CN211059479U - Warm siphunculus supports mounting structure - Google Patents

Warm siphunculus supports mounting structure Download PDF

Info

Publication number
CN211059479U
CN211059479U CN201921819956.9U CN201921819956U CN211059479U CN 211059479 U CN211059479 U CN 211059479U CN 201921819956 U CN201921819956 U CN 201921819956U CN 211059479 U CN211059479 U CN 211059479U
Authority
CN
China
Prior art keywords
plate
heating
roof
assembly
joint piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921819956.9U
Other languages
Chinese (zh)
Inventor
姜杰
黄小芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Xinheyue Environmental Technology Co ltd
Original Assignee
Wuhan Xinheyue Environmental Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Xinheyue Environmental Technology Co ltd filed Critical Wuhan Xinheyue Environmental Technology Co ltd
Priority to CN201921819956.9U priority Critical patent/CN211059479U/en
Application granted granted Critical
Publication of CN211059479U publication Critical patent/CN211059479U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a warm logical pipe supports mounting structure relates to the piping erection field, hang subassembly, first adjusting part, second adjusting part, fixed subassembly and warm logical pipeline including bottom plate, lateral part joint subassembly, top, the top hangs the subassembly and includes L shape installation fixed plate, roof, L shape installation fixed plate is equipped with two sets of and bilateral symmetry and arranges, the horizontal part of L shape installation fixed plate passes through expansion bolts fixed mounting on the roof, L shape installation fixed plate's bottom is connected and is fixed with the roof, lateral part joint subassembly is provided with two sets ofly, lateral part joint subassembly vertical layout, the top horizontal slip assembly of lateral part joint subassembly in the roof, the bottom horizontal slip assembly of lateral part joint subassembly in the bottom plate, lateral part joint subassembly passes through fixed subassembly demountable installation in the both sides department of roof the utility model discloses have the installation that can be applicable to the pipeline of different thicknesses, the high effect of practicality.

Description

Warm siphunculus supports mounting structure
Technical Field
The utility model belongs to the technical field of the piping erection technique and specifically relates to a heating ventilation pipe supports mounting structure is related to.
Background
At present, the heating ventilation is called as heat supply, gas supply, ventilation and air conditioning engineering in subject classification, and comprises the following steps: in the three aspects of heating, ventilation and air conditioning, the heating through pipes have various types according to different construction requirements in actual installation, and the heating through pipes of different types have different thicknesses.
Retrieving a chinese patent with publication number 201820046829.9 now and disclosing a warm logical pipe installation special stand, including the pipe strap, the inboard of pipe strap is provided with the tooth, and the lower extreme of pipe strap is provided with reinforcing bolt, the upper end of pipe strap is provided with the connecting seat, the upper end of connecting seat is provided with the extension board.
The above prior art solutions have the following drawbacks: the heating through pipe is clamped by the two pipe clamps, the radian of the pipe clamps is fixed, the heating through pipe with one diameter and the thickness can only be matched, and the heating through pipe with different thicknesses can not be adjusted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a warm siphunculus supports mounting structure has the installation that can be applicable to the pipeline of different thicknesses, advantage that the practicality is high.
The utility model discloses an above-mentioned purpose can be realized through following technical scheme that a warm logical pipe supports mounting structure, including bottom plate, lateral part joint subassembly, top suspension subassembly, first adjusting part, second adjusting part, fixed subassembly and warm logical pipeline, the top suspension subassembly includes L shape installation fixed plate, roof, L shape installation fixed plate is equipped with two sets and bilateral symmetry arranges, the horizontal part of L shape installation fixed plate passes through expansion bolts fixed mounting on the roof, the bottom connection of L shape installation fixed plate is fixed with the roof, lateral part joint subassembly is provided with two sets, lateral part joint subassembly vertical arrangement, the top of lateral part joint subassembly is slided from side to side and is assembled in the roof, the bottom of lateral part joint subassembly slide from side to side is assembled in the bottom plate, lateral part joint subassembly passes through fixed subassembly demountable installation in the both sides department of roof, warm logical pipeline passes in the frame that bottom plate, two sets of lateral part joint subassemblies and top suspension subassembly formed;
a first adjusting assembly is arranged between the two groups of side clamping assemblies, and the distance between the two groups of side clamping assemblies is adjusted through the first adjusting assembly, so that the clamping degree of the two sides of the heating and ventilating pipeline is adjusted;
and a second adjusting assembly is arranged on the top suspension assembly and used for adjusting the distance between the second adjusting assembly and the base plate relative to the second adjusting assembly, and then the warm through pipe is clamped by the second adjusting assembly and the base plate.
Through adopting above-mentioned technical scheme, top suspension assembly and lateral part joint subassembly demountable installation, reserve sufficient construction space for laying of warm logical pipeline, when being connected two sets of lateral part joint subassemblies with top suspension assembly, form a frame and lay and reserve sufficient space for running through of warm logical pipeline, the distance of two sets of lateral part joint subassemblies is reduced to the first adjusting part of rethread, it is tight to make its both sides that will warm logical pipeline press from both sides, adjust the second adjusting part and make its and the bottom plate between the distance reduce, the upper and lower portion that will warm logical pipeline presss from both sides tightly, can adjust and press from both sides the pipeline tightly according to the pipeline of different thicknesses, therefore, the practicability is high, and convenient for operation, and is simple.
The utility model discloses further set up to, lateral part joint subassembly includes: the side plate is connected and fixed with the first fixing rod on one side close to the heating and ventilation pipeline, one end, far away from the side plate, of the first fixing rod is connected and fixed with the middle of the first clamping piece, and the length direction of the first clamping piece is perpendicular to the arrangement direction of the heating and ventilation pipeline.
Through adopting above-mentioned technical scheme, the arc design, when first joint piece supports tight warm logical pipeline, elastic deformation takes place for first joint piece, has certain clamping-force to warm logical pipeline for first joint piece is more firm with warm logical pipeline's relation of connection.
The utility model discloses further set up as, first adjusting part includes: the bottom of each side plate is fixedly connected with the dovetail slide block, a dovetail groove is formed in the upper surface of the bottom plate and is perpendicular to the arrangement direction of the heating and ventilation pipeline, the dovetail slide block is assembled with the dovetail groove in a sliding mode, a cap portion and a thread portion are arranged at two ends of the first screw respectively, the first screw penetrates through the two side plates simultaneously, the thread portion of the first screw extends out of one side plate, the first nut is assembled with the thread portion in a threaded mode, and the first nut and the cap portion are located on the outer sides of the two side plates respectively.
Through adopting above-mentioned technical scheme, enable the dovetail slider and freely slide in the dovetail recess, and be difficult for breaking away from in the dovetail recess, and then drive two blocks of curb plates and be close to each other or keep away from and be connected with the bottom plate all the time, when warm logical pipeline is supported tightly with two blocks of curb plates orientation, through screwing up first nut, and then fixed with the distance between two blocks of curb plates, make first joint piece on the curb plate stable, firm will warm logical pipeline and press from both sides tightly.
The utility model discloses further set up to, the second adjusting part includes: the top middle position of the top plate is provided with a threaded through hole, the second screw is assembled in the threaded through hole in a threaded mode and penetrates through the top plate, the bottom end of the second screw is rotatably connected with the second clamping piece, the length direction of the second clamping piece is perpendicular to the arrangement direction of the heating and ventilation pipeline, and the second clamping piece is located below the top plate.
Through adopting above-mentioned technical scheme, the length direction that makes the second joint piece warms up the pipeline all the time perpendicularly and lays the direction setting, when rotating the second screw rod, makes the second joint piece not rotate thereupon, and the bottom of second screw rod is close to warm logical pipeline gradually, and then drives the top that the second joint piece pasted tight warm logical pipeline and will warm the upper and lower portion of logical pipeline with the bottom plate and press from both sides tightly, further consolidates installation fastness, the stability of warm logical pipeline.
The utility model discloses further set up to, fixed subassembly includes: a rotating block, a rotating rod and a fixed plate,
the top of curb plate has seted up the round platform recess, the turning block rotates the assembly with the round platform recess, the turning block exposes the one end of round platform recess and is connected fixedly with the dwang, the one end that the curb plate was kept away from to the dwang is connected fixedly with the middle part of fixed plate, the roof is seted up two rectangle through-holes of laying along upper and lower direction, two fixed plate and rectangle through-hole looks adaptation, when two fixed plates passed the rectangle through-hole of roof, and is rotatory the fixed plate makes it perpendicular with the rectangle through-hole, is fixed in the upper surface of roof with the fixed plate through the bolt.
Through adopting the above technical scheme, the turning block can still be difficult for breaking away from in the round platform recess in the free rotation in the round platform recess, the turning block rotates and drives the dwang and rotate, and then drive the fixed plate and rotate, when the fixed plate is parallel with the rectangle through-hole, make the fixed plate run through from rectangle through-hole below to, when rotating fixed plate, the fixed plate is crossed with the rectangle through-hole, the fixed plate can not break away from rectangle through-hole department easily, and then make the fixed plate be connected with the roof and consolidate through the bolt, above-mentioned structure makes fixed subassembly and roof demountable installation, and then can dismantle lateral part joint subassembly from the roof or install, and is simple in operation, and flexible, be convenient for construct in the actual installation.
The utility model discloses further set up to, fixed third connecting rod is connected to the bottom plate in the bottom of forked tail recess, the top of third connecting rod is stretched out the forked tail recess and is connected fixed third joint piece, the length direction of third joint piece warms up the ventilation pipe perpendicularly and lays the direction setting.
Through adopting above-mentioned technical scheme, when the installation, block the bottom that the pipeline was led to the heating through the third joint piece, also play a supporting role to the pipeline that leads to the heating simultaneously.
The utility model discloses further set up to, the shape structure of first joint piece, second joint piece and third joint piece is the same, and is elastic steel sheet.
Through adopting above-mentioned technical scheme, elastic steel sheet can produce elastic deformation under the effect of certain power, and can resume original shape again after the effect of removal force for first joint piece, second joint piece and third joint piece can laminate in the warm outside setting of logical pipeline of different thicknesses and when external force disappears under having the effect of external force, and the easy reconversion is drawn materials convenient and repeatedly usable.
The utility model discloses further set up to, first joint piece, second joint piece and third joint piece have the rubber slab through glue subsides near one side of warm logical pipeline.
Through adopting above-mentioned technical scheme, the rubber slab that increases plays the cushioning effect to a certain extent for first joint piece, second joint piece and third joint piece will warm logical pipeline and be difficult for causing the damage to warm logical pipeline when pressing from both sides tightly, and the rubber material has certain anti-skidding effect, further strengthens first joint piece, second joint piece and third joint piece and warms the fastness of being connected between the logical pipeline.
To sum up, the utility model discloses a beneficial technological effect does:
firstly, the top suspension assembly and the side clamping assemblies are detachably mounted, the heating and ventilation pipeline is arranged, when two groups of side clamping assemblies are connected with the top suspension assembly, a frame is formed to reserve enough space for the through arrangement of the heating and ventilation pipeline, the distance between the two groups of side clamping assemblies is reduced through the first adjusting assembly, so that the two sides of the heating and ventilation pipeline are clamped tightly, the distance between the second adjusting assembly and the bottom plate is reduced through adjusting the second adjusting assembly, the upper part and the lower part of the heating and ventilation pipeline are clamped tightly, the pipeline can be adjusted and clamped tightly according to different thicknesses, the practicability is high, and the operation is convenient and simple;
it is two, the turning block can be difficult for breaking away from in the round platform recess in the free rotation in the round platform recess, the round platform rotates and drives the dwang and rotate, and then drive the fixed plate and rotate, when the fixed plate is parallel with the rectangle through-hole, make the fixed plate run through from rectangle through-hole below to, when rotating the fixed plate, the fixed plate is alternately with the rectangle through-hole, the fixed plate can not break away from rectangle through-hole department easily, and then make fixed plate and roof be connected and consolidate through the bolt, above-mentioned structure makes fixed subassembly and roof demountable installation, and then can dismantle or install lateral part joint subassembly from the roof, the operation is simple, and flexibility, be convenient for construct in actual installation.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the connection relationship between the middle clamping assembly and the top and bottom plates
Fig. 3 is an exploded view of the fixing assembly and the side plate of the present invention.
The number of the reference numbers is 1, a bottom plate, 2, a top suspension assembly, 21, L-shaped installation fixing plates, 22, a top plate, 3, a side clamping assembly, 31, a side plate, 32, a first fixing rod, 33, a first clamping sheet, 4, a first adjusting assembly, 41, a dovetail-shaped sliding block, 42, a first screw rod, 43, a first nut, 5, a second adjusting assembly, 51, a second clamping sheet, 52, a second screw rod, 6, a fixing assembly, 61, a rotating block, 62, a rotating rod, 63, a fixing plate, 7, a heating and ventilation pipeline, 8, a third connecting rod, 9, a third clamping sheet and 10, a rubber plate.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a heating ventilation pipe supporting and mounting structure, which comprises a bottom plate 1, a side clamping component 3, a top suspension component 2, a first adjusting component 4, a second adjusting component 5, a fixing component 6 and a heating ventilation pipe 7, wherein the top suspension component 2 comprises L-shaped mounting fixing plates 21, a top plate 22, L-shaped mounting fixing plates 21 are provided with two groups and are arranged in bilateral symmetry, the horizontal part of the L-shaped mounting fixing plates 21 is fixedly mounted on the top of a wall through expansion bolts, the bottom end of the L-shaped mounting fixing plates 21 is welded and fixed with the top plate 22, the side clamping component 3 is provided with two groups, the side clamping component 3 is vertically arranged, the top of the side clamping component 3 is assembled on the top plate 22 in a left-right sliding manner, the bottom of the side clamping component 3 is assembled on the bottom plate 1 in a left-right sliding manner, the side clamping component 3 is detachably mounted at two sides of the top plate 22 through the fixing component 6, and the heating ventilation pipe 7 passes through a frame;
a first adjusting component 4 is arranged between the two groups of side clamping components 3, and the distance between the two groups of side clamping components 3 is adjusted through the first adjusting component 4, so that the clamping degree of the two sides of the heating and ventilating pipeline 7 is adjusted;
be equipped with second adjusting part 5 on the top suspension assembly 2, second adjusting part 5 is used for adjusting the distance between its self relative bottom plate 1, and then presss from both sides tight warm siphunculus through second adjusting part 5 and bottom plate 1.
The side clamping assembly 3 comprises: the side plate 31, the first fixing rod 32 and the first clamping sheet 33, the first clamping sheet 33 is arc-shaped, the first fixing rod 32 is fixed to one side of the side plate 31 close to the heating and ventilation pipeline 7 in a welding mode, one end, far away from the side plate 31, of the first fixing rod 32 is fixed to the middle of the first clamping sheet 33 in a welding mode, and the length direction of the first clamping sheet 33 is perpendicular to the arrangement direction of the heating and ventilation pipeline 7. When the first clamping sheet 33 abuts against the heating ventilation pipeline 7, the first clamping sheet 33 is elastically deformed, so that certain clamping force is provided for the heating ventilation pipeline 7, and the connection relation between the first clamping sheet 33 and the heating ventilation pipeline 7 is firmer.
The first adjustment assembly 4 comprises: dovetail slider 41, first screw rod 42 and first nut 43, the bottom of curb plate 31 is connected and is fixed with dovetail slider 41, the dovetail recess has been seted up to the upper surface of bottom plate 1, the dovetail recess perpendicular to warm logical pipeline 7 lays the direction, dovetail slider 41 and dovetail recess sliding assembly, the both ends of first screw rod 42 are provided with cap portion and screw thread section respectively, first screw rod 42 runs through two curb plates 31 simultaneously, and the screw thread section of first screw rod 42 stretches out one of them curb plate 31, first nut 43 and screw thread section screw thread assembly, first nut 43 and cap portion are located the outside of two curb plates 31 respectively.
Enable dovetail slider 41 free slip in dovetail recess, and be difficult for breaking away from in the dovetail recess, and then drive two blocks of curb plates 31 and be close to each other or keep away from and be connected with bottom plate 1 all the time, when supporting two blocks of curb plates 31 towards warm logical pipeline 7 tightly, through screwing up first nut 43, and then fix the distance between two blocks of curb plates 31, make the first joint piece 33 on the curb plate 31 stable, firm will warm logical pipeline 7 and press from both sides tightly.
The second adjustment assembly 5 comprises: the top middle position of the top plate 22 is provided with a threaded through hole, the second screw rod 52 is assembled in the threaded through hole in a threaded mode and penetrates through the top plate 22, the bottom end of the second screw rod 52 is rotatably connected with the second clamping piece 51, the length direction of the second clamping piece 51 is perpendicular to the arrangement direction of the heating and ventilation pipeline 7, and the second clamping piece 51 is located below the top plate 22. The length direction that makes second joint piece 51 warms up the pipeline 7 all the time perpendicularly and lays the direction setting, when rotating second screw rod 52, makes second joint piece 51 not rotate along with it, and the bottom of second screw rod 52 is close to warm pipeline 7 gradually, and then drives second joint piece 51 and pastes the top of tight warm pipeline 7 and press from both sides tightly with the upper and lower portion that the pipeline 7 will be warmed up with bottom plate 1, further consolidates installation fastness, the stability of warm pipeline 7.
The bottom plate 1 is connected fixed third connecting rod 8 in the bottom of forked tail recess, and forked tail recess and welded fastening third joint piece 9 are stretched out on the top of third connecting rod 8, and the length direction of third joint piece 9 warms up the pipeline 7 perpendicularly and lays the direction setting. When the heating and ventilation pipeline 7 is installed, the bottom of the heating and ventilation pipeline 7 is clamped through the third clamping sheet 9, and meanwhile, the heating and ventilation pipeline 7 is supported.
The first clamping sheet 33, the second clamping sheet 51 and the third clamping sheet 9 are the same in shape and structure and are all made of elastic steel sheets. Elastic steel sheet can produce elastic deformation under the effect of certain power, and can resume original shape again after the effect of power of getting rid of for first joint piece 33, second joint piece 51 and third joint piece 9 can laminate in the warm outside setting of logical pipeline 7 of different thicknesses and when external force disappears under having the effect of external force, and the easy reconversion is drawn materials convenient and repeatedly usable.
The rubber plate 10 is adhered to the sides of the first, second and third snap pieces 33, 51 and 9 adjacent to the heating and ventilating duct 7 by glue. The rubber sheet 10 that increases plays the cushioning effect to a certain extent for first joint piece 33, second joint piece 51 and third joint piece 9 will warm logical pipeline 7 tight clamp the time difficult damage to warm logical pipeline 7 that causes, and the rubber material has certain anti-skidding effect, further strengthens the fastness of being connected between first joint piece 33, second joint piece 51 and third joint piece 9 and the warm logical pipeline 7.
Referring to fig. 2 and 3, the fixing assembly 6 includes: the rotary block 61, dwang 62 and fixed plate 63, the round platform recess has been seted up on the top of curb plate 31, rotary block 61 rotates the assembly with the round platform recess, rotary block 61 exposes the one end of round platform recess and dwang 62 welded fastening, the one end that the curb plate 31 was kept away from to the dwang 62 is welded fastening with the middle part of fixed plate 63, roof 22 has seted up two rectangle through-holes of laying along the upper and lower direction, two fixed plates 63 and rectangle through-hole looks adaptation, when two fixed plates 63 passed the rectangle through-hole of roof 22, rotatory fixed plate 63 made it perpendicular with the rectangle through-hole, be fixed in the upper surface of roof 22 with fixed plate 63 through.
The rotating block 61 can freely rotate in the circular truncated cone groove and is not easy to break away from the circular truncated cone groove, the rotating block 61 rotates to drive the rotating rod 62 to rotate, the fixing plate 63 is driven to rotate, when the fixing plate 63 is parallel to the rectangular through hole, the fixing plate 63 is driven to run through from the lower side of the rectangular through hole, when the fixing plate 63 rotates, the fixing plate 63 is crossed with the rectangular through hole, the fixing plate 63 cannot easily break away from the rectangular through hole, the fixing plate 63 is connected with the top plate 22 and reinforced through bolts, the structure enables the fixing assembly 6 to be detachably mounted with the top plate 22, the lateral clamping assembly 3 can be detached or mounted from the top plate 22, the operation is simple and flexible, and construction is facilitated in the actual mounting process.
The implementation principle of the embodiment is as follows: top suspension subassembly 2 and lateral part joint subassembly 3 demountable installation, reserve sufficient construction space for laying of warm logical pipeline 7, when being connected two sets of lateral part joint subassemblies 3 and top suspension subassembly 2, form a frame and lay and reserve sufficient space for running through of warm logical pipeline 7, the distance of two sets of lateral part joint subassemblies 3 is reduced to rethread first adjusting part 4, it is tight to make its both sides that will warm logical pipeline 7 press from both sides, adjust the distance that second adjusting part 5 made between its and the bottom plate 1 and reduce, the upper and lower portion that will warm logical pipeline 7 presss from both sides tightly, can adjust and press from both sides the pipeline tightly according to the pipeline of different thicknesses, the practicality is high, and convenient for operation, it is simple.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. A heating and ventilation pipe supporting and mounting structure is characterized by comprising: a bottom plate (1), a side clamping component (3), a top suspension component (2), a first adjusting component (4), a second adjusting component (5), a fixing component (6) and a warm-ventilation pipeline (7),
the top suspension assembly (2) comprises L-shaped mounting fixing plates (21) and a top plate (22), wherein the L-shaped mounting fixing plates (21) are arranged in a bilateral symmetry mode, the horizontal part of the L-shaped mounting fixing plates (21) is fixedly mounted on a wall top through expansion bolts, the bottom end of the L-shaped mounting fixing plates (21) is fixedly connected with the top plate (22), the side clamping assemblies (3) are arranged in two groups, the side clamping assemblies (3) are vertically arranged, the tops of the side clamping assemblies (3) are assembled on the top plate (22) in a left-right sliding mode, the bottoms of the side clamping assemblies (3) are assembled on the bottom plate (1) in a left-right sliding mode, the side clamping assemblies (3) are detachably mounted on two sides of the top plate (22) through fixing assemblies (6), and the heating and ventilation pipeline (7) penetrates through a frame formed by the bottom plate (1), the two groups of the side clamping assemblies (3) and the top suspension assembly (2);
a first adjusting assembly (4) is arranged between the two groups of side clamping assemblies (3), and the distance between the two groups of side clamping assemblies (3) is adjusted through the first adjusting assembly (4), so that the clamping degree of the two sides of the heating and ventilation pipeline (7) is adjusted;
be equipped with second adjusting part (5) on top suspension subassembly (2), second adjusting part (5) are used for adjusting the distance between its self relative bottom plate (1), and then press from both sides tight warm siphunculus through second adjusting part (5) and bottom plate (1).
2. The heating ventilation tube support mounting structure according to claim 1, wherein the side clamping assembly (3) comprises: curb plate (31), first dead lever (32) and first joint piece (33), first joint piece (33) are the arc, curb plate (31) are close to warm one side of leading to pipe way (7) and connect and are fixed with first dead lever (32), the one end that curb plate (31) were kept away from in first dead lever (32) is connected fixedly with the middle part of first joint piece (33), the length direction of first joint piece (33) is perpendicular warms to lead to pipe way (7) and is laid the direction setting.
3. The heating coil support mounting structure of claim 2, wherein the heating coil support mounting structure is configured to support a heating coil in a heating coil
The first adjustment assembly (4) comprises: a dovetail-shaped sliding block (41), a first screw rod (42) and a first nut (43),
the bottom of the side plate (31) is fixedly connected with a dovetail-shaped sliding block (41), a dovetail-shaped groove is formed in the upper surface of the bottom plate (1), the dovetail-shaped groove is perpendicular to the arrangement direction of the heating and ventilation pipeline (7), the dovetail-shaped sliding block (41) is assembled with the dovetail-shaped groove in a sliding mode, a cap portion and a threaded portion are arranged at two ends of the first screw (42) respectively, the first screw (42) penetrates through the two side plates (31) simultaneously, the threaded portion of the first screw (42) extends out of one side plate (31), the first nut (43) is assembled with the threaded portion in a threaded mode, and the first nut (43) and the cap portion are located on the outer sides of the two side plates (31) respectively.
4. A heating and ventilation tube support mounting structure according to claim 3, wherein the second adjustment assembly (5) comprises: a second engagement piece (51), a second screw (52),
the top middle position of roof (22) has seted up the screw thread through-hole, second screw rod (52) screw thread assembly in the screw thread through-hole and run through roof (22), the bottom of second screw rod (52) is rotated and is connected with second joint piece (51), the length direction of second joint piece (51) is perpendicular warms up the ventilation pipe way (7) and is laid the direction and set up, second joint piece (51) are in the below of roof (22).
5. The heating ventilation tube support mounting structure according to claim 2, wherein the fixing assembly (6) comprises: a rotating block (61), a rotating rod (62) and a fixed plate (63),
the round platform recess has been seted up on the top of curb plate (31), turning block (61) and round platform recess rotate the assembly, the one end that the round platform recess was exposed in turning block (61) is connected fixedly with dwang (62), the one end that curb plate (31) were kept away from in dwang (62) is connected fixedly with the middle part of fixed plate (63), roof (22) are seted up two rectangle through-holes of laying along upper and lower direction, two fixed plate (63) and rectangle through-hole looks adaptation, when two fixed plate (63) pass the rectangle through-hole of roof (22), rotate fixed plate (63) make it perpendicular with the rectangle through-hole, are fixed in the upper surface of roof (22) with fixed plate (63) through the bolt.
6. The heating and ventilation pipe support and installation structure according to claim 4, wherein the bottom plate (1) is fixedly connected with a third connecting rod (8) at the bottom of the dovetail groove, the top end of the third connecting rod (8) extends out of the dovetail groove and is fixedly connected with a third clamping sheet (9), and the length direction of the third clamping sheet (9) is perpendicular to the arrangement direction of the heating and ventilation pipes (7).
7. The heating and ventilation pipe support and mounting structure according to claim 6, wherein the first, second and third snap tabs (33, 51, 9) are identical in shape and structure and are all made of elastic steel sheet.
8. The heating ventilation pipe support mounting structure according to claim 6, wherein the first, second and third snap tabs (33, 51, 9) are glued with a rubber plate (10) on a side close to the heating ventilation pipe (7).
CN201921819956.9U 2019-10-25 2019-10-25 Warm siphunculus supports mounting structure Expired - Fee Related CN211059479U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921819956.9U CN211059479U (en) 2019-10-25 2019-10-25 Warm siphunculus supports mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921819956.9U CN211059479U (en) 2019-10-25 2019-10-25 Warm siphunculus supports mounting structure

Publications (1)

Publication Number Publication Date
CN211059479U true CN211059479U (en) 2020-07-21

Family

ID=71585459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921819956.9U Expired - Fee Related CN211059479U (en) 2019-10-25 2019-10-25 Warm siphunculus supports mounting structure

Country Status (1)

Country Link
CN (1) CN211059479U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240476A (en) * 2020-10-13 2021-01-19 南京沃天科技有限公司 Stable mounting structure for pressure sensor
CN113048289A (en) * 2021-03-12 2021-06-29 曹凌微 A fixed mounting device for building warm logical pipeline
CN113418054A (en) * 2021-07-09 2021-09-21 华云川建设有限公司 Fire engineering pipeline installation device and installation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112240476A (en) * 2020-10-13 2021-01-19 南京沃天科技有限公司 Stable mounting structure for pressure sensor
CN113048289A (en) * 2021-03-12 2021-06-29 曹凌微 A fixed mounting device for building warm logical pipeline
CN113418054A (en) * 2021-07-09 2021-09-21 华云川建设有限公司 Fire engineering pipeline installation device and installation method

Similar Documents

Publication Publication Date Title
CN211059479U (en) Warm siphunculus supports mounting structure
CN2913772Y (en) Joint positioning structure for electronic expansion valve stator coil and valve body
CN204504032U (en) A kind of stamping line and terminal-collecting machine thereof
CN217784413U (en) Pipeline bracket for central air-conditioning engineering installation
CN214699483U (en) Mounting structure of suspender type air pipe
CN210344541U (en) Positioning device for mounting formed calcium silicate forming elbow
CN214740050U (en) Steel structure auxiliary mounting device
CN220281311U (en) Automobile wire harness corrugated pipe bracket
CN219624230U (en) Fastening structure of air conditioner pipeline
CN218208156U (en) Mounting structure of warm siphunculus
CN220727354U (en) Assembled process pipeline support
CN220870232U (en) Pipeline supporting device for installation of central air conditioning engineering
CN219796372U (en) Building water supply and drainage heating ventilation fixed mounting structure
CN213439196U (en) Pipeline connecting device for building heating and ventilation construction
WO2022082942A1 (en) Pipeline attached sheet fixing device
CN220060825U (en) Heat supply pipeline protection mechanism
CN217502826U (en) Pipeline fixing device for heating and ventilating air conditioner
CN215410562U9 (en) Heating and ventilation air conditioner installation fixing device
CN219082447U (en) Water conservancy pipeline supports connecting device
CN217142922U (en) Clamp for welding heating and ventilation pipe
CN217153258U (en) Make things convenient for welding-free gallows of steel construction building electromechanical pipeline installation
CN209910060U (en) Outdoor unit support of split air conditioner
CN215941680U (en) Device is decided to refrigerant pipe for air conditioner installation
CN219141070U (en) Air conditioner anti-shake installation device based on ground source heat pump
CN220930537U (en) Stainless steel tuber pipe installation construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200721

Termination date: 20211025