CN217437530U - Fixing device for hoisting in building construction - Google Patents

Fixing device for hoisting in building construction Download PDF

Info

Publication number
CN217437530U
CN217437530U CN202220587203.5U CN202220587203U CN217437530U CN 217437530 U CN217437530 U CN 217437530U CN 202220587203 U CN202220587203 U CN 202220587203U CN 217437530 U CN217437530 U CN 217437530U
Authority
CN
China
Prior art keywords
arc
strip frame
limiting
plate
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220587203.5U
Other languages
Chinese (zh)
Inventor
印伟涛
明红利
印亚丽
何敬涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Zhongyuan Construction Group Co.,Ltd.
Original Assignee
Jilin Province Jiantai Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Province Jiantai Construction Engineering Co ltd filed Critical Jilin Province Jiantai Construction Engineering Co ltd
Priority to CN202220587203.5U priority Critical patent/CN217437530U/en
Application granted granted Critical
Publication of CN217437530U publication Critical patent/CN217437530U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a construction lifts by crane and uses fixing device, include: the support plate, be provided with a plurality of first limit structure on the lateral wall of support plate one side, be provided with a plurality of second limit structure on the lateral wall of the opposite side of support plate, the one end of arc is articulated with the lateral wall that corresponds of support plate, the other end of arc is articulated with the one end of first arc strip frame, first arc strip frame is kept away from the frame inslot of arc one end and is equipped with the mounting panel, spacing snap ring rotates through the pivot and installs on the mounting panel, the one end of arc is articulated with the lateral wall that corresponds of support plate, the other end of arc is articulated with the one end of second arc strip frame, the strip frame width of second arc strip frame is less than the internal diameter length of spacing snap ring, it is high to have fixed stability, the effect of construction safety nature is improved.

Description

Fixing device for hoisting in building construction
Technical Field
The utility model belongs to the technical field of the construction equipment, in particular to construction lifts by crane and uses fixing device.
Background
In the process of modern city construction, the construction of high-rise buildings does not leave the hoisting equipment, and the hoisting equipment for building construction mainly hoists building materials or equipment to a higher position for the construction of the high-rise buildings;
however, when the existing hoisting equipment is used for hoisting building materials, particularly steel bars passing through pipes, the fixing equipment for fixing the hoisted building materials at the bottom end of the hoisting equipment is poor in fixity, and is easy to loosen and twist in the hoisting process, so that great potential safety hazards exist in the construction process.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and mentioning among the background art because the current fixed equipment fixed stability for lifting by crane is relatively poor, lead to the work progress to have the technical problem of potential safety hazard, provide a construction lifts by crane and uses fixing device, it is high to have fixed stability, improves the effect of construction safety nature.
The utility model provides a technical scheme does:
a fixing device for hoisting in building construction comprises: the device comprises a carrier plate, a plurality of first limiting structures and a plurality of second limiting structures, wherein the side wall of one side of the carrier plate is provided with the first limiting structures;
first limit structure includes: the device comprises an arc-shaped plate and a first arc-shaped strip frame, wherein one end of the arc-shaped plate is hinged with the side wall of the corresponding side of a support plate, the other end of the arc-shaped plate is hinged with one end of the first arc-shaped strip frame, a mounting plate is arranged in a frame groove of one end, far away from the arc-shaped plate, of the first arc-shaped strip frame, and a limiting snap ring is rotatably mounted on the mounting plate through a rotating shaft;
the second limit structure includes: the support plate comprises an arc-shaped plate and a second arc-shaped strip frame, one end of the arc-shaped plate is hinged to the corresponding side wall of the support plate, the other end of the arc-shaped plate is hinged to one end of the second arc-shaped strip frame, and the width of the strip frame of the second arc-shaped strip frame is smaller than the inner diameter length of the limiting clamp ring.
Preferably, the limiting snap ring and the second arc-shaped strip frame are made of stainless steel.
Preferably, the limiting snap ring is fixedly sleeved with an anti-skid pad.
Preferably, the side edges of the carrier plate, which are far away from the first limiting connecting rod structure and the second limiting connecting rod structure, are symmetrically provided with fixed limiting rings.
Preferably, the first limiting connecting rod structures and the second limiting connecting rod structures are symmetrically arranged respectively.
Preferably, a plurality of expansion-proof shrinkage holes are formed in the arc-shaped plate.
The beneficial effects of the utility model are embodied in the following aspect:
1. the utility model discloses a bilateral symmetry at the support plate sets up first spacing connecting rod structure and the spacing connecting rod structure of second, the direction of placing through the spacing snap ring on the mounting panel of adjustment first connecting rod structure, can mutually support with the spacing connecting rod structure of second, and then link locking or separate first spacing connecting rod structure and the spacing connecting rod structure of second, the final spacing fixed purpose of the thing of being lifted by crane of accomplishing on to the support plate, because spacing connecting rod structure's arc, first arc strip frame and second arc strip frame are the arc structure, under the connection locking state, be of value to the lifting by crane of the building materials of convenient pipe class, and be of value to the improvement and be lifted by the fixed stability of thing at the in-process of lifting by crane, be of value to the effect that improves the construction safety nature.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of a limit snap ring.
In the figure: the anti-slip mat comprises a support plate 1, a fixed limiting ring 2, an arc plate 3, a first arc strip frame 4, a second arc strip frame 5, a mounting plate 6, a limiting snap ring 7, an anti-expansion shrinkage hole 8 and an anti-slip mat 9.
Detailed Description
The present invention is further described in detail below with reference to the drawings so that those skilled in the art can implement the invention with reference to the description.
As shown in fig. 1-2, the utility model provides a building construction lifts by crane uses fixing device, include: the method comprises the following steps: the lifting structure comprises a support plate 1, wherein a plurality of first limiting structures are arranged on the side wall of one side of the support plate 1, a plurality of second limiting structures are arranged on the side wall of the other side of the support plate 1, the first limiting connecting rod structures and the second limiting connecting rod structures are symmetrically arranged respectively, and therefore the lifting structure is beneficial to the mutual matching of the first arc-shaped strip frames 4 and the second arc-shaped strip frames 5, and the limiting and fixing of the building materials to be lifted are completed.
First spacing connecting rod structure includes: the support plate comprises an arc-shaped plate 3 and a first arc-shaped strip frame 4, wherein one end of the arc-shaped plate 3 is hinged with the side wall of the corresponding side of the support plate 1, the other end of the arc-shaped plate 3 is hinged with one end of the first arc-shaped strip frame 4, a mounting plate 6 is arranged in a frame groove at one end of the first arc-shaped strip frame 4, which is far away from the arc-shaped plate 3, and a limiting snap ring 7 is rotatably mounted on the mounting plate 6 through a rotating shaft;
the second spacing connecting rod structure includes: arc 3 and second arc strip frame 5, the one end of arc 3 is articulated with the corresponding side lateral wall of 1 support plate of support plate 1, the other end of arc 3 is articulated with the one end of second arc strip frame 5, the strip frame width of second arc strip frame 5 is less than the internal diameter length of spacing snap ring 7, is of value to guaranteeing that spacing snap ring 7 can block in the framework of second arc strip frame 5 when horizontal position, guarantees that first arc strip frame 4 keeps the locking state with second arc strip frame 5, guarantees spacing fixed to the building materials.
The utility model discloses a theory of operation: the utility model discloses a bilateral symmetry at support plate 1 sets up first spacing connecting rod structure and the spacing connecting rod structure of second, through adjusting the direction of placing of spacing snap ring 7 on the mounting panel 6 of first connecting rod structure, can mutually support with the spacing connecting rod structure of second, and then link the locking or separate first spacing connecting rod structure with the spacing connecting rod structure of second, the final spacing fixed purpose of being lifted by the thing of accomplishing on support plate 1, because spacing connecting rod structure's arc 3, first arc strip frame 4 and second arc strip frame 5 are the arc structure, under connecting the locking state, be of value to the convenience of lifting by crane of the building materials of tubular product class, it is concrete:
when the building material on the carrier plate 1 needs to be limited and fixed, one ends of the first arc-shaped strip frame 4 and the second arc-shaped strip frame 5 which are symmetrical to each other are far away from the corresponding arc-shaped plate 3 to be contacted with each other, the second arc-shaped strip frame 5 is arranged right above the first arc-shaped strip frame 4, the limiting snap ring 7 can be rotated to enable the limiting snap ring 7 to be in a vertical position, the limiting snap ring 7 can penetrate through the corresponding second arc-shaped strip frame 5 when in the vertical position, the limiting snap ring 7 can be rotated 790 degrees after penetrating through the corresponding second arc-shaped strip frame 5 to enable the limiting snap ring 7 to reach a horizontal position, as the length of the inner diameter of the limiting snap ring 7 is greater than the strip frame width of the second arc-shaped strip frame 5, the limiting snap ring 7 can be clamped in the second arc-shaped strip frame 5 when in the horizontal position, and further the first limiting connecting rod structure and the second limiting connecting rod structure are in a locking state, the building material to be lifted to be limited and fixed, the building materials are effectively prevented from falling off the carrier plate 1;
when the building materials need to be loaded and unloaded onto the support plate 1, the limiting clamp ring can be rotated for 790 degrees again, so that the limiting clamp ring 7 returns to the vertical position, the limiting clamp ring 7 can leave the second arc-shaped strip frame 5, and an operator can enable the first limiting connecting rod structure and the second limiting connecting rod structure to be in an open state, so that the building materials can be conveniently loaded and unloaded;
through above-mentioned process, can mutually support through first spacing connecting rod structure and second spacing connecting rod structure, accomplish spacing and fixed to the building materials, be of value to improving the stationary stability, and then improve the security of lifting by crane the process.
The anti-slip pad 9 is fixedly sleeved on the limiting snap ring 7, so that the stability of the limiting snap ring 7 in a locking state is improved, and the limiting and fixing effects on the building materials are prevented from being influenced by the relative sliding of the limiting snap ring 7;
the side edges of the support plate 1, which are far away from the first limiting connecting rod structure and the second limiting connecting rod structure, are symmetrically provided with the fixed limiting rings 2, and the building materials can be bound by ropes between the two fixed limiting rings 2 in the hoisting process, so that the stability of the building materials on the support plate 1 can be further improved;
set up a plurality of shrinkage cavities 8 that prevent rising on the arc 3, be of value to and prevent that temperature variation from influencing the structural stability of arc 3 and each spacing connecting rod structure.
While embodiments of the invention have been disclosed above, it is not intended to be limited to the applications listed in the specification and the examples. It can be applicable to various and be fit for the utility model discloses a field completely. Additional modifications will readily occur to those skilled in the art. The invention is therefore not to be limited to the specific details and illustrations shown and described herein, without departing from the general concept defined by the claims and their equivalents.

