CN210482952U - Novel building engineering scaffold - Google Patents
Novel building engineering scaffold Download PDFInfo
- Publication number
- CN210482952U CN210482952U CN201921129620.XU CN201921129620U CN210482952U CN 210482952 U CN210482952 U CN 210482952U CN 201921129620 U CN201921129620 U CN 201921129620U CN 210482952 U CN210482952 U CN 210482952U
- Authority
- CN
- China
- Prior art keywords
- rod
- montant
- support
- scaffold
- fixed block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model belongs to the technical field of the construction equipment, especially, relate to a novel building engineering scaffold, including supporting the montant, the position department that the support montant body of rod is close to the top is provided with the support plectane, and the below that the support montant body of rod is located the support plectane is provided with the connecting plate, and the outside equidistance that supports the montant body of rod is provided with first fixed block, and the inside of first fixed block runs through there is the horizontal pole. The utility model discloses in, through supporting the montant, the connecting plate, first fixed block, the setting of second fixed block and horizontal pole, can be in the installation scaffold frame, the effectual condition of avoiding scaffold frame part to lose appears, the installation procedure of scaffold frame has been simplified, the work speed of engineering construction has been improved, secondly, through square pole, square through hole, the horizontal pole, the setting of second fixed block and second nut, do not need the outrigger ladder or climb to the scaffold frame through the connecting rod between the scaffold frame on, the work load of workman has been reduced, the danger of staff climbing scaffold frame has been reduced.
Description
Technical Field
The utility model belongs to the technical field of the construction equipment, especially, relate to a novel building engineering scaffold.
Background
The scaffold is a general term in the building field, is used in places where external walls, interior decoration or high floor height cannot be directly constructed on the construction site, is mainly used for up-down dry life of constructors or peripheral safety net enclosure, high-altitude installation components and the like, is a scaffold, is made of materials such as bamboo, wood, steel pipes or synthetic materials, is also used as a template in some projects, and is widely used in advertising departments, municipal departments, traffic roads, bridges, mines and the like.
Traditional building engineering scaffold frame all adopts a plurality of scaffold poles to link together through nut bolt assembly usually, because the body of connecting rod, the quantity of nut and bolt is more, the condition of losing appears easily in the in-process of using the transportation, it is more complicated to have the installation procedure simultaneously, reduce the work speed of engineering construction, and simultaneously, staff climbing scaffold frame need be with the help of the ladder or directly pass through the connecting rod between the scaffold frame, the process of staff work transport ladder has been increased, workman's work load has been increased, and, staff climbing scaffold frame's danger has been increased.
SUMMERY OF THE UTILITY MODEL
The utility model provides a to foretell problem, a novel building engineering scaffold frame is provided.
In order to achieve the purpose, the utility model discloses a technical scheme do, a novel building engineering scaffold, including supporting the montant, the position department that supports the montant body of rod and be close to the top is provided with the support plectane, the below that supports the montant body of rod and be located the support plectane is provided with the connecting plate, the outside equidistance that supports the montant body of rod is provided with first fixed block, the inside of first fixed block runs through there is the horizontal pole.
As preferred, the dwang has been run through on the top of connecting plate, and the dwang with support the montant and adopt the welded mode fixed together, the one end that the dwang was kept away from to the connecting plate lateral wall is provided with the second fixed block.
Preferably, a fixing screw penetrates through the second fixing block, and a first nut is connected to the rod body of the fixing screw in a threaded manner.
As preferred, square through hole has been seted up with the position department of horizontal pole contact to first fixed block, the position department that the horizontal pole corresponds with square through hole is provided with square pole, the one end of horizontal pole is provided with the limiting plate, the threaded rod has been seted up to the other end of horizontal pole, and threaded connection has the second nut on the threaded rod.
Preferably, be provided with the work flat board between the support montant, the position department that the work flat board corresponds with the support plectane all is provided with fixed ear, the top of supporting the montant runs through in fixed ear, the top threaded connection who supports the montant body of rod and is located fixed ear has the spiral shell.
Preferably, universal wheels are arranged at the bottoms of the supporting vertical rods.
Compared with the prior art, the utility model has the advantages and positive effects that,
1. in the utility model, through the arrangement of the supporting vertical rods, the connecting plates, the first fixing blocks, the second fixing blocks, the rotating rods and the transverse rods, when the scaffold is installed, only the transverse rods are required to be inserted into the second fixing blocks, and the adjacent connecting plates are required to be connected, so that the condition that scaffold parts are lost is effectively avoided, the installation steps of the scaffold are simplified, and the work speed of engineering construction is improved;
2. the utility model discloses in, through the setting of square pole, square through hole, horizontal pole, second fixed block and second nut, the staff climbs to the scaffold frame through the horizontal pole on, does not need the outrigger ladder or scrambles the scaffold frame through the connecting rod between the scaffold frame on, has reduced workman's work load, has reduced the danger that the staff climbed the scaffold frame.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive labor.
Fig. 1 is a left side view structural schematic diagram of a novel scaffold for construction engineering provided by the present invention;
fig. 2 is a schematic front structural view of a novel scaffold for construction engineering provided by the present invention;
fig. 3 is a schematic top view of the novel scaffold for construction engineering provided by the present invention;
fig. 4 is a schematic front structural view of a vertical supporting rod of the novel scaffold for building engineering provided by the present invention;
fig. 5 is the utility model provides a pair of novel building engineering scaffold frame horizontal pole's enlarged structure schematic diagram.
In the above figures, 1, a helical casing; 2. fixing the ear; 3. a supporting circular plate; 4. a limiting plate; 5. a first fixed block; 6. a cross bar; 601. a square rod; 602. a threaded rod; 7. a universal wheel; 8. a working plate; 9. a second nut; 10. fixing the screw rod; 11. supporting the vertical rod; 12. a first nut; 13. a connecting plate; 14. a second fixed block; 15. a square through hole; 16. rotating the rod.
Detailed Description
In order to make the above objects, features and advantages of the present invention more clearly understood, the present invention will be further described with reference to the accompanying drawings and examples. It should be noted that the embodiments and features of the embodiments of the present application may be combined with each other without conflict.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those specifically described herein, and therefore the present invention is not limited to the limitations of the specific embodiments of the present disclosure.
As shown in fig. 1-5, the utility model provides a novel building engineering scaffold, including supporting montant 11, the position department that the support montant 11 body of rod is close to the top is provided with supports plectane 3, be used for placing work flat board 8, the below that the support montant 11 body of rod is located supports plectane 3 is provided with connecting plate 13, be used for linking together positive two support montants 11, the outside equidistance that supports the 11 body of rod of montant is provided with first fixed block 5, the quantity of first fixed block 5 sets up according to the structure size of a dimension of scaffold, horizontal pole 6 has been run through to the inside of first fixed block 5, be convenient for link together around the support montant 11 that corresponds, be used for artifical climbing scaffold as the cat ladder.
A rotating rod 16 penetrates through the top end of the connecting plate 13, the rotating rod 16 and the vertical supporting rod 11 are fixed together in a welding mode, the connecting plate 13 can conveniently rotate, a second fixing block 14 is arranged at one end, away from the rotating rod 16, of the outer side wall of the connecting plate 13, a fixing screw rod 10 penetrates through the inside of the second fixing block 14, a first nut 12 is connected to the rod body of the fixing screw rod 10 in a threaded mode, the adjacent second fixing blocks 14 can be connected together, a square through hole 15 is formed in the position, where the first fixing block 5 is in contact with the cross rod 6, a square rod 601 is arranged at the position, corresponding to the square through hole 15, of the cross rod 6, the rotation of the cross rod 6 is prevented, when people climb, the safety of workers is affected, a limiting plate 4 is arranged at one end of the cross rod 6, a threaded rod 602 is arranged at the other end of the cross rod 6, a, support and be provided with dull and stereotyped 8 of work between the montant 11 for the place of the direct work of staff, dull and stereotyped 8 of work all is provided with fixed ear 2 with the position department that supports plectane 3 and correspond, the top of supporting montant 11 is run through in fixed ear 2, the top threaded connection that the support montant 11 body of rod is located fixed ear 2 has the scroll cover 1, the cooperation supports plectane 3 and will fix ear 2 fixedly, the bottom of supporting montant 11 all is provided with universal wheel 7, the removal of the scaffold position of being convenient for.
When the scaffold is installed, the corresponding second fixing blocks 14 are installed together through the matching of the fixing screw rods 10 and the first nuts 12, so that the two connecting plates 13 are fixed together, the cross rods 6 are inserted into the square through holes 15, the second nuts 9 are installed on the threaded rods 602 and screwed, through the arrangement of the supporting vertical rods 11, the connecting plates 13, the first fixing blocks 5, the second fixing blocks 14, the rotating rods 16 and the cross rods 6, when the scaffold is installed, the cross rods 6 are only required to be inserted into the first fixing blocks 5, and the adjacent connecting plates 13 are required to be connected, so that the condition that scaffold parts are lost is effectively avoided, the installation steps of the scaffold are simplified, the work speed of engineering construction is improved, the cross rods 6 and the scaffold are sequentially installed on the supporting vertical rods 11 according to the mode, and then the fixing lugs 2 are matched with the supporting vertical rods 11, install dull and stereotyped 8 of working on supporting montant 11, dull and stereotyped 8 of fixed work of cooperation through scroll cover 1 and support plectane 3, the back finishes in the installation, the workman is through a plurality of horizontal poles 6, climb on dull and stereotyped 8 of working, through square pole 601, square through hole 15, horizontal pole 6, the setting of second fixed block 14 and second nut 9, the staff climbs to the scaffold frame through horizontal pole 6 on, do not need the outrigger ladder or climb to the scaffold frame through the connecting rod between the scaffold frame, the work load of workman has been reduced, the danger of staff climbing scaffold frame has been reduced.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in other forms, and any person skilled in the art may use the above-mentioned technical contents to change or modify the equivalent embodiment into equivalent changes and apply to other fields, but any simple modification, equivalent change and modification made to the above embodiments according to the technical matters of the present invention will still fall within the protection scope of the technical solution of the present invention.
Claims (6)
1. The utility model provides a novel building engineering scaffold, includes support montant (11), its characterized in that: support montant (11) body of rod and be provided with support plectane (3) near the position department on top, the below that the support montant (11) body of rod is located support plectane (3) is provided with connecting plate (13), the outside equidistance of the support montant (11) body of rod is provided with first fixed block (5), the inside of first fixed block (5) is run through there is horizontal pole (6).
2. A novel scaffold for construction engineering according to claim 1, characterized in that: the top of connecting plate (13) runs through has dwang (16), and dwang (16) and support montant (11) and adopt the welded mode to fix together, the one end that dwang (16) were kept away from to connecting plate (13) lateral wall is provided with second fixed block (14).
3. A novel scaffold for construction engineering according to claim 2, characterized in that: a fixing screw rod (10) penetrates through the second fixing block (14), and a first nut (12) is connected to the rod body of the fixing screw rod (10) in a threaded mode.
4. A novel scaffold for construction engineering according to claim 1, characterized in that: square through hole (15) have been seted up with the position department of horizontal pole (6) contact in first fixed block (5), horizontal pole (6) are provided with square pole (601) with the position department that square through hole (15) correspond, the one end of horizontal pole (6) is provided with limiting plate (4), threaded rod (602) have been seted up to the other end of horizontal pole (6), and threaded rod (602) go up threaded connection has second nut (9).
5. A novel scaffold for construction engineering according to claim 1, characterized in that: support and be provided with work flat board (8) between montant (11), the position department that work flat board (8) and support plectane (3) correspond all is provided with fixed ear (2), the top of supporting montant (11) runs through in fixed ear (2), the top threaded connection who supports montant (11) the body of rod and be located fixed ear (2) has spiral shell (1).
6. A novel scaffold for construction engineering according to claim 1, characterized in that: the bottom of the supporting vertical rod (11) is provided with universal wheels (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921129620.XU CN210482952U (en) | 2019-07-18 | 2019-07-18 | Novel building engineering scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921129620.XU CN210482952U (en) | 2019-07-18 | 2019-07-18 | Novel building engineering scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210482952U true CN210482952U (en) | 2020-05-08 |
Family
ID=70533359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921129620.XU Active CN210482952U (en) | 2019-07-18 | 2019-07-18 | Novel building engineering scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210482952U (en) |
-
2019
- 2019-07-18 CN CN201921129620.XU patent/CN210482952U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207144428U (en) | A kind of easy-to-dismount building scaffold | |
CN205188839U (en) | Movably -assembled anti -collision bridge wall construction hanging basket | |
CN210482952U (en) | Novel building engineering scaffold | |
CN206273948U (en) | Truss operating platform | |
CN209429487U (en) | A kind of scaffold of architectural engineering | |
CN207228591U (en) | A kind of architectural engineering scaffold | |
CN203462997U (en) | Wrong climbing prevention type climbing ladder | |
CN107217912B (en) | A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction | |
CN210369827U (en) | Scaffold for building external wall construction | |
CN211775606U (en) | Regularization assembled that can have enough to meet need climbs frame and goes up people's passageway | |
CN204174915U (en) | Scaffold | |
CN210302162U (en) | Sand pool structure of job site fire control is built in room | |
CN204626931U (en) | In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform | |
CN220469346U (en) | Building scaffold component | |
CN218323856U (en) | Detachable scaffold connecting piece | |
CN218061366U (en) | Building external climbing type building construction operation platform | |
CN207004058U (en) | A kind of assembled steel tubing string welding procedure operating platform | |
CN218176598U (en) | All-steel climbing frame convenient to disassemble | |
CN211421777U (en) | Movable operation frame for construction engineering | |
CN218375052U (en) | High construction frame of security | |
CN207944690U (en) | A kind of engineering construction multifunctional combination scaffold | |
CN215760283U (en) | Portable scaffold for building installation | |
CN216841400U (en) | Wall panel installation is with supplementary cat ladder | |
CN216587603U (en) | Strong-bearing-capacity scaffold for road and bridge engineering | |
CN215948842U (en) | Safe type scaffold frame for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 12-5 Fu'an Road, fengniancun street, Dongli District, Tianjin 300000 Patentee after: Tianjin Jiangxu Engineering Co., Ltd Address before: 12-5 Fu'an Road, fengniancun street, Dongli District, Tianjin 300000 Patentee before: Tianjin Jiangxu Communication Technology Co.,Ltd. |