CN210239089U - Aluminum plate curtain wall superelevation furred ceiling work platform - Google Patents

Aluminum plate curtain wall superelevation furred ceiling work platform Download PDF

Info

Publication number
CN210239089U
CN210239089U CN201920760933.9U CN201920760933U CN210239089U CN 210239089 U CN210239089 U CN 210239089U CN 201920760933 U CN201920760933 U CN 201920760933U CN 210239089 U CN210239089 U CN 210239089U
Authority
CN
China
Prior art keywords
ceiling
hanging
hanging basket
curtain wall
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920760933.9U
Other languages
Chinese (zh)
Inventor
Hebiao Zhao
赵和标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Heyuanxing Construction Co ltd
Original Assignee
Jiangsu Heyuanxing Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Heyuanxing Construction Co ltd filed Critical Jiangsu Heyuanxing Construction Co ltd
Priority to CN201920760933.9U priority Critical patent/CN210239089U/en
Application granted granted Critical
Publication of CN210239089U publication Critical patent/CN210239089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a furred ceiling operation platform, concretely relates to aluminum plate curtain wall superelevation furred ceiling operation platform. An aluminum plate curtain wall ultrahigh ceiling operation platform comprises a ceiling, a suspension arm, a hanging basket, a steel wire rope and a wood springboard; the suspended ceiling is arranged on the top of a high-rise building, and a suspension arm is arranged on the suspended ceiling. The suspension arm is connected to the hanging basket through a steel wire rope, a wood springboard is laid on the upper end face of the hanging basket, and the distance between the wood springboard and the hanging basket is 1.8 m. The utility model has the advantages of structural design scientific and reasonable, factor of safety is high, take and tear open the convenience, are favorable to saving area and improve the work efficiency, all have extensive application on construction operation platforms such as high space, large-span daylighting top, furred ceiling and curtain such as housing construction, bridge building.

Description

Aluminum plate curtain wall superelevation furred ceiling work platform
Technical Field
The utility model relates to a furred ceiling operation platform, concretely relates to aluminum plate curtain wall superelevation furred ceiling operation platform.
Background
Along with the economic development of the country, various modern public buildings in urban construction emerge endlessly, buildings with high space and large span are more and more, the construction safety risk and the construction difficulty of the daylighting roof and the indoor ceiling are also more and more large, and the construction cost is higher and more. If the full-space red scaffold is adopted for construction, when the height of the building space is more than or equal to 50 meters, the construction cost is high and uneconomical, and the bearing capacity of the indoor floor slab cannot meet the construction requirement, so that the structural safety risk is high; meanwhile, the scaffold occupies a large ground space, the indoor multi-species coordination construction is influenced, and the defects of long construction period and low efficiency exist. Therefore, how to solve the problems economically, safely and effectively becomes a new technical problem to be solved urgently in public building high-space large-span daylighting roof and indoor decoration ceiling construction.
SUMMERY OF THE UTILITY MODEL
In order to overcome and adopt the construction of full red scaffold frame among the prior art, when building space height is more than or equal to 50 meters, not only construction cost is high, uneconomic, and indoor floor bearing capacity can not satisfy the construction requirement moreover, and it is big to lead to structure safety risk, and the scaffold frame occupies the ground space great simultaneously, influences indoor multiplex kind of coordination construction, has the defect that construction period is long, inefficiency, the utility model provides an aluminum plate curtain wall superelevation furred ceiling operation platform.
An aluminum plate curtain wall superelevation furred ceiling work platform includes: a suspended ceiling, a suspension arm, a hanging basket, a steel wire rope and a wood springboard; the suspended ceiling is fixed on the top of a high-rise building, and the suspended ceiling is provided with the suspension arm; the hanging arm is connected with the hanging basket through a steel wire rope, the wood springboard is laid on the upper end face of the hanging basket, and the distance between the wood springboard and the hanging ceiling is 1.8 m.
Furthermore, at least eight suspension arms are arranged on the suspended ceiling, and each suspension arm is connected to a corresponding hanging basket through at least two steel wire ropes.
Further, the hanging basket is of a square structure, the upper end surface of the hanging basket is a horizontal surface,
further, the horizontal distance between the centers of the hanging baskets is 2.5 m.
Furthermore, two ends of the wood springboard are arranged at the center positions of the two hanging baskets, and the contact part of the wood springboard and the hanging baskets is fixed through bolts.
The utility model provides an aluminum plate curtain wall superelevation furred ceiling operation platform, beneficial effect lies in, the utility model discloses a furred ceiling is fixed on high-rise building, connects in the hanging flower basket through wire rope, lays the wooden springboard again on the hanging flower basket, forms an operation platform, and is compared with traditional whole superelevation operation platforms that scaffold was taken into, the utility model has the advantages of structural design scientific and reasonable, factor of safety are high, take and tear open the convenience, shorten the time limit for a project, are favorable to saving area and improve the work efficiency, all have extensive application on construction operation platforms such as high space, large-span daylighting top, furred ceiling and curtain such as housing construction, bridge construction.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a top view of the present invention;
in the figure, 1, a suspended ceiling; 2. a suspension arm; 3. a hanging basket; 4. a wire rope; 5. a wood springboard.
Detailed Description
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance. Meanwhile, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; the connection can be mechanical connection or electrical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The following describes preferred embodiments of the present invention in detail with reference to the accompanying drawings.
As shown in fig. 1 to 2, the aluminum plate curtain wall ultrahigh ceiling operation platform comprises a ceiling 1, a suspension arm 2, a hanging basket 3, a steel wire rope 4 and a wood springboard 5. The furred ceiling 1 has welded 8 at least davits 2 on the furred ceiling 1 through the welding of just fossil fragments on high-rise building's vestibule steel construction, and davit 2 is the steel material. Two steel wire ropes 4 are anchored on each suspension arm 2 through bolts, each suspension arm 2 is connected to a corresponding hanging basket 3 through 2 steel wire ropes 4, the hanging basket 3 is of a square structure, the upper end face of the hanging basket is a horizontal plane, a wood springboard 5 is convenient to lay, and the hanging basket can be purchased from the market. Wire rope 4 is connected in hanging flower basket 3 through the auto-lock riser, and the auto-lock riser includes rocking arm, casing, assembly and the internal stranded conductor wheel of casing and the locking structure between rocking arm and the stranded conductor wheel, can make wire rope 4 rotate round the stranded conductor wheel through rocking the rocking arm, can lock the locking structure between rocking arm and the stranded conductor wheel when adjusting wire rope 4 to a certain position to can make eight hanging flower baskets 3 be in same horizontal plane. The wood springboard 5 is laid on the horizontal plane formed by the upper end surfaces of the eight hanging baskets 3, the wood springboard 5 is spliced on the upper end surfaces of the hanging baskets 3 in a seamless mode to form an operation platform, the wood springboard 5 at the two ends of the operation platform props against the wall surface of a high-rise building, and the wood springboard 5 is prevented from shaking, so that danger is brought to workers during operation. The distance between the wood springboard 5 and the suspended ceiling 1 is 1.8m, which is about the height of an adult, the height is convenient for the construction of workers, an aluminum plate is placed on an operation platform formed by the wood springboard 5, and meanwhile, the operation of the workers can be supplied.
In the embodiment, further, the distance between the centers 2 of the hanging baskets 2 is 2.5m, which is exactly the same as the length of the wood springboard 5, two ends of the wood springboard 5 are arranged at the center of the hanging baskets 2, the contact parts of the wood springboard 5 and the frames of the hanging baskets 2 are fixed by bolts, seven wood springboards 5 can be laid on eight hanging baskets 2, the wood springboards 5 with corresponding lengths can be laid according to the actual distance between the hanging baskets 2 at the two ends and the building, and the wood springboards 5 at the two ends can abut against the building, so that the whole operation platform cannot shake.
Installing the operation platform: when a worker enters a work site and must wear a safety helmet, the worker should first weld the suspended ceiling 1 to the corridor steel structure of a high-rise building through the steel keel, weld one suspension arm every 2.5m on the suspended ceiling 1, and weld at least eight suspension arms 2. 2 steel wire ropes 4 are anchored on each suspension arm 2 through bolts, each suspension arm 2 is connected with a corresponding hanging basket 3 through 2 steel wire ropes 4, eight hanging baskets are adjusted into a horizontal plane by utilizing self-locking lifters on the steel wire ropes 4, wood springboards 5 are laid on the horizontal plane formed by the upper end surfaces of the eight hanging baskets 3, the wood springboards 5 are spliced on the upper end surface of the hanging baskets 3 in a seamless mode, so that a worker operation platform is formed, in order to prevent the wood springboards 5 from shaking, the wood springboards 5 at the two ends of the operation platform are abutted against the wall surface of a high-rise building, and the wood springboards can be locked on the hanging baskets through bolts for drilling.
Table 1 is a comparison between the construction period and the cost for constructing a conventional scaffold platform and the platform of the present invention, the data in the table is typical, and as can be seen from the figure, the construction period and the cost for constructing a conventional scaffold operation platform are 20 days and 30 ten thousand yuan respectively; build the utility model discloses the time limit for a project and the cost of operation platform are 4 days and 3 ten thousand yuan respectively. Compared with the construction period of the traditional scaffold construction work platform, the construction period of the work platform of the utility model is shortened by 80%; compared with the construction cost of the traditional scaffold, the construction cost of the operation platform of the utility model is reduced by 90%;
TABLE 1 for putting up the traditional scaffold platform and putting up the utility model discloses the time limit for a project of platform and the contrast of cost
Item Construction period/day Cost/ten thousand yuan
Build the utility model discloses work platform 4 3
Build traditional scaffold operation platform 20 30
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides an aluminum plate curtain superelevation furred ceiling work platform which characterized in that includes: a suspended ceiling, a suspension arm, a hanging basket, a steel wire rope and a wood springboard; the suspended ceiling is fixed on the top of a high-rise building, and the suspended ceiling is provided with the suspension arm; the hanging arm is connected with the hanging basket through a steel wire rope, the wood springboard is laid on the upper end face of the hanging basket, and the distance between the wood springboard and the hanging ceiling is 1.8 m.
2. The aluminum sheet curtain wall superelevation ceiling work platform of claim 1, wherein at least eight of the suspension arms are configured on the ceiling, each of the suspension arms being connected to a respective one of the suspension baskets by at least two of the wire ropes.
3. The aluminum curtain wall ultrahigh ceiling operation platform is characterized in that the hanging basket is of a square structure, and the upper end surface of the hanging basket is a horizontal surface.
4. The aluminum sheet curtain wall ultra-high ceiling work platform as claimed in claim 1, wherein the horizontal spacing between the centers of the hanging baskets is 2.5 m.
5. The aluminum curtain wall ultra-high ceiling operation platform as claimed in claim 1 or 2, wherein two ends of the wood springboard are arranged at the center of the two hanging baskets, and the contact part of the wood springboard and the hanging baskets is fixed through bolts.
CN201920760933.9U 2019-05-24 2019-05-24 Aluminum plate curtain wall superelevation furred ceiling work platform Active CN210239089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920760933.9U CN210239089U (en) 2019-05-24 2019-05-24 Aluminum plate curtain wall superelevation furred ceiling work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920760933.9U CN210239089U (en) 2019-05-24 2019-05-24 Aluminum plate curtain wall superelevation furred ceiling work platform

Publications (1)

Publication Number Publication Date
CN210239089U true CN210239089U (en) 2020-04-03

Family

ID=69971378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920760933.9U Active CN210239089U (en) 2019-05-24 2019-05-24 Aluminum plate curtain wall superelevation furred ceiling work platform

Country Status (1)

Country Link
CN (1) CN210239089U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113027140A (en) * 2021-03-15 2021-06-25 中铁建工集团建筑安装有限公司 Reverse ceiling aluminum plate installation method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113027140A (en) * 2021-03-15 2021-06-25 中铁建工集团建筑安装有限公司 Reverse ceiling aluminum plate installation method and system
CN113027140B (en) * 2021-03-15 2022-04-12 中铁建工集团建筑安装有限公司 Reverse ceiling aluminum plate installation method and system

Similar Documents

Publication Publication Date Title
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN105822072A (en) Hoisting construction structure and method for air corridor ceiling
CN202642059U (en) Boat side suspension type mobile staging
CN111576691B (en) Frame type glass curtain wall mounting method and glass curtain wall system
CN104763109A (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN102673753A (en) Suspension-type movable scaffold for ship
CN210239089U (en) Aluminum plate curtain wall superelevation furred ceiling work platform
CN109440985A (en) Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method
CN106437123A (en) Supporting leg automatic turnover type overall lifting elevator well operation platform
CN115538792A (en) Residential building machine installation construction method and structure
CN205502551U (en) Platform is suspended in midair in high altitude large -span vestibule construction
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN103835369A (en) Extensible high-altitude conjoined steel structure
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN103029817A (en) Lift cage for folding ships and offshore engineering structures
CN218406387U (en) Steel platform suitable for suspended ceiling of hotel lobby installation
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN214941062U (en) Structure for improving layering reverse order of hollow steel gallery
CN207553635U (en) Elevator shaft safety protection device and elevator
CN210289068U (en) Elevator shaft lifting platform
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN112160608A (en) Lifting and mounting method for high-altitude full-transparent steel ring gallery
CN216974142U (en) Non-standard hanging basket mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant