CN217998865U - Wall scaffold board installation device is leaned on to activity assembled scaffold frame - Google Patents

Wall scaffold board installation device is leaned on to activity assembled scaffold frame Download PDF

Info

Publication number
CN217998865U
CN217998865U CN202221646277.8U CN202221646277U CN217998865U CN 217998865 U CN217998865 U CN 217998865U CN 202221646277 U CN202221646277 U CN 202221646277U CN 217998865 U CN217998865 U CN 217998865U
Authority
CN
China
Prior art keywords
scaffold
wall
bracing piece
supporting
link plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221646277.8U
Other languages
Chinese (zh)
Inventor
俞伟明
王钟力
胡佳佳
张洁
吴新贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Chengfeng Construction Engineering Co ltd
Original Assignee
Zhejiang Chengfeng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Chengfeng Construction Engineering Co ltd filed Critical Zhejiang Chengfeng Construction Engineering Co ltd
Priority to CN202221646277.8U priority Critical patent/CN217998865U/en
Application granted granted Critical
Publication of CN217998865U publication Critical patent/CN217998865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a construction technical field specifically discloses activity assembled scaffold leans on wall scaffold board installation device, locate a plurality of connecting rods between the bracing piece group including two bracing piece groups and symmetry, can dismantle between the connecting rod and be connected with the first link plate that is used for supporting the staff to stand, be equipped with the climbing ladder that supplies the staff to climb between the first link plate, one of them side symmetry of bracing piece group is equipped with a plurality of coupling assembling that can carry out the connection with the wall, has solved traditional scaffold frame inconvenient use, takes place easily during the use to rock and causes the potential safety hazard, takes place the problem of turning on one's side easily when the workman scrambles simultaneously.

Description

Wall scaffold board installation device is leaned on to activity assembled scaffold frame
Technical Field
The application relates to the technical field of building construction, and particularly discloses a movably-assembled scaffold wall-leaning scaffold board mounting device.
Background
At present, scaffolds are adopted in building construction, road and bridge construction or ship building industry. The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging scaffold, choose formula scaffold, climb formula scaffold according to the structural style, the characteristics of scaffold lie in, can constitute different single, double scaffolds of group frame size, shape and bearing capacity according to concrete construction requirements, support frame, support column, material hoisting frame, the scaffold that climbs, the construction equipment of multiple functions such as cantilever frame.
When whitewashing at the external wall of building wall, the inconvenient construction operation of scaffold frame that uses, simultaneously when unevenness's ground surface mounting, the scaffold frame can produce and rock, and the construction workman can utilize the fragment of brick to pave, but still can't avoid the potential safety hazard that the scaffold frame of rocking produced, scrambles the scaffold frame when the scaffold frame rocks simultaneously, makes the scaffold frame take place to turn on one's side easily to the potential safety hazard of increase scaffold frame. Accordingly, the present inventors have devised a wall scaffold board mounting apparatus for a movably-assembled scaffold in order to solve the above-described problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the inconvenient use of traditional scaffold frame, take place easily during the use and rock and cause the potential safety hazard, take place the problem of turning on one's side easily when the workman scrambles simultaneously.
In order to achieve the purpose, the utility model discloses a basic scheme provides activity assembled scaffold leans on wall scaffold board installation device, locate a plurality of connecting rods between the bracing piece group including two bracing piece groups and symmetry, can dismantle between the connecting rod and be connected with the first link plate that is used for supporting the staff to stand, be equipped with the climbing ladder that supplies the staff climbing between the first link plate, the one side symmetry of one of them bracing piece group is equipped with a plurality of coupling assembling that can carry out being connected with the wall.
The principle and effect of this basic scheme lie in:
1. compared with the prior art, the utility model is provided with two support rod groups, a connecting rod and a hanging plate, the support rod groups and the connecting rod together form a connecting bracket, the hanging plate supports the staff, the hanging plate is arranged between the support rod groups, the support rod group can be held by hand on the support rod groups, the risk of falling and injury of the staff when falling down can be reduced,
2. compared with the prior art, the utility model discloses be equipped with coupling assembling, coupling assembling can be connected the bracing piece group with the wall, connects through coupling assembling and can prevent that the condition that rocks from appearing in the scaffold frame, can also prevent that the condition that the staff turned on one's side from appearing simultaneously.
Furthermore, the support rod group comprises two support rods which are parallel to each other. The supporting and connecting functions are realized through the supporting rod set.
Furthermore, a second hanging plate for supporting a worker to stand is arranged between the connecting assemblies. Can improve the rate of utilization of scaffold frame through setting up the second link plate, the second link plate can be dismantled simultaneously, makes things convenient for the scaffold frame to use.
Furthermore, coupling assembling is including locating the connecting rod on the bracing piece and the connection piece of rigid coupling on the connecting rod, it has the mounting hole to open on the connecting piece. Pass the mounting hole through the bolt and be connected connection piece and wall, conveniently fix scaffold frame.
Furthermore, reinforcing ribs are arranged on the connecting rods. The structural strength of the connecting rod can be improved by arranging the reinforcing ribs, and the deformation of the connecting rod under the action of force is avoided.
Further, a plurality of through grooves and a plurality of through holes are formed in the first hanging plate and the second hanging plate. Through setting up logical groove and through-hole and make things convenient for the building debris on the wall to drop and can reduce the weight of first link plate and second link plate simultaneously.
Furthermore, a plurality of obliquely arranged reinforcing rods are arranged between the supporting rods, and the adjacent reinforcing rods and the supporting rods form a triangular structure. The triangular structure is formed by matching the adjacent reinforcing rods and the supporting rods, so that the strength and the stability of the structure are improved conveniently.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are only some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a schematic structural diagram illustrating a wall scaffold board mounting device of a movable assembled scaffold according to an embodiment of the present disclosure;
fig. 2 is a schematic view of a portion a of a movably-assembled scaffold wall-up scaffold mounting apparatus according to an embodiment of the present application;
fig. 3 shows a schematic diagram of a connector of the installation device of the movably-assembled scaffold against the wall scaffold board according to the embodiment of the present application.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the objects of the present invention, the following detailed description is given to the embodiments, structures, features and effects according to the present invention with reference to the accompanying drawings and preferred embodiments.
Reference numerals in the drawings of the specification include: the device comprises a supporting rod group 1, a supporting rod 101, a connecting rod 2, a first hanging plate 3, a climbing ladder 4, a connecting assembly 5, a connecting rod 501, a reinforcing rib 502, a second hanging plate 6, a reinforcing rod 7, a connecting piece 8, a connecting piece 9, a base 901, a substrate 902, a connecting bolt 903, a connecting pin 904 and a U-shaped clamp 10.
The embodiment of the mounting device of the movably-assembled scaffold against the wall scaffold board is shown in figures 1 and 2: including two bracing piece group 1 and symmetry locate a plurality of connecting rods 2 between the bracing piece group 1, one side symmetry of left bracing piece group 1 is equipped with a plurality of coupling assembling 5 that can carry out the connection with the wall, and bracing piece group 1 is two vertical settings and the bracing piece 101 that is parallel to each other, and the quantity of bracing piece 101 is four. A plurality of obliquely arranged reinforcing rods 7 are arranged between the supporting rods 101 and 101, and the adjacent reinforcing rods 7 and the supporting rods 101 form a triangular structure together. The adjacent reinforcing rods 7 are matched with the supporting rods 101 to form a triangular structure, so that the strength and the stability of the structure are improved conveniently. The first hanging plate 3 used for supporting workers to stand is detachably connected between the connecting rods 2, specifically, hooks are fixedly connected to two sides of the first hanging plate 3, and the first hanging plate 3 is hung on the connecting rods 2 through the hooks on the two sides of the first hanging plate 3 to complete installation of the first hanging plate 3; be equipped with the climbing ladder 4 that supplies the staff to scramble between first link plate 3, climbing ladder 4 supplies staff climbing work, the inside of scaffold is located to climbing ladder 4, be equipped with the second link plate 6 that is used for supporting the staff to stand between coupling assembling 5, can improve the rate of utilization of scaffold through setting up second link plate 6, the also fixed mounting in both sides of second link plate 6 has the couple simultaneously, the couple through 6 both sides of second link plate is hung and is accomplished the installation of second link plate 6 on two coupling assembling 5, the mode of connecting through the couple is conveniently dismantled, compact structure is practical.
Coupling assembling 5 is including locating connecting rod 2 and the connection piece 8 of fixed connection on connecting rod 2 on bracing piece 101, connecting rod 2 and bracing piece 101 are connected through connecting piece 9 and U type checkpost 10, as shown in fig. 3, connecting piece 9 includes two connecting clip that can take place relative rotation, connect through connecting pin axle 904 between the connecting clip, the connecting clip includes base 901 and articulates the substrate 902 on base 901, it has connecting bolt 903 that can be connected base 901 and substrate 902 to articulate on base 901, can be connected bracing piece 101 and connecting rod 2 through screwing up connecting bolt 903, U type checkpost 10 also plays the effect of being connected bracing piece 101 and connecting rod 2.
Open on the connection piece 8 has the mounting hole, passes the mounting hole through the bolt and is connected connection piece 8 and wall, conveniently fixes scaffold frame, avoids the scaffold frame to rock. Be equipped with stiffening rib 502 on connecting rod 2, can improve the structural strength of connecting rod 2 through setting up stiffening rib 502, avoid connecting rod 2 atress to take place to warp, all opened a plurality of logical grooves and a plurality of through-hole on first link plate 3 and the second link plate 6, lead to the groove through setting up and the through-hole makes things convenient for building debris on the wall to drop and can reduce the weight of first link plate 3 and second link plate 6 simultaneously, makes things convenient for the staff to build and be under construction to scaffold.
Compared with the prior art, the utility model discloses be equipped with coupling assembling 5, coupling assembling 5 can be connected bracing piece group 1 and wall, it can prevent that the condition that the scaffold frame from rocking from appearing to connect through coupling assembling 5, form the triangle-shaped structure through setting up adjacent stiffener 7 and bracing piece 101 cooperation simultaneously, be convenient for improve the intensity and the stability of structure, it can improve the utilization ratio of scaffold frame to build second link plate 6 between coupling assembling 5, be connected coupling assembling 5 and wall and prevent that the condition that the staff scrambles the scaffold frame and turn on one's side from appearing, moreover, the steam generator is compact in structure, therefore, the clothes hanger is strong in practicability, the inconvenient use of traditional scaffold frame has been solved, easy the emergence is rocked and is caused the potential safety hazard during use, simultaneously the easy problem that takes place to turn on one's side when the workman scrambles.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed by the preferred embodiment, it is not limited to the present invention, and any person skilled in the art can make modifications or changes equivalent to the equivalent embodiments by utilizing the above disclosed technical contents without departing from the technical scope of the present invention, but all the modifications, changes and changes of the technical spirit of the present invention made to the above embodiments are also within the scope of the technical solution of the present invention.

Claims (7)

1. Activity assembled scaffold frame leans on wall scaffold board installation device, its characterized in that: locate a plurality of connecting rods between the bracing piece group including two bracing piece groups and symmetry, can dismantle between the connecting rod and be connected with the first link plate that is used for supporting the staff and stands, be equipped with the climbing ladder that supplies the staff climbing between the first link plate, one side symmetry of one of them bracing piece group is equipped with a plurality of coupling assembling that can carry out the connection with the wall.
2. A device for installing a movably-assembled scaffold against a wall scaffold board according to claim 1, wherein the set of support bars is two support bars parallel to each other.
3. A device for mounting a scaffold against a wall according to claim 2, wherein a second hang plate is provided between the connection members for supporting a worker to stand.
4. The device for installing the scaffold on the scaffold board according to claim 3, wherein the connecting component comprises a connecting rod arranged on the supporting rod and a connecting piece fixedly connected to the connecting rod, and the connecting piece is provided with an installing hole.
5. A device for mounting a scaffold against a wall as claimed in claim 4, wherein the connector bars are provided with reinforcing ribs.
6. The device for mounting a scaffold against a wall as claimed in claim 3, wherein the first and second boards are each provided with a plurality of through slots and a plurality of through holes.
7. A device for mounting a scaffold against a wall as claimed in claim 2, wherein a plurality of obliquely arranged reinforcing rods are arranged between the supporting rods, and adjacent reinforcing rods and supporting rods form a triangular structure.
CN202221646277.8U 2022-06-28 2022-06-28 Wall scaffold board installation device is leaned on to activity assembled scaffold frame Active CN217998865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221646277.8U CN217998865U (en) 2022-06-28 2022-06-28 Wall scaffold board installation device is leaned on to activity assembled scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221646277.8U CN217998865U (en) 2022-06-28 2022-06-28 Wall scaffold board installation device is leaned on to activity assembled scaffold frame

Publications (1)

Publication Number Publication Date
CN217998865U true CN217998865U (en) 2022-12-09

Family

ID=84313684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221646277.8U Active CN217998865U (en) 2022-06-28 2022-06-28 Wall scaffold board installation device is leaned on to activity assembled scaffold frame

Country Status (1)

Country Link
CN (1) CN217998865U (en)

Similar Documents

Publication Publication Date Title
CN107090968B (en) Lifting method of integrated attached lifting scaffold
CN217998865U (en) Wall scaffold board installation device is leaned on to activity assembled scaffold frame
CN206844431U (en) A kind of curtain wall construction support
CN219528334U (en) Scaffold for building construction
CN210976512U (en) Building scaffold convenient to disassemble
CN208668903U (en) A kind of fabricated scaffold
CN211548713U (en) A suspension type scaffold frame for square chimney
CN107806242A (en) A kind of high intensity scaffold fastenings for building
CN214785757U (en) Scaffold frame that building engineering used
CN212642080U (en) Adjustable overhanging scaffold structure
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN112538960A (en) Make things convenient for dismouting and firm scaffold frame
CN207131062U (en) A kind of job platform
CN219773544U (en) Scaffold for building engineering
CN218668421U (en) Building beam frame
CN214834564U (en) Device for quickly installing outer frame
CN216276815U (en) Connecting assembly for hanging frame of building machine
CN218406331U (en) Anti-tilting scaffold
CN110565929B (en) Scaffold for construction of large-specification wall paving piece of building outer wall
CN219411741U (en) Movable large-scale construction platform
CN210828303U (en) Novel scaffold board for attached lifting foot support
CN214995851U (en) Climb a high strength triangular supports
CN215976843U (en) Light bridge outlet construction work platform
CN212333249U (en) Steel pipe storage frame for building site
CN213509561U (en) Scaffold fixing calipers for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant