CN210289038U CN201920665120.1U CN201920665120U CN210289038U CN 210289038 U CN210289038 U CN 210289038U CN 201920665120 U CN201920665120 U CN 201920665120U CN 210289038 U CN210289038 U CN 210289038U
Authority
CN
China
Prior art keywords
rods
scaffold
pull
rod
scaffold frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920665120.1U
Other languages
Chinese (zh)
Inventor
杨孝伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920665120.1U priority Critical patent/CN210289038U/en
Application granted granted Critical
Publication of CN210289038U publication Critical patent/CN210289038U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold frame for building engineering convenient to installation, the bracing piece comprises a supporting bar, the quantity of bracing piece is four, four two sets of, two sets of about every two for a set of sharing of bracing piece the telescopic link has been cup jointed in the equal activity in inside of bracing piece, the top fixedly connected with bearing plate of telescopic link. This scaffold frame for building engineering convenient to installation, through the integrated design, the problem that this scaffold frame installation procedure is complicated when using has been avoided, the efficiency of construction has been improved, in addition, through the pull rod, the pull ring, mutually support between compression spring and the spacing hole, under compression spring's elastic action, can make the pull rod cup joint with the spacing hole activity of co-altitude not, thereby can change the construction environment demand that highly differs with the adaptation of this scaffold frame, the problem that current scaffold frame operates complicacy when adjusting the height has been solved, the practicality of this scaffold frame has been improved.

Description

Scaffold frame for building engineering convenient to installation
Technical Field
The utility model relates to a construction equipment technical field specifically is a scaffold frame for building engineering convenient to installation.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
The current scaffold is usually formed by connecting one section of steel pipe, when setting up the scaffold, utilize nut and iron wire to couple together every section of steel pipe usually, the operation is complicated, and very big time when scaffold installation has been increased, and when the height that needs to change the scaffold is with the different construction height of adaptation, need dismantle or increase the quantity of steel pipe, greatly reduced scaffold's installation effectiveness in the work progress, in addition, current scaffold mostly is the bottom and does not set up the wheel, when scaffold is removed to needs, can appear carrying difficulty's problem because scaffold quality is too big, scaffold's flexibility has been reduced, consequently, need to produce a scaffold for the building engineering of being convenient for the installation and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame for building engineering convenient to installation, in order to solve the current scaffold frame that proposes in the above-mentioned background art and to form by connecting one section steel pipe usually, when setting up the scaffold frame, utilize nut and iron wire to connect every section steel pipe usually, the operation is complicated, and very big increase the time when scaffold frame installation, and when the height that needs to change the scaffold frame is with the different construction height of adaptation, need dismantle or increase the quantity of steel pipe, greatly reduced the installation effectiveness of scaffold frame in the work progress, in addition, current scaffold frame is mostly that the bottom does not set up the wheel, when needs remove the scaffold frame, can be because the too big problem of transport difficulty appears in scaffold frame quality, the problem of scaffold frame flexibility has been reduced.
In order to achieve the above object, the utility model provides a following technical scheme: a scaffold for construction engineering convenient to install comprises four support rods, wherein each two of the four support rods are divided into a left group and a right group, telescopic rods are movably sleeved in the two groups of the support rods, the top of the telescopic rod is fixedly connected with a bearing plate, the top of the bearing plate is fixedly provided with a guard rail, the sides of the two groups of support rods far away are movably sleeved with pull rods, the number of the pull rods is four, each two of the four pull rods are divided into a left group and a right group, pull rings are fixedly arranged at the ends far away from the two groups of the pull rods, compression springs positioned in the supporting rods are movably sleeved on the outer surfaces of the four pull rods, the outer surface of the telescopic rod is provided with a limiting hole, the limiting hole is movably sleeved with the pull rod, and the bottom of the supporting rod is fixedly provided with a universal wheel.
Preferably, one end of the compression spring is fixedly connected with the inner wall of the support rod, and the other end of the compression spring is fixedly connected with the outer surface of the pull rod.
Preferably, the number of the limiting holes is four, and the four limiting holes are uniformly distributed on the outer surface of the telescopic rod at equal intervals.
Preferably, the middle part fixed mounting of bracing piece has the connecting rod, the quantity of connecting rod is four, four per two of connecting rod divide into about a set of two sets of for a set of altogether, two sets of the equal swing joint of one end that the connecting rod kept away from mutually has the dead lever.
Preferably, the number of the fixing rods is four, fixing nails are fixedly mounted at the bottoms of the four fixing rods, and the fixing nails are conical.
Preferably, two sets of equal fixed mounting has the bearing bar between the bracing piece, the bearing bar is made by the stainless steel.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this scaffold frame for building engineering convenient to installation, through the integrated design, the problem that need utilize nut and iron wire to couple together every section steel pipe when having avoided the installation, the problem of this scaffold frame program complicacy when using has been avoided, the efficiency of construction has been improved, in addition, through the pull rod, the pull ring, mutually support between compression spring and the spacing hole, under compression spring's elastic force effect, can make the pull rod cup joint with the spacing hole activity of co-altitude not, thereby can change the height of this scaffold frame with the different construction environment demand of adaptation, the problem of current scaffold frame complicated operation when the height-adjusting has been solved, the practicality of this scaffold frame has been improved.
2. This scaffold frame for building engineering convenient to installation, there is the universal wheel through the bottom fixed mounting at the bracing piece, can make this scaffold frame in the nimble removal of job site, the problem of carrying difficulty has been avoided current scaffold frame because the quality is too big to appear, the flexibility of this scaffold frame has been improved, in addition, utilize the connecting rod, mutually support between dead lever and the staple, can the effectual frictional force that increases staple and bottom surface, prevent when the construction, this scaffold frame appears rocking and causes irreversible injury for constructor, great improvement the security of this scaffold frame.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the internal structure of the support rod of the present invention;
fig. 3 is a schematic structural view of the limiting hole of the present invention.
In the figure: 1. a support bar; 2. a telescopic rod; 3. a bearing plate; 4. a pull rod; 5. a pull ring; 6. a compression spring; 7. a limiting hole; 8. a connecting rod; 9. fixing the rod; 10. fixing nails; 11. a load-bearing bar; 12. a universal wheel; 13. a guard rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides an embodiment: the scaffold comprises supporting rods 1, connecting rods 8 are fixedly arranged in the middle of the supporting rods 1, the number of the connecting rods 8 is four, every two of the four connecting rods 8 are divided into a left group and a right group, the ends, far away from the two groups of connecting rods 8, of the two groups of connecting rods 8 are movably connected with fixing rods 9, the number of the fixing rods 9 is four, fixing nails 10 are fixedly arranged at the bottoms of the four fixing rods 9, the fixing nails 10 are conical, the friction force between the fixing nails 10 and the bottom surface can be effectively increased by utilizing the mutual matching of the connecting rods 8, the fixing rods 9 and the fixing nails 10, the irreversible injury to constructors caused by shaking during construction is prevented, the safety of the scaffold is greatly improved, the number of the supporting rods 1 is four, every two of the four supporting rods 1 are divided into a left group and a right group, bearing rods 11 are fixedly arranged between the, the stability of the scaffold is greatly improved, telescopic rods 2 are movably sleeved inside two groups of supporting rods 1, a bearing plate 3 is fixedly connected to the top of each telescopic rod 2, a protective guard 13 is fixedly mounted on the top of each bearing plate 3, the safety of construction personnel during construction is guaranteed, pull rods 4 are movably sleeved on one side, far away from each two groups of supporting rods 1, of each four pull rods 4, every two groups of four pull rods 4 are divided into a left group and a right group, pull rings 5 are fixedly mounted at one ends, far away from each two groups of pull rods 4, compression springs 6 located inside the supporting rods 1 are movably sleeved on the outer surfaces of the four pull rods 4, one ends of the compression springs 6 are fixedly connected with the inner walls of the supporting rods 1, the other ends of the compression springs 6 are fixedly connected with the outer surfaces of the pull rods 4, limiting holes 7 are formed in the outer surface of each telescopic rod 2, the number of the limiting holes 7 is four, the four limiting holes 7, the limit hole 7 is movably sleeved with the pull rod 4, the scaffold for building engineering convenient to install avoids the problem that each section of steel pipe needs to be connected by utilizing nuts and iron wires during installation through integrated design, avoids the problem that the installation procedure of the scaffold is complex during use, improves the efficiency of building construction, in addition, through the mutual matching of the pull rod 4, the pull ring 5, the compression spring 6 and the limit hole 7, under the elastic action of the compression spring 6, the pull rod 4 can be movably sleeved with the limit holes 7 with different heights, so that the height of the scaffold can be changed to adapt to different construction environment requirements, the problem that the operation of the existing scaffold is complex during height adjustment is solved, the practicability of the scaffold is improved, the universal wheel 12 is fixedly installed at the bottom of the support rod 1, and the universal wheel 12 is fixedly installed at the bottom of the support rod 1, can make the nimble removal of this scaffold at the job site, avoid current scaffold because the quality is too big and the problem of transport difficulty appears, improve the flexibility of this scaffold.
The working principle is as follows: during the use, promote this scaffold frame earlier to the position of pre-construction, then open dead lever 9, make staple 10 and ground contact, make this scaffold frame remain stable, then the height of this scaffold frame of altitude mixture control according to the job site, at first spur pull ring 5, make pull rod 4 and spacing hole 7 separate, then twitch telescopic link 2, change telescopic link 2 when the length of bracing piece 1 inside is to suitable height, loosen pull ring 5, make pull rod 4 cup joint with the spacing hole 7 activity on the co-altitude not, this scaffold height's regulation has been accomplished promptly, constructor climbs bearing plate 3 through the ladder at last, stand on bearing plate 3 carry out the construction can.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a scaffold frame for building engineering convenient to installation, includes bracing piece (1), its characterized in that: the number of the supporting rods (1) is four, every two of the four supporting rods (1) are divided into a left group and a right group, the two groups of the supporting rods (1) are movably sleeved with the telescopic rods (2), the top of each telescopic rod (2) is fixedly connected with the bearing plate (3), the top of each bearing plate (3) is fixedly provided with the guard rail (13), one sides, away from the two groups of the supporting rods (1), of the two groups of the supporting rods are movably sleeved with the pull rods (4), the number of the pull rods (4) is four, every two of the four pull rods (4) are divided into a left group and a right group, one ends, away from the two groups of the pull rods (4), of the two groups of the pull rods (4) are fixedly provided with pull rings (5), the outer surfaces of the four pull rods (4) are movably sleeved with compression springs (6) located in the supporting rods (1), and the, the limiting hole (7) is movably sleeved with the pull rod (4), and the bottom of the supporting rod (1) is fixedly provided with a universal wheel (12).
2. A scaffold for construction engineering convenient to install according to claim 1, wherein: one end of the compression spring (6) is fixedly connected with the inner wall of the support rod (1), and the other end of the compression spring (6) is fixedly connected with the outer surface of the pull rod (4).
3. A scaffold for construction engineering convenient to install according to claim 1, wherein: the number of the limiting holes (7) is four, and the four limiting holes (7) are uniformly distributed on the outer surface of the telescopic rod (2) at equal intervals.
4. A scaffold for construction engineering convenient to install according to claim 1, wherein: the middle part fixed mounting of bracing piece (1) has connecting rod (8), the quantity of connecting rod (8) is four, four per two of connecting rod (8) are divided into about a set of two sets ofly, two sets of the equal swing joint in one end that connecting rod (8) kept away from mutually has dead lever (9).
5. A scaffold for construction engineering convenient to install according to claim 4, wherein: the number of the fixing rods (9) is four, fixing nails (10) are fixedly mounted at the bottoms of the fixing rods (9), and the fixing nails (10) are conical.
6. A scaffold for construction engineering convenient to install according to claim 1, wherein: and a bearing rod (11) is fixedly arranged between the two groups of support rods (1), and the bearing rod (11) is made of stainless steel.
CN201920665120.1U 2019-05-10 2019-05-10 Scaffold frame for building engineering convenient to installation Expired - Fee Related CN210289038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920665120.1U CN210289038U (en) 2019-05-10 2019-05-10 Scaffold frame for building engineering convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920665120.1U CN210289038U (en) 2019-05-10 2019-05-10 Scaffold frame for building engineering convenient to installation

Publications (1)

Publication Number Publication Date
CN210289038U true CN210289038U (en) 2020-04-10

Family

ID=70068744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920665120.1U Expired - Fee Related CN210289038U (en) 2019-05-10 2019-05-10 Scaffold frame for building engineering convenient to installation

Country Status (1)

Country Link
CN (1) CN210289038U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160575A (en) * 2020-09-25 2021-01-01 黑龙江建筑职业技术学院 Bearing frame convenient for height adjustment for building construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112160575A (en) * 2020-09-25 2021-01-01 黑龙江建筑职业技术学院 Bearing frame convenient for height adjustment for building construction

Similar Documents

Publication Publication Date Title
CN201826516U (en) Novel attached lifting scaffold
CN210289038U (en) Scaffold frame for building engineering convenient to installation
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN212773366U (en) Door type scaffold
CN204418629U (en) A kind of integrated form climbing frame
CN202417283U (en) Transmission line n-shaped rod fork beam insulation climbing device
CN201620593U (en) Spring-board frame for building construction
CN211420885U (en) Protective device for high-altitude safety in construction of bent cap support base cushion stone and support installation
CN210947630U (en) Scaffold with hard isolation structure for construction of exterior wall dry-hanging marble
CN204212388U (en) Monolithic combined scaffold
CN209742770U (en) Adjustable construction ladder
CN215631499U (en) Hanging basket without balance weight
CN207377209U (en) A kind of indirect cool tower lifts broadening platform stent
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN219772735U (en) Safety protection structure that bridge support set up
CN217998865U (en) Wall scaffold board installation device is leaned on to activity assembled scaffold frame
CN213626768U (en) High-stability protection device for high-rise building construction
CN213654205U (en) Anti-falling device for guide rail type lifting scaffold
CN217782763U (en) All-steel climbing frame is with climbing frame net piece
CN213898085U (en) Super roofing curtain hanging flower basket
CN212671122U (en) Scaffold for building construction
CN220814839U (en) Building engineering building climbing frame
CN210713750U (en) Engineering construction is with safe type hanging flower basket
CN211873764U (en) A remove handling frame for building engineering
CN219138362U (en) Formwork system of high-altitude suspended beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200410

Termination date: 20210510

CF01 Termination of patent right due to non-payment of annual fee