CN210025752U - Precast processing system for concrete anti-collision wall - Google Patents

Precast processing system for concrete anti-collision wall Download PDF

Info

Publication number
CN210025752U
CN210025752U CN201920316501.9U CN201920316501U CN210025752U CN 210025752 U CN210025752 U CN 210025752U CN 201920316501 U CN201920316501 U CN 201920316501U CN 210025752 U CN210025752 U CN 210025752U
Authority
CN
China
Prior art keywords
guide rail
fixed
portal frame
processing system
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920316501.9U
Other languages
Chinese (zh)
Inventor
孙岩
陈庭光
黄勇新
姚炎海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Guanyue Highway and Bridge Co Ltd
Original Assignee
Guangdong Guanyue Highway and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Guanyue Highway and Bridge Co Ltd filed Critical Guangdong Guanyue Highway and Bridge Co Ltd
Priority to CN201920316501.9U priority Critical patent/CN210025752U/en
Application granted granted Critical
Publication of CN210025752U publication Critical patent/CN210025752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a precast processing system of concrete anti-collision wall, which comprises a second guide rail, a slide block, a fastening bolt, a connecting bar block, a stop lever and a placement groove, wherein the second guide rail is respectively fixed at the left end and the inner right end in a small portal frame, the slide block is connected in the second guide rail in a sliding way, the slide block is detachably connected with the fastening bolt through screw threads, the outer end surface of the fastening bolt passes through the slide block and is contacted with the inner end of the second guide rail, the connecting bar block is fixed at the upper end of the slide block, the connecting bar block is arranged at the inner side of the second guide rail, the placement groove is processed at the upper end of the connecting bar block, the stop lever is placed on the placement groove, the stop lever is respectively positioned at the front side and the rear side of a tank body, so as to block the tank body, avoid the tank body from shaking, the quick dismouting of carrying on has reduced artifical transport.

Description

Precast processing system for concrete anti-collision wall
Technical Field
The utility model discloses a precast processing system of concrete anticollision wall belongs to the building construction equipment field.
Background
Among the prior art, when prefabricating concrete anticollision wall and adding, carry out artifical manual carrying to the template usually to personnel's work load has been increaseed, and operating time is long, when pouring concrete, generally transport through the concrete truck, and pour into the template respectively in, thereby increaseed the time of pouring, the result of use is poor, consequently, needs concrete anticollision wall prefabricated processing system to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a precast processing system of concrete anticollision wall to solve the problem that proposes in the above-mentioned background art, the utility model discloses convenient to use is convenient for carry template and concrete fast, easy operation, and the work load is little.
In order to achieve the above purpose, the present invention is realized by the following technical solution: the concrete anti-collision wall prefabricating and processing system comprises a small portal frame, wherein the small portal frame is fixed on the upper end surface of a moving wheel set, the moving wheel set is connected to the upper end of a guide rail I in a sliding manner, a lifting rope is sleeved on the small portal frame in a sliding manner, the lower end of the lifting rope is fixedly connected with a lifting hook, the lower end of the lifting hook is suspended with a tank body, the lifting hook and the tank body are arranged in the small portal frame, a protection mechanism is connected in the small portal frame in a sliding manner and is arranged on the outer side of the tank body, a limiting component is fixed on the upper portion of the lifting hook, the protection mechanism comprises a guide rail II, a sliding block, a fastening bolt, a connecting strip block, a stop lever and a placing groove, the guide rail II is respectively fixed at the left end and the inner right end in the small, the outer end face of the fastening bolt penetrates through the sliding block and is in contact with the inner end of the second guide rail, a connecting strip block is fixed to the upper end of the sliding block and arranged on the inner side of the second guide rail, a placing groove is machined in the upper end of the connecting strip block, a stop lever is placed on the placing groove, and the stop lever is located on the front side and the rear side of the tank body respectively.
In an embodiment, spacing subassembly is including fixed frame, otic placode, limiting plate and magnet piece, fixed frame is fixed on lifting hook upper portion, fixed frame right-hand member front and back symmetry welded fastening has two otic placodes, two the otic placode passes through the dwang and is connected with the rotation of limiting plate left part, inlay on the limiting plate up end right part and be fixed with the magnet piece.
In one embodiment, the front end and the rear end of the movable wheel set are respectively welded and fixed with a push plate, and the lower part of the push plate extends into the first guide rail.
In one embodiment, the stop lever is equipped with two, two the front and back symmetry of stop lever sets up both sides around the jar body, connecting strip piece upper end equidistance processing has two at least standing grooves, two the baffle is all placed on the standing groove.
The utility model has the advantages that: the utility model discloses a precast processing system of concrete anticollision wall, the utility model discloses an add guide rail two, the slider, fastening bolt, the connecting strip piece, pin and standing groove, this design is convenient for block the jar body, avoid the jar body to rock, the stability of pouring of concrete has been improved, thereby construction speed has been guaranteed to the efficient, and be convenient for carry out the rapid transit to the template, the quick dismouting that carries on, manual handling has been reduced, the prior art has been solved, when carrying out precast processing to concrete anticollision wall, carry out manual work to the template usually, thereby personnel's work load has been increaseed, and operating time is long, and when pouring the concrete, generally transport through the concrete truck, and pour into in the template respectively, thereby the time of pouring has been increaseed, the poor problem of result of use.
Because of adding fixed frame, otic placode, limiting plate and magnet piece, this design is convenient for protect and spacing the lifting hook, avoids the lifting hook to drop with jar body is automatic, because of adding the push pedal, and this design is convenient for clear up the impurity on the guide rail one, is convenient for remove the stable removal of wheelset, the utility model discloses convenient to use is convenient for carry template and concrete fast, easy operation, and the work load is little.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
FIG. 1 is a schematic structural view of the precast processing system for concrete anti-collision walls of the present invention;
FIG. 2 is a schematic view of a protection mechanism in the precast concrete processing system of the present invention;
FIG. 3 is a schematic structural view of a connecting bar block in the precast concrete wall processing system of the present invention;
FIG. 4 is a schematic view of a limiting assembly in the precast concrete wall processing system of the present invention;
in the figure: 1-a small portal frame, 2-a protection mechanism, 3-a tank body, 4-a guide rail I, 5-a moving wheel set, 6-a lifting hook, 7-a limiting component, 8-a lifting rope, 21-a guide rail II, 22-a sliding block, 23-a fastening bolt, 24-a connecting strip block, 25-a stop lever, 26-a placing groove, 71-a fixing frame, 72-an ear plate, 73-a limiting plate and 74-a magnet block.
Detailed Description
Before the embodiments are described in detail, it is to be understood that the invention is not limited in its application to the details of construction and the arrangements of components set forth in the following description or illustrated in the drawings. The utility model discloses can be the embodiment that other modes realized. Also, it is to be understood that the phraseology and terminology used herein is for the purpose of description and should not be regarded as limiting. The use of "including," "comprising," "having," and the like, herein is meant to encompass the items listed thereafter and equivalents thereof as well as additional items. In particular, when "a certain element" is described, the present invention is not limited to the number of the element being one, and may include a plurality of the elements.
Referring to fig. 1-4, the present invention provides a technical solution: a precast processing system for a concrete anti-collision wall comprises a small portal frame 1, wherein the small portal frame 1 is fixed on the upper end surface of a movable wheel set 5, the movable wheel set 5 is connected to the upper end of a guide rail I4 in a sliding manner, a lifting rope 8 is sleeved on the small portal frame 1 in a sliding manner, the lower end of the lifting rope 8 is fixedly connected with a lifting hook 6, a tank body 3 is hung at the lower end of the lifting hook 6, the lifting hook 6 and the tank body 3 are both arranged inside the small portal frame 1, a protection mechanism 2 is connected inside the small portal frame 1 in a sliding manner, the protection mechanism 2 is arranged outside the tank body 3, a limiting component 7 is fixed on the upper part of the lifting hook 6, the movable wheel set 5 is started, so that the movable wheel set 5 moves along the guide rail I4 and further drives the small portal frame 1 to move, the small portal frame 1 moves to drive the lifting rope 8, user of service can take off jar body 3 from lifting hook 6 to with the template integration together and transfer through lifting hook 6, easy operation has improved work efficiency.
The protection mechanism 2 comprises a second guide rail 21, a sliding block 22, a fastening bolt 23, a connecting bar block 24, a stop lever 25 and a placing groove 26, the second guide rail 21 is respectively fixed at the left end and the inner right end in the small portal frame 1, the sliding block 22 is connected in the second guide rail 21 in a sliding manner, the sliding block 22 is detachably connected with the fastening bolt 23 through threads, the outer end face of the fastening bolt 23 penetrates through the sliding block 22 and is contacted with the inner end of the second guide rail 21, the connecting bar block 24 is fixed at the upper end of the sliding block 22, the connecting bar block 24 is arranged at the inner side of the second guide rail 21, the placing groove 26 is processed at the upper end of the connecting bar block 24, the stop lever 25 is placed on the placing groove 26, the stop lever 25 is respectively positioned at the front side and the rear side of the tank body 3, a user moves the sliding block 22 along the second guide rail 21 to further drive the fastening bolt 23 and, and rotate fastening bolt 23, fastening bolt 23 rotates and moves left along slider 22 to carry out the tight fixed in top to slider 22, then in the user places two pin 25 the standing groove 26 on the relevant position of connecting strip piece 24 upper end, and set up pin 25 both sides around the jar body 3, thereby spacing jar body 3, avoid jar body 3 to rock, thereby improved the stability when jar body 3 removes.
Spacing subassembly 7 is including fixed frame 71, otic placode 72, limiting plate 73 and magnet piece 74, fixed frame 71 is fixed on lifting hook 6 upper portion, fixed frame 71 right-hand member front and back symmetry welded fastening has two otic placodes 72, two otic placodes 72 are rotated through dwang and limiting plate 73 left part and are connected, inlay on the limiting plate 73 up end right part and be fixed with magnet piece 74, the user of service fixes fixed frame 71 on lifting hook 6, then rotate limiting plate 73 downwards round the axis of dwang, and then drive magnet piece 74 and rotate downwards, thereby realize magnet piece 74 and lifting hook 6 right side below and contact, and then carry out shutoff and spacing to lifting hook 6 right-hand member, avoid jar body 3 and lifting hook 6 automatic break away from.
Remove the equal welded fastening in both ends around wheelset 5 and have the push pedal, inside the push pedal lower part stretched into guide rail 4, removed wheelset 5 and removed along guide rail 4 to drive the push pedal and remove, and then realize that the impurity of push pedal on to guide rail 4 clears up, improved the mobility stability who removes wheelset 5.
The stop levers 25 are provided with two, and two stop levers 25 front and back symmetry sets up both sides around the jar body 3, and the equidistance processing has two at least standing grooves 26 in connecting strip piece 24 upper end, and two baffles are all placed on standing groove 26, and two stop levers 25 are convenient for place on standing groove 26 on the different positions to carry on spacingly to the jar body 3 of different volumes.
The concepts described herein may be embodied in other forms without departing from the spirit or characteristics thereof. The particular embodiments disclosed should be considered illustrative rather than limiting. The scope of the invention is, therefore, indicated by the appended claims rather than by the foregoing description. Any changes which come within the meaning and range of equivalency of the claims are to be embraced within their scope.

Claims (4)

1. Precast processing system of concrete anticollision wall, including small-size portal frame, its characterized in that: the small portal frame is fixed on the upper end face of the moving wheel set, the moving wheel set is connected to the upper end of the guide rail in a sliding mode, a lifting rope is sleeved on the small portal frame in a sliding mode, the lower end of the lifting rope is fixedly connected with a lifting hook, the lower end of the lifting hook is hung on a tank body, the lifting hook and the tank body are arranged inside the small portal frame, a protection mechanism is connected inside the small portal frame in a sliding mode, the protection mechanism is arranged on the outer side of the tank body, and a limiting component is fixed on the upper portion;
protection machanism includes guide rail two, slider, fastening bolt, connecting strip piece, pin and standing groove, left end and interior right-hand member in small-size portal frame are fixed respectively to guide rail two, the inside sliding connection of guide rail two has the slider, can dismantle with fastening bolt through the screw thread on the slider and be connected, the outer terminal surface of fastening bolt passes the slider to contact with two inner of guide rail, the slider upper end is fixed with the connecting strip piece, the connecting strip piece sets up at two inboards of guide rail, processing has the standing groove on the connecting strip piece, the pin has been placed on the standing groove, the pin is located jar body front and back both sides respectively.
2. The precast concrete impact wall processing system according to claim 1, characterized in that: spacing subassembly is including fixed frame, otic placode, limiting plate and magnet piece, fixed frame is fixed on lifting hook upper portion, symmetrical welded fastening has two otic placodes around the fixed frame right-hand member, two the otic placode passes through the dwang and is connected with the rotation of limiting plate left part, inlay on the limiting plate up end right part and be fixed with the magnet piece.
3. The precast concrete impact wall processing system according to claim 1, characterized in that: the front end and the rear end of the movable wheel set are respectively fixedly welded with a push plate, and the lower portion of the push plate extends into the guide rail I.
4. The precast concrete impact wall processing system according to claim 1, characterized in that: the utility model discloses a storage tank, including the jar body, the pin is equipped with two, two the symmetry sets up both sides around the jar body around the pin, connecting strip piece upper end equidistance processing has two at least standing grooves, two the pin is all placed on the standing groove.
CN201920316501.9U 2019-03-13 2019-03-13 Precast processing system for concrete anti-collision wall Active CN210025752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920316501.9U CN210025752U (en) 2019-03-13 2019-03-13 Precast processing system for concrete anti-collision wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920316501.9U CN210025752U (en) 2019-03-13 2019-03-13 Precast processing system for concrete anti-collision wall

Publications (1)

Publication Number Publication Date
CN210025752U true CN210025752U (en) 2020-02-07

Family

ID=69354900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920316501.9U Active CN210025752U (en) 2019-03-13 2019-03-13 Precast processing system for concrete anti-collision wall

Country Status (1)

Country Link
CN (1) CN210025752U (en)

Similar Documents

Publication Publication Date Title
CN215125439U (en) Portable consulting platform of manpower resources
CN210025752U (en) Precast processing system for concrete anti-collision wall
CN208776276U (en) A kind of construction fork truck with pusher
CN203976317U (en) A kind of harbour cargo handing device
CN109433409A (en) A kind of hardware copper and iron bits separation equipment
CN205348898U (en) Positive N broach move up -down and translation stereo garage of burden X
CN210018455U (en) File cabinet
CN209145364U (en) A kind of parking device
CN208071065U (en) A kind of Multifunctional elevator car
CN208555433U (en) A kind of Multifunction washing part frame
CN207671616U (en) A kind of multilayer logistics carrier convenient for unloading
CN207031520U (en) Storing blanking device is used in a kind of rare earth waste processing
CN204111183U (en) Super long heavy rail carrying anti-drop device
CN204342262U (en) Nuclear waste disposal steel case special hanger
CN217458938U (en) Totally enclosed type circulation regeneration device for electrolytic alkaline etching solution
CN210709275U (en) Improve lifting machine equipment of operating efficiency
CN214062505U (en) Novel three-dimensional intelligent garage
CN219217451U (en) Port lifting equipment
CN207360456U (en) A kind of hanging beam transfer device
CN216066589U (en) Energy-concerving and environment-protective type easy open can aluminium lid cutting recovery unit
CN205133066U (en) Frame mechanism before two promotion carrier -and -stackers
CN108301322B (en) One kind can cross pier formula bridge inspection equipment
CN214569286U (en) Material stacking and carrying mechanism for building construction
CN214567153U (en) Metal casting finished product output device
CN217708640U (en) Iron ball forging transfer crown block

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 502, No. 106, East Ring Road, Dalong street, Panyu District, Guangzhou City, Guangdong Province

Patentee after: GUANGDONG GUANYUE HIGHWAY & BRIDGE Co.,Ltd.

Address before: 510000 802, eight floor, 461 Tianrun Road, Tianhe District, Guangzhou, Guangdong.

Patentee before: GUANGDONG GUANYUE HIGHWAY & BRIDGE Co.,Ltd.

CP02 Change in the address of a patent holder