CN204473731U - A kind of building operation material lifting device - Google Patents

A kind of building operation material lifting device Download PDF

Info

Publication number
CN204473731U
CN204473731U CN201520112288.1U CN201520112288U CN204473731U CN 204473731 U CN204473731 U CN 204473731U CN 201520112288 U CN201520112288 U CN 201520112288U CN 204473731 U CN204473731 U CN 204473731U
Authority
CN
China
Prior art keywords
bracing frame
main
main bracing
moving rail
shifting axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520112288.1U
Other languages
Chinese (zh)
Inventor
肖瑶瑶
张玉婷
宗同堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520112288.1U priority Critical patent/CN204473731U/en
Application granted granted Critical
Publication of CN204473731U publication Critical patent/CN204473731U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of building operation material lifting device, it is characterized in that material putting groove is placed in main bracing frame side, position-limited lever is placed in material putting groove side, spiral power rail and position-limited lever parallel, and one end is placed on main bracing frame by swivel bearing, the other end is connected with stepping motor, material push pedal side is placed on position-limited lever by spacing collar, opposite side is placed on spiral power rail by spiral sleeve, shifting axle is placed on elevator bucket, shifting axle two ends are placed on main moving rail and auxiliary moving rail respectively, reel is placed on elevator bucket, steer motor is placed on main bracing frame, winding roller is placed in steer motor by dynamical axis, steel strand one end curls on winding roller, the other end curls on reel, traction electric machine is placed on main bracing frame, live-rollers is placed on traction electric machine by turning cylinder, fixed pulley is placed on link plate, draught line one end curls on live-rollers, the other end is connected with shifting axle through fixed pulley.

Description

A kind of building operation material lifting device
Technical field
A kind of building operation material lifting device of the utility model, relate to a kind of when construction, the bont that material lifting can be needed height to workmen, belongs to Architectural Equipment field.Use when building a wall in particular to a kind of building ground, effectively masonry and cement can be risen to the bont at workman's scaffold place.
Background technology
At present, in construction walling construction, wall-building material is generally by hoist machinery hoists extremely each floor, the mechanical equipment builds such as hoisting crane are large, can not construct at the narrow space of floor, resource cannot make full use of, at the narrow space of floor, build labourer must rely on manpower that building materials is transported to job location, transportation mode is wasted time and energy, when wall is built higher, or when needing material transportation higher, general be all a people under up throw away masonry, one people constructs at upper material of catching, this long repetitive operation, add the working strength of workmen, the comparatively large more difficult lifting of sandstone quality sometimes, though workmen utilizes pulley to promote, but still need manpower to carry out service hoisting, after being promoted to assigned address, workman is still needed to be unloaded by building materials, waste many time and efforts.
Summary of the invention
In order to improve above-mentioned situation, a kind of building operation of the utility model material lifting device provide time building a wall in a kind of building ground use, effectively masonry and cement can be risen to the bont at workman's scaffold place.Can effectively improve building operation efficiency, use manpower and material resources sparingly.
A kind of building operation material lifting device of the utility model is achieved in that a kind of building operation material lifting device of the utility model is made up of subject support means, mobile running gear and handling bont.Subject support means is made up of link plate, main moving rail, main bracing frame, main rotating shaft, auxiliary moving rail, auxiliary S. A. and wheel.Wheel is placed in below main bracing frame, and main moving rail one end is placed in main bracing frame side by main rotating shaft, and the other end is placed on link plate, and auxiliary moving rail one end is placed in main bracing frame side by auxiliary S. A., and the other end is placed on link plate.Mobile running gear is made up of material putting groove, material push pedal, spacing collar, position-limited lever, swivel bearing, spiral sleeve, spiral power rail and stepping motor.Stepping motor is placed on main bracing frame, material putting groove is placed in main bracing frame side, position-limited lever is placed in material putting groove side, spiral power rail and position-limited lever parallel, and one end is placed on main bracing frame by swivel bearing, the other end is connected with stepping motor, and material push pedal side is placed on position-limited lever by spacing collar, and opposite side is placed on spiral power rail by spiral sleeve.Handling bont is made up of elevator bucket, reel, steel strand, dynamical axis, winding roller, live-rollers, turning cylinder, traction electric machine, steer motor, shifting axle, draught line and fixed pulley.Shifting axle is placed on elevator bucket, shifting axle two ends are placed on main moving rail and auxiliary moving rail respectively, reel is placed on elevator bucket, steer motor is placed on main bracing frame, winding roller is placed in steer motor by dynamical axis, steel strand one end curls on winding roller, the other end curls on reel, traction electric machine is placed on main bracing frame, live-rollers is placed on traction electric machine by turning cylinder, fixed pulley is placed on link plate, and draught line one end curls on live-rollers, and the other end is connected with shifting axle through fixed pulley.
During use, first main bracing frame is positioned over the scaffold side of workman's operation, then workman regulates main moving rail and auxiliary moving rail, main moving rail one end is rotated around main bracing frame by main rotating shaft, auxiliary moving rail one end is rotated around main bracing frame by auxiliary S. A., main moving rail and auxiliary moving rail drive link plate to move jointly, link plate is made to hang on the scaffold of workman's use, then only need to put required brick or cement material toward material putting groove, stepping motor rotates, spiral power rail is driven to rotate around swivel bearing, and then drive spiral sleeve to move on spiral power rail, material push pedal side is moved along position-limited lever by spacing collar, opposite side is moved along spiral power rail by spiral sleeve.Material push pedal is made to shift onto in elevator bucket by the material in material putting groove, then traction electric machine work is made, traction electric machine drives live-rollers to rotate by turning cylinder, the continuous coiling of live-rollers, draught line is made to drive shifting axle to move through fixed pulley, shifting axle moves along the main moving rail at two ends and auxiliary moving rail, and then drive elevator bucket to move, steer motor rotates backward, along with the rising of elevator bucket, steel strand on winding roller constantly extend, when elevator bucket arrives the height needed for workman time, stop traction electric machine work, then steer motor is rotated forward, constantly steel strand are curled on winding roller, and then drive reel to turn to, and then elevator bucket is rotated around shifting axle, material is taken on scaffold, workman is facilitated to take, can reach time building a wall in building ground use, effectively masonry and cement can be risen to the object at workman's scaffold place.
Beneficial effect
One, structure is simple, convenient and practical.
Two, with low cost, be easy to promote.
Three, can effectively improve building operation efficiency, use manpower and material resources sparingly.
Accompanying drawing explanation
Accompanying drawing 1 is the three-dimensional structure diagram of a kind of building operation material lifting device of the utility model
In accompanying drawing
Wherein part is: link plate (1), main moving rail (2), elevator bucket (3), shifting axle (4), reel (5), steel strand (6), dynamical axis (7), winding roller (8), main bracing frame (9), material putting groove (10), material push pedal (11), spacing collar (12), position-limited lever (13), swivel bearing (14), spiral sleeve (15), main rotating shaft (16), spiral power rail (17), stepping motor (18), auxiliary S. A. (19), wheel (20), live-rollers (21), turning cylinder (22), traction electric machine (23), steer motor (24), auxiliary moving rail (25), draught line (26), fixed pulley (27)
Detailed description of the invention:
A kind of building operation material lifting device of the utility model realizes like this, during use, first main bracing frame (9) is positioned over the scaffold side of workman's operation, then workman regulates main moving rail (2) and auxiliary moving rail (25), main moving rail (2) one end is rotated around main bracing frame (9) by main rotating shaft (16), auxiliary moving rail (25) one end is rotated around main bracing frame (9) by auxiliary S. A. (19), main moving rail (2) and auxiliary moving rail (25) drive link plate (1) mobile jointly, link plate (1) is made to hang on the scaffold of workman's use, then only need to put required brick or cement material toward material putting groove (10), stepping motor (18) rotates, spiral power rail (17) is driven to rotate around swivel bearing (14), and then drive spiral sleeve (15) upper mobile at spiral power rail (17), make material push pedal (11) side mobile along position-limited lever (13) by spacing collar (12), opposite side is mobile along spiral power rail (17) by spiral sleeve (15).Material push pedal (11) is made to shift onto in elevator bucket (3) by the material in material putting groove (10), then traction electric machine (23) is made to work, traction electric machine (23) drives live-rollers (21) to rotate by turning cylinder (22), live-rollers (21) constantly coiling, draught line (26) is made to drive shifting axle (4) mobile through fixed pulley (27), shifting axle (4) along the main moving rail (2) at two ends and auxiliary moving rail (25) mobile, and then drive elevator bucket (3) mobile, steer motor (24) rotates backward, along with the rising of elevator bucket (3), steel strand (6) on winding roller (8) constantly extend, when elevator bucket (3) arrives the height needed for workman time, stop traction electric machine (23) work, then steer motor (24) is rotated forward, constantly steel strand (6) are curled on winding roller (8), and then drive reel (5) to turn to, and then elevator bucket (3) is rotated around shifting axle (4), material is taken on scaffold, workman is facilitated to take, can reach time building a wall in building ground use, effectively masonry and cement can be risen to the object at workman's scaffold place.

Claims (1)

1. a building operation material lifting device, is characterized in that: by subject support means, mobile running gear and handling bont composition, subject support means is by link plate, main moving rail, main bracing frame, main rotating shaft, auxiliary moving rail, auxiliary S. A. and wheel composition, wheel is placed in below main bracing frame, main moving rail one end is placed in main bracing frame side by main rotating shaft, the other end is placed on link plate, auxiliary moving rail one end is placed in main bracing frame side by auxiliary S. A., the other end is placed on link plate, and mobile running gear is by material putting groove, material push pedal, spacing collar, position-limited lever, swivel bearing, spiral sleeve, spiral power rail and stepping motor composition, stepping motor is placed on main bracing frame, material putting groove is placed in main bracing frame side, position-limited lever is placed in material putting groove side, and spiral power rail and position-limited lever parallel, and one end is placed on main bracing frame by swivel bearing, the other end is connected with stepping motor, material push pedal side is placed on position-limited lever by spacing collar, and opposite side is placed on spiral power rail by spiral sleeve, and handling bont is by elevator bucket, reel, steel strand, dynamical axis, winding roller, live-rollers, turning cylinder, traction electric machine, steer motor, shifting axle, draught line and fixed pulley composition, shifting axle is placed on elevator bucket, shifting axle two ends are placed on main moving rail and auxiliary moving rail respectively, reel is placed on elevator bucket, steer motor is placed on main bracing frame, winding roller is placed in steer motor by dynamical axis, steel strand one end curls on winding roller, the other end curls on reel, traction electric machine is placed on main bracing frame, and live-rollers is placed on traction electric machine by turning cylinder, and fixed pulley is placed on link plate, draught line one end curls on live-rollers, and the other end is connected with shifting axle through fixed pulley.
CN201520112288.1U 2015-02-11 2015-02-11 A kind of building operation material lifting device Expired - Fee Related CN204473731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520112288.1U CN204473731U (en) 2015-02-11 2015-02-11 A kind of building operation material lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520112288.1U CN204473731U (en) 2015-02-11 2015-02-11 A kind of building operation material lifting device

Publications (1)

Publication Number Publication Date
CN204473731U true CN204473731U (en) 2015-07-15

Family

ID=53629535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520112288.1U Expired - Fee Related CN204473731U (en) 2015-02-11 2015-02-11 A kind of building operation material lifting device

Country Status (1)

Country Link
CN (1) CN204473731U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800527A (en) * 2016-05-12 2016-07-27 李从宾 Material hoist for building construction
CN110939272A (en) * 2019-12-16 2020-03-31 孟召阳 A concrete is carried and is used traction positioning device for construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800527A (en) * 2016-05-12 2016-07-27 李从宾 Material hoist for building construction
CN109110701A (en) * 2016-05-12 2019-01-01 李从宾 A kind of construction material elevator
CN110939272A (en) * 2019-12-16 2020-03-31 孟召阳 A concrete is carried and is used traction positioning device for construction
CN110939272B (en) * 2019-12-16 2021-06-15 安徽德茂建设工程有限公司 A concrete is carried and is used traction positioning device for construction

Similar Documents

Publication Publication Date Title
CN205772950U (en) A kind of Small-size crane for building construction
CN104140037B (en) Wallboard Lift-on/Lift-off System
CN106185690A (en) A kind of building retaining wall automatic lifting Handling device
CN107905250B (en) Retaining wall construction all-in-one for concrete highway
CN202415018U (en) Portable rotating lifting machine
CN204473731U (en) A kind of building operation material lifting device
CN205294474U (en) Wire rope winding machine
CN202449788U (en) Special crane device for wall bricks
CN203794533U (en) Light portable mobile lifting equipment
CN204342297U (en) A kind of transfer crane with jib structure
CN105883634B (en) A kind of mushroom builds special purpose crane
CN212769476U (en) Electric hoist bridge crane
CN206634962U (en) A kind of removable simple and easy hoisting equipment
CN104150393B (en) A kind of micro power power equipment rotary hoisting device
CN206328081U (en) A kind of hoist engine lifted for plastering machine ash bucket
CN203855340U (en) Novel device for lifting cargoes
CN202544409U (en) High-rise building construction material discharging device
CN203513129U (en) Lifting device for conveying digging pile construction materials
CN203246794U (en) Machine for hoisting and transporting railway and highway high-cutting protection slope protective construction sandstone materials
CN203922508U (en) A kind of Portable crane device
CN202611216U (en) Telescopic discharging device for high-rise building
CN206397083U (en) A kind of plastering machine ash bucket lifting device
CN214144693U (en) Liftable support for construction engineering construction
CN105923584B (en) A kind of cave dwelling special purpose crane
CN103979426A (en) Portable lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20160211