CN210564564U - Small-space gradual-change section concrete trolley - Google Patents

Small-space gradual-change section concrete trolley Download PDF

Info

Publication number
CN210564564U
CN210564564U CN201921375067.8U CN201921375067U CN210564564U CN 210564564 U CN210564564 U CN 210564564U CN 201921375067 U CN201921375067 U CN 201921375067U CN 210564564 U CN210564564 U CN 210564564U
Authority
CN
China
Prior art keywords
wood
steel truss
small
truss
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921375067.8U
Other languages
Chinese (zh)
Inventor
张建均
张伟
李源
苏海
栾琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN201921375067.8U priority Critical patent/CN210564564U/en
Application granted granted Critical
Publication of CN210564564U publication Critical patent/CN210564564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses little space gradual change section concrete platform truck, including the steel truss that plays main supporting role, adorn the many pin wooden trusses that bear concreting gravity and lateral pressure outside the steel truss, fix at least one deck plank sheathing on many pin wooden trusses, hug closely the baoli board on plank sheathing surface, the inside headroom size of steel truss is greater than 1.2 mx 1.0 m. The utility model discloses simple manufacture, construction convenience, simple, operating personnel can conveniently get into the inside template operation of demolising of platform truck, and is with low costs, the change of adaptable various small cross-section size gradual change sections.

Description

Small-space gradual-change section concrete trolley
Technical Field
The utility model relates to an applicable little space gradual change section concrete platform truck in little space gradual change section concrete lining construction.
Background
In the construction of hydropower stations, the structural design form of the transition section of the tunnel is usually changed from a circle to a square or from an urban door opening to a rectangle, and the change condition of the transition section is shown in fig. 3-6. The gradual change section template generally adopts the wood truss, nails the plank sheathing that two-layer thickness is 1.5cm on the wood truss, nails one deck plywood again on the plank sheathing, and gradual change section concrete lining thickness is less sometimes, and sets up the atress reinforcing bar between template and the country rock surface, and operating space is very narrow and small. If a common wood truss is used, after the wood truss is installed, an operator cannot enter the space between the wood truss and the surface of the surrounding rock to bind the steel bars, nail the template and nail the plywood.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the little space gradual change section lining cutting operation, ordinary wood truss supports the problem that the operation personnel can't get into and carry out ligature reinforcing bar, nail template and nail baoli board operation between wood truss and the surrounding rock surface, provides a preparation simply, and construction convenience, simple, operating personnel can conveniently get into the inside template operation of demolising of platform truck, and is with low costs, the little space gradual change section concrete platform truck of the change of adaptable various little section size gradual change sections.
The purpose of the utility model is realized like this:
the utility model discloses little space gradual change section concrete platform truck, including the steel truss that plays main supporting role, adorn the many pin wooden trusses that bear concreting gravity and lateral pressure outside the steel truss, fix at least one deck plank sheathing on many pin wooden trusses, hug closely the baoli board on plank sheathing surface, the inside headroom size of steel truss is greater than 1.2 mx 1.0m, and after concrete placement accomplished, operating personnel can conveniently get into the inside template operation of demolising of platform truck.
The distance between the two adjacent wood trusses in the longitudinal direction is 75cm, so that the combined steel formwork is convenient to support when a part of the hole section is used.
The wood template has 2 layers, each layer is 1.5cm thick, and the wood template is nailed on the wood truss layer by iron nails.
The steel truss is made of profile steel, plays a main supporting role, and has enough bearing capacity, rigidity and stability, the internal clearance size is larger than 1.2 multiplied by 1.0m, after concrete pouring is completed, an operator can conveniently enter the steel truss to disassemble a template, the steel truss can be made in sections, and the length can be properly adjusted according to the field condition. The wood trusses are made of square wood and bear the gravity and lateral pressure during concrete pouring, the distance between the two wood trusses along the longitudinal direction is generally 75cm, and the wood trusses can be conveniently supported when a combined steel template is used for a part of hole sections. If a layer of wooden template with the thickness of 3cm is used, the rigidity is high, the wooden template cannot adapt to the complex change of a gradual change section, and only a layer of wooden template with the thickness of 1.5cm is used, the bearing capacity and the rigidity are small, and the gravity and the lateral pressure of the poured concrete cannot be borne, so that the wooden template is constructed by 2 layers of wooden boards with the thickness of 1.5cm, is nailed on a wooden truss layer by iron nails, and transmits the gravity and the lateral pressure of the poured concrete to the wooden truss. The plywood mainly plays a role in repairing cracks and improving the surface smoothness and the finish degree of concrete.
The utility model discloses simple manufacture, construction convenience, simple, it is with low costs, operating personnel can conveniently get into the inside template operation of demolising of platform truck, and the change of the various small cross section size gradual changes sections of adaptation is accomplished in the back to the at utmost concrete placement. In actual construction, steel trusses, wood trusses and the like are properly adjusted according to the actual size of the transition section, and the method can be widely applied to various small-space transition section lining operations.
Drawings
Fig. 1 is the utility model discloses little space gradual change section concrete platform truck rectangle section structure chart.
Fig. 2 is the utility model discloses the circular section structure chart of little space gradual change section concrete platform truck.
Fig. 3 is a diagram of the transition progression of fig. 1.
Fig. 4 is a diagram of a transition progression 2.
Fig. 5 is a diagram of a transition progression 3.
Fig. 6 is a perspective view of the gradual transition process.
Detailed Description
Example 1:
fig. 1 shows a drawing of this embodiment 1, and the small-space gradual-change-section concrete trolley of this embodiment 1 with a rectangular cross section includes a steel truss 1 serving as a main supporting function, a plurality of wood trusses 2 directly bearing the gravity and lateral pressure of cast concrete, a two-layer wood formwork 3 fixed on the plurality of wood trusses, and a plywood 4 tightly attached to the surface of the wood formwork. The steel truss is made of profile steel, and the internal clearance size of the steel truss is larger than 1.2 multiplied by 1.0 m. The thickness of each layer of the wood template is 1.5 cm. And the distance between two adjacent wood trusses along the longitudinal direction is 75 cm.
Reference numerals 5, 6, 7, 8, 9 and 10 in fig. 1 respectively refer to a track foundation, a steel track, a transition section hole wall, concrete to be poured, a transition section bed surface and poured concrete.
Example 2:
fig. 2 shows a diagram of the present embodiment 2. This example 2 is basically the same as example 1. The difference is that the section of the small space concrete trolley in the embodiment 2 is circular.
Fig. 3 to 5 are graphs of the gradual transition process of the gradual transition section.
Fig. 6 is a perspective view of the gradual transition process.
The utility model discloses preparation, installation, application method as follows:
the method comprises the steps of processing section steel for a steel truss in a steel structure processing factory according to a design drawing, processing a wood truss in a wood processing factory according to the design drawing, transporting the wood truss to a construction site by a dump truck, placing the steel truss on a paved rail, fixing the wood truss on the steel truss, enabling the distance between the two wood trusses along the longitudinal direction to be 75cm, manually nailing a wood formwork with two thick layers on the wood truss by iron nails, planing the surface of the formwork by a plane, and nailing a plywood on the fixed wood formwork by small iron nails. And finally, lubricating oil is coated on the steel track, the whole template is pushed to a small section from a large section manually or by a winch, and the small-space gradual-change section concrete trolley is installed after measurement, lofting and positioning are carried out and then fixed.

Claims (3)

1. The small-space gradual-change-section concrete trolley is characterized by comprising a steel truss which plays a main supporting role, a plurality of wood trusses which are arranged outside the steel truss and bear the gravity and lateral pressure of poured concrete, at least one layer of wood formwork which is fixed on the plurality of wood trusses, and a bumper plate which is tightly attached to the surface of the wood formwork, wherein the clearance size inside the steel truss is larger than 1.2m multiplied by 1.0 m.
2. The small-space gradually-graded concrete trolley according to claim 1, wherein a distance between two adjacent wood trusses in a longitudinal direction is 75 cm.
3. The small-space gradual-section concrete trolley according to claim 1 or 2, wherein the wooden formwork has 2 layers, each layer is 1.5cm thick, and the wooden truss is nailed with iron nails in a layered manner.
CN201921375067.8U 2019-08-23 2019-08-23 Small-space gradual-change section concrete trolley Active CN210564564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921375067.8U CN210564564U (en) 2019-08-23 2019-08-23 Small-space gradual-change section concrete trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921375067.8U CN210564564U (en) 2019-08-23 2019-08-23 Small-space gradual-change section concrete trolley

Publications (1)

Publication Number Publication Date
CN210564564U true CN210564564U (en) 2020-05-19

Family

ID=70631132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921375067.8U Active CN210564564U (en) 2019-08-23 2019-08-23 Small-space gradual-change section concrete trolley

Country Status (1)

Country Link
CN (1) CN210564564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962478A (en) * 2021-02-05 2021-06-15 中铁七局集团武汉工程有限公司 Concrete structure inverted siphon inner and outer mould trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112962478A (en) * 2021-02-05 2021-06-15 中铁七局集团武汉工程有限公司 Concrete structure inverted siphon inner and outer mould trolley

Similar Documents

Publication Publication Date Title
CN103088947B (en) Cold bending thin wall lattice configuration steel-concrete folding heat preservation floor slab and production technology thereof
CN104895584A (en) Modularization steel die trolley and construction process thereof
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN108360721A (en) Precast concrete ultrathin type bidirectional stress type steel bar truss laminated floor slab
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN111236309A (en) Construction method of prefabricated prestressed plate of assembled underground station
CN210564564U (en) Small-space gradual-change section concrete trolley
CN101769072B (en) Method for making composite beam with composite beam die
CN113482312A (en) Guide type double-layer structure elevator shaft operating platform and construction method based on platform
CN114033167A (en) Post-cast joint structure of laminated slab and construction method
CN109667376A (en) Novel superposed superstructure and its construction method suitable for steel construction H profile steel beam
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN210369292U (en) Cast-in-place coincide mould shell integral structure of assembled building
CN209703805U (en) A kind of novel superposed superstructure suitable for steel construction H profile steel beam
CN210342693U (en) Outer wall integration composite insulation board consolidates support
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN113294175B (en) Construction method of tunnel secondary lining structure and tunnel secondary lining structure
CN115214005A (en) Circulating beam manufacturing system of precast beam field and construction method thereof
CN112609966B (en) Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system
CN212534207U (en) Prefabricated wallboard of assembled subway station unilateral
CN210508479U (en) Reinforced structure of historical architecture unit wall body
CN112227580A (en) Steel pipe truss prestressed hollow superimposed sheet
CN112695802A (en) Optimized outlet shaft top bridge machine room structure
CN113152728A (en) Wallboard and floor exempt from to fall to ground supporting template system
GB2340531A (en) Method of manufacturing pre-fabricated building construction elements

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant