CN210622226U - Building rubbish clearing device in high-rise building construction floor - Google Patents

Building rubbish clearing device in high-rise building construction floor Download PDF

Info

Publication number
CN210622226U
CN210622226U CN201921302954.2U CN201921302954U CN210622226U CN 210622226 U CN210622226 U CN 210622226U CN 201921302954 U CN201921302954 U CN 201921302954U CN 210622226 U CN210622226 U CN 210622226U
Authority
CN
China
Prior art keywords
pipe
fixedly connected
building
pipe wall
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921302954.2U
Other languages
Chinese (zh)
Inventor
朱娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921302954.2U priority Critical patent/CN210622226U/en
Application granted granted Critical
Publication of CN210622226U publication Critical patent/CN210622226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a building rubbish clearance device in high-rise building construction floor belongs to building construction equipment technical field, include and constitute the clear passageway of spiral jointly by a plurality of spiral pipes and pipe connection spare, the fixedly connected with passage all inclines on one side pipe wall of a plurality of spiral pipes, the vertical fixedly connected with sleeve pipe of one end of passage, the intraductal inlet pipe that has cup jointed that slides of cover, it rotates to have connected with the ring gear to feed through antifriction bearing on the pipe wall of inlet pipe, the eccentric fixedly connected with feeder hopper of upper end edge of ring gear, be equipped with in the feeder hopper and prevent stifled mechanism, fixedly connected with motor on the pipe wall of inlet pipe, the output fixedly connected with gear of motor. The utility model discloses, can high efficiency clear the intraformational building rubbish of high-rise building, the difficult clear passageway of blockking up of building rubbish when clearing the transportation moreover, effectual intensity of labour who has alleviateed the workman is difficult for producing raise dust and noise when the building rubbish is cleared the transportation simultaneously.

Description

Building rubbish clearing device in high-rise building construction floor
Technical Field
The utility model relates to a building construction equipment technical field especially relates to a building rubbish clearance device in high-rise building construction floor.
Background
The construction waste refers to construction waste generated by human or natural reasons in engineering and comprises waste concrete, waste residue soil, waste soil, residual mud, waste mortar, waste materials and the like. The materials are not helpful for the building per se, but are substances generated in the building process, and corresponding clearing treatment needs to be carried out in time, so that ideal engineering project construction can be achieved.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art when clearing building rubbish in the high-rise building construction floor, at first collect rubbish by the workman and pile, then load at the dolly that uses the building site and take the companion ladder and transport to ground, clear process of transporting is loaded down with trivial details slow, workman intensity of labour is great to building site road surface road conditions is relatively poor, it is slow to transport speed, has wasted the problem of manpower and materials, and the clear device of transporting of building rubbish in the high-rise building construction floor that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building rubbish clearance device in high-rise building construction floor, includes and constitutes the clear passageway of spiral jointly by a plurality of spiral pipes and pipe connection spare, and is a plurality of fixedly connected with passage all inclines on the pipe wall of one side of spiral pipe, the vertical fixedly connected with sleeve pipe of one end of passage, the inlet pipe has been cup jointed in the cover intraductal slip, it rotates and is connected with the ring gear to feed through antifriction bearing on the pipe wall of inlet pipe, the eccentric center fixedly connected with feeder hopper of upper end edge of ring gear, be equipped with in the feeder hopper and prevent stifled mechanism, fixedly connected with motor on the pipe wall of inlet pipe, the output fixedly connected with gear of motor, gear and ring gear meshing, the intraductal stop gear that.
Preferably, prevent stifled mechanism including invering the round platform in the feeder hopper, the lower extreme of round platform passes through the upper end mouth of pipe edge fixed connection of a plurality of connecting blocks and inlet pipe, a plurality of evenly distributed's of inboard fixedly connected with hemisphere lug of feeder hopper, the upper end fixedly connected with toper piece of round platform.
Preferably, stop gear is including fixing the annular piece in the cover, the lower extreme contact of annular piece is connected with the limiting plate, one side fixedly connected with transfer line of limiting plate, the bar through-hole has been seted up on the sheathed tube pipe wall, the pole wall of transfer line is rotated through the lateral wall of pivot with the bar through-hole and is connected, bar through-hole and fixedly connected with tension spring are passed to the one end of transfer line, tension spring keeps away from the one end and the sheathed tube pipe wall fixed connection of transfer line.
Preferably, the outer edge of the opening at the upper end of the sleeve is connected with a limiting bolt through a threaded hole, and one end of the limiting bolt penetrates through the threaded hole and is in contact connection with the pipe wall of the feeding pipe.
Preferably, an L-shaped rod is fixedly connected to the pipe wall of the material guide pipe, and an installation plate is fixedly connected to one end of a horizontal portion of the L-shaped rod.
Compared with the prior art, the utility model provides a building rubbish clearance device in high-rise building construction floor possesses following beneficial effect:
1. this device is cleared to building rubbish in high-rise building construction floor, through the pipe connection spare that is equipped with, spiral pipe, mounting panel, L type pole, feeder hopper, inlet pipe, sleeve pipe, passage, spacing bolt, motor, gear, ring gear, hemisphere lug and round platform, can extrude building rubbish for the great concrete piece of caking splits, avoids blockking up in the clear passageway of carrying of spiral, the effectual clear efficiency of carrying that increases building rubbish.
2. This device is cleared to building rubbish in high-rise building construction floor through sleeve pipe, limiting plate, annular piece, transfer line and the tension spring that is equipped with, can be so that when clearing rubbish, the interior gas of spiral clear transport passageway is difficult for discharging from the passage, produces raise dust and noise when avoiding the clear transport passageway of spiral to use.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses, can high efficiency clear the intraformational building rubbish of high-rise building, the difficult clear passageway of blockking up of building rubbish when clearing the transportation moreover, effectual workman's intensity of labour that has alleviateed is difficult for producing raise dust and noise when the building rubbish is cleared the transportation simultaneously.
Drawings
Fig. 1 is a schematic structural view of a construction waste clearing device in a high-rise building construction floor provided by the utility model;
fig. 2 is a schematic view of the internal structure of a sleeve in the device for clearing and transporting the construction waste in the construction floor of the high-rise building provided by the utility model;
fig. 3 is an enlarged view of a structure at a in fig. 1.
In the figure: the device comprises a spiral pipe 1, a pipeline connecting piece 2, a material guide pipe 3, a sleeve 4, a mounting plate 5, an L-shaped rod 6, a tension spring 7, a limiting plate 8, an annular block 9, a transmission rod 10, a feeding pipe 11, a hemispherical bump 12, a feeding hopper 13, a conical block 14, a circular truncated cone 15, a gear ring 16, a motor 17 and a gear 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-3, a device for clearing and transporting construction wastes in a high-rise building construction floor comprises a spiral clearing and transporting channel composed of a plurality of spiral pipes 1 and a pipeline connecting piece 2, wherein a material guide pipe 3 is fixedly connected to the pipe wall of one side of each spiral pipe 1 in an inclined manner, a sleeve pipe 4 is fixedly connected to one end of the material guide pipe 3 in a vertical manner, a material inlet pipe 11 is sleeved in the sleeve pipe 4 in a sliding manner, a limit bolt is connected to the outer edge of the pipe orifice of the upper end of the sleeve pipe 4 through a threaded hole in a threaded manner, one end of the limit bolt penetrates through the threaded hole and is in contact connection with the pipe wall of the material inlet pipe 11, the limit bolt is convenient for fixing the material inlet pipe 11 and the material inlet hopper 13, a gear ring 16 is rotatably connected to the pipe wall of the material inlet pipe 11 through a rolling bearing, be equipped with in the feeder hopper 13 and prevent stifled mechanism, fixedly connected with motor 17 on the pipe wall of inlet pipe 11, motor 17's model is K187 to its power input end passes through wire and control switch and external power source electric connection, and this technique has been widely used in the life, and the skilled person in the art should know, so do not do too much redundance again, motor 17's output fixedly connected with gear 18, gear 18 and ring gear 16 meshing are equipped with stop gear in the sleeve pipe 4.
The anti-blocking mechanism comprises a circular truncated cone 15 which is inverted in a feed hopper 13, the lower end of the circular truncated cone 15 is fixedly connected with the edge of an upper end pipe orifice of a feed pipe 11 through a plurality of connecting blocks, the inner side of the feed hopper 13 is fixedly connected with a plurality of hemispherical bumps 12 which are uniformly distributed, the hemispherical bumps 12 can increase the friction force between the feed hopper 13 and construction waste and are beneficial to being matched with the circular truncated cone 15 to crush the construction waste, the upper end of the circular truncated cone 15 is fixedly connected with a conical block 14, a limiting mechanism comprises an annular block 9 which is fixed in a sleeve 4, the lower end of the annular block 9 is in contact connection with a limiting plate 8, one side of the limiting plate 8 is fixedly connected with a transmission rod 10, a strip-shaped through hole is formed in the pipe wall of the sleeve 4, the rod wall of the transmission rod 10 is rotatably connected with the side wall of the strip-shaped through, the pipe wall of the material guide pipe 3 is fixedly connected with an L-shaped rod 6, one end of the horizontal part of the L-shaped rod 6 is fixedly connected with a mounting plate 5, and the spiral cleaning and transporting channel is convenient to mount step by step according to the number of layers of a building.
In the utility model, the spiral pipe 1 is installed layer by layer according to the number of floors by using the pipeline connecting piece 2, the mounting plate 5 is fixed on the wall by using the expansion bolt, and then the spiral clearing channel is fixed, when the garbage on different floors is cleared, the feeding hopper 13 is carried to reach the appointed floor, the feeding pipe 11 is inserted into the sleeve 4, the limit bolt is screwed for positioning, the construction garbage is added from the feeding hopper 13, when the agglomeration of the construction garbage is large, the starting motor 17 drives the gear 18 to rotate, the gear 18 rotates to drive the gear ring 16 to rotate the feeding hopper 13, the hemispherical lug 12 is driven to contact with one side of the circular platform 15 after the rotation of the feeding hopper 13, thereby the construction garbage can be extruded, the concrete block with large agglomeration is cracked, the blockage in the spiral clearing channel is avoided, the construction garbage enters the sleeve 4 and the guide pipe 3 from the feeding pipe 11, and then the construction garbage slides, effectual clearance efficiency that has increased building rubbish, and difficult production raise dust and noise, building rubbish falls on limiting plate 8 when entering into the sleeve pipe 4, limiting plate 8 receives building rubbish's gravity to drive transfer line 10 swing, it is flexible to drive tension spring 7 during the transfer line 10 swing, building rubbish is when passing through annular block 9, tension spring 7 stimulates transfer line 10 and makes limiting plate 8 reset, thereby when can making clearance rubbish, the interior gas of spiral clearance passageway is difficult for discharging from passage 3, produce the raise dust when avoiding the clearance passageway to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a building rubbish clearing device in high-rise building construction floor, includes and constitutes the spiral clearing passageway jointly by a plurality of spiral pipes (1) and pipe connection spare (2), its characterized in that, a plurality of fixedly connected with passage (3) all inclines on one side pipe wall of spiral pipe (1), the vertical fixedly connected with sleeve pipe (4) of one end of passage (3), slide in sleeve pipe (4) and cup jointed inlet pipe (11), it is connected with ring gear (16) to communicate antifriction bearing rotation on the pipe wall of inlet pipe (11), the inclined to one side axle center fixedly connected with feeder hopper (13) of upper end edge of ring gear (16), be equipped with anti-blocking mechanism in feeder hopper (13), fixedly connected with motor (17) on the pipe wall of inlet pipe (11), the output fixedly connected with gear (18) of motor (17), gear (18) and ring gear (16) meshing, and a limiting mechanism is arranged in the sleeve (4).
2. The device for clearing construction wastes in the construction floors of the high-rise buildings according to claim 1, wherein the anti-blocking mechanism comprises a circular truncated cone (15) which is inverted in a feed hopper (13), the lower end of the circular truncated cone (15) is fixedly connected with the edge of the upper end pipe orifice of the feed pipe (11) through a plurality of connecting blocks, the inner side of the feed hopper (13) is fixedly connected with a plurality of uniformly distributed hemispherical convex blocks (12), and the upper end of the circular truncated cone (15) is fixedly connected with a conical block (14).
3. The building rubbish clearing device in the high-rise building construction floor of claim 1, characterized in that, stop gear is including fixing annular piece (9) in sleeve pipe (4), the lower extreme contact of annular piece (9) is connected with limiting plate (8), one side fixedly connected with transfer line (10) of limiting plate (8), the bar through-hole has been seted up on the pipe wall of sleeve pipe (4), the pole wall of transfer line (10) is rotated through the pivot and the lateral wall of bar through-hole and is connected, bar through-hole and fixedly connected with tension spring (7) are passed to the one end of transfer line (10), tension spring (7) keep away from the one end of transfer line (10) and the pipe wall fixed connection of sleeve pipe (4).
4. The device for cleaning the building wastes in the construction floors of the high-rise buildings according to the claim 1, characterized in that a limit bolt is connected with the outer edge of the upper end pipe orifice of the sleeve (4) through a threaded hole by screw threads, and one end of the limit bolt passes through the threaded hole and is connected with the pipe wall of the feeding pipe (11) in a contact way.
5. The device for cleaning the building wastes in the construction floors of the high-rise buildings according to the claim 1, characterized in that the pipe wall of the material guiding pipe (3) is fixedly connected with an L-shaped rod (6), and one end of the horizontal part of the L-shaped rod (6) is fixedly connected with a mounting plate (5).
CN201921302954.2U 2019-08-13 2019-08-13 Building rubbish clearing device in high-rise building construction floor Expired - Fee Related CN210622226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921302954.2U CN210622226U (en) 2019-08-13 2019-08-13 Building rubbish clearing device in high-rise building construction floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921302954.2U CN210622226U (en) 2019-08-13 2019-08-13 Building rubbish clearing device in high-rise building construction floor

Publications (1)

Publication Number Publication Date
CN210622226U true CN210622226U (en) 2020-05-26

Family

ID=70760755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921302954.2U Expired - Fee Related CN210622226U (en) 2019-08-13 2019-08-13 Building rubbish clearing device in high-rise building construction floor

Country Status (1)

Country Link
CN (1) CN210622226U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012430A (en) * 2020-08-31 2020-12-01 祝红星 Interlayer building construction building rubbish clearance system
CN113175181A (en) * 2021-05-21 2021-07-27 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012430A (en) * 2020-08-31 2020-12-01 祝红星 Interlayer building construction building rubbish clearance system
CN113175181A (en) * 2021-05-21 2021-07-27 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction
CN113175181B (en) * 2021-05-21 2023-02-03 中信国安建工集团有限公司 A rubbish is cleared and is transported device for high-rise building construction

Similar Documents

Publication Publication Date Title
CN210622226U (en) Building rubbish clearing device in high-rise building construction floor
CN109807121B (en) Top-down descending type pipeline cleaning robot
CN107380852A (en) A kind of slag waggon for being used to deliver urban building waste
CN207596096U (en) For the feeding system of mixing plant
CN210544934U (en) Anti-blocking modified starch raw material air conveying pipeline
CN202983825U (en) Salt-leaching system
CN208963982U (en) A kind of feeding device of building waste
CN111042834A (en) Concrete wet spraying machine and working method thereof
CN210449352U (en) Engineering garbage recycling device
CN110142096B (en) Engineering garbage recycling device
CN210285678U (en) Continuous material feeding unit of bottom building for building engineering
CN207153182U (en) A kind of three-level sedimentation basin
CN113426534B (en) Building solid waste treatment equipment with dustproof effect for high-rise building construction
CN211358973U (en) Solid waste processing apparatus for building engineering
CN207057199U (en) A kind of high-rise building cylinder flue automatic cleaning apparatus
CN115532381A (en) Construction waste portable transfer equipment
CN206307763U (en) Portable feed auger elevator
CN211544917U (en) Building engineering is carried with novel material device
CN212943144U (en) Building engineering residue processing apparatus
CN212171399U (en) Environment-friendly construction waste compaction processing apparatus
CN106966189A (en) A kind of refuse treatment conveyor for skyscraper
CN207119529U (en) A kind of spiral rolling screening machine
CN205708675U (en) A kind of novel architecture intelligent cement conveyer device
CN210965399U (en) Construction waste treatment equipment
CN215631730U (en) Concrete conveying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200526