Claims (5)

1. The utility model provides a construction is lifted by crane and is used fixing device which characterized in that includes: the device comprises a carrier plate, wherein a plurality of first limiting structures are arranged on the side wall of one side of the carrier plate, and a plurality of second limiting structures are arranged on the side wall of the other side of the carrier plate;
first limit structure includes: the device comprises an arc-shaped plate and a first arc-shaped strip frame, wherein one end of the arc-shaped plate is hinged with the side wall of the corresponding side of a support plate, the other end of the arc-shaped plate is hinged with one end of the first arc-shaped strip frame, a mounting plate is arranged in a frame groove of the first arc-shaped strip frame, which is far away from one end of the arc-shaped plate, and a limiting snap ring is rotatably mounted on the mounting plate through a rotating shaft;
the second limit structure comprises: the support plate comprises an arc-shaped plate and a second arc-shaped strip frame, one end of the arc-shaped plate is hinged to the corresponding side wall of the support plate, the other end of the arc-shaped plate is hinged to one end of the second arc-shaped strip frame, and the width of the strip frame of the second arc-shaped strip frame is smaller than the inner diameter length of the limiting clamp ring.
2. The fixing device for hoisting in building construction according to claim 1, wherein the limiting snap ring and the second arc-shaped strip frame are made of stainless steel.
3. The fixing device for hoisting in building construction as claimed in claim 2, wherein the limiting snap ring is fixed with a non-slip mat.
4. The fixing device for hoisting in building construction according to claim 3, wherein the support plate is symmetrically provided with fixing limiting rings at the sides far away from the first limiting connecting rod structure and the second limiting connecting rod structure.
5. The fixing device for hoisting in building construction as claimed in claim 4, wherein the arc plate is provided with a plurality of anti-expansion holes.
CN202220587203.5U 2022-03-17 2022-03-17 Fixing device for hoisting in building construction Active CN217437530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220587203.5U CN217437530U (en) 2022-03-17 2022-03-17 Fixing device for hoisting in building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220587203.5U CN217437530U (en) 2022-03-17 2022-03-17 Fixing device for hoisting in building construction

Publications (1)

Publication Number Publication Date
CN217437530U true CN217437530U (en) 2022-09-16

Family

ID=83214758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220587203.5U Active CN217437530U (en) 2022-03-17 2022-03-17 Fixing device for hoisting in building construction

Country Status (1)

Country Link
CN (1) CN217437530U (en)

Similar Documents

Publication Publication Date Title
CN111285262A (en) Steel coil lifting appliance device for unmanned crane and working method thereof
CN217437530U (en) Fixing device for hoisting in building construction
CN210340141U (en) House building engineering lifting device
CN201598093U (en) Hoisting fixture for large-sized sectional box-type beam
CN208103776U (en) Building materials boom hoisting
CN207759922U (en) Large span suspender
CN213923765U (en) Portable I-steel hoist and mount appurtenance
CN212712384U (en) Building templates hoist device
CN212315299U (en) Anti-swing device of hoisting equipment
CN210884899U (en) Hoist steel reinforcement cage hoist
CN210236958U (en) Be fixed in portable hoist that is used for hanging chain block on H shaped steel roof beam
CN208843584U (en) A kind of brake drum special hanger
CN207108239U (en) A kind of Novel steel profile hoisting device
CN207890904U (en) A kind of stone tongs clamping adjustable angle
CN220766249U (en) Lifting appliance for building construction
CN114104963B (en) Assembled wallboard hoist and mount fixing device
CN213505561U (en) Concrete tank crane anti-falling safety protection device
CN218595871U (en) Superimposed sheet hoist of adjustable rings position
CN212503649U (en) Horizontal hoisting auxiliary hanging bracket for prefabricated laminated slab
CN210286481U (en) Prefabricated component's transport frock
CN218403299U (en) Steel reinforcement cage hoist
CN219259318U (en) Crane lifting appliance
CN211733590U (en) Concrete column hangs gets device for hydraulic engineering
CN218145321U (en) Heat treatment hanging basket
CN213865044U (en) Hoisting mechanism for tunnel construction trestle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 107, No. 153 Renmin Street, Chaoyang District, Changchun City, Jilin Province, 130000

Patentee after: Jilin Zhongyuan Construction Group Co.,Ltd.