CN210965399U - Construction waste treatment equipment - Google Patents

Construction waste treatment equipment Download PDF

Info

Publication number
CN210965399U
CN210965399U CN201921311742.0U CN201921311742U CN210965399U CN 210965399 U CN210965399 U CN 210965399U CN 201921311742 U CN201921311742 U CN 201921311742U CN 210965399 U CN210965399 U CN 210965399U
Authority
CN
China
Prior art keywords
material conveying
treatment tank
fixed
conveying channel
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921311742.0U
Other languages
Chinese (zh)
Inventor
郑婷婷
黄南坚
郑楚龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhonglianjian Construction Engineering Co ltd
Original Assignee
Guangdong Zhonglianjian Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhonglianjian Construction Engineering Co ltd filed Critical Guangdong Zhonglianjian Construction Engineering Co ltd
Priority to CN201921311742.0U priority Critical patent/CN210965399U/en
Application granted granted Critical
Publication of CN210965399U publication Critical patent/CN210965399U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building, in particular to a construction waste treatment device, which solves the problems of adding waste materials, adopting manual stacking and loading to reduce the crushing effect in the prior art, and comprises a treatment tank, a material conveying channel, a material injection hopper and a material discharge pipe, wherein the upper part of the treatment tank is provided with a material inlet hole, a material conveying channel is fixed on the flange, a material conveying belt controlled to operate by a first motor is arranged in an inner cavity of the material conveying channel, a material injection hole is formed in the upper part of the material conveying channel, which is close to the material conveying belt, a material injection hopper is fixed on the bolt, a discharge hole is arranged at the bottom of the treatment tank, a discharge pipe is fixed on the flange, after the treatment tank is utilized to crush the waste materials, the waste material will be discharged through the discharging pipe, and simple structure continuity is strong, utilizes treatment facility to accomplish the broken processing to construction waste material, has increased the simple operation nature of reprocessing to broken processing back waste material.

Description

Construction waste treatment equipment
Technical Field
The utility model relates to a building technical field especially relates to a construction waste treatment facility.
Background
The construction waste refers to the general name of dregs, waste concrete, waste bricks and stones and other wastes produced by people in the production activities of the construction industry such as demolition, construction, decoration and repair. The construction waste can be classified into slag, concrete blocks, broken stone blocks, broken bricks and tiles, waste mortar, slurry, asphalt blocks, waste plastics, waste metals, waste bamboo and wood and the like according to the composition.
The garbage disposal device is mainly used for cleaning the wastes generated on the construction site, wherein the bricks are used for a plurality of wastes, and the wastes are hard wastes like bricks, so that the wastes are inconvenient to clean, and can be firstly disposed by the civil engineering garbage disposal device and then cleaned. The existing treatment device adopts manual stacking and filling for adding waste materials, so that the crushing effect is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the adding of the waste material that exists among the prior art, adopt the manual work to pile up and load, reduce the shortcoming of broken effect, and the construction waste treatment facility who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a construction waste treatment device comprises a treatment tank, a material conveying channel, a material injection hopper and a material discharge pipe, wherein a feeding hole is formed in the upper portion of the treatment tank, the material conveying channel is fixed on a flange, a material conveying belt controlled to operate through a first motor is arranged in an inner cavity of the material conveying channel, a material injection hole is formed in the material conveying channel close to the upper portion of the material conveying belt, the material injection hopper is fixed on the material conveying channel through bolts, and the material discharge hole is formed in the bottom of the treatment tank and the material discharge pipe is fixed on the flange;
the inner cavity of the treatment tank is internally provided with two first crushing paddles, a second crushing paddle is arranged between the first crushing paddles in a matched mode, an installation rod is fixed to an inner circular hole bolt of the second crushing paddle, a fixing rod is fixed to an inner circular hole bolt of the first crushing paddle, one end of the fixing rod extends to the outside of the treatment tank, and a belt is sleeved on the outside of the fixing rod.
Preferably, the outer wall bolt of defeated material passageway is fixed with first motor, and the output of first motor is connected with the belt roller through the shaft coupling transmission, and the belt roller is pegged graft defeated material is taken.
Preferably, a support frame is fixed to the outer bottom of the material conveying channel through bolts, and one end of the support frame is fixed to the outer wall of the treatment tank through bolts.
Preferably, the treatment tank is externally provided with a second motor, an output shaft of the second motor is in transmission connection with a fixed rod, and the fixed rod is sleeved with a belt.
Preferably, the belt is sleeved with two fixing rods, and bolts corresponding to the fixing rods are fixed on the first crushing paddle.
The utility model has the advantages that:
1. the utility model discloses, utilize the broken oar of first broken oar and second of mutually supporting, to falling into the waste material in the treatment tank through defeated material passageway, play the crushing effect.
2. The utility model discloses, utilize the treatment tank to accomplish the back to waste material broken handle, the waste material will discharge through the discharging pipe, and simple structure continuity is strong, utilizes treatment facility to accomplish the broken processing to construction waste material, has increased the simple operation nature of reprocessing waste material after the broken handle.
Drawings
FIG. 1 is a schematic front view of a construction waste treatment apparatus according to the present invention;
FIG. 2 is a schematic diagram of a right-view structure of the construction waste treatment equipment according to the present invention, wherein the first crushing paddle and the second motor are connected;
fig. 3 is a schematic top view of the material conveying channel and the material conveying belt of the construction waste treatment equipment of the present invention.
In the figure: 1 treatment tank, 2 first broken oar, 3 notes material hopper, 4 defeated material passageways, 5 first motor, 6 defeated material belts, 7 support frames, 8 second motor, 9 broken oar of second, 10 discharging pipes, 11 installation poles, 12 belts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example (b): referring to fig. 1-3, a construction waste treatment device comprises a treatment tank 1, a material conveying channel 4, a material injection hopper 3 and a discharge pipe 10, wherein the material conveying channel 4 is provided with a material injection hole at the upper part close to a material conveying belt 6, the material injection hopper 3 is fixed by a bolt, the bottom of the treatment tank 1 is provided with a discharge hole, and the discharge pipe 10 is fixed by a flange;
wherein, the feed port has been seted up on the upper portion of treatment tank 1 to the flange is fixed with defeated material passageway 4, sets up in the inner chamber of defeated material passageway 4 through the defeated material area 6 of first motor 5 control operation, and the outer wall bolt fastening of defeated material passageway 4 has first motor 5, and the output of first motor 5 has 12 rollers of belt through coupling joint transmission, and 12 rollers of belt are pegged graft on defeated material area 6.
Specifically, waste materials to be crushed are put into a material conveying channel 4 through a material injection hopper 3 and fall onto a material conveying belt 6, a belt 12 roller and the material conveying belt 6 are driven to operate by controlling a first motor 5, and the waste materials falling onto the upper end of the material conveying belt 6 can be driven to move towards a material outlet close to the material conveying channel 4 through the circulating operation of the material conveying belt 6, so that the waste materials fall into a treatment tank 1 through the material conveying channel 4;
further, utilize processing jar 1 to accomplish the back to waste material broken handle, the waste material will be discharged through discharging pipe 10, and simple structure continuity is strong, utilizes treatment facility to accomplish the broken processing to construction waste, has increased the simple operation nature of reprocessing to the waste material after the broken handle.
Wherein, be provided with two first broken oars 2 in the inner chamber of handling jar 1, and the cooperation is provided with the broken oar 9 of second between the first broken oar 2, the interior round hole bolt fastening of the broken oar 9 of second has installation pole 11, the interior round hole bolt fastening of first broken oar 2 has the dead lever, and the one end of dead lever extends to the outside of handling jar 1, the belt 12 has been cup jointed to the outside of dead lever, the externally mounted of handling jar 1 has second motor 8, and the output shaft transmission of second motor 8 is connected with the dead lever, the belt 12 has been cup jointed on the dead lever, two dead levers have been cup jointed on the belt 12, and the bolt fastening that the dead lever corresponds is on first broken oar 2.
It is specific, control the operation of second motor 8 drive dead lever, and make the dead lever drive the operation of belt 12, belt 12 drives the dead lever operation of being connected with the second not, consequently, through the rotation of two syntropy moving first broken oar 2, will drive the broken oar 9 of second and do the cooperation and do the operation, utilize the broken oar 2 of first broken oar and the broken oar 9 of second of mutually supporting, to falling into the waste material in the treatment tank 1 through defeated material passageway 4, play the crushing effect, waste material after the breakage will pass through the space between the broken oar 2 of first broken oar and the broken oar 9 of second, the landing is gone down, discharge through discharging pipe 10.
Preferably, the outer bottom of the material conveying channel 4 is fixed with a support frame 7 through bolts, one end of the support frame 7 is fixed on the outer wall of the treatment tank 1 through bolts, and the support frame 7 plays a bearing role in mounting and fixing the material conveying channel 4.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The construction waste treatment equipment comprises a treatment tank (1), a material conveying channel (4), a material injection hopper (3) and a discharge pipe (10), and is characterized in that the upper part of the treatment tank (1) is provided with a feeding hole, the material conveying channel (4) is fixed on a flange, a material conveying belt (6) which is controlled to operate through a first motor (5) is arranged in an inner cavity of the material conveying channel (4), the material conveying channel (4) is provided with a material injection hole close to the upper part of the material conveying belt (6), the material injection hopper (3) is fixed on the material conveying channel by bolts, the bottom of the treatment tank (1) is provided with a discharge hole, and the discharge pipe (10) is fixed on the flange;
the inner cavity of the treatment tank (1) is internally provided with two first crushing paddles (2), a second crushing paddle (9) is arranged between the first crushing paddles (2) in a matched mode, an installation rod (11) is fixed to an inner circular hole of the second crushing paddle (9) through a bolt, a fixing rod is fixed to an inner circular hole of the first crushing paddle (2) through a bolt, one end of the fixing rod extends to the outside of the treatment tank (1), and a belt (12) is sleeved on the outside of the fixing rod.
2. The construction waste treatment equipment as claimed in claim 1, wherein the outer wall of the material conveying channel (4) is fixed with a first motor (5) by bolts, and the output end of the first motor (5) is connected with a belt roller through a coupling transmission, and the belt roller is inserted on the material conveying belt (6).
3. The construction waste treatment apparatus as claimed in claim 1, wherein a support frame (7) is bolted to the outer bottom of the feed channel (4), and one end of the support frame (7) is bolted to the outer wall of the treatment tank (1).
4. The construction waste treatment apparatus according to claim 1, wherein a second motor (8) is installed outside the treatment tank (1), and an output shaft of the second motor (8) is in transmission connection with a fixing rod, and a belt (12) is sleeved on the fixing rod.
5. The construction waste treatment apparatus according to claim 1, wherein two fixing rods are sleeved on the belt (12), and bolts corresponding to the fixing rods are fixed on the first crushing paddle (2).
CN201921311742.0U 2019-08-14 2019-08-14 Construction waste treatment equipment Expired - Fee Related CN210965399U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921311742.0U CN210965399U (en) 2019-08-14 2019-08-14 Construction waste treatment equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921311742.0U CN210965399U (en) 2019-08-14 2019-08-14 Construction waste treatment equipment

Publications (1)

Publication Number Publication Date
CN210965399U true CN210965399U (en) 2020-07-10

Family

ID=71414501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921311742.0U Expired - Fee Related CN210965399U (en) 2019-08-14 2019-08-14 Construction waste treatment equipment

Country Status (1)

Country Link
CN (1) CN210965399U (en)

Similar Documents

Publication Publication Date Title
CN111359712B (en) Garbage crushing device for constructional engineering
CN211755442U (en) Building rubbish breaker for building engineering
CN110898912B (en) Construction is with useless reducing mechanism admittedly
CN107971105A (en) A kind of environment-friendly type processing unit for construction waste recycling
CN211801139U (en) Screening device is smashed to building rubbish
CN108906847B (en) Waste concrete treatment and raw material extraction and recovery device for building construction
CN112718794B (en) Harmless muck treatment system
CN213966794U (en) Secondary crushing equipment for waste concrete slag
CN210058435U (en) Integrated device suitable for sorting and crushing construction waste
CN210965399U (en) Construction waste treatment equipment
CN212018899U (en) Building rubbish sorting device for building
CN208661375U (en) A kind of building waste pulverizer
CN214765773U (en) Novel construction waste treatment device
CN215277563U (en) Breaker is used in concrete production
CN215197452U (en) Building rubbish breaker for building engineering
CN112659366B (en) Equipment for preparing self-insulation hollow building block by using building waste and preparation method thereof
CN211170489U (en) Construction waste screening processing apparatus
CN212524249U (en) Be used for building rubbish to retrieve cracker
CN210914469U (en) Conveying device for producing dry-mixed mortar powder
CN211070276U (en) Energy-concerving and environment-protective concrete crushing recovery unit
CN216727634U (en) Ground and for foundation engineering refuse treatment device
CN215277589U (en) Concrete is with smashing recovery unit
CN111068894A (en) Building construction waste material classification device
CN111331750A (en) Mixing device for producing plastic pipe
CN214974332U (en) Building solid waste treatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

Termination date: 20210814

CF01 Termination of patent right due to non-payment of annual fee