CN103029817A - Lift cage for folding ships and offshore engineering structures - Google Patents

Lift cage for folding ships and offshore engineering structures Download PDF

Info

Publication number
CN103029817A
CN103029817A CN2012105363939A CN201210536393A CN103029817A CN 103029817 A CN103029817 A CN 103029817A CN 2012105363939 A CN2012105363939 A CN 2012105363939A CN 201210536393 A CN201210536393 A CN 201210536393A CN 103029817 A CN103029817 A CN 103029817A
Authority
CN
China
Prior art keywords
ships
frames
platform
upper frame
boats
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105363939A
Other languages
Chinese (zh)
Inventor
贾立刚
戴克文
刘岩岩
张晓宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Bohai Equipment Manufacturing Co Ltd
China Petroleum Liaohe Equipment Co
Original Assignee
China Petroleum Liaohe Equipment Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum Liaohe Equipment Co filed Critical China Petroleum Liaohe Equipment Co
Priority to CN2012105363939A priority Critical patent/CN103029817A/en
Publication of CN103029817A publication Critical patent/CN103029817A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a building tool of ships and offshore engineering structures and particularly relates to a lift cage for folding ships and offshore engineering structures. Railings are arranged at the upper ends of upper frames of the lift cage, chains are arranged on the railings, ear plates and fixed plates are arranged on the upper frames, reinforcing plates and connecting frames are arranged at the lower ends of the upper frames, transverse supports and platform frames are arranged on each connecting frame at intervals, support legs are arranged at same sides of all the platform frames, steel plate opening screens and steel plate fixing screens are arranged on the upper frames and the platform frames and are connected by articulated mechanisms, a vertical ladder is arranged between each upper frame and the platform frame closest to the lower end of the upper frame, and a vertical ladder is arranged between the two upper-lower adjacent platform frames. According to the lift cage for folding the ships and the offshore engineering structures, the structure is simple, the construction is convenient, the safety is high, the construction cost is lowered, the working efficiency is improved, the areas for shipways or shipyard are not occupied, and the great convenience and the operation space are provided for mechanical equipment and staff.

Description

A kind of boats and ships and ocean engineering structure close up uses cage
Technical field:
The present invention relates to a kind of boats and ships and ocean engineering structure and build frock, particularly a kind of boats and ships and ocean engineering structure close up and use cage.
Background technology:
It is the most important stage in boats and ships and the ocean engineering structure manufacture process that building berth or dock close up.The speed that closes up is directly connected to the production cycle of boats and ships and ocean engineering structure.Accounting for greatly whole 35% of the work capacity of closing up and ship hull plate closes up the work such as the welding, polishing, check, application of seam, is to close up one of most important component part.
Now close up the scaffold that stitches construction for outside plate and mainly contain two kinds of forms: a kind of for building posture, another kind is the chain suspension formula.Building posture scaffold begins to set up the cellular structure of 2.5m * 2.5m take scaffold tubes and fastener as main body from ground, be used for the support scaffolding pedal.In actual use, need to set up a large amount of scaffolds, then in the place that has construction to need pedal is set.The safety of this kind scaffold is higher, but uses more material and man-hour in the erection process, has taken simultaneously the larger area of building berth or dock, and passing through of mechanical equipment or personnel had considerable influence.And scaffold tubes gets rusty easily, corrodes, therefore operating cycles is shorter, thereby has increased the material cost of scaffold.Because consumption is more, thereby has increased transportation, loading and unloading and place carrying cost, also is inconvenient to manage.Chain suspension formula scaffold hangs on main ship deck or the landing slab take chain and scaffold tubes as main body.Every about 1.8m one deck scaffold tubes is set, is used for laying treadle of false work.This kind scaffolding structure is simple, but in work progress, easily swings, and safety is relatively poor, workmen's inconvenient operation.In addition, the number of plies of this kind scaffold is generally less, is difficult to satisfy the construction needs of large ship and ocean engineering structure.Existing these two kinds of scaffolds all need the staff of specialty to set up, thereby have increased operation and the handling cost of shipyard.Two kinds of scaffolds all need to just begin to set up after the body section lifting puts in place, thereby cause closing up the cycle growth.
Summary of the invention:
The technical problem to be solved in the present invention provides a kind of boats and ships and ocean engineering structure and closes up and use cage, this device has been realized simple in structure, easy construction, safe, reduce laid down cost, increase work efficiency, do not take building berth or dock area, for mechanical equipment and personnel provide larger comfort feature and operational space.Overcome existing scaffold construction inconvenience, poor stability, laid down cost is high, the deficiency of long construction period.
The technical solution used in the present invention is: a kind of boats and ships and ocean engineering structure close up uses cage, comprises chain, railing and upper frame; The upper frame upper end is provided with railing, railing is provided with chain, upper frame is provided with otic placode and adapter plate, the upper frame lower end is provided with brace panel and connecting frame, be interval with cross-tie and platform framework on the connecting frame, the same side of all platform frameworks is equipped with feet, upper frame and platform framework are provided with opens expanded metal lath and fixation steel plate net, open expanded metal lath and be connected the linkage connection with fixation steel plate Netcom, be provided with vertical ladder between the nearest platform framework in upper frame and lower end, be equipped with vertical ladder between two neighbouring platform frameworks.
Neighbouring two open expanded metal laths about homonymy not.
Neighbouring two vertical ladders about homonymy not.
Distance is 1.8m ~ 2.0m between neighbouring two platform frameworks.
Every grade of spacing of vertical ladder is 270mm ~ 350mm.
The invention has the beneficial effects as follows: the present invention has been owing to having adopted vertical ladder and platform perforate have been set, thereby the workmen can enter from cage top or bottom, arrives diverse location by vertical ladder and carries out operation, easy construction; Owing to having adopted the mode that otic placode is set at upper frame, thereby cage can use hoisting crane one step lifting to put in place, thereby saves and close up the time, do not need professional scaffold built troop, saves company cost; Owing to using cage not take building berth or dock area, thereby provide larger comfort feature and operational space for mechanical equipment and personnel; In addition, the present invention have advantages of simple in structure, safe, reduce laid down cost and increase work efficiency.
Description of drawings:
The present invention will be further described in detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is structural representation of the present invention.
Fig. 2 is front view of the present invention.
Fig. 3 is the left view of Fig. 2.
Fig. 4 is the back view of Fig. 2.
Fig. 5 is that the A-A of Fig. 4 is to section-drawing.
Fig. 6 is that the B-B of Fig. 4 is to section-drawing.
Fig. 7 is that the C-C of Fig. 4 is to section-drawing.
Fig. 8 is that the D-D of Fig. 4 is to section-drawing.
Fig. 9 is that the E-E of Fig. 4 is to section-drawing.
Figure 10 is that the F-F of Fig. 4 is to section-drawing.
The specific embodiment:
Such as Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, shown in Figure 10, a kind of boats and ships and ocean engineering structure close up uses cage, comprises chain 1, railing 2 and upper frame 3; Upper frame 3 upper ends are provided with railing 2, railing 2 is provided with chain 1, upper frame 3 is provided with otic placode 4 and adapter plate 9, upper frame 3 lower ends are provided with brace panel 5 and connecting frame 8, be interval with cross-tie 6 and platform framework 7 on the connecting frame 8, the same side of all platform frameworks 7 is equipped with feet 10, upper frame 3 and platform framework 7 are provided with opens expanded metal lath 13 and fixation steel plate net 14, opening expanded metal lath 13 is connected with the fixation steel plate net by linkage 12 connections, be provided with vertical ladder 11 between the nearest platform framework 7 in upper frame 3 and lower end, be equipped with vertical ladder 11 between two neighbouring platform frameworks 7.Neighbouring two open expanded metal laths 13 about homonymy not.Neighbouring two vertical ladders 11 about homonymy not.Distance is 1.8m ~ 2.0m between neighbouring two platform frameworks 7.Every grade of spacing of vertical ladder 11 is 270mm ~ 350mm.The present invention is the rigid structure that is welded by sheet material and section bar, is rigidly connected by welding manner and hull structure during use, hangs on ship hull plate and closes up the seam zone; The present invention climbs up and down for the workmen by vertical ladder 11, is connected with deck in ship structure or landing slab by adapter plate 9, is supported on the ship hull plate by feet 10.The present invention can realize the work such as welding, polishing, check, application.
Be understandable that, above about specific descriptions of the present invention, only for the present invention being described and being not to be subject to the described technical scheme of the embodiment of the invention, those of ordinary skill in the art is to be understood that, still can make amendment or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as satisfy, all within protection scope of the present invention.

Claims (5)

1. boats and ships and ocean engineering structure close up and use cage, comprise chain (1), railing (2) and upper frame (3); It is characterized in that: upper frame (3) upper end is provided with railing (2), railing (2) is provided with chain (1), upper frame (3) is provided with otic placode (4) and adapter plate (9), upper frame (3) lower end is provided with brace panel (5) and connecting frame (8), be interval with cross-tie (6) and platform framework (7) on the connecting frame (8), the same side of all platform frameworks (7) is equipped with feet (10), upper frame (3) and platform framework (7) are provided with opens expanded metal lath (13) and fixation steel plate net (14), open expanded metal lath (13) and be connected 14 with the fixation steel plate net) connect by linkage (12), be provided with vertical ladder (11) between the nearest platform framework (7) in upper frame (3) and lower end, be equipped with vertical ladder (11) between neighbouring two platform frameworks (7).
2. close up according to boats and ships claimed in claim 1 and ocean engineering structure and use cage, it is characterized in that: described neighbouring two open expanded metal laths (13) about homonymy not.
3. close up according to boats and ships claimed in claim 1 and ocean engineering structure and use cage, it is characterized in that: described neighbouring two vertical ladders (11) about homonymy not.
4. close up according to boats and ships claimed in claim 1 and ocean engineering structure and use cage, it is characterized in that: distance is 1.8m ~ 2.0m between described neighbouring two platform frameworks (7).
5. close up according to boats and ships claimed in claim 1 and ocean engineering structure and use cage, it is characterized in that: every grade of spacing of described vertical ladder (11) is 270mm ~ 350mm.
CN2012105363939A 2012-12-12 2012-12-12 Lift cage for folding ships and offshore engineering structures Pending CN103029817A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105363939A CN103029817A (en) 2012-12-12 2012-12-12 Lift cage for folding ships and offshore engineering structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105363939A CN103029817A (en) 2012-12-12 2012-12-12 Lift cage for folding ships and offshore engineering structures

Publications (1)

Publication Number Publication Date
CN103029817A true CN103029817A (en) 2013-04-10

Family

ID=48017325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105363939A Pending CN103029817A (en) 2012-12-12 2012-12-12 Lift cage for folding ships and offshore engineering structures

Country Status (1)

Country Link
CN (1) CN103029817A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563845A (en) * 2014-12-29 2015-04-29 一重集团大连设计研究院有限公司 Platform ladder used for pressing machine and provided with inter-ladder rest platforms
CN106907011A (en) * 2017-04-06 2017-06-30 中冶天工集团有限公司 A kind of metope color steel construction method of installation and its hanging ladder of application
CN109850094A (en) * 2019-03-29 2019-06-07 上海海事大学 A kind of cruise tooling occasional passage
CN111075344A (en) * 2019-12-27 2020-04-28 河南华鹰机械设备有限公司 Safe vertical operation equipment and use method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1484480A (en) * 1920-02-24 1924-02-19 Donaggio Alfredo Scaffolding
GB2152992A (en) * 1983-12-09 1985-08-14 Henry Reed Collapsible scaffolding having supply lines or guide rails or handrails
GB2230814A (en) * 1989-04-24 1990-10-31 Laing & Sons Ltd James Suspended staging: escape apparatus
JPH05319374A (en) * 1991-10-24 1993-12-03 Mmc Compliance Eng Inc Method of work and work device
US20060243527A1 (en) * 2005-04-28 2006-11-02 David Dunn Insulated hanger device
CN201023631Y (en) * 2007-04-06 2008-02-20 上海外高桥造船有限公司 Hanging cage
CN201932344U (en) * 2010-12-27 2011-08-17 舟山中远船务工程有限公司 Cage device for ship side sectional folding operation
CN102328739A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Erection-free combined scaffold device for ship

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1484480A (en) * 1920-02-24 1924-02-19 Donaggio Alfredo Scaffolding
GB2152992A (en) * 1983-12-09 1985-08-14 Henry Reed Collapsible scaffolding having supply lines or guide rails or handrails
GB2230814A (en) * 1989-04-24 1990-10-31 Laing & Sons Ltd James Suspended staging: escape apparatus
JPH05319374A (en) * 1991-10-24 1993-12-03 Mmc Compliance Eng Inc Method of work and work device
US20060243527A1 (en) * 2005-04-28 2006-11-02 David Dunn Insulated hanger device
CN201023631Y (en) * 2007-04-06 2008-02-20 上海外高桥造船有限公司 Hanging cage
CN102328739A (en) * 2010-07-12 2012-01-25 南通尧盛钢结构有限公司 Erection-free combined scaffold device for ship
CN201932344U (en) * 2010-12-27 2011-08-17 舟山中远船务工程有限公司 Cage device for ship side sectional folding operation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄孟尉: "万吨级船台脚手架", 《造船技术》, no. 6, 30 June 1985 (1985-06-30) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563845A (en) * 2014-12-29 2015-04-29 一重集团大连设计研究院有限公司 Platform ladder used for pressing machine and provided with inter-ladder rest platforms
CN106907011A (en) * 2017-04-06 2017-06-30 中冶天工集团有限公司 A kind of metope color steel construction method of installation and its hanging ladder of application
CN109850094A (en) * 2019-03-29 2019-06-07 上海海事大学 A kind of cruise tooling occasional passage
CN111075344A (en) * 2019-12-27 2020-04-28 河南华鹰机械设备有限公司 Safe vertical operation equipment and use method thereof

Similar Documents

Publication Publication Date Title
CN207048306U (en) Sliding formwork flexibility platform
CN201512345U (en) Multifunctional integrated lifting frame
CN103029817A (en) Lift cage for folding ships and offshore engineering structures
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN105888227B (en) Superelevation is tubaeform steel structure exterior finish operation platform and its building method
CN202990427U (en) Climbing discharging platform
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN109095319A (en) A kind of construction elevator operating system integrated with climbing frame
CN216640303U (en) Foldable T roof beam hogging moment construction operation is with hanging basket
CN201932344U (en) Cage device for ship side sectional folding operation
CN107720580B (en) Quick construction hoisting device and method for boiler construction water-cooled wall
CN205574235U (en) Bulk freighter wing tank section construction stores pylon
CN207277870U (en) A kind of elevator protective device with shaped
CN213139097U (en) Frame-type chain hangs scaffold frock platform
CN101597956B (en) Suspended scaffold
CN212316686U (en) Net piece folding type combined safety hanging basket
CN209924407U (en) Combined working platform for steel structure high-altitude installation
CN107795133A (en) A kind of monoblock type shielded frame platform and its construction method
CN204983595U (en) Attached type lifting scaffold
CN210239089U (en) Aluminum plate curtain wall superelevation furred ceiling work platform
CN203755178U (en) Novel ultra-wide large-span specially-shaped steel arch bridge construction device
CN208122244U (en) A kind of hoistable platform for Metro Connected Passage-way Construction
CN201808660U (en) Movable scaffold hook
CN115140271B (en) Special hanging cage for ship mounting glass
CN110789679A (en) Movable type ascending ladder frame for welding cushion blocks of supporting box of cabin cover of container ship

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CNPC BOHAI EQUIPMENT MANUFACTURING CO., LTD.

Free format text: FORMER OWNER: LIAOHE PETROLEUM EQUIPMENT COMPANY, CNPC

Effective date: 20130626

Owner name: LIAOHE PETROLEUM EQUIPMENT COMPANY, CNPC

Effective date: 20130626

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 124010 PANJIN, LIAONING PROVINCE TO: 300457 BINHAI NEW DISTRICT, TIANJIN

TA01 Transfer of patent application right

Effective date of registration: 20130626

Address after: 300457 Binhai New Area, Tianjin Binhai Service Outsourcing Industrial Park, building 3

Applicant after: CNPC Bohai Equipment Manufacturing Co., Ltd.

Applicant after: China Petroleum Liaohe Equipment Company

Address before: 124010 Yingbin Road 32, Xinglongtai District, Liaoning, Panjin

Applicant before: China Petroleum Liaohe Equipment Company

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130410