CN218063681U - Auxiliary device for installing heating and ventilation pipeline - Google Patents

Auxiliary device for installing heating and ventilation pipeline Download PDF

Info

Publication number
CN218063681U
CN218063681U CN202221651953.0U CN202221651953U CN218063681U CN 218063681 U CN218063681 U CN 218063681U CN 202221651953 U CN202221651953 U CN 202221651953U CN 218063681 U CN218063681 U CN 218063681U
Authority
CN
China
Prior art keywords
pipe
plate
fixedly connected
auxiliary device
arc board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221651953.0U
Other languages
Chinese (zh)
Inventor
张成博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221651953.0U priority Critical patent/CN218063681U/en
Application granted granted Critical
Publication of CN218063681U publication Critical patent/CN218063681U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ventilation (AREA)

Abstract

The utility model provides an auxiliary device is used in warm logical pipe installation, this auxiliary device is used in warm logical pipe installation, including first arc board and last arc board, the inside of first arc board is provided with warm logical pipe body, the first slide bar of fixed surface of rear surface of first arc board, the outside sliding connection of first slide bar has fixed pipe, the inside sliding connection of fixed pipe has the second slide bar, the arc board under the one end fixedly connected with second of fixed pipe is kept away from to the second slide bar, the inside of arc board all is provided with first fixed subassembly under first arc board and the second. The utility model provides an auxiliary device is used in warm logical pipeline installation has solved current warm logical pipeline of part and when installing, needs the staff to lift up warm logical pipeline, then installs warm logical pipeline, and work efficiency is lower, and working strength is great simultaneously, the problem of satisfying the user demand that can not be fine.

Description

Auxiliary device for installing heating and ventilation pipeline
Technical Field
The utility model relates to a warm logical pipeline field especially relates to an auxiliary device is used in warm logical pipeline installation.
Background
The thickness and specification of the heating and ventilation pipeline are variable according to requirements, both ends of the air pipe are always externally connected with accessories (such as an elbow and a reducing pipe) in the connection process, both ends of the heating and ventilation pipeline are not provided with grooves and are provided with sealing rings under the general condition, the application range of the heating and ventilation pipeline is very wide, and a purification system is fed back to the air pipe, a central air-conditioning ventilation pipe, an industrial air supply and exhaust ventilation pipe, an environmental protection system air suction and exhaust pipe, a mining gas drainage pipe, a mining rubberized cloth air duct and the like.
At present, when the warm logical pipeline of current part is being installed, need the staff to lift up warm logical pipeline, then install warm logical pipeline, work efficiency is lower, and working strength is great simultaneously, the demand that satisfies the user that can not be fine.
Therefore, it is necessary to provide a new auxiliary device for installing a heating ventilation pipeline to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a warm logical pipe-line installation is with auxiliary device which has the staff of being convenient for to install and fix warm logical pipe-line, can improve work efficiency to a certain extent simultaneously.
The utility model provides an auxiliary device is used in warm logical pipe installation, including first arc board and last arc board, the inside of first arc board is provided with warm logical pipe body, the first slide bar of back fixed surface of first arc board is connected with, the outside sliding connection of first slide bar has fixed pipe, the inside sliding connection of fixed pipe has the second slide bar, the arc board under the one end fixedly connected with second of fixed pipe is kept away from to the second slide bar, the inside of arc board all is provided with first fixed subassembly under first arc board and the second, the inside of going up the arc board is provided with the fixed subassembly of second.
In order to reach the effect that can make warm logical pipe body can stabilize and place, conduct the utility model provides an auxiliary device is used in warm logical pipe installation, it is preferred, first fixed subassembly includes spring, lower cardboard and soft board, the spring has all been welded to the inner circle of arc board under first arc board and the second, the top welding of spring has lower cardboard, the top of cardboard is provided with the soft board down.
In order to reach and rotate vertical regulation pipe and can drive the motion of vertical regulation pole, and then make the effect that the height of arc board can be adjusted under first arc board and the second, as the utility model provides an auxiliary device is used in warm logical pipeline installation, it is preferred, the equal fixedly connected with vertical regulation pole in bottom of arc board under first arc board and the second, the outside threaded connection of vertical regulation pole has vertical regulation pipe, the bottom of vertical regulation pipe is rotated and is connected with the base plate.
Can stabilize in first curb plate top in order to reach the screw rod and rotate for the effect that the screw rod can normally be operated, as the utility model provides an auxiliary device is used in warm logical pipeline installation, it is preferred, the equal fixedly connected with first curb plate in both sides of first arc board and second arc board down, the top of first curb plate is rotated and is connected with the screw rod.
In order to reach the effect that the motion of first transverse adjustment pole can drive the motion of first arc board, as the utility model provides a warm auxiliary device for ventilating pipe installation, it is preferred, the top fixedly connected with dead lever of first curb plate, the first transverse adjustment pole of rear surface fixedly connected with of first arc board.
In order to reach and rotate the transverse adjustment pipe and can drive first transverse adjustment pole and the motion of second transverse adjustment pole to can carry out the effect of adjusting to the transverse position of arc board under first arc board and the second, conduct the utility model provides an auxiliary device for the installation of warm logical pipeline, it is preferred, the outside threaded connection of first transverse adjustment pole has the transverse adjustment pipe, the inside threaded connection of transverse adjustment pipe has the second transverse adjustment pole, the one end that the transverse adjustment pipe was kept away from to the second transverse adjustment pole is connected with the front surface fixed connection of arc board under the second.
In order to reach the effect that can remain stable when rotating that makes the lateral adjustment pipe, as the utility model provides an auxiliary device is used in warm logical pipe installation, preferred, the outside of lateral adjustment pipe is rotated and is connected with the support cover, the bottom of supporting the cover and the top fixed connection of fixed pipe.
In order to reach under first arc board and the second arc board when carrying out longitudinal position adjustment, effect that can remain stable does the utility model provides a warm auxiliary device for logical pipe installation, it is preferred, the equal fixedly connected with second bracing piece in bottom of arc board under first arc board and the second, the outside sliding connection of second bracing piece has the second stay tube, the first bracing piece of bottom fixedly connected with of fixed pipe, the outside sliding connection of first bracing piece has first stay tube.
Can fix warm logical pipe body in order to reach, prevent that warm logical pipe body from at will gliding effect at the in-process of installation, conduct the utility model provides an auxiliary device is used in warm logical pipe erection, it is preferred, the fixed subassembly of second includes rotating-tube, carriage release lever and last cardboard, the inside rotation of going up the arc board is connected with the rotating-tube, the inside threaded connection of rotating-tube has the carriage release lever, the cardboard is gone up to the bottom fixedly connected with of carriage release lever.
In order to reach and rotate the screw rod and can drive the motion of second curb plate, and then can drive the effect of going up the arc board motion when the motion of second curb plate, do the utility model provides an auxiliary device is used in warm logical pipeline installation, it is preferred, go up the top fixedly connected with fixed block of arc board, one side fixedly connected with roof of fixed block, go up the equal fixedly connected with second curb plate in both sides of arc board, the through-hole has been seted up to the inside of second curb plate, the bottom of roof is rotated with the top of rotating-tube and is connected.
Compared with the prior art, the beneficial effects of the utility model are that:
this auxiliary device is used in warm logical pipeline installation, through setting up the fixed subassembly of first fixed subassembly and second, when the staff need install warm logical pipe body, at first the top of soft board is placed to warm logical pipe body, then rotate the rotating tube, the rotating tube drives the carriage release lever motion, and then the carriage release lever drives the cardboard motion, it can extrude warm logical pipe body to go up the cardboard, make warm logical pipe body oppress cardboard down, thereby make warm logical pipe body can be fixed tightly by the fixed subassembly of first fixed subassembly and second, prevent that warm logical pipe body from sliding, and then the staff of being convenient for installs warm logical pipe body, improve the installation effectiveness of warm logical pipe body, current partial warm logical pipeline is when installing having solved, it will warm logical pipeline to need the staff to lift, then install warm logical pipeline, work efficiency is lower, working strength is great simultaneously, the problem of user's demand can not be fine satisfied.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of an auxiliary device for installing a heating and ventilation pipeline according to the present invention;
fig. 2 is a schematic view of the structural connection between the first fixing component and the first lower arc plate according to the present invention;
FIG. 3 is a schematic view of the structural connection between the second fixing member and the upper arc plate according to the present invention;
FIG. 4 is a schematic view of the structural connection between the first lateral adjustment rod and the lateral adjustment tube of the present invention;
fig. 5 is an enlarged schematic view of a structure shown in fig. 2 according to the present invention.
Reference numbers in the figures: 1. a first lower arc plate; 2. an upper arc plate; 3. a heating and ventilation pipe body; 4. a first slide bar; 5. a fixed tube; 6. a second slide bar; 7. a second lower arc plate; 8. a first fixed component; 81. a spring; 82. a lower clamping plate; 83. a soft board; 9. a second fixed component; 91. rotating the tube; 92. a travel bar; 93. an upper clamping plate; 10. a longitudinal adjusting rod; 11. a longitudinal adjustment tube; 12. a substrate; 13. a first side plate; 14. a screw; 15. a fixing rod; 16. a first transverse adjusting rod; 17. a lateral adjustment tube; 18. a second transverse adjusting rod; 19. a support sleeve; 20. a first support bar; 21. a first support tube; 22. a second support bar; 23. a second support tube; 24. a fixed block; 25. a top plate; 26. a second side plate; 27. and a through hole.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5 in combination, wherein fig. 1 is a schematic structural view of an auxiliary device for installing a heating and ventilating duct according to a preferred embodiment of the present invention; fig. 2 is a schematic view of the structural connection between the first fixing assembly and the first lower arc plate according to the present invention; FIG. 3 is a schematic view of the structural connection between the second fixing member and the upper arc plate according to the present invention; FIG. 4 is a schematic view of the structural connection between the first lateral adjustment rod and the lateral adjustment tube of the present invention; fig. 5 is an enlarged schematic view of a structure shown in fig. 2 according to the present invention. The utility model provides a warm auxiliary device for pipe installation that leads to, including first arc board 1 and last arc board 2, the inside of first arc board 1 is provided with warm siphunculus body 3, the first slide bar 4 of rear surface fixedly connected with of first arc board 1, the outside sliding connection of first slide bar 4 has fixed pipe 5, the inside sliding connection of fixed pipe 5 has second slide bar 6, arc board 7 under the one end fixedly connected with second of fixed pipe 5 is kept away from to second slide bar 6, the inside of arc board 7 all is provided with first fixed subassembly 8 under first arc board 1 and the second, the inside of going up arc board 2 is provided with the fixed subassembly 9 of second.
In a specific implementation process, as shown in fig. 2, 4 and 5, the first fixing assembly 8 includes a spring 81, a lower catch plate 82 and a soft plate 83, the springs 81 are welded to inner rings of the first lower arc plate 1 and the second lower arc plate 7, the lower catch plate 82 is welded to the top of the spring 81, and the soft plate 83 is arranged on the top of the lower catch plate 82.
The bottom of the first lower arc plate 1 and the bottom of the second lower arc plate 7 are fixedly connected with a longitudinal adjusting rod 10, the outer side of the longitudinal adjusting rod 10 is in threaded connection with a longitudinal adjusting pipe 11, and the bottom of the longitudinal adjusting pipe 11 is rotatably connected with a base plate 12.
The first side plate 13 is fixedly connected to two sides of the first lower arc plate 1 and the second lower arc plate 7, and a screw 14 is rotatably connected to the top of the first side plate 13.
The top of the first side plate 13 is fixedly connected with a fixing rod 15, and the rear surface of the first lower arc plate 1 is fixedly connected with a first transverse adjusting rod 16.
The outer side of the first transverse adjusting rod 16 is in threaded connection with a transverse adjusting pipe 17, the inner portion of the transverse adjusting pipe 17 is in threaded connection with a second transverse adjusting rod 18, and one end, far away from the transverse adjusting pipe 17, of the second transverse adjusting rod 18 is fixedly connected with the front surface of the second lower arc plate 7.
The outer side of the transverse adjusting pipe 17 is rotatably connected with a supporting sleeve 19, and the bottom of the supporting sleeve 19 is fixedly connected with the top of the fixed pipe 5.
The bottom of the first lower arc plate 1 and the bottom of the second lower arc plate 7 are fixedly connected with a second supporting rod 22, the outer side of the second supporting rod 22 is slidably connected with a second supporting tube 23, the bottom of the fixed tube 5 is fixedly connected with a first supporting rod 20, and the outer side of the first supporting rod 20 is slidably connected with a first supporting tube 21.
It should be noted that: when the staff need install warm logical pipe body 3, at first according to the specific height of installation, rotate vertical control pipe 11, vertical control pipe 11 drives vertical regulation pole 10 motion, and then under the effect of vertical regulation pole 10, can drive arc board 7 motion under first arc board 1 and the second, thereby can adjust the height of arc board 7 under first arc board 1 and the second, after first arc board 1 and the vertical position of second arc board 7 are adjusted, rotate horizontal control pipe 17, horizontal control pipe 17 drives first horizontal control pole 16 and the motion of second horizontal control pole 18, and then can adjust the horizontal position of arc board 7 under first arc board 1 and the second, make the horizontal position of arc board 7 under first arc board 1 and the second can change, when arc board 7 moves under first arc board 1 and the second, can drive first bracing piece 20 and slide in the inside of first bracing piece 21, and then make the motion of arc board 1 and second arc board 7 can keep stable.
Referring to fig. 3, the second fixing assembly 9 includes a rotating pipe 91, a moving rod 92 and an upper clamping plate 93, the rotating pipe 91 is rotatably connected to the inside of the upper arc plate 2, the moving rod 92 is threadedly connected to the inside of the rotating pipe 91, and the upper clamping plate 93 is fixedly connected to the bottom of the moving rod 92.
Go up the top fixedly connected with fixed block 24 of arc board 2, one side fixedly connected with roof 25 of fixed block 24, go up the equal fixedly connected with second curb plate 26 in both sides of arc board 2, through-hole 27 has been seted up to the inside of second curb plate 26, and the bottom of roof 25 is rotated with the top of rotating-tube 91 and is connected.
It should be noted that: after the longitudinal position and the transverse position of arc board 7 adjusted to finish under first arc board 1 and second, to warm logical pipe body 3 and place the top at soft board 83, make spring 81 compressed, then rotate screw rod 14, screw rod 14 drives the motion of second curb plate 26, and then can adjust the longitudinal position of last arc board 2, after the longitudinal position adjustment of last arc board 2 finishes, rotate the swinging head 91, swinging head 91 drives the motion of carriage release lever 92, drive the motion of cardboard 93 when the motion of carriage release lever 92, and then can fix warm logical pipe body 3, prevent that the gliding condition from appearing when the installation of warm logical pipe body 3.
The utility model provides a pair of auxiliary device is used in warm logical pipeline installation's theory of operation as follows:
when the worker needs to install the heating ventilation pipe body 3, at first, the substrate 12 is placed at a designated position, then according to the specific height of installation, the longitudinal adjusting pipe 11 is rotated, the longitudinal adjusting pipe 11 drives the longitudinal adjusting rod 10 to move, and then under the action of the longitudinal adjusting rod 10, the first lower arc plate 1 and the second lower arc plate 7 can be driven to move, thereby the heights of the first lower arc plate 1 and the second lower arc plate 7 can be adjusted, after the longitudinal positions of the first lower arc plate 1 and the second lower arc plate 7 are adjusted, the transverse adjusting pipe 17 is rotated, the transverse adjusting pipe 17 drives the first transverse adjusting rod 16 and the second transverse adjusting rod 18 to move, and further the transverse positions of the first lower arc plate 1 and the second lower arc plate 7 can be adjusted, so that the transverse positions of the first lower arc plate 1 and the second lower arc plate 7 can be changed, when the first lower arc plate 1 and the second lower arc plate 7 move, the first supporting rod 20 can be driven to slide inside the first supporting pipe 21, so that the first lower arc plate 1 and the second lower arc plate 7 can be kept in the transverse positions when the first lower arc plate 1 and the second lower arc plate 7 move, and the longitudinal adjusting rod 7 can be kept in the case of the longitudinal adjusting rod 2, and the heating ventilation pipe body 3, then the heating ventilation pipe body can be prevented from moving, the top of the heating ventilation pipe body 92, the heating ventilation pipe body 2, and the heating ventilation pipe 14, and the heating ventilation pipe 21 can be prevented from moving, and the heating ventilation pipe 14, and the heating ventilation pipe 2, and the heating ventilation pipe 14.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (10)

1. The utility model provides an auxiliary device is used in warm logical pipeline installation, its characterized in that, includes first arc board (1) and last arc board (2) down, the inside of first arc board (1) is provided with warm logical pipe body (3), the rear surface fixedly connected with first slide bar (4) of first arc board (1) down, the outside sliding connection of first slide bar (4) has fixed pipe (5), the inside sliding connection of fixed pipe (5) has second slide bar (6), arc board (7) under the one end fixedly connected with second of fixed pipe (5) are kept away from in second slide bar (6), the inside of arc board (7) all is provided with first fixed subassembly (8) under first arc board (1) and the second, the inside of going up arc board (2) is provided with second fixed subassembly (9).
2. The auxiliary device for installing the heating and ventilation pipeline is characterized in that the first fixing component (8) comprises a spring (81), a lower clamping plate (82) and a soft plate (83), the spring (81) is welded on the inner rings of the first lower arc plate (1) and the second lower arc plate (7), the lower clamping plate (82) is welded on the top of the spring (81), and the soft plate (83) is arranged on the top of the lower clamping plate (82).
3. The auxiliary device for installing the heating and ventilation pipeline is characterized in that longitudinal adjusting rods (10) are fixedly connected to the bottoms of the first lower arc plate (1) and the second lower arc plate (7), longitudinal adjusting pipes (11) are connected to the outer sides of the longitudinal adjusting rods (10) in a threaded mode, and base plates (12) are rotatably connected to the bottoms of the longitudinal adjusting pipes (11).
4. The auxiliary device for installing the heating and ventilation pipeline according to claim 1, wherein a first side plate (13) is fixedly connected to both sides of the first lower arc plate (1) and the second lower arc plate (7), and a screw (14) is rotatably connected to the top of the first side plate (13).
5. The auxiliary device for installing a heating and ventilating duct according to claim 4, wherein a fixing rod (15) is fixedly connected to the top of the first side plate (13), and a first transverse adjusting rod (16) is fixedly connected to the rear surface of the first lower arc plate (1).
6. The auxiliary device for installing the heating and ventilation pipeline is characterized in that a transverse adjusting pipe (17) is in threaded connection with the outer side of the first transverse adjusting rod (16), a second transverse adjusting rod (18) is in threaded connection with the inner side of the transverse adjusting pipe (17), and one end, far away from the transverse adjusting pipe (17), of the second transverse adjusting rod (18) is fixedly connected with the front surface of the second lower arc plate (7).
7. The auxiliary device for installing the heating and ventilation pipeline is characterized in that a supporting sleeve (19) is rotatably connected to the outer side of the transverse adjusting pipe (17), and the bottom of the supporting sleeve (19) is fixedly connected with the top of the fixed pipe (5).
8. The auxiliary device for installing the heating and ventilation pipeline is characterized in that a second support rod (22) is fixedly connected to the bottoms of the first lower arc plate (1) and the second lower arc plate (7), a second support pipe (23) is slidably connected to the outer side of the second support rod (22), a first support rod (20) is fixedly connected to the bottom of the fixed pipe (5), and a first support pipe (21) is slidably connected to the outer side of the first support rod (20).
9. The auxiliary device for installing the heating and ventilation pipeline is characterized in that the second fixing component (9) comprises a rotating pipe (91), a moving rod (92) and an upper clamping plate (93), the rotating pipe (91) is rotatably connected to the inside of the upper arc plate (2), the moving rod (92) is connected to the inside of the rotating pipe (91) in a threaded mode, and the upper clamping plate (93) is fixedly connected to the bottom of the moving rod (92).
10. The auxiliary device for installing the heating and ventilation pipeline according to claim 9, wherein a fixing block (24) is fixedly connected to the top of the upper arc plate (2), a top plate (25) is fixedly connected to one side of the fixing block (24), second side plates (26) are fixedly connected to both sides of the upper arc plate (2), a through hole (27) is formed in each second side plate (26), and the bottom of each top plate (25) is rotatably connected to the top of the corresponding rotating pipe (91).
CN202221651953.0U 2022-06-28 2022-06-28 Auxiliary device for installing heating and ventilation pipeline Active CN218063681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221651953.0U CN218063681U (en) 2022-06-28 2022-06-28 Auxiliary device for installing heating and ventilation pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221651953.0U CN218063681U (en) 2022-06-28 2022-06-28 Auxiliary device for installing heating and ventilation pipeline

