plate 301 is placed at the upper ends of the damping springs 302, and the supporting plate 301 is parallel to the bottom surface of the air duct fixing layer 3, so that the damping performance of the air duct fixing layer 3 is improved.
Further, please refer to fig. 1, the bottom of the outer wall of the two sides of the ceiling layer 1, the bottom and the top of the outer wall of the two sides of the water pipe fixing layer 2 and the air pipe fixing layer 3 are all fixedly provided with a convex edge 4, the ceiling layer 1, the convex edges 4 on the water pipe fixing layer 2 and the air pipe fixing layer 3 are mutually attached when the three are installed together, bolts can be conveniently penetrated and fixed in the two convex edges 4 which are mutually attached, and therefore the bolt fixation of the ceiling layer 1, the water pipe fixing layer 2 and the air pipe fixing layer 3 is realized.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a fixing device that warm siphunculus of building engineering was laid, includes from top to bottom loops through fixed, the ceiling layer (1) that all is "U type" form of bolt layering, water pipe fixed bed (2) and tuber pipe fixed bed (3), its characterized in that:
expansion bolts (101) are connected to both ends of the top of the suspended ceiling layer (1) in a penetrating manner;
the utility model discloses a water pipe fixing layer, including water pipe fixed layer (2), supporting shoe (203) will pipe strap (201) support the setting on the bottom surface of water pipe fixed layer (2), the bottom fixed mounting of supporting shoe (203) has positioning bolt (204), positioning bolt (204) are kept away from the one end of supporting shoe (203) is followed the opening runs through to the outside of water pipe fixed layer (2) and is equipped with the nut, just positioning bolt (204) can along the opening carries out horizontal slip on the bottom surface of water pipe fixed layer (2), the inboard of water pipe fixed layer (2) is along a plurality of pipe straps (201) are installed to open-ended position, the bottom of pipe strap (201) is provided with supporting shoe (203).
2. The fixing device for laying the warm through pipe for the building engineering as claimed in claim 1, wherein: the suspended ceiling layer (1), the water pipe fixing layer (2) and the air pipe fixing layer (3) are located on the same vertical surface, and the sizes and the shapes of the bottom surfaces of the suspended ceiling layer, the water pipe fixing layer and the air pipe fixing layer are completely consistent.
3. The fixing device for laying the warm through pipe for the building engineering as claimed in claim 1, wherein: the inner side of the pipe clamp (201) is attached with a rubber pad (202), and the supporting block (203) is made of rubber.
4. The fixing device for laying the warm through pipe for the building engineering as claimed in claim 1, wherein: the positioning bolt (204) is composed of two sections of cylinders with different diameters, the axes of the two sections of cylinders are welded together in a collinear manner, the cylinder with the large diameter is positioned on the outer side of the water pipe fixing layer (2), the outer wall of the cylinder is provided with threads, the length of the cylinder with the small diameter is equal to the thickness of the bottom surface of the water pipe fixing layer (2), and the cylinder is connected with the opening of the water pipe fixing layer (2) in a sliding and clamping manner, and the outer wall of the cylinder is smooth.
5. The fixing device for laying the warm through pipe for the building engineering as claimed in claim 1, wherein: the air pipe fixing layer is characterized in that a plurality of damping springs (302) are fixedly mounted on the bottom surface of the air pipe fixing layer (3), a supporting plate (301) is placed at the upper ends of the damping springs (302), and the supporting plate (301) is parallel to the bottom surface of the air pipe fixing layer (3).
6. The fixing device for laying the warm through pipe for the building engineering as claimed in claim 1, wherein: the bottom of the outer walls of the two sides of the suspended ceiling layer (1), the bottom and the top of the outer walls of the two sides of the water pipe fixing layer (2) and the air pipe fixing layer (3) are both fixedly provided with convex edges (4).
CN201921658671.1U 2019-09-30 2019-09-30 Fixing device that warm siphunculus of building engineering was laid Active CN210624675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921658671.1U CN210624675U (en) 2019-09-30 2019-09-30 Fixing device that warm siphunculus of building engineering was laid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921658671.1U CN210624675U (en) 2019-09-30 2019-09-30 Fixing device that warm siphunculus of building engineering was laid

Publications (1)

Publication Number Publication Date
CN210624675U true CN210624675U (en) 2020-05-26

Family

ID=70757632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921658671.1U Active CN210624675U (en) 2019-09-30 2019-09-30 Fixing device that warm siphunculus of building engineering was laid

Country Status (1)

Country Link
CN (1) CN210624675U (en)

Similar Documents

Publication Publication Date Title
CN207848612U (en) A kind of antidetonation suspension and support
CN210624675U (en) Fixing device that warm siphunculus of building engineering was laid
CN202571685U (en) Device for welding air conditioning four-way valve pipeline assembly
CN211059479U (en) Warm siphunculus supports mounting structure
CN202810097U (en) Combined keel structure
CN214368233U (en) Heating pipe clamping device with adjustable tension force
CN212361041U (en) Heating pipe clamping device with adjustable tension force
CN206094349U (en) Shock absorber support of outer machine of air conditioner
CN208619866U (en) A kind of construction pipeline support equipment
CN211521354U (en) Electric pipeline hoisting device
CN220889297U (en) Floor heating groove plate capable of accommodating fresh air pipeline
CN109654298B (en) Adjustable central air conditioner pipeline mounting bracket convenient to hoist and mount
CN203131369U (en) Intelligent building indoor unit with freely-adjusted visual angle
CN221075560U (en) Heating and ventilation pipeline positioning and mounting structure
CN112095888A (en) Assembled furred ceiling structure convenient to adjustment mounting dimension
CN217502831U (en) Single-suspension-pipe longitudinal anti-seismic support
CN216897777U (en) Warm ventilation pipe with shock attenuation buffer structure
CN220600679U (en) Heating and ventilation pipeline mounting bracket
CN218063681U (en) Auxiliary device for installing heating and ventilation pipeline
CN209184139U (en) Adjustable 5G house wiring lineation clamp
CN211059615U (en) Electronic display screen installation mount
CN207921488U (en) A kind of drainage pipeline mounting structure
CN112252566B (en) Wall corner suspended ceiling structure for interior decoration
CN216138387U (en) Fixture for welding building heating ventilation pipe