CN210505259U - Auxiliary clamping device for building material transportation - Google Patents

Auxiliary clamping device for building material transportation Download PDF

Info

Publication number
CN210505259U
CN210505259U CN201921137485.3U CN201921137485U CN210505259U CN 210505259 U CN210505259 U CN 210505259U CN 201921137485 U CN201921137485 U CN 201921137485U CN 210505259 U CN210505259 U CN 210505259U
Authority
CN
China
Prior art keywords
clamping device
clamping
arm
auxiliary
building material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921137485.3U
Other languages
Chinese (zh)
Inventor
薛传生
李培培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921137485.3U priority Critical patent/CN210505259U/en
Application granted granted Critical
Publication of CN210505259U publication Critical patent/CN210505259U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a clamping device is assisted in building material transportation, arc friction cushion increase friction improves fastening degree, and the horizontal form film fills the building material inner space, increases the contact surface, and difficult slip improves whole clamping device performance, clamping device includes first arm lock, second arm lock, pivot, fixed orifices, internal fixation device and wire rope, and the fixed orifices has been seted up on first arm lock and the second arm lock one. The utility model relates to a clamping device is assisted in building material transportation, two sides are fixed, guarantee the stability of centre gripping, improve personnel's safety, avoid appearing pounding the accident, and dual fixed use is convenient firm more, and convenient the dismantlement, and arc friction cushion increases the friction, improves fastening degree, and the interior space of building material is filled to the horizontal form film, increases the contact surface, and difficult slip improves whole clamping device performance.

Description

Auxiliary clamping device for building material transportation
Technical Field
The utility model relates to a building material transports technical field, specifically is a building material transports supplementary clamping device.
Background
In the process of building construction, building materials need to be hoisted to a high position, the traditional hoisting method adopts two steel wire ropes to bundle two ends of the building materials for hoisting, although the operation is simpler and the required appliances are fewer, the method has the following defects: first, if the building material is not balanced during handling, the building material tends to slip off, which not only can cause failure of the handling, but can also endanger personnel safety. The difficulty in taking the steel wire rope is increased, the steel wire rope is bound with the building materials to be tightened particularly in order to prevent the building materials from falling off, the steel wire rope is difficult to disassemble and use the steel bar, and the steel wire rope can be popped out by the pretightening force of the steel wire rope when the steel wire rope is disassembled, so that the operator is threatened.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a clamping device is assisted in building material transportation, two sides are fixed, guarantee the stability of centre gripping, improve personnel's safety, avoid appearing pounding the accident by a crashing object, and dual fixed use is convenient firm more, and convenient dismantlement, and arc friction cushion increases the friction, improves fastening degree, and the interior space of building material is filled to the horizontal form film, increases the contact surface, is difficult for sliding, improves whole clamping device performance, has solved the problem among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: an auxiliary clamping device for building material transportation comprises an auxiliary device, wherein the auxiliary device comprises a fixed rod, a telescopic cylinder, a telescopic rod and a connecting rod, the telescopic cylinder is arranged below the fixed rod, the telescopic rod is connected below the telescopic cylinder, the connecting rod is arranged below two ends of the telescopic rod, and the clamping device is arranged below the auxiliary device;
the clamping device comprises a first clamping arm, a second clamping arm, a rotating shaft, a fixing hole, an internal fixing device and a steel wire rope, wherein the fixing hole is formed in one end of the first clamping arm and one end of the second clamping arm;
the inner fixing device is composed of an arc-shaped friction rubber pad, a transverse rubber sheet and salient points, the arc-shaped friction rubber pad is provided with the transverse rubber sheet, and the transverse rubber sheet is provided with the salient points.
Preferably, one end of the fixed rod can be arranged on the lifting device or the conveyor, and the other end of the fixed rod is fixedly provided with the telescopic cylinder and the telescopic rod.
Preferably, the first clamping arm and the second clamping arm are both provided with fixing holes, a steel wire rope is fixedly connected in the fixing holes in the first clamping arm, and the fixing holes in the second clamping arm are movably connected with the steel wire rope.
Preferably, the number of the transverse films and the number of the salient points are not less than three, the transverse films are uniformly distributed on the arc-shaped friction rubber pad, and the salient points are uniformly distributed on the transverse films.
Preferably, the first clamping arm and the second clamping arm are movably connected through a rotating shaft.
Preferably, clamping device and connecting rod all set up two, and clamping device all installs in both sides connecting rod below.
Preferably, a fixing block is mounted at the front end of the connecting rod, and a penetrating hole is formed in the fixing block.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a clamping device is assisted in building material transportation, fixedly connected with wire rope in the fixed orifices on the first arm lock, and fixed orifices and wire rope swing joint on the second arm lock, through pivot swing joint between first arm lock and the second arm lock, clamping device and connecting rod all set up two, clamping device all installs in both sides connecting rod below, during the use, loosen insertion building material through first arm lock and second arm lock, the wire rope in the fixed orifices on the rethread second arm lock is pulled and is fastened and decide, it is fixed to two sides, guarantee the stability of centre gripping, personnel's safety is improved, avoid appearing pounding the accident, dual fixed use is convenient firm more, and convenient the dismantlement.
2. The utility model relates to a clamping device is assisted in building material transportation is provided with horizontal form film on the arc friction cushion, installs the bump on the horizontal form film, and horizontal form film and bump all set up to be no less than three, and horizontal form film evenly distributed is on arc friction cushion, and bump evenly distributed is on horizontal form film, and arc friction cushion increases the friction, improves fastening degree, and horizontal form film fills the building material inner space, increases the contact surface, and difficult slip improves whole clamping device performance.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the clamping device of the present invention;
FIG. 3 is a schematic view of the fixing form of the steel wire rope of the present invention;
FIG. 4 is an enlarged view of the point A of the present invention;
fig. 5 is a schematic structural view of the internal fixation device of the present invention.
In the figure: 1. an auxiliary device; 11. fixing the rod; 12. a telescopic cylinder; 13. a telescopic rod; 14. a connecting rod; 141. a fixed block; 142. a through hole; 2. a clamping device; 21. a first clamp arm; 22. a second clamp arm; 23. a rotating shaft; 24. a fixing hole; 25. an internal fixation device; 251. an arc-shaped friction rubber pad; 252. a horizontal film; 253. salient points; 26. a steel cord.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an auxiliary clamping device for building material transportation comprises an auxiliary device 1, the auxiliary device 1 comprises a fixing rod 11, a telescopic cylinder 12, a telescopic rod 13 and a connecting rod 14, the telescopic cylinder 12 is disposed below the fixing rod 11, the telescopic rod 13 is connected below the telescopic cylinder 12, the connecting rod 14 is disposed below two ends of the telescopic rod 13, the clamping device 2 is disposed below the auxiliary device 1, the clamping device 2 comprises a first clamping arm 21, a second clamping arm 22, a rotating shaft 23, a fixing hole 24, an internal fixing device 25 and a steel wire rope 26, a fixing hole 24 is disposed at one end of the first clamping arm 21 and the second clamping arm 22, the rotating shaft 23 is disposed at the joint between the first clamping arm 21 and the second clamping arm 22, the steel wire rope 26 is disposed in the fixing hole 24, the internal fixing device 25 is disposed on the inner wall of the first clamping arm 21 and the second clamping arm 22, one end of the fixing rod 11 can, the other end of the fixing rod 11 is fixedly provided with a telescopic cylinder 12 and a telescopic rod 13, the first clamping arm 21 and the second clamping arm 22 are respectively provided with a fixing hole 24, the fixing hole 24 on the first clamping arm 21 is fixedly connected with a steel wire rope 26, the fixing hole 24 on the second clamping arm 22 is movably connected with the steel wire rope 26, the first clamping arm 21 and the second clamping arm 22 are movably connected through a rotating shaft 23, two clamping devices 2 and two connecting rods 14 are respectively arranged, the clamping devices 2 are respectively arranged below the connecting rods 14 on the two sides, the front end of each connecting rod 14 is provided with a fixing block 141, the fixing block 141 is provided with a penetrating hole 142, when in use, the first clamping arm 21 and the second clamping arm 22 are used for loosening and clamping building materials, the steel wire ropes 26 in the fixing holes 24 on the second clamping arm 22 are tensioned and fixed, the steel wire ropes 26 penetrate through the penetrating holes 142 for fixing, the accident of injuring by a crashing object is avoided, and dual fixed use is convenient firm more, and convenient the dismantlement.
Referring to fig. 5, the internal fixing device 25 is composed of an arc-shaped friction rubber pad 251, a horizontal rubber sheet 252 and at least three protrusions 253, the horizontal rubber sheet 252 is disposed on the arc-shaped friction rubber pad 251, the protrusions 253 are disposed on the horizontal rubber sheet 252, the horizontal rubber sheet 252 and the protrusions 253 are disposed at least three times, the horizontal rubber sheet 252 is uniformly distributed on the arc-shaped friction rubber pad 251, the protrusions 253 are uniformly distributed on the horizontal rubber sheet 252, the friction of the arc-shaped friction rubber pad 251 is increased, the fastening degree is improved, the horizontal rubber sheet 252 fills up gaps in building materials, contact surfaces are increased, sliding is not easy, and the use performance of the whole clamping device 2 is improved.
In summary, the following steps: the utility model discloses auxiliary clamping device for building material transportation, the steel wire rope 26 is fixedly connected in the fixing hole 24 on the first arm lock 21, and the fixing hole 24 on the second arm lock 22 is movably connected with the steel wire rope 26, the first arm lock 21 is movably connected with the second arm lock 22 through the rotating shaft 23, the clamping device 2 and the connecting rod 14 are both provided with two, the clamping device 2 is all arranged below the connecting rod 14 on both sides, when in use, the clamping building material is loosened through the first arm lock 21 and the second arm lock 22, then the steel wire rope 26 in the fixing hole 24 on the second arm lock 22 is tightened and fixed, the double-side fixation is realized, the stability of clamping is ensured, the safety of personnel is improved, the occurrence of injury accidents is avoided, the double-fixation is more convenient and stable, and the disassembly is convenient, the horizontal rubber sheet 252 is arranged on the arc friction rubber pad 251, the salient point 253 is arranged on the horizontal rubber sheet 252, the horizontal, horizontal form film 252 evenly distributed is on arc friction cushion 251, and bump 253 evenly distributed is on horizontal form film 252, and arc friction cushion 251 increases the friction, improves fastening degree, and horizontal form film 252 fills the building material inner space, increases the contact surface, and difficult slip improves whole clamping device 2 performance.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A building material transportation auxiliary clamping device, includes auxiliary device (1), its characterized in that: the auxiliary device (1) comprises a fixing rod (11), a telescopic cylinder (12), a telescopic rod (13) and a connecting rod (14), the telescopic cylinder (12) is arranged below the fixing rod (11), the telescopic rod (13) is connected below the telescopic cylinder (12), the connecting rod (14) is arranged below two ends of the telescopic rod (13), and the clamping device (2) is arranged below the auxiliary device (1);
the clamping device (2) comprises a first clamping arm (21), a second clamping arm (22), a rotating shaft (23), a fixing hole (24), an internal fixing device (25) and a steel wire rope (26), wherein one end of the first clamping arm (21) and one end of the second clamping arm (22) are provided with the fixing hole (24), the rotating shaft (23) is arranged at the joint between the first clamping arm (21) and the second clamping arm (22), the steel wire rope (26) is arranged in the fixing hole (24), and the internal fixing device (25) is arranged on the inner walls of the first clamping arm (21) and the second clamping arm (22);
the inner fixing device (25) is composed of an arc-shaped friction rubber pad (251), a transverse rubber sheet (252) and salient points (253), the arc-shaped friction rubber pad (251) is provided with the transverse rubber sheet (252), and the salient points (253) are installed on the transverse rubber sheet (252).
2. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: one end of the fixed rod (11) can be arranged on a lifting device or a conveyor, and the other end of the fixed rod (11) is fixedly provided with a telescopic cylinder (12) and a telescopic rod (13).
3. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: all set up fixed orifices (24) on first arm lock (21) and the second arm lock (22), fixedly connected with wire rope (26) in fixed orifices (24) on first arm lock (21), and fixed orifices (24) and wire rope (26) swing joint on second arm lock (22).
4. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: the number of the transverse films (252) and the number of the salient points (253) are not less than three, the transverse films (252) are uniformly distributed on the arc-shaped friction rubber pad (251), and the salient points (253) are uniformly distributed on the transverse films (252).
5. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: the first clamping arm (21) and the second clamping arm (22) are movably connected through a rotating shaft (23).
6. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: clamping device (2) and connecting rod (14) all set up two, and clamping device (2) all install in both sides connecting rod (14) below.
7. The auxiliary clamping device for the transportation of building materials as claimed in claim 1, wherein: the front end of the connecting rod (14) is provided with a fixed block (141), and the fixed block (141) is provided with a penetrating hole (142).
CN201921137485.3U 2019-07-18 2019-07-18 Auxiliary clamping device for building material transportation Expired - Fee Related CN210505259U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921137485.3U CN210505259U (en) 2019-07-18 2019-07-18 Auxiliary clamping device for building material transportation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921137485.3U CN210505259U (en) 2019-07-18 2019-07-18 Auxiliary clamping device for building material transportation

Publications (1)

Publication Number Publication Date
CN210505259U true CN210505259U (en) 2020-05-12

Family

ID=70583999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921137485.3U Expired - Fee Related CN210505259U (en) 2019-07-18 2019-07-18 Auxiliary clamping device for building material transportation

Country Status (1)

Country Link
CN (1) CN210505259U (en)

Similar Documents

Publication Publication Date Title
CN209780317U (en) fixing part for repairing cracks of high-rise building
CN210505259U (en) Auxiliary clamping device for building material transportation
CN205442405U (en) Anchor clamps play to put in a position
CN206680061U (en) A kind of gravity type board suspending frame
CN107069533B (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN218174383U (en) Steel pipe hoisting device
CN218478453U (en) Adjustable hoisting sling
CN214204819U (en) Novel cable support for electrical engineering
CN109167302A (en) A kind of wire termination drawing method for the tight hanging wire construction of transmission line of electricity
CN210140398U (en) Multifunctional suspension equipment for mechanical engineering
CN206384703U (en) The hoisting connecting piece of architectural prefab
CN207226818U (en) A kind of H profile steel lifting appliance for hoisting
CN217437530U (en) Fixing device for hoisting in building construction
CN210973547U (en) Auxiliary hoisting tool for construction equipment
CN218151069U (en) Convenient and fast's tunnel detection device
CN217516507U (en) Bridge crane fixing device
CN210311840U (en) Waste concrete treatment device for building
CN212863894U (en) Gantry crane is with preventing disconnected traditional thread binding putting
CN214456361U (en) Wall head crane with rotatable suspension arm
CN215924163U (en) Steel bar clamping mechanism for building construction
CN211496604U (en) Plate hoisting device for building construction
CN214734004U (en) Telescopic crane boom
CN217947344U (en) Prefabricated component lifting device
CN114104963B (en) Assembled wallboard hoist and mount fixing device
CN219567304U (en) Culvert pipe hoisting sling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200512

Termination date: 20210718

CF01 Termination of patent right due to non-payment of annual fee