CN210049540U - Dry-paving mortar distributor for floor bricks and stone materials - Google Patents

Dry-paving mortar distributor for floor bricks and stone materials Download PDF

Info

Publication number
CN210049540U
CN210049540U CN201920627011.0U CN201920627011U CN210049540U CN 210049540 U CN210049540 U CN 210049540U CN 201920627011 U CN201920627011 U CN 201920627011U CN 210049540 U CN210049540 U CN 210049540U
Authority
CN
China
Prior art keywords
guide
ash
dry
ash distribution
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920627011.0U
Other languages
Chinese (zh)
Inventor
郑朋军
李遐
苏肖飞
郭政
殷定涛
满宗
陈广华
高瑞帅
王轶峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yijian Group Co Ltd
Original Assignee
Zhengzhou Yijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yijian Group Co Ltd filed Critical Zhengzhou Yijian Group Co Ltd
Priority to CN201920627011.0U priority Critical patent/CN210049540U/en
Application granted granted Critical
Publication of CN210049540U publication Critical patent/CN210049540U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the field of buildings, in particular to a dry-paving ash distributor for floor tiles and stone materials, which comprises two parallel guide rails, an ash distributing groove positioned above the two guide rails and a guide roller which is driven by the guide roller to move along the guide rails; the fixed vertical support post of installing of tip of guide roller's shaft, the altitude mixture control guide holder is installed to the symmetry on the left and right both sides wall in cloth ash groove, and the upper end of support post passes from the altitude mixture control guide holder to install the locating part that is used for the fixed stay post on the altitude mixture control guide holder, still be provided with high scale mark on the support post, the upper and lower extreme in cloth ash groove is the opening end to along being provided with one row of seta vertical bar at the lower extreme in cloth ash groove, this ash distributor can make the spreading, the leveling of dry hard mortar, seta one shot forming, has improved the speed of paving greatly.

Description

Dry-paving mortar distributor for floor bricks and stone materials
Technical Field
The utility model relates to a building field, concretely relates to dry laying ash distributor of ground brick stone material.
Background
At present, in the known building construction field, dry paving operation is generally adopted for paving floor tiles or stones, the paving thickness is relatively large, more materials are used, in the traditional construction process, dry and hard mortar is generally directly poured to a position needing construction by a shovel, then a trowel is used for leveling, and then the trowel is used for scraping, so that the floor tiles or the stones can be paved, and the process has the defects of slow paving of the dry and hard mortar and low paving efficiency.
Disclosure of Invention
To the defect and the problem that exist among the prior art, the utility model provides a dry laying ash distributor of ceramic tile stone material, this ash distributor is light and handy portable, but has height-adjusting's wheel in addition in order to satisfy the requirement of different cloth ash thickness, and the speed of paving has been improved greatly to the spreading of dry and hard mortar, make level, napping one shot forming to the efficiency of paving of ceramic tile or stone material has been improved.
The utility model provides a scheme that its technical problem adopted is: the dry-paving ash distributor for the floor tiles and the stone comprises two parallel guide rails, guide rollers and ash distributing grooves, wherein the ash distributing grooves are positioned above the two guide rails and can move along the guide rails under the drive of the guide rollers; the end part of the wheel shaft of the guide roller is fixedly and vertically provided with a support upright post, the left side wall and the right side wall of the ash distribution groove are symmetrically provided with height adjusting guide seats, the upper end of the support upright post penetrates through the height adjusting guide seats, the height adjusting guide seats are provided with limit parts for fixing the support upright post, the support upright post is also provided with height scale marks, the upper end and the lower end of the ash distribution groove are both open ends, and the lower end edge of the ash distribution groove is provided with a row of napping vertical bars.
Furthermore, the guide rail is a pair of angle irons, the vertical surfaces of the angle irons are positioned on the outer side of the guide roller, the horizontal surfaces of the angle irons are positioned at the lower end of the guide roller, and the guide roller rolls along the length direction of the guide rail.
Furthermore, two height adjusting guide seats with the same height are respectively installed on the left side and the right side of the ash distribution groove, and the two height adjusting guide seats are respectively sleeved on the corresponding supporting stand columns.
Furthermore, a handle is arranged on the rear side wall of the ash distribution groove.
Furthermore, the locating part is a claw bolt, a screw hole is formed in the height adjusting guide seat, and the inner end of the claw bolt penetrates through the screw hole to be in pressure contact with the supporting upright post.
Furthermore, a cylindrical groove is formed in the height adjusting guide seat, and the inner end of the claw bolt penetrates through the screw hole to be in press contact with the bottom of the cylindrical groove.
Furthermore, the napping vertical bars are uniformly welded at the lower end of the front side wall of the ash distribution groove.
Furthermore, the napping vertical bars are reinforcing steel bars with the diameter of 6mm, and the interval between every two adjacent napping vertical bars is 15-25 mm.
The utility model has the advantages that: the utility model discloses a dry laying ash distributor of floor tile stone can be spread at ceramic tile or stone material and paste the in-process and reduce construction process, shortens and spreads grey time, improves and spreads grey roughness to improve the shop of ceramic tile or stone material and paste efficiency and quality.
The ash distribution groove is uncovered, bottomless and communicated with the upper end and the lower end, so that dry and hard mortar can be fed from the upper end conveniently, the mortar flows downwards when the ash distribution groove advances, and the mortar stops flowing when the ash distribution groove stops, so that the dry and hard mortar can be extruded from the lower end automatically. The wheel with the adjustable height and arranged at the lower end of the ash distribution groove is used for meeting the requirements of different ash distribution thicknesses, and is convenient for operators to control the ash distribution thickness. Meanwhile, a row of galling vertical bars vertical to the walking direction of the ash distribution groove are arranged on the ash distribution groove, and in the process of advancing along with the ash distribution groove, the galling vertical bars synchronously carry out galling treatment on the surface of the mortar after spreading and leveling, so that three procedures of spreading, leveling and galling of the dry and hard mortar are formed in one step in place, the spreading speed is greatly improved, and the spreading and pasting efficiency of the floor tiles or the stone is improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a front view of the present invention.
Fig. 4 is a side view of the present invention.
In the figure: the method comprises the following steps of 1-guide rail, 2-guide roller, 3-ash distribution groove, 4-wheel shaft, 5-support upright post, 6-height adjustment guide seat, 7-height scale mark, 8-napping vertical bar, 9-handle and 10-claw bolt.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Example 1: a dry mortar distributor for floor bricks and stone materials is shown in figures 1-4 and comprises a guide rail 1, a guide roller 2 and a mortar distributing groove 3, wherein the guide roller 2 moves along the guide rail 1, and the mortar distributing groove 3 is connected with a wheel shaft 4 of the guide roller 2 and moves along with the guide roller. The guide rail 1 is composed of a pair of angle irons which are parallel to each other, 30x30x2mm in length and 2000mm in length, one surface of each angle iron is horizontally placed on the ground, the vertical surface of each angle iron is located on the outer side of the corresponding guide roller 2, the horizontal surface of each angle iron is located at the lower end of the corresponding guide roller 2, each guide roller is a common plastic wheel with the outer diameter of 150mm, and the corresponding guide roller 2 rolls along the length direction of the corresponding angle iron. Bricks can be pressed at the front end and the rear end of the angle iron in the construction process, so that the angle iron is prevented from overturning or shifting. The angle bar surface is brushed with the anti-rust paint, prevents to take place the corrosion with materials such as cement in the use, and the purpose of laying the guide rail can make guide roller steady movement above that, avoids pouring the influence of unevenness to the dry and hard cement mortar paving quality because of the bed course.
The end part of the wheel shaft 4 of the guide roller 2 is vertically fixed with a support upright post 5 upwards, the support upright post is a steel plate with the length of 5mm and the width of 200mm and the width of 50mm, the left side wall and the right side wall of the ash distribution groove 3 are symmetrically provided with height adjusting guide seats 6, the heights of the two height adjusting guide seats 6 are consistent, the upper end of the support upright post 5 can extend out from the height adjusting guide seat 6 from bottom to top, the height adjusting guide seat 6 is provided with a screw hole, a claw bolt 10 penetrates through the screw hole, the inner end of the claw bolt 10 passes through the screw hole to be pressed with the support upright post 5, the back surface of the support upright post 5 is tightly pressed on the back surface inside the height adjusting guide seat 6, the front surface of the support upright post 5 is tightly pressed by the claw bolt 10, thereby the support upright post 5 is fixed in the height adjusting guide seat 6, in order to realize the accurate adjustment of the height, wherein, the scale value that corresponds along the last line of altitude mixture control guide holder 6 is the height value on cloth ash groove 3 lower extreme distance ground, when removing support post 5 and highly adjusting cloth ash groove 3 like this, adjustment guide roller 2's that can be accurate height to adjust cloth ash groove 3's distance ground height, satisfy different cloth ash thickness demands, it is convenient more quick, save time, and guarantee that the height of cloth ash groove 3 both sides keeps unanimous.
The ash distribution groove is a cuboid without a bottom and a cover, the cuboid is formed by welding a galvanized iron sheet with the thickness of 1mm and a metal strip with the thickness of 2mm and the width of 500mm, the size of the ash distribution groove is 1000X300X200mm (the length X is wide and the height X is high), dry and hard mortar is not in the ash distribution groove 3, but when the ash distribution groove 3 moves, the mortar flows out from the lower end of the ash distribution groove 3 and is strickled by the lower edge of the side wall of the ash distribution groove 3, and the paving and leveling of the mortar are synchronously and automatically completed. A handle 9 is arranged on the rear side wall of the ash distribution groove 3 to assist in pushing the ash distribution groove 3 to advance. And a row of napping vertical bars 8 are welded at the lower end of the front side wall of the ash distribution groove 3, the napping vertical bars 8 are made of HPB300 steel bars with the diameter of 6mm, and the spacing distance between every two adjacent napping vertical bars 8 is 20mm, so that the paved dry hard mortar is napped.
Example 2: the difference between the dry floor tile mortar distributor of the present embodiment and embodiment 1 will be mainly described.
In this embodiment, evenly be provided with the cylindricality recess on altitude mixture control guide holder 6, wherein, the cylindricality recess is opened in the outside of altitude mixture control guide holder 6, the inner of claw bolt 10 can pass the screw and press with the tank bottom of cylindricality recess and touch like this, compare with embodiment 1, the bolt just can be by preliminary spacing in the cylindricality recess between not screwing up, play the effect that prevents support post 5 gliding, then the bolt of screwing up both sides in proper order can be further fixed support post 5, stability is better.

Claims (8)

1. The utility model provides a dry laying mortar distributor of ground brick stone material which characterized in that: the guide rail, the guide rollers and the ash distribution grooves are arranged in parallel, the ash distribution grooves are arranged above the two guide rails, and the ash distribution grooves are driven by the guide rollers to move along the guide rails; the end part of the wheel shaft of the guide roller is fixedly and vertically provided with a support upright post, the left side wall and the right side wall of the ash distribution groove are symmetrically provided with height adjusting guide seats, the upper end of the support upright post penetrates through the height adjusting guide seats, the height adjusting guide seats are provided with limit parts for fixing the support upright post, the support upright post is also provided with height scale marks, the upper end and the lower end of the ash distribution groove are both open ends, and the lower end edge of the ash distribution groove is provided with a row of napping vertical bars.
2. The dry floor tile and stone mortar distributor according to claim 1, wherein: the guide rail is a pair of angle irons, the vertical surfaces of the angle irons are positioned on the outer sides of the guide rollers, the horizontal surfaces of the angle irons are positioned at the lower ends of the guide rollers, and the guide rollers roll along the length direction of the guide rail.
3. The dry floor tile and stone mortar distributor according to claim 1, wherein: two height adjusting guide seats with the same height are respectively installed on the left side and the right side of the ash distribution groove, and the two height adjusting guide seats are respectively sleeved on the corresponding supporting stand columns.
4. The dry floor tile and stone mortar distributor according to claim 1, wherein: a handle is arranged on the rear side wall of the ash distribution groove.
5. The dry floor tile and stone mortar distributor according to claim 1, wherein: the locating part is the goat's horn bolt, it has the screw to open on the altitude mixture control guide holder, the inner of goat's horn bolt passes the screw and supports the stand pressure and touch.
6. The dry floor tile and stone mortar distributor according to claim 5, wherein: the height adjustment guide seat is provided with a cylindrical groove, and the inner end of the claw bolt penetrates through the screw hole to be in press contact with the bottom of the cylindrical groove.
7. The dry floor tile and stone mortar distributor according to claim 1, wherein: and the napping vertical bars are uniformly welded at the lower end of the front side wall of the ash distribution groove.
8. The dry floor tile and stone mortar distributor according to claim 1, wherein: the napping vertical bars are reinforcing steel bars with the diameter of 6mm, and the interval between every two adjacent napping vertical bars is 15-25 mm.
CN201920627011.0U 2019-05-05 2019-05-05 Dry-paving mortar distributor for floor bricks and stone materials Expired - Fee Related CN210049540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920627011.0U CN210049540U (en) 2019-05-05 2019-05-05 Dry-paving mortar distributor for floor bricks and stone materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920627011.0U CN210049540U (en) 2019-05-05 2019-05-05 Dry-paving mortar distributor for floor bricks and stone materials

Publications (1)

Publication Number Publication Date
CN210049540U true CN210049540U (en) 2020-02-11

Family

ID=69380811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920627011.0U Expired - Fee Related CN210049540U (en) 2019-05-05 2019-05-05 Dry-paving mortar distributor for floor bricks and stone materials

Country Status (1)

Country Link
CN (1) CN210049540U (en)

Similar Documents

Publication Publication Date Title
CN206512569U (en) Concrete road surface steel form
CN210049540U (en) Dry-paving mortar distributor for floor bricks and stone materials
CN103643618A (en) High speed railway supporting layer corner finishing template
CN110469131B (en) Ash spreading and seam scraping integrated construction device and method for wall masonry
CN211057551U (en) Highway is paving device for engineering
CN110374300B (en) Stone floor system and construction method thereof
CN111677302A (en) Wall building auxiliary tool
CN105040559B (en) Road surface slip form mold of underneath type slip form paver
CN217871872U (en) Flattening film-coating trolley for cast-in-place concrete floor surface
CN102888809B (en) Highly-efficient leveling method for construction of large-area concrete ground floor
CN215212457U (en) Multifunctional paving device with adjustable paving thickness for masonry
CN202787999U (en) Movable type support bridge for efficient large area concrete terrace construction
CN110748034A (en) Hollow wall construction process
CN213890730U (en) Positioning device for cutting deformation joint of bridge guardrail
CN204850478U (en) Controlling means is pour to concrete floor thickness
CN111005583B (en) Wall building block transverse mortar joint and vertical mortar joint control device
CN210798340U (en) Simple mortar laying and laying pointing trolley
CN207597215U (en) Interlocking segment brick paving machine making positioning auxiliary device
CN109707120B (en) Flashing construction device and method for roof parapet
CN218712014U (en) Curb construction location, elevation control and exempt from device of pointing
CN219675098U (en) Mortar leveling device applied to tile paving
CN111501492A (en) Highway drainage ditch traction extrusion type slip form construction equipment and construction method
CN212763986U (en) Floating device of annular full-automatic production line cloth machine
CN221320592U (en) Curb installation adjusting device
CN217326563U (en) Mortar spreading device for masonry

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200211

Termination date: 20210505