CN210236964U - Quick mounting tool for assembled inner partition plate - Google Patents

Quick mounting tool for assembled inner partition plate Download PDF

Info

Publication number
CN210236964U
CN210236964U CN201920700778.1U CN201920700778U CN210236964U CN 210236964 U CN210236964 U CN 210236964U CN 201920700778 U CN201920700778 U CN 201920700778U CN 210236964 U CN210236964 U CN 210236964U
Authority
CN
China
Prior art keywords
steel pipes
steel pipe
electric hoist
transverse steel
inner partition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920700778.1U
Other languages
Chinese (zh)
Inventor
Dongfeng Zhu
朱东烽
Weisheng Zhang
张伟生
Jinhui Xie
解金辉
Jifa Zeng
曾继发
Shuiquan Lian
练水泉
Weiyong Li
李卫勇
xinxing Yan
颜新星
Jianming Pan
潘健明
Huan Wang
王欢
Qilong Zhang
张绮珑
Guangqiang You
尤光强
Xiaobing Lian
练小冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuncheng Architectural Technology Co ltd
Original Assignee
Guangdong Yuncheng Architectural Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuncheng Architectural Technology Co ltd filed Critical Guangdong Yuncheng Architectural Technology Co ltd
Priority to CN201920700778.1U priority Critical patent/CN210236964U/en
Application granted granted Critical
Publication of CN210236964U publication Critical patent/CN210236964U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a quick installation tool for an assembled inner partition board, which comprises an electric hoist, two vertical steel pipes, two first transverse steel pipes and a hoisting device, wherein the electric hoist comprises a motor and a reel, the electric hoist is connected with the reel through a reel connecting rod, the reel connecting rod is provided with a rotation speed sensor, the electric hoist and the rotation speed sensor are respectively and electrically connected with a controller, the electric hoist is fixedly connected with a base, the base is detachably connected with the first transverse steel pipes, the first transverse steel pipes are detachably and horizontally connected with the vertical steel pipes, one ends of the vertical steel pipes are fixed on the ground, the other ends of the vertical steel pipes are obliquely fixed on a beam column, the hoisting device comprises a steel wire rope, a second transverse steel pipe, a lifting hook and a safety belt, the second transverse steel pipe is detachably connected with the vertical steel pipes on one side close to the beam column, the disassembly is convenient, the erection speed is high, and the working efficiency is accelerated.

Description

Quick mounting tool for assembled inner partition plate
Technical Field
The utility model relates to a construction field, concretely relates to is the swift mounting tool of partition plate in assembled.
Background
An inner partition board mounting tool is an inner partition board device for building construction and mounting, and is mainly used for construction and mounting of non-bearing inner partition board and bearing outer wall board of an assembly type building, but the inner partition board mounting tool is limited by space when being mounted on a transfer floor or a non-standard floor with too small space. On one hand, the inner partition wall mounting tool is large in size, and the mounting tool cannot enter the inner partition wall mounting tool when the inner partition wall mounting tool is used for replacing floors; on the other hand, the partition wall installer has fixed height and cannot be used for installation on non-standard floors. Furthermore, the installation tool is difficult to move and apply for uneven areas of the installation site.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a swift mounting tool of partition plate in assembled, this instrument dismantles conveniently, is convenient for remove, and it is fast to erect for interior partition plate installation job schedule.
In order to achieve the purpose, the utility model provides a quick installation tool for an assembled inner partition wall board, which comprises an electric hoist, two vertical steel pipes, two first horizontal steel pipes and a hoisting device, wherein the electric hoist comprises a motor and a reel, the electric hoist is connected with the reel through a reel connecting rod, a rotating speed sensor is arranged on the reel connecting rod, the electric hoist and the rotating speed sensor are respectively and electrically connected with a controller, the electric hoist is fixedly connected with a base, the base is detachably connected with the first horizontal steel pipes, the first horizontal steel pipes are detachably and horizontally connected with the vertical steel pipes, one ends of the vertical steel pipes are fixed on the ground, the other ends of the vertical steel pipes are obliquely fixed on a beam column, the hoisting device comprises a steel wire rope, a second horizontal steel pipe, a lifting hook and a safety belt, the second horizontal steel pipe is detachably connected with the vertical steel pipe on one side close to the beam column, and a fixed pulley is arranged on the second transverse steel pipe, one end of the steel wire rope is wound on the winding drum, the other end of the steel wire rope bypasses the fixed pulley and is connected with one end of a lifting hook, and the other end of the lifting hook is connected with a safety belt.
Preferably, the first transverse steel pipe and the second transverse steel pipe are respectively locked with the connecting fastener for the vertical steel pipe, and under the condition that the steel pipes are displaced, the connecting fastener can be always firmly fixed, the possibility of steel pipe slippage is eliminated, and the steel pipes are convenient to detach.
Preferably, the base is locked with the U-shaped screw rod for the first transverse steel pipe, the base is fixedly connected with the first transverse steel pipe, and the base is convenient to detach.
Preferably, a handle is arranged on the motor.
Preferably, the two vertical steel pipes are connected by a support rod at one side close to the ground, so that the stability between the two vertical steel pipes is improved.
The utility model has the advantages that: the tool is small in size, high in moving and erecting speed and capable of improving working efficiency; secondly, steel pipe length can be selected according to the field conditions, does not receive the space restriction, is favorable to the installation work to develop fast, and this instrument is quick detachable transportation moreover, is convenient for have enough to meet the need the use.
Drawings
Fig. 1 is a schematic structural view of a rapid installation tool for an assembled internal partition wall plate of the present invention;
fig. 2 is the utility model relates to a swift mounting tool principle block diagram of partition plate in assembled.
Reference numerals: 1. an electric hoist; 101. a motor; 102. a reel; 103. a drum connecting rod; 104. a base; 105. a controller; 106. a control switch; 107. a rotational speed sensor; 2. a first transverse steel pipe; 3. a vertical steel pipe; 4. a beam column; 5. a wire rope; 6. a second transverse steel pipe; 7. a hook; 8. a seat belt; 9. a fixed pulley; 10. a handle; 11. a support rod.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present application and are not intended to limit the present application.
Referring to fig. 1, the fast installation tool for an assembled inner partition wall board of the present invention is shown, comprising an electric hoist 1, two vertical steel pipes 3, two first horizontal steel pipes 2 and a hoisting device, wherein the electric hoist 1 comprises a motor and a reel 102, the electric hoist 1 is connected to the reel 102 through a reel connecting rod 103, a rotation speed sensor 107 is arranged on the reel connecting rod 103, the electric hoist 1 and the rotation speed sensor 107 are respectively electrically connected to a controller 105, the controller 105 is electrically connected to a control switch 106, the electric hoist 1 is fixedly connected to a base 104, the base 104 is detachably connected to the first horizontal steel pipes 2, the first horizontal steel pipes 2 are detachably and horizontally connected to the vertical steel pipes 3, one end of the vertical steel pipes 3 is fixed on the ground, the other end of the vertical steel pipes 3 is obliquely fixed to a beam column 4, hoisting device includes wire rope 5, the horizontal steel pipe of second 6, lifting hook 7 and safety belt 8, the horizontal steel pipe of second 6 be close to beam column 4 one side with vertical steel pipe 3 detachability is connected, be equipped with fixed pulley 9 on the horizontal steel pipe of second 6, the winding of wire rope 5 one end is in on reel 102, the wire rope 5 other end is walked around fixed pulley 9 connects lifting hook 7 one end, safety belt 8 is connected to the lifting hook 7 other end, 1 mounted position of electric block can be decided according to the on-the-spot condition, connects two first horizontal steel pipes 2 behind two vertical steel pipes 3, has confirmed the electric block mounted position, and the signal transmission of control switch 106 realizes interior partition plate hoist and mount to controller 105 control hoisting device.
Further, the first transverse steel pipe 2 and the second transverse steel pipe 6 are respectively locked with the vertical steel pipe 3 through connecting fasteners, and the connecting fasteners can be always firmly fixed under the condition that the steel pipes are displaced, so that the possibility of steel pipe slippage is eliminated, and the steel pipes are convenient to detach.
Further, the base 104 and the first transverse steel pipe 2 are locked by a U-shaped screw, so that the base 104 and the first transverse steel pipe 2 are fastened and connected, and the disassembly is also convenient.
Further, a handle 10 is arranged on the motor 101.
Furthermore, the two vertical steel pipes are connected by a support rod 11 at one side close to the ground, so that the stability between the two vertical steel pipes 3 is improved.
The utility model discloses a theory of operation: after the inner partition board is locked on the safety belt 8 by a shackle, the control switch 106 further controls the controller 105 to control the winding drum 102 to rotate, and the steel wire rope 5 drives the lifting hook 7 to lift the safety belt 8, so that the inner partition board is lifted. When the interior partition board is close to the installation position, the controller 105 controls the rotating speed of the winding drum 102, the rotating speed of the winding drum 102 is smaller than the value of the rotating speed sensor 107 on the winding drum connecting rod 103 fed back to the controller 105, the interior partition board is prevented from colliding with the beam column 4 due to the fact that the speed is too high, and positioning and reinforcing of the follow-up interior partition board are facilitated.
The utility model has the advantages that: the tool is small in size, high in moving and erecting speed and capable of improving working efficiency; secondly, steel pipe length can be selected according to the field conditions, does not receive the space restriction, is favorable to the installation work to develop fast, and this instrument is quick detachable transportation moreover, is convenient for have enough to meet the need the use.
While the preferred embodiments of the present invention have been described, the present invention is not limited to the above embodiments, and those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of the present invention, and such equivalent modifications or substitutions are intended to be included within the scope of the present invention as defined by the appended claims.

Claims (5)

1. A quick mounting tool for an assembled inner partition wall plate comprises an electric hoist, two vertical steel pipes, two first transverse steel pipes and a hoisting device, and is characterized in that the electric hoist comprises a motor and a winding drum, the electric hoist is connected with the winding drum through a winding drum connecting rod, a rotating speed sensor is arranged on the winding drum connecting rod, the electric hoist and the rotating speed sensor are respectively and electrically connected with a controller, the electric hoist is fixedly connected with a base, the base is detachably connected with the first transverse steel pipes, the first transverse steel pipes are detachably and horizontally connected with the vertical steel pipes, one ends of the vertical steel pipes are fixed on the ground, the other ends of the vertical steel pipes are obliquely fixed on a beam column, the hoisting device comprises a steel wire rope, a second transverse steel pipe, a lifting hook and a safety belt, the second transverse steel pipe is detachably connected with the vertical steel pipe on one side close to the beam column, and a fixed pulley is arranged on the second transverse steel pipe, one end of the steel wire rope is wound on the winding drum, the other end of the steel wire rope bypasses the fixed pulley and is connected with one end of a lifting hook, and the other end of the lifting hook is connected with a safety belt.
2. The quick mounting tool for the assembled inner partition wall plate according to claim 1, wherein the first transverse steel pipe and the second transverse steel pipe are respectively locked with the vertical steel pipe by using a connecting fastener.
3. The quick installation tool for the assembled inner partition plate according to claim 1, wherein the base is locked with the first transverse steel pipe through a U-shaped screw.
4. The quick installation tool for the assembled inner partition plate according to claim 1, wherein a handle is arranged on the motor.
5. The quick installation tool for the assembled inner partition wall plate according to claim 1, wherein the two vertical steel pipes are connected by a support rod at the side close to the ground.
CN201920700778.1U 2019-05-15 2019-05-15 Quick mounting tool for assembled inner partition plate Expired - Fee Related CN210236964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920700778.1U CN210236964U (en) 2019-05-15 2019-05-15 Quick mounting tool for assembled inner partition plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920700778.1U CN210236964U (en) 2019-05-15 2019-05-15 Quick mounting tool for assembled inner partition plate

Publications (1)

Publication Number Publication Date
CN210236964U true CN210236964U (en) 2020-04-03

Family

ID=69970172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920700778.1U Expired - Fee Related CN210236964U (en) 2019-05-15 2019-05-15 Quick mounting tool for assembled inner partition plate

Country Status (1)

Country Link
CN (1) CN210236964U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607157A (en) * 2022-03-16 2022-06-10 四川华远建设工程有限公司 Building wall supporting structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114607157A (en) * 2022-03-16 2022-06-10 四川华远建设工程有限公司 Building wall supporting structure and construction method thereof
CN114607157B (en) * 2022-03-16 2023-12-05 四川华远建设工程有限公司 Building wall supporting structure and construction method thereof

Similar Documents

Publication Publication Date Title
WO2014066705A1 (en) Hoisting platform system
CN210236964U (en) Quick mounting tool for assembled inner partition plate
KR20100022835A (en) A rotatable crane hookblock powered by a lifting cable and its control method
CN215516356U (en) Hoisting equipment for ship anchoring
CN211619332U (en) Simple elevator
CN210457242U (en) Detachable hoist engine hoist device
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN204473731U (en) A kind of building operation material lifting device
CN210029833U (en) Lifting equipment for building construction
JP2011252318A (en) Load receiving platform and its transferring method
CN214326953U (en) Civil residential building construction hoisting device
CN217264205U (en) Pipe hoisting device
CN213738306U (en) Slat wall hoisting accessory for building
CN220011964U (en) Portable fodder hoist engine
JP4222990B2 (en) Floor opening device, floor opening method
CN215592420U (en) Auxiliary hoisting machine with electric cylinder
CN217437589U (en) Prefabricated part hoisting device
KR100722252B1 (en) Portable winch
CN214828524U (en) Portable assembled building board hoist device
CN215592400U (en) Building site is with visual tower crane of safety
CN211004222U (en) Hoisting machine convenient to disassemble and assemble
CN211644432U (en) Platform-free lifting device for mounting large equipment on high-rise building
EP2911971B1 (en) Hoisting platform system
CN216889867U (en) NALC light partition plate installation device
CN210855034U (en) Concrete static cutting hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403