CN210421561U - Glass curtain wall - Google Patents

Glass curtain wall Download PDF

Info

Publication number
CN210421561U
CN210421561U CN201921155119.0U CN201921155119U CN210421561U CN 210421561 U CN210421561 U CN 210421561U CN 201921155119 U CN201921155119 U CN 201921155119U CN 210421561 U CN210421561 U CN 210421561U
Authority
CN
China
Prior art keywords
fastener
curtain wall
glass
wall
slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921155119.0U
Other languages
Chinese (zh)
Inventor
陆刚强
赵华君
李坚锋
徐科宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazi Pentium Construction Engineering Group Co.,Ltd.
Original Assignee
Zhejiang Pentium Municipal Garden Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Pentium Municipal Garden Construction Engineering Co Ltd filed Critical Zhejiang Pentium Municipal Garden Construction Engineering Co Ltd
Priority to CN201921155119.0U priority Critical patent/CN210421561U/en
Application granted granted Critical
Publication of CN210421561U publication Critical patent/CN210421561U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a glass curtain wall, relate to the technical field that the curtain was decorated, it includes a plurality of parallel arrangement's of rigid coupling on building outer wall stand crossbeam, it has a plurality of curtain wall glass to arrange in proper order between two adjacent crossbeams, the bolt rigid coupling has left fastener and the right fastener of a plurality of "T" types on the crossbeam, left side fastener and right fastener all include the horizontal piece and two vertical pieces of integrative rigid coupling, horizontal piece and two adjacent lateral walls of vertical piece all form the right angle wall, the double-layered groove of "L" font is all seted up in right angle wall department to left side fastener and right fastener, curtain wall glass fixes on the crossbeam through the double-layered groove grafting adaptation with being located in two left fasteners and two right fasteners of its four corners department, right fastener and left fastener lock between two adjacent curtain wall glass on the same horizontal plane are connected. The utility model discloses a lock of two adjacent left fasteners and right fastener is connected and has been realized the even adjustment in clearance between the curtain glass.

Description

Glass curtain wall
Technical Field
The utility model belongs to the technical field of the technique of curtain decoration and specifically relates to a glass curtain wall is related to.
Background
The glass curtain wall is a building external protective structure or a decorative structure which has certain displacement capacity relative to a main structure and does not bear the action of the main structure, the glass curtain wall has a single-layer glass structure and a double-layer glass structure, the used glass is mostly mirror glass or common glass, and the glass is generally supported by a stand column, an aluminum profile or a steel profile and the like during installation. The glass curtain wall of modern high-rise building is made up of mirror glass and ordinary glass, and the insulating layer is filled with dry air or inert gas, so that it has the advantages of sound-insulating, heat-insulating, frost-resisting, moisture-resisting and high wind pressure-resisting strength.
Chinese patent with patent publication No. CN108222345A, a glass curtain wall is proposed, which comprises a stand column, a cross beam, an outer cover plate and glass, wherein a supporting plate protrudes from an outer side surface of the cross beam, a cushion block is placed at the bottom of the supporting plate, the cushion block is provided with a bearing part for supporting the glass along the length direction thereof, the cushion block is further provided with two first drainage grooves and two second drainage grooves which are arranged along the length direction thereof, the first drainage grooves are communicated with the second drainage grooves, the first drainage grooves are further provided with first drainage holes, outer ends of the supporting plate are bent upwards to form forming plates for forming clamping grooves, third drainage grooves are formed between the outer ends of the supporting plate and the forming plates, and the bottom of the third drainage grooves is provided with second drainage holes; the outer cover plate comprises a main plate, a clamping hook plate is connected to the middle of the main plate, the clamping hook plate is clamped and fixed in a clamping groove, a fourth water drainage groove is bent at the bottom of the main plate, and a third water drainage hole is formed in the bottom of the fourth water drainage groove. The invention can realize the effect of effectively discharging rainwater permeating into the glass curtain wall.
The above prior art solutions have the following drawbacks: separate through the bearing part between two adjacent curtain wall glass on same vertical face, but the clearance control between two adjacent curtain wall glass on the same horizontal plane relies on constructor's operation experience usually, leads to the clearance to differ between two adjacent curtain wall glass to when the glass curtain wall overall structure takes place expend with heat and contract with cold phenomenon winter and summer, the internal stress that curtain wall glass bore is uneven, leads to bursting apart easily.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a curtain wall glass installation gap is even glass curtain wall.
The utility model aims at realizing through the following technical scheme:
the utility model provides a glass curtain wall, includes a plurality of parallel arrangement's of rigid coupling on building outer wall stand crossbeam, adjacent two arrange in proper order between the crossbeam has a plurality of curtain wall glass, the left fastener and the right fastener of bolt joint rigid coupling has a plurality of "T" types on the crossbeam, a left side fastener with right side fastener all includes the horizontal piece and two vertical pieces of integrative rigid coupling, horizontal piece and two the adjacent lateral wall of vertical piece all forms right angle wall, a left side fastener with right side fastener in the double-layered groove of "L" font is all seted up to right angle wall department, curtain wall glass through with be located two of its four corners department in left side fastener and two right fasteners press from both sides groove grafting adaptation and fix on the crossbeam, adjacent two on the same horizontal plane between the curtain wall glass right side fastener with left side fastener lock is connected.
By adopting the technical scheme, when the curtain wall glass is installed, the distance between two adjacent cross beams is set according to the size of the curtain wall glass, then the cross beams are equidistantly and parallelly fixed on the building outer wall upright post, two left fasteners and two right fasteners are sequentially bolted and fixed on the two adjacent cross beams, the curtain wall glass is installed between the left fastener and the right fastener on the same cross beam, the curtain wall glass is fixed on the cross beam through the splicing and adapting of four corners of the curtain wall glass and clamping grooves on the left fastener and the right fastener respectively, so that the gap between two adjacent curtain wall glasses on the same vertical line is fixed, and the gap between two adjacent curtain wall glasses on the same horizontal line is influenced by the distance between the right fastener and the left fastener and is also fixed and adjustable, thereby when the curtain wall glass is installed, the uniform gap between the two adjacent curtain wall glasses can be realized, therefore, when the curtain wall glass expands with heat and contracts with cold, enough gaps are provided for buffering deformation, and the stability of the integral structure of the glass curtain wall is ensured as far as possible.
Further setting the following steps: two on the right side fastener the equal vertical setups of terminal surface that vertical piece deviates from each other are located the slot of pressing from both sides the groove both sides, slot one side run through to vertical piece deviates from the lateral wall of horizontal piece, two on the left side fastener vertical piece deviates from the equal rigid coupling in one side of horizontal piece have with the inserted block of slot grafting adaptation.
Through adopting above-mentioned technical scheme, when the equal plug connection of slot at both ends about the inserted block at both ends and the right fastener about left fastener, left side fastener is connected with right fastener lock and is formed a atress wholly to left side fastener or right fastener can transmit the dead load to right fastener or left fastener of being connected with its lock when providing the support for curtain wall glass, have improved left fastener and right fastener and to curtain wall glass's bearing capacity, have improved glass curtain wall connection structure's stability.
Further setting the following steps: the slot wall of the slot is fixedly connected with a plurality of salient points which are used for tightly abutting against the insertion block.
Through adopting above-mentioned technical scheme, when the inserted block was pegged graft with the slot and is fit for, the bump supported the inserted block tightly on the cell wall of slot, and then made left fastener inseparabler with being connected of right fastener, improved the compactness of being connected between left fastener and the right fastener.
Further setting the following steps: the upper end face of the vertical block positioned above the right fastener is provided with scales along the side line of the slot wall, and after the right fastener is buckled with the left fastener, the scales are used for marking the distance between the bottom wall of the vertical clamping groove section on the right fastener and the bottom wall of the vertical clamping groove section on the left fastener.
Through adopting above-mentioned technical scheme, when right side fastener is connected with left fastener lock, the degree of depth that the inserted block inserted in the slot is different, the clearance between two adjacent curtain wall glass is also different, so can realize the clearance between two adjacent curtain wall glass on the same water flat line through the degree of depth that the adjustment inserted block inserted in the slot, and this clearance accessible scale is surveyed directly perceivedly, constructor can adjust the clearance between the curtain wall glass accurately swiftly, and avoided the influence that the human factor caused the clearance degree of consistency between the curtain wall glass as far as possible.
Further setting the following steps: and corner sleeves which are matched with the clamping grooves in an inserting manner are sleeved at the four corners of the curtain wall glass.
Through adopting above-mentioned technical scheme, the corner sleeve protects curtain wall glass's four corners to avoid curtain wall glass and left fastener and right fastener excessive friction when the installation to cause the damage to curtain wall glass as far as possible.
Further setting the following steps: the left fastener and the right fastener are attached to the bottom wall of the vertical section of the clamping groove through the buffer strips.
Through adopting above-mentioned technical scheme, the buffering strip can further provide the buffering for when curtain wall glass pegs graft in left fastener or right fastener to left fastener and right fastener cause the damage to curtain wall glass so that break along with the vibration when the building takes place to shake.
Further setting the following steps: the middle parts of the horizontal blocks on the left fastener and the right fastener are provided with fixing grooves along the length direction of the horizontal blocks, the bottom walls of the fixing grooves are provided with communicating grooves which penetrate through the horizontal blocks, and two fixing bolts which are connected with the cross beam in a bolted mode are arranged in the communicating grooves in a penetrating mode.
Through adopting above-mentioned technical scheme, earlier pass fixing bolt through the intercommunication groove when installing left fastener or right fastener and fix on the crossbeam, treat that curtain wall glass's four corners is equallyd divide do not with left fastener or right fastener plug-in connection back, slidable right fastener supports curtain wall glass tightly in the double-layered groove of left fastener to glass curtain wall connection structure's intensity has been guaranteed as far as possible, and is also comparatively convenient during actual installation.
Further setting the following steps: the fixed slot length direction's two cell walls have all seted up the slot line, work as left side fastener with right side fastener lock is connected the back, left side fastener with right side fastener is kept away from the common buckle in one side of crossbeam is connected with the decorative board of "ten" font, the decorative board is close to one side rigid coupling of crossbeam have a plurality of with the card of slot line joint adaptation.
Through adopting above-mentioned technical scheme, the decorative board can be dismantled with left fastener and right fastener and be connected for it is more convenient when later stage is maintained or is changed curtain wall glass, and the decorative board also can play certain guard action to fixing bolt simultaneously, in order to avoid the quick corrosion of fixing bolt.
To sum up, the utility model discloses a beneficial technological effect does:
1. the adjacent two curtain wall glasses on the same horizontal line are connected through buckling of the adjacent right fastener and the left fastener to realize the control of the gap between the two adjacent curtain wall glasses, so that when the curtain wall glasses are installed, the uniform gap between the two adjacent curtain wall glasses can be realized;
2. when the inserting block on the left fastener is inserted and matched with the inserting groove on the right fastener, the left fastener and the right fastener are buckled and connected to form a stressed whole, so that the bearing performance of the left fastener and the right fastener on curtain wall glass is improved, and the stability of a glass curtain wall connecting structure is improved;
3. the gap between the curtain wall glass is adjusted accurately and quickly by observing the scales by constructors, and the influence of human factors on the uniformity of the gap between the curtain wall glass is avoided as much as possible.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a partially enlarged schematic view of a portion a in fig. 1.
Reference numerals: 1. a cross beam; 2. curtain wall glass; 3. a left fastener; 4. a right fastener; 5. a horizontal block; 6. a vertical block; 7. a clamping groove; 8. a slot; 9. inserting a block; 10. calibration; 11. a corner sleeve; 12. a buffer strip; 13. fixing grooves; 14. a communicating groove; 15. fixing the bolt; 16. a slot line; 17. a decorative panel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the glass curtain wall disclosed by the present invention, the glass curtain wall comprises a plurality of beams 1 which are fixedly connected to the building outer wall column and arranged in parallel, a plurality of curtain wall glasses 2 are sequentially arranged between two adjacent beams 1, the four corners of the curtain wall glasses 2 are all sleeved with L-shaped corner sleeves 11 which are inserted and adapted with the clamping grooves 7, and the corner sleeves 11 are made of plastic materials; the cross beam 1 is fixedly connected with a plurality of T-shaped left fasteners 3 and right fasteners 4 in a bolted mode, each of the left fasteners 3 and the right fasteners 4 comprises a horizontal block 5 and two vertical blocks 6 which are fixedly connected integrally, a fixing groove 13 along the length direction of each horizontal block 5 on each of the left fasteners 3 and the right fasteners 4 is formed in the middle of each horizontal block 5, a communicating groove 14 penetrating through each horizontal block 5 is formed in the bottom wall of each fixing groove 13, two fixing bolts 15 connected with the cross beam 1 are arranged in each communicating groove 14 in a penetrating mode, a clamping groove 7 is formed in the bending point where the horizontal blocks 5 and the vertical blocks 6 are connected, two ends of each clamping groove 7 extend towards the end portions of the horizontal blocks 5 and the vertical blocks 6 which are deviated from each other, the two clamping grooves 7 are arranged in an L shape and are symmetrically arranged on the central line of the horizontal blocks 5 in the length direction, the curtain wall glass 2 is fixed on the cross beam 1 through the splicing fit with the clamping grooves 7 in the two left fasteners, and a right fastener 4 and a left fastener 3 between two adjacent curtain wall glass 2 on the same horizontal plane are buckled and connected.
When the curtain wall glass 2 is installed, firstly, the distance between two adjacent cross beams 1 is set according to the size of the curtain wall glass 2, then, a plurality of cross beams 1 are equidistantly and parallelly fixed on a building outer wall upright post, then, a plurality of fixing bolts 15 respectively penetrate through communicating grooves 14 on a left fastener 3 and a right fastener 4 and are connected with the cross beams 1 in a bolted mode, two fixing bolts 15 are arranged in each communicating groove 14, then, the curtain wall glass 2 is installed between the left fastener 3 and the right fastener 4 on the same cross beam 1, then, the curtain wall glass 2 is tightly pressed in a clamping groove 7 in the left fastener 3 by sliding the right fastener 4, then, the fixing bolts 15 are screwed to completely fix the left fastener 3 and the right fastener 4 on the cross beam 1, the curtain wall glass 2 is fixed on the cross beam 1 through the splicing connection of four corners of the curtain wall glass 2 with the clamping grooves 7 on the left fastener 3 and the right fastener 4 respectively, so that the gap between two adjacent, the gap between two adjacent curtain wall glass 2 on the same horizontal line is influenced by the distance between the right fastener 4 and the left fastener 3, and is fixed and adjustable, so that when the curtain wall glass 2 is installed, the gap between the two adjacent curtain wall glass 2 is uniform, and when the curtain wall glass 2 expands with heat and contracts with cold, enough gaps are formed to buffer the deformation, and the stability of the integral structure of the glass curtain wall is ensured as much as possible; the corner cover 11 made of plastic protects the four corners of the curtain wall glass 2, so that the curtain wall glass 2 is prevented from being damaged due to excessive friction when the curtain wall glass 2 and the left fastener 3 and the right fastener 4 are installed as far as possible.
Referring to fig. 2, two vertical blocks 6 on the right side fastener 4 keep away from one side of its horizontal block 5 and offer the slot 8 that is located the double-sided of clamp groove 7, slot 8 one side runs through the tip that two vertical blocks 6 kept away from each other and is less than the length of vertical block 6, the equal rigid coupling in one side of two vertical blocks 6 on the left side fastener 3 back to horizontal block 5 has the inserted block 9 with the plug-in adaptation of slot 8 grafting, integrative rigid coupling has a plurality of bumps (not shown in the figure) that are used for supporting inserted block 9 on the cell wall of slot 8, the up end of the vertical block 6 who lies in the top on the right side fastener 4 is provided with scale 10 along the sideline of the cell wall of slot 8, after right side fastener 4 is connected with left fastener 3 lock, scale 10 is used for marking the interval between the diapire of the vertical section of clamp groove 7 on the right side fastener 4 and the diapire.
When the insertion blocks 9 at the upper end and the lower end of the left fastener 3 are connected with the insertion grooves 8 at the upper end and the lower end of the right fastener 4 in an inserting manner, the insertion blocks 9 are abutted against the groove walls of the insertion grooves 8 by the convex points, so that the left fastener 3 is more tightly connected with the right fastener 4, and the left fastener 3 and the right fastener 4 are buckled and connected to form a stressed whole, so that the left fastener 3 or the right fastener 4 can transmit static load to the right fastener 4 or the left fastener 3 buckled and connected with the curtain wall glass 2 when supporting the curtain wall glass 2, the bearing performance of the left fastener 3 and the right fastener 4 on the curtain wall glass 2 is improved, and the stability of a glass curtain wall connecting structure is improved; when the depth that inserted block 9 inserted in slot 8 is different, the clearance between two adjacent curtain wall glass 2 is also different, so can realize the clearance between two adjacent curtain wall glass 2 on the same water flat line through the degree of depth that adjustment inserted block 9 inserted in slot 8, and this clearance accessible scale 10 is observed directly perceivedly, constructor can adjust the clearance between curtain wall glass 2 accurately and swiftly, and avoided the influence that the clearance degree of consistency of human factor between to curtain wall glass 2 caused as far as possible.
Referring to fig. 1 and 2, left side fastener 3 and right fastener 4 have laminated buffering strip 12 on the diapire of the vertical section of double-layered groove 7, slot line 16 has all been seted up to two cell walls of fixed slot 13 length direction, after left side fastener 3 is connected with the lock of right fastener 4, the common buckle in one side of crossbeam 1 is kept away from to left side fastener 3 and right fastener 4 is connected with the decorative board 17 of "ten" font, decorative board 17 is close to one side rigid coupling of crossbeam 1 has a plurality ofly and the card (not shown in the figure) of the "L" type of slot line 16 joint adaptation, the card sets up four and is located the position that decorative board 17 lateral wall and four slot lines correspond, two cards that are corresponding to same fixed slot 13 are outer "eight" word setting, when the card was kept away from the one end of decorative board 17 and is pegged graft with slot line 16, decorative board 17 is fixed on left side.
The buffer strip 12 can further provide buffer for the curtain wall glass 2 when being inserted into the left fastener 3 or the right fastener 4, so as to prevent the curtain wall glass 2 from being damaged and broken by the left fastener 3 and the right fastener 4 following vibration when the building vibrates; decorative board 17 can be dismantled with left fastener 3 and right fastener 4 and be connected for it is more convenient when later stage is maintained or is changed curtain wall glass 2, and decorative board 17 also can play certain guard action to fixing bolt 15 simultaneously, in order to avoid the quick corrosion of fixing bolt 15.
The implementation principle and the beneficial effects of the embodiment are as follows:
when the curtain wall glass 2 is installed, firstly, the distance between two adjacent cross beams 1 is set according to the size of the curtain wall glass 2, then, a plurality of cross beams 1 are equidistantly and parallelly fixed on an outer wall upright post of a building, then, two left fasteners 3 and two right fasteners 4 are sequentially bolted and fixed on the two adjacent cross beams 1, the curtain wall glass 2 is installed between the left fasteners 3 and the right fasteners 4 on the same cross beam 1, the curtain wall glass 2 is fixed on the cross beam 1 through the splicing and adapting of four corners of the curtain wall glass 2 and clamping grooves 7 on the left fasteners 3 and the right fasteners 4 respectively, so that the gap between two adjacent curtain wall glasses 2 on the same vertical line is fixed, the gap between two adjacent curtain wall glasses 2 on the same horizontal line is influenced by the distance between the right fasteners 4 and the left fasteners 3 and is also fixed and adjustable, thereby, when the curtain wall glass 2 is installed, the gap between the two adjacent curtain wall glasses 2 is uniform, therefore, when the curtain wall glass 2 expands with heat and contracts with cold, enough gaps are provided for buffering deformation, and the stability of the integral structure of the glass curtain wall is ensured as far as possible.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a glass curtain wall, includes a plurality of parallel arrangement's of rigid coupling on building outer wall stand crossbeam (1), adjacent two it has a plurality of curtain wall glass (2), its characterized in that to arrange in proper order between crossbeam (1): left fastener (3) and right fastener (4) that the bolt rigid coupling has a plurality of "T" types on crossbeam (1), left side fastener (3) with right side fastener (4) all include horizontal piece (5) and two vertical pieces (6) of integrative rigid coupling, horizontal piece (5) and two the lateral wall that vertical piece (6) are adjacent all forms the right angle wall, left side fastener (3) with right side fastener (4) in the double-layered groove (7) of "L" font are all seted up to right angle wall department, curtain glass (2) through with be located two of its four corners department in left side fastener (3) and two right side fastener (4) press from both sides groove (7) grafting adaptation and fix on crossbeam (1), adjacent two on the same horizontal plane between curtain glass (2) right side fastener (4) with left side fastener (3) lock is connected.
2. The glass curtain wall of claim 1, wherein: two on right side fastener (4) the equal vertical setups of terminal surface that vertical piece (6) deviate from each other are located slot (8) of pressing from both sides groove (7) both sides, slot (8) one side run through to vertical piece (6) deviate from the lateral wall of horizontal piece (5), two on left side fastener (3) vertical piece (6) deviate from the equal rigid coupling in one side of horizontal piece (5) have with inserted block (9) of slot (8) grafting adaptation.
3. The glass curtain wall of claim 2, wherein: the wall of the slot (8) is integrally and fixedly connected with a plurality of salient points for tightly abutting against the insertion block (9).
4. The glass curtain wall of claim 3, wherein: the upper end face of the vertical block (6) positioned above the right fastener (4) is provided with scales (10) along the side line of the groove wall of the slot (8), and when the right fastener (4) is buckled with the left fastener (3) to be connected, the scales (10) are used for marking the bottom wall of the vertical section of the clamping groove (7) on the right fastener (4) and the distance between the bottom walls of the vertical sections of the clamping groove (7) on the left fastener (3).
5. The glass curtain wall of claim 1, wherein: the four corners of the curtain wall glass (2) are respectively sleeved with a corner sleeve (11) which is matched with the clamping groove (7) in an inserting manner.
6. The glass curtain wall of claim 5, wherein: and the left fastener (3) and the right fastener (4) are attached to the bottom wall of the vertical section of the clamping groove (7) by buffer strips (12).
7. The glass curtain wall of claim 1, wherein: the middle parts of the horizontal blocks (5) on the left fastener (3) and the right fastener (4) are provided with fixing grooves (13) along the length direction, the bottom walls of the fixing grooves (13) are provided with communicating grooves (14) penetrating through the horizontal blocks (5), and two fixing bolts (15) connected with the cross beam (1) in a bolted mode are arranged in the communicating grooves (14) in a penetrating mode.
8. The glass curtain wall of claim 7, wherein: fixed slot (13) length direction's two cell walls have all been seted up slot line (16), work as left side fastener (3) with right side fastener (4) lock is connected the back, left side fastener (3) with right side fastener (4) are kept away from the common buckle in one side of crossbeam (1) is connected with decorative board (17) of "ten" font, decorative board (17) are close to one side rigid coupling of crossbeam (1) have a plurality of with the card of slot line (16) joint adaptation.
CN201921155119.0U 2019-07-22 2019-07-22 Glass curtain wall Active CN210421561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921155119.0U CN210421561U (en) 2019-07-22 2019-07-22 Glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921155119.0U CN210421561U (en) 2019-07-22 2019-07-22 Glass curtain wall

Publications (1)

Publication Number Publication Date
CN210421561U true CN210421561U (en) 2020-04-28

Family

ID=70382417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921155119.0U Active CN210421561U (en) 2019-07-22 2019-07-22 Glass curtain wall

Country Status (1)

Country Link
CN (1) CN210421561U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931353A (en) * 2020-07-14 2022-01-14 安徽斯格特信息系统有限公司 Energy-conserving cooling curtain for building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931353A (en) * 2020-07-14 2022-01-14 安徽斯格特信息系统有限公司 Energy-conserving cooling curtain for building

Similar Documents

Publication Publication Date Title
CN101413334B (en) Architecture art embossment stone wall surface dried hanging structure and construction method thereof
CN204645336U (en) A kind of mounting plug-in type aluminum facade
CN102493622A (en) Wallboard installing component and method for installing decorative wallboard by using same
CN210421561U (en) Glass curtain wall
CN111926950B (en) Ultrahigh-bay combined decorative glass partition structure and construction method thereof
CN112064833A (en) Assembled partition wall structure
CN111962792A (en) Wall surface hanging system and mounting method
CN110847534A (en) Stone toilet wall assembly and mounting method thereof
CN210239022U (en) Wall body ceramic tile joins externally structure
CN102747820B (en) Novel wall protection plate for decoration
CN102777042A (en) Installation technology of connecting board type inner separation wall
EP3272959A1 (en) Building wall
CN112144807A (en) Wallboard mounting structure and mounting method thereof
KR20090043801A (en) Stone panel curtain wall structure
CN106592878A (en) Photovoltaic panel supporting frame applied to colored steel tile
CN215166847U (en) Exterior wall system
CN215889127U (en) Leveling component
CN106049702A (en) Integrated building wall structure
FI117484B (en) System for mounting facade panels
CN215889027U (en) Assembled wall system with wallboard capable of being installed transversely and vertically in two directions
CN211690931U (en) Interior decoration division wall
CN212427880U (en) Wall surface hanging system
CN211369382U (en) Dry hanging system for assembled ceramic tiles
CN211114565U (en) Keel
CN113417418A (en) Assembly type wall system with wall boards capable of being installed transversely and vertically in two directions and installation method of assembly type wall system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 6 / F, 126 Wenjiao Road, Fuchun street, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Huazi Pentium Construction Engineering Group Co.,Ltd.

Address before: 6 / F, 126 Wenjiao Road, Fuchun street, Fuyang District, Hangzhou City, Zhejiang Province

Patentee before: Zhejiang Pentium Municipal Garden Construction Engineering Co.,Ltd.