Publications (1)

Publication Number Publication Date
CN218063681U true CN218063681U (en) 2022-12-16

Family

ID=84436541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221651953.0U Active CN218063681U (en) 2022-06-28 2022-06-28 Auxiliary device for installing heating and ventilation pipeline

Country Status (1)

Country Link
CN (1) CN218063681U (en)

Similar Documents

Publication Publication Date Title
CN212251465U (en) Pipe clamp for fixing heating ventilation air conditioner pipeline
CN211548834U (en) Building curtain wall mounting and fixing support
CN107335948B (en) A kind of quick assembly tool of T profile
CN218063681U (en) Auxiliary device for installing heating and ventilation pipeline
CN208884960U (en) A kind of movable type scaffold bracket for overhead construction of building engineering
CN104759554B (en) A kind of stamping line and terminal-collecting machine thereof
CN110181441B (en) Positioning jig of stop valve
CN205600259U (en) Quick locking mechanism of screw
CN217784413U (en) Pipeline bracket for central air-conditioning engineering installation
CN215055004U (en) Paint spraying tool for building construction
CN206746884U (en) It is a kind of can spary side clamping device
CN212078774U (en) Load-bearing tripod
CN210421924U (en) Fixing support is reserved to sleeve pipe in well
CN217502844U (en) Metal pipeline support for steel structure erection
CN216587561U (en) Ceiling mounting bracket is used to hotel's building decoration
CN217557322U (en) Scalable regulation formula building curtain dropout prevention means
CN215523724U (en) Air conditioner installation device for heating and ventilation engineering
CN207547675U (en) A kind of aluminium ladder drilling assembly machine
CN220470847U (en) Supporting structure and ventilation pipe
CN220516711U (en) Simple top plate bolt mounting tool
CN220401685U (en) Solar cell panel fastener
CN210029955U (en) Heating and ventilation engineering installation structure
CN217559204U (en) Fixing device for building heating and ventilation
CN219177097U (en) Heating and ventilation pipeline mounting bracket
CN215110913U (en) Auxiliary device with carrying function for laying sewage pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant