CN210262746U - Strutting arrangement is used in bridge construction - Google Patents

Strutting arrangement is used in bridge construction Download PDF

Info

Publication number
CN210262746U
CN210262746U CN201920908459.XU CN201920908459U CN210262746U CN 210262746 U CN210262746 U CN 210262746U CN 201920908459 U CN201920908459 U CN 201920908459U CN 210262746 U CN210262746 U CN 210262746U
Authority
CN
China
Prior art keywords
supporting
bridge construction
rod
buffer
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920908459.XU
Other languages
Chinese (zh)
Inventor
刘德辉
肖烨
雷伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Technical College of Railway High Speed
Original Assignee
Hunan Technical College of Railway High Speed
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Technical College of Railway High Speed filed Critical Hunan Technical College of Railway High Speed
Priority to CN201920908459.XU priority Critical patent/CN210262746U/en
Application granted granted Critical
Publication of CN210262746U publication Critical patent/CN210262746U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge construction field specifically discloses a strutting arrangement is used in bridge construction, include: the device comprises a first supporting plate, a second supporting plate, a fixing plate, a supporting column, a hydraulic rod, a fixing table and a base; the two first supporting plates are respectively hinged and installed on the left side and the right side of the second supporting plate, the second supporting plate is arranged at the top end of a supporting column, the fixing plate is installed on the supporting column, the lower end of the supporting column is fixedly installed on a hydraulic rod, the lower end of the hydraulic rod is connected with a hydraulic cylinder, the hydraulic cylinder is arranged in a fixing table, and the fixing table is connected with the base through a buffer assembly; compared with the supporting device for bridge construction in the prior art, the supporting device for bridge construction has the following advantages: the vibration reduction device is provided with a buffer assembly, so that the vibration generated in the vertical direction can be reduced; secondly, the buffer plate is arranged, so that the vibration sense generated in the transverse direction can be reduced; and thirdly, the ground anchor is arranged and used for reinforcing the supporting device for bridge construction.

Description

Strutting arrangement is used in bridge construction
Technical Field
The utility model relates to a bridge construction technical equipment field specifically is a strutting arrangement is used in bridge construction.
Background
A bridge supporting device is an auxiliary tool commonly used in the bridge construction process. The construction of buildings often meets some road and bridge construction operations, wherein the construction and maintenance of tunnels or door openings can be met, and when the construction operations are related, a supporting device aiming at facilities such as tunnels or door openings is often used as the support and protection of the facilities.
Bridge strutting arrangement among the prior art basically can both play the fixed effect of better support to the door opening, but bridge strutting arrangement among the prior art generally does not set up the buffering subassembly, and when receiving the collision, bridge strutting arrangement vibration amplitude is great, also transmits stronger vibration sense to the good door opening of pouring easily simultaneously, long-term in the past, makes the door opening take place the phenomenon of collapsing easily.
To the problem in the above-mentioned background art, the utility model aims at providing a strutting arrangement is used in bridge construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a strutting arrangement is used in bridge construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a support device for bridge construction, comprising: the device comprises a first supporting plate, a second supporting plate, a fixing plate, supporting columns, hydraulic rods, a fixing table and a base, wherein the number of the first supporting plates is two, the two first supporting plates are respectively hinged and installed on the left side and the right side of the second supporting plate, the second supporting plate is arranged at the top ends of the supporting columns, the fixing plate is installed on the supporting columns, and the fixing plate is connected with the first supporting plates through electric telescopic rods; the lower end of the supporting column is fixedly arranged on a hydraulic rod, the lower end of the hydraulic rod is connected with a hydraulic cylinder, the hydraulic cylinder is arranged in a fixed table, and the fixed table is connected with the base through a buffer assembly;
the buffer assembly comprises a connecting rod and a buffer spring, the upper end of the connecting rod passes through the fixed platform and then is fixed through a shaft seal, the lower end of the connecting rod is installed and fixed in the base, and the buffer spring is arranged on the part of the connecting rod between the fixed platform and the base; the left side and the right side of the fixed table are provided with buffer plates, and the buffer plates are connected with the fixed table through first compression springs; the base lower extreme is equipped with first landing leg and second landing leg, and first landing leg one side is through second compression spring connection earth anchor.
As a further aspect of the present invention: be equipped with the connecting block on the support column, the connecting block left and right sides passes through coupling assembling joint support pole.
As a further aspect of the present invention: the connecting block includes two the same clamp splice, and two clamp splices all are equipped with the arc passageway towards one side inwards, and both sides all are equipped with the fixed block around two clamp splices.
As a further aspect of the present invention: the clamp splice is articulated to be installed articulated piece towards outside one side, has seted up the perforation on the articulated piece.
As a further aspect of the present invention: the bracing piece top is equipped with the top, install coupling assembling on the top.
As a further aspect of the present invention: the connecting assembly comprises a first curved frame and a second curved frame, and the first curved frame and the second curved frame are hinged to the left side and the right side of the top; first bent frame one end is articulated to be installed the threaded rod, and the bent frame one end of second is equipped with the screw end, when the bracing piece assembles through coupling assembling and connecting block, passes behind the perforation of articulated piece through threaded rod one end and is connected with the screw end of the bent frame front end of second, makes the bracing piece top install on the connecting block.
Compared with the prior art, the beneficial effects of the utility model are that:
compared with the supporting device for bridge construction in the prior art, the supporting device for bridge construction has the following advantages:
the vibration reduction device is provided with a buffer assembly, so that the vibration generated in the vertical direction can be reduced;
secondly, the buffer plate is arranged, so that the vibration sense generated in the transverse direction can be reduced;
thirdly, the ground anchor is arranged and used for reinforcing the supporting device for bridge construction;
fourthly, in addition, it still passes through connecting block joint support pole, has improved strutting arrangement stable effect is used in the bridge construction, and importantly, connecting block and bracing piece are dismantled the equipment convenience.
Drawings
In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the drawings that are needed in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention.
Fig. 1 is the utility model discloses a strutting arrangement's for bridge construction structure sketch map.
Fig. 2 is the utility model discloses a strutting arrangement's for bridge construction connecting block structure sketch map.
Fig. 3 is the utility model discloses a principle sketch that strutting arrangement's for bridge construction connecting block and bracing piece pass through coupling assembling to be connected.
In the figure: 1-first supporting plate, 2-second supporting plate, 3-electric telescopic rod, 4-fixing plate, 5-supporting column, 6-connecting block, 7-supporting rod, 8-hydraulic rod, 9-hydraulic cylinder, 10-fixing table, 11-buffer plate, 12-first compression spring, 13-ground anchor, 14-second compression spring, 15-first supporting leg, 16-second supporting leg, 17-base, 18-buffer spring, 19-connecting rod, 20-connecting assembly, 21-clamping block, 22-fixing block, 23-hinged block, 24-top head, 25-first bent frame, 26-second bent frame, 27-threaded end and 28-threaded rod.
Detailed Description
In order to make the technical problem, technical solution and advantageous effects to be solved by the present invention more clearly understood, the following description is given in conjunction with the accompanying drawings and embodiments to illustrate the present invention in further detail. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
Referring to fig. 1, in embodiment 1 of the present invention, a supporting device for bridge construction includes: the device comprises a first supporting plate 1, a second supporting plate 2, a fixing plate 4, supporting columns 5, hydraulic rods 8, a fixing table 10 and a base 17, wherein the number of the first supporting plates 1 is two, the two first supporting plates 1 are respectively hinged to the left side and the right side of the second supporting plate 2, the second supporting plate 2 is arranged at the top ends of the supporting columns 5, the fixing plate 4 is arranged on the supporting columns 5, and the fixing plate 4 is connected with the first supporting plates 1 through electric telescopic rods 3; the lower end of the support column 5 is fixedly arranged on a hydraulic rod 8, the lower end of the hydraulic rod 8 is connected with a hydraulic cylinder 9, the hydraulic cylinder 9 is arranged in a fixed table 10, and the fixed table 10 is connected with a base 17 through a buffer assembly;
the buffer assembly comprises a connecting rod 19 and a buffer spring 18, the upper end of the connecting rod 19 penetrates through the fixed platform 10 and then is fixed through a shaft seal, the lower end of the connecting rod 19 is installed and fixed in the base 17, and the buffer spring 18 is arranged on the part of the connecting rod 19 between the fixed platform 10 and the base 17; the left side and the right side of the fixed table 10 are provided with buffer plates 11, and the buffer plates 11 are connected with the fixed table 10 through first compression springs 12; a first leg 15 and a second leg 16 are arranged at the lower end of the base 17, and one side of the first leg 15 is connected with the ground anchor 13 through a second compression spring 14;
can be right through the buffering subassembly strutting arrangement for bridge construction plays the cushioning effect when receiving impact force from top to bottom, can be right through buffer board 11 strutting arrangement for bridge construction plays the cushioning effect when receiving the side direction impact force, can be right through earth anchor 13 strutting arrangement for bridge construction position is further fixed, moreover strutting arrangement for bridge construction receives when striking, earth anchor 13 also can be right through second compression spring 14 strutting arrangement for bridge construction carries out the buffering to a certain extent.
Further, in order to improve the supporting effect of the supporting device for bridge construction, the supporting column 5 is provided with the connecting block 6, and the left side and the right side of the connecting block 6 are connected with the supporting rod 7 through the connecting assembly 20.
Referring to fig. 2, specifically, the connecting block 6 includes two identical clamping blocks 21, an arc-shaped channel is disposed on the inward side of each of the two clamping blocks 21, and fixing blocks 22 are disposed on the front and rear sides of each of the two clamping blocks 21;
when the two clamping blocks 21 are assembled, the bolts sequentially penetrate through the two fixing blocks 22 to enable the clamping blocks 21 to be assembled into the connecting block 6, and the arc-shaped channel in the middle of the two clamping blocks 21 forms a through hole for penetrating through the supporting column 5.
Example 2
Furthermore, the clamping block 21 is hinged with a hinge block 23 at one side facing outward, and the hinge block 23 is provided with a through hole.
Referring to fig. 3, further, a plug 24 is disposed at the top end of the support rod 7, and the connecting assembly 20 is mounted on the plug 24.
Specifically, the connecting assembly 20 includes a first curved frame 25 and a second curved frame 26, and the first curved frame 25 and the second curved frame 26 are hinged to the left and right sides of the plug 24; one end of the first curved frame 25 is hinged with a threaded rod 28, and one end of the second curved frame 26 is provided with a threaded end 27;
when the support rod 7 is assembled with the connecting block 6 through the connecting assembly 20, one end of the threaded rod 28 passes through the through hole of the hinge block 23 and then is connected with the threaded end 27 at the front end of the second curved frame 26, so that the top end of the support rod 7 is installed on the connecting block 6.
The embodiment of the utility model provides a theory of operation is:
when the supporting device for bridge construction is used, the heights of the first supporting plate 1 and the second supporting plate 2 are adjusted through the starting hydraulic rod 8 according to the height required by bridge construction, so that the first supporting plate 1 and the second supporting plate 2 simultaneously support a bridge pier; in addition, the first supporting plate 1 is automatically adjusted to adapt to the pier surface by starting the electric telescopic rod 3 according to the requirement of the cambered surface of the pier;
after the supporting device for bridge construction is installed, the ground anchor 13 is driven into the ground to improve the stability; in addition, when the supporting device for bridge construction supports a bridge pier, the supporting device for bridge construction meets the downward vibration force of the bridge pier and receives the impact force of the side surface, and the buffering effect is improved through the design of the self buffering structure.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. A support device for bridge construction, comprising: first backup pad (1), second backup pad (2), fixed plate (4), support column (5), hydraulic stem (8), fixed station (10) and base (17), its characterized in that:
the number of the first supporting plates (1) is two, the two first supporting plates (1) are respectively hinged to the left side and the right side of the second supporting plate (2), the second supporting plate (2) is arranged at the top end of the supporting column (5), the fixing plate (4) is arranged on the supporting column (5), and the fixing plate (4) is connected with the first supporting plates (1) through the electric telescopic rods (3); the lower end of the supporting column (5) is fixedly arranged on a hydraulic rod (8), the lower end of the hydraulic rod (8) is connected with a hydraulic cylinder (9), the hydraulic cylinder (9) is arranged in a fixed table (10), and the fixed table (10) is connected with a base (17) through a buffer assembly;
the buffer assembly comprises a connecting rod (19) and a buffer spring (18), the upper end of the connecting rod (19) penetrates through the fixed platform (10) and then is fixed through a shaft seal, the lower end of the connecting rod (19) is fixedly installed in the base (17), and the buffer spring (18) is arranged on the part, between the fixed platform (10) and the base (17), of the connecting rod (19); the left side and the right side of the fixed table (10) are provided with buffer plates (11), and the buffer plates (11) are connected with the fixed table (10) through first compression springs (12);
the lower end of the base (17) is provided with a first supporting leg (15) and a second supporting leg (16), and one side of the first supporting leg (15) is connected with the ground anchor (13) through a second compression spring (14).
2. The supporting device for bridge construction according to claim 1, wherein: be equipped with connecting block (6) on support column (5), connecting block (6) left and right sides passes through coupling assembling (20) joint support pole (7).
3. The supporting device for bridge construction according to claim 2, wherein: the connecting block (6) comprises two identical clamping blocks (21), an arc-shaped channel is arranged on one inward side of each clamping block (21), and fixing blocks (22) are arranged on the front side and the rear side of each clamping block (21).
4. The supporting device for bridge construction according to claim 3, wherein: the clamping block (21) is hinged with a hinged block (23) towards one outer side, and a through hole is formed in the hinged block (23).
5. The supporting device for bridge construction according to claim 2, wherein: the top end of the supporting rod (7) is provided with a top head (24), and the top head (24) is provided with a connecting assembly (20).
6. The supporting device for bridge construction according to claim 5, wherein: the connecting assembly (20) comprises a first curved frame (25) and a second curved frame (26), and the first curved frame (25) and the second curved frame (26) are hinged to the left side and the right side of the plug (24); threaded rod (28) are installed in the articulated threaded rod of installing of first bent frame (25) one end, and the bent frame of second (26) one end is equipped with screw end (27), when bracing piece (7) are assembled through coupling assembling (20) and connecting block (6), pass behind the perforation of articulated piece (23) through threaded rod (28) one end and be connected with screw end (27) of the bent frame of second (26) front end, make bracing piece (7) top install on connecting block (6).
CN201920908459.XU 2019-06-17 2019-06-17 Strutting arrangement is used in bridge construction Expired - Fee Related CN210262746U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920908459.XU CN210262746U (en) 2019-06-17 2019-06-17 Strutting arrangement is used in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920908459.XU CN210262746U (en) 2019-06-17 2019-06-17 Strutting arrangement is used in bridge construction

Publications (1)

Publication Number Publication Date
CN210262746U true CN210262746U (en) 2020-04-07

Family

ID=70042939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920908459.XU Expired - Fee Related CN210262746U (en) 2019-06-17 2019-06-17 Strutting arrangement is used in bridge construction

Country Status (1)

Country Link
CN (1) CN210262746U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827145A (en) * 2020-08-07 2020-10-27 胡令江 Bridge reinforcing device with shock insulation function
CN113550238A (en) * 2021-07-30 2021-10-26 黄山学院 Huizhou ancient bridge restores and uses strutting arrangement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827145A (en) * 2020-08-07 2020-10-27 胡令江 Bridge reinforcing device with shock insulation function
CN113550238A (en) * 2021-07-30 2021-10-26 黄山学院 Huizhou ancient bridge restores and uses strutting arrangement
CN113550238B (en) * 2021-07-30 2023-01-24 黄山学院 Supporting device for repairing Huizhou ancient bridge

Similar Documents

Publication Publication Date Title
CN210262746U (en) Strutting arrangement is used in bridge construction
CN209838448U (en) Supporting device for coal mine tunneling
CN214329383U (en) Assembled building shock-absorbing structure
CN110847407A (en) Steel construction building with shock resistance
CN217053015U (en) Anti-seismic bridge support
CN215108931U (en) Auxiliary support for construction of underground fan room of highway
CN213024914U (en) Anti-seismic device for simulating avionics
CN112228124B (en) Underground chamber ore bin supporting structure and construction process thereof
CN214271714U (en) Road and bridge construction equipment
CN211172048U (en) Embedded structure of pile foundation for construction engineering construction
CN218149027U (en) Anti-seismic building structure building safety device
CN213476736U (en) Safety early warning railing is used in road construction
CN212670834U (en) Post angle node for building engineering
CN212771907U (en) Bridge damping support
CN215111710U (en) Tripod for surveying and mapping
CN209907639U (en) Anti-seismic cross beam connecting structure
CN219011283U (en) Bearing platform tower crane foundation structure
CN220202468U (en) Movable box girder protection device
CN219060442U (en) Split type building shock-absorbing structure
CN213576264U (en) Mine electromechanical device's shock attenuation protection mechanism
CN213022392U (en) Multifunctional rock-soil testing and detecting device
CN216689770U (en) Steel construction that rocks is prevented to antidetonation
CN220888332U (en) Steel structure fixing device for bridge construction
CN214784324U (en) Vertical lifting device for breaking hammer
CN219604135U (en) Bridge steel corbel convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200407

Termination date: 20